vu - software testing march 21
TRANSCRIPT
-
8/2/2019 VU - Software Testing March 21
1/17
Click to edit Master subtitle style
4/23/12
VILLANOVA University
Department Computing SciencesSoftware Testing Course
March 21, 2012
-
8/2/2019 VU - Software Testing March 21
2/17
4/23/12
WEEKLY CLASS AGENDA
Each class will consist of the followingdiscussions: Review of the last class assessment,
discussion of those topics which may
need more clarification. Review of assigned paper, answer
questions, discuss format, discusssources, etc.
Articles. Scheduled Topic. Exam Questions.
-
8/2/2019 VU - Software Testing March 21
3/17
4/23/12
March 21, 2012 Agenda
Review Last Weeks Feedback
The Paper Questions/Planning
Articles Presentation Mr. Joe Carfagno, Sr.
Director Comcast Cable NE&TO CQA
Voice/XPlat/HSD Test
Quality Lifecycle and Artifacts
Assurance Reviews
-
8/2/2019 VU - Software Testing March 21
4/17
4/23/12
Comments from Last Class
Liked taking the exam on line.
-
8/2/2019 VU - Software Testing March 21
5/17
4/23/12
Schedule
January 18 First Class discuss syllabus and expectationsJanuary 22 last day to make changes in registration (drop, add)January 31 last day for application for graduationJanuary 25 Chapter 1February 1 Chapter 9February 8 Alfred Fry, Library Systems
Chapter 3 Logic PartitioningFebruary 15 Mr. George Henderson, Sr. Dir. Lab Operations, ComcastNE&TO Real-Time TestingFebruary 22 Chapter 2 Graph Coverage
February 29 (Was going to be the Mid-Term Exam)But we are moving Mr. Russ Handorf, FBI Philadelphia Cyber Squad
To 2/29March 7 Mid-Term Recess begins after last class Saturday (No Class thisweek)March 14 Steven Schultz, Writing CenterMarch 21 Mr. Joseph Carfagno Sr. Director Voice/Xplat/HSD Test ComcastMarch 28 Mr. Doug Sanders, Dir. CASD, Comcast NE&TO CQA
April 4 Adam Rahn, Comcast RecruiterEaster recess begins after our class ends tonight
April 11 Chapter 4 Input Space PatitioningApril 18 James Shaut, Sr. Mgr. Lab Operations. "The Parallels of Leadership."April 25 Chapter 5 Syntax-Based TestingMay 2 Review/Q&AMay 9 Finals, last class
NextWeek
-
8/2/2019 VU - Software Testing March 21
6/17
4/23/12
Articles?
Learners name, and course number
Article Title/Author
Evaluation of the Relevance of thearticle to the readings in less than300 words expressed at a college
masters level. How well does the article express a real
world application of the reading topic?
Is a new point of view provided?
-
8/2/2019 VU - Software Testing March 21
7/17
4/23/12
Main Points to understand
Review if needed from last week Requirement Reviews
Traceability How Test Types are planned in
Lifecycle
Regression, Reliability, Functional, Load,Performance, Acceptance, Integration
How do Assurance Reviews Limit
Testing?
-
8/2/2019 VU - Software Testing March 21
8/17
4/23/12
Types of Testing
Functional verification ofrequirements
Regression verification thatprevious requirements still functioncorrectly
Reliability - verification that thesoftware or system persists
Performance speed, volume
Load - stress
Page 5A&O calls
out ?
Where dothese fallin A&Os
list of 5?
-
8/2/2019 VU - Software Testing March 21
9/17
4/23/12
Beizers Testing Levels
Based on Test Process Maturity
Level 0 There is no difference betweentesting and debugging.
Level 1 purpose of testing is to showthat software works.
Level 2 purpose of testing is to show
software does not work.
Level 3 purpose is to reduce risk ofuse.
Level 4 Mental position that testing is
What is the difference
between debuggingand testing?
Page8
-
8/2/2019 VU - Software Testing March 21
10/17
4/23/12
SDLCProjectPlanning
Requirement
Definition
Design
Developme
ntIntegration and Test
Install andAccept
-
8/2/2019 VU - Software Testing March 21
11/17
4/23/12
Software Dev Lifecycle
-
8/2/2019 VU - Software Testing March 21
12/17
4/23/12
A Generalized Lifecycle
Ideation Architect Design Develop Integration
Deploy
-
8/2/2019 VU - Software Testing March 21
13/17
4/23/12
Inside the Lifecycle Livesthe Quality Lifecycle
Idea Arch.
Design Develop
Integration Deploy
Test Planning UnitTest
SubTest
SubTest
Accept
-
8/2/2019 VU - Software Testing March 21
14/17
4/23/12
Inside the LifecycleLive the Artifacts
Idea Arch.
Design Develop
Integration Deploy
Test Planning UnitTest
SubTest
SubTest
Accept
BusinessRequirem
ent
ProductRequirem
entTechnicalRequirem
ent
DetailDesign
TechnicalSpecificati
on
Development Plan
DropSchedule
Unit TestPlan
Operational Plan
Deployment
Schedule
And On,and on, .
-
8/2/2019 VU - Software Testing March 21
15/17
4/23/12
mongs e r ac sQuality must be preparing
to TestIdea Arch
.Design Develo
pIntegration Deplo
yTest Planning Unit
TestSub
TestTest Accep
t
BusinessRequirem
entProduct
Requirement
TechnicalRequirem
entDetailDesign
TechnicalSpecificati
onDevelopment PlanDrop
ScheduleUnit TestPlan
Operational PlanDeployme
ntSchedule
And On,
and on, .
High LevelTest Plan
ReqsReview
Detailed
Planning
ArchRev
Arch Plan
TestStrategy
ArchBuildDetailedTest
Plan
Build Validation andMaint.
Automation Framework andPlannin
Automation Validation
TestCases
andMaint
DefectManageme
nt
-
8/2/2019 VU - Software Testing March 21
16/17
4/23/12
mongs e r ac sQuality must be preparing
to TestIdea Arch
.Design Develo
pIntegration Deplo
yTest Planning Unit
TestSub
TestTest Accep
t
BusinessRequirem
ent
ProductRequirem
ent
TechnicalRequirem
ent
DetailDesign
TechnicalSpecificati
on
Development Plan
DropSchedule
Unit TestPlan
Operational Plan
Deployment
Schedule
And On,and on, .
High LevelTest Plan
ReqsReview
Detailed
Planning
ArchRev
Arch Plan
TestStrategy
ArchBuildDetailedTest
Plan
Build Validation andMaint.
Automation Framework andPlannin
Automation Validation
TestCases
andMaint
DefectManageme
nt
Maintain Traceability
-
8/2/2019 VU - Software Testing March 21
17/17
4/23/12
Test Questions?
We need 5 Test Questions.