Page 1: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Vulcan- the Next Olympic Dam?

January 2011

Greg Solomon

Chairman

Page 2: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Tasman Group Corporate OverviewTasman Group Corporate Overview

Eden Energy LtdEden Energy Ltd Fission Energy LtdFission Energy Ltd

MineralsCu, Au, U, Ag,

Pb, Zn, Ni , Oil Shale

16.8%16.8% 19.7%19.7%

Tasman Resources LtdTasman Resources Ltd(TAS)

Eden Energy LtdEden Energy Ltd

(EDE)(EDE)Fission Energy LtdFission Energy Ltd

(FIS)

Hydrogen & HythaneHydrogen & Hythane

PyrolysisPyrolysis

Coal Bed MethaneCoal Bed Methane

SA Natural GasSA Natural Gas

Geothermal EnergyGeothermal Energy

Mt Thirsty Co-Ni50%50%

100%100%

50%50%

100%100%

100%100%

50%50%

Uranium – SA, WA

100%100%

Page 3: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Lake Torrens Project SummaryLake Torrens Project Summary

• > 2,000 km2 of tenements adjacent to Olympic Dam

• Six IOCGU targets within ~ 35 km of Olympic Dam

• Vulcan - new IOCGU system discovered Nov 2009

-30 km north of Olympic Dam

- IOCGU mineralisation - Cu, Au, Ag, U, (+ Mo, REE etc)

- 57 m of strong Cpy/Py mineralisation in VUD 3

- similar target area to OD > 11 km2 -virtually untested

- 5 drill holes to date – all mineralised

- drilling resumed Jan 2011

Page 4: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Vulcan Project:Vulcan Project:Showing Showing Tectonic Lineaments (WMC, 1975)Tectonic Lineaments (WMC, 1975)

Page 5: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Tasman IOCGU TargetsTasman IOCGU Targets

Page 6: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Vulcan IOCGU Project

Residual Gravity Image showing Tasman Drilling

Page 7: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Olympic Dam - Vulcan: Residual Gravity Comparison

(calculated residual gravity response if Vulcan at same depth as OD)

Olympic Dam Vulcan

2km2km

Page 8: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Vulcan Prospect: Comparisons

Page 9: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Vulcan VUD 001: Breccia Styles

Mineralised, hematite matrix-

rich breccia (py, cpy)

Heterolithic, sulphide-

rich breccia

rich breccia (py, cpy)

Heterolithic,

carbonate

breccia (py,

cpy, hem)

Page 10: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Vulcan: VUD 3

Massive Sulphides Massive Sulphides -- 930.2 930.2 -- 930.9m 930.9m

cpy

py

Page 11: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Vulcan VUD 003: Cu - Au - U3O8 Mineralisation

Core from interval: 0.34m at 5.9% Cu, 2.23g/t Au

Core from interval: 0.75m at 4.4% Cu,

1.34g/t Au, 0.58kg/t U3O8

Page 12: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Vulcan VUD 003:

• 245m Alteration and Mineralisation, includes:

From To Th. Cu (%) Au (g/t) U3O8 (kg/t)

874.20 930.85 56.65 0.59 0.17 0.05

inc.

895.08 895.42 0.34 5.85 2.23 0.03895.08 895.42 0.34 5.85 2.23 0.03

and

912.00 919.80 7.80 1.21 0.35 0.14

inc.

919.05 919.80 0.75 4.44 1.34 0.58

and

930.20 930.85 0.65 7.80 2.41 0.03

Page 13: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Vulcan VUD 003:

Down-hole correlation of IOCGU metals

Cover Sediments Cover Sediments

Basement Basement

U3O8 CuCuAu

Page 14: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Vulcan IOCGU Project: Program

• Jan 2011

- diamond drilling program underway

- 4-6 holes over 2 to 3 months

• Proposed resolution of Aboriginal heritage

issues affecting southern part of target -

current

Page 15: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

Corporate Structure - January 2011

• Issued Shares (TAS)– 202,907,678

• Options (TASOB) – 20,589,396

– 10c / 30 June 2012– 10c / 30 June 2012

• Market Cap - $26.4m (Jan 2011)

• Cash - $1.9m (Jan 2011)

Page 16: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

DisclaimerDisclaimer

The interpretations and conclusions reached in this presentationare based on current geological theory and the best evidenceavailable to the authors at the time of writing. It is the nature ofall scientific conclusions that they are founded on anassessment of probabilities and, however high theseprobabilities might be, they make no claim for completecertainty. Any economic decisions that might be taken on thebasis of interpretations or conclusions contained in this reportbasis of interpretations or conclusions contained in this reportwill therefore carry an element of risk.

It should not be assumed that the reported Exploration Resultswill result, with further exploration, in the definition of aMineral Resource.

Page 17: Vulcan-the Next Olympic Dam? · 2011. 1. 27. · Lake Torrens Project Summary • > 2,000 km 2 of tenements adjacent to Olympic Dam • Six IOCGU targets within ~ 35 km of Olympic

The information in this presentation that relates to Exploration

Results and Activities is based on information compiled by

Robert Smith and Michael Glasson who are Members of the

Australian Institute of Geoscientists. Robert Smith and Michael

Glasson are full-time employees of the Company. Robert Smith

and Michael Glasson have sufficient experience which is relevant

to the style of mineralisation and type of deposit under

Competent Person’s StatementCompetent Person’s Statement

to the style of mineralisation and type of deposit under

consideration and to the activity which they are undertaking to

qualify as Competent Persons as defined in the 2004 Edition of

the “Australasian Code for Reporting of Exploration Results,

Mineral Resources and Ore Reserves”. Robert Smith and Michael

Glasson consent to the inclusion in the report of the matters based