volume 18 pg 1-96 - lo bidder video - construction ...€¦ · computer programs ms project...

88
09/29/2005 EstSeminar Volume XVIII Page 1

Upload: ngotuyen

Post on 11-Oct-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

09/29/2005

EstSeminar Volume XVIII Page 1

09/29/2005

EstSeminar Volume XVIII Page 2

FOR REFERENCE ONLY SPECIAL EDITION

SEARCHABLE KEY WORD INDEX & LIST OF ESTIMATING TOOLS, BOOK & CD ROM

INDEXES – OVER $200 BILLION COST DATA

• KEYWORD INDEX

• LIST OF OVER 250 (255) JOSEPH A. BROWN/AEROSPACE ESTIMATING TOOLS

• BOOKS, JAB/APB

• CD ROMS

• PUBLISHED TECHNICAL PAPERS

• REPORTS

• ESTIMATING SEMINARS

• POWER POINT PRESENTATION

• VIDEO/DVD

• COST ENGINEERING STUDIES – OVER 25

• NEW EXCITING ESTIMATING TOOLS NOW OVER 20

• COMPUTER EXCEL/M.S. PROJECT PROGRAMS

• COST ENGINEERING, ANALYSIS, & SUMMARY

• CONSTRUCTION MANAGEMENT

• COMPUTER CAD/ACCE AUTOMATIC COMPUTER COST ESTIMATION

• KSC COST INDEX SOURCE FOR PRICING, COST DATA, NAMES SOME ADDRESS, & PHONE NUMBERS

• JAB INDEXES OF VOLUMNS 1-15 & CD ROMS 1-20

• MISC COST DATA, SOURCES, & COSTS

• APB – VOLUMES 1, ARCHITECTURAL, STRUCTURAL. 2. MECHANICAL & ELECTRICAL, 3. SYSTEM SUMMARIES

• MATRIX INDEX OF VOLUME 3 SYSTEM SUMMARIES

• SEARCHABLE – 16 WAYS MICROSOFT WORD, EXCEL – PDF ETC.

NOTE: PLEASE E-MAIL JAB FOR SEARCHABLE COPY OF THIS 80 PAGE LIST FOR TESTING

___________________________ JOSEPH A. BROWN CCE SENIOR ENG. 321-264-8419 – 321-452-4909 after Oct. 15, 2005 [email protected] [email protected]

09/29/2005

EstSeminar Volume XVIII Page 3

KEY WORDS FOR JAB/AEROSPACE COST DATA REFERENCES & INDEX INDEX PAGE 1. Keywords, Ref. No. Page, CD-ROM............................................................................. 3

2. KSC Estimating Specification – 4.................................................................................. 7

3. Aerospace Price Books 12............................................................................................ 7

4. Joe A. Brown Cost Data Books 11................................................................................ 9

5. Other Reports 3............................................................................................................ 9

6. CD ROM Index – 14 each............................................................................................. 10

7 Published Technical Paper/Comments 58 .................................................................... 11

8. Papers, Reports & Other 48 each................................................................................. 11

9 15 Color Graphics Power Point Educational Estimating Tools #101-115A................... 16

10. Cost Estimating Seminars #116-122............................................................................. 17

11. Video’s #123-126 .......................................................................................................... 17

12. NASA Tech Briefs #127-131......................................................................................... 18

13. JAB Cost Engineering Studies #132-157...................................................................... 18

14. 15 New Exciting Estimating Tools Spin-Offs #158-171................................................. 19

15. Computer Programs MS Excel #172-181 ..................................................................... 20

16. Computer Programs MS Project #182-186 ................................................................... 20

17. Unique Specialized Summaries Analysis #187-197...................................................... 20

18. Analysis For Cost Engineering & Aerospace #198-219 ................................................ 20

19. Copies of Technical Papers, Available @ 9 places #355.............................................. 25

20. Copies of KSC Cost Data Reports @ KSC Technical Library See #256 ...................... 25

21. 44 KSC Cost Indexes Sources, & Reference for Cost Data ......................................... 26

22. JAB Books & CD ROM Indexes .................................................................................... 28

23. Misc. Cost Data, Sources, Costs, etc............................................................................ 50

24. Searchable – MS Word, Excel, PDF – 16 Ways ........................................................... 54

25. APB Volumes 1, 2, & 3 Indexes 27 pages Excel .......................................................... A-1

26. Matrix Index of APB Volume 3, System Summaries ..................................................... B-1 These Books, References, Reports, CD Roms, Videos & DVD, Estimating Tools – (now over 200) have been created, developed, supported, documented, and/or tested by, Con$truction Co$t Con$ultant, Inc. (CCCI) Joseph A. Brown (JAB), & KSC Cost Engineering team work efforts. A special thank you to all that have helped in this team work efforts – Cost Engineers, Students, Associats, Word Processors, Graphics, Associate Instructors, Cost Engineering Teamwork members are named in the books, etc.

09/29/2005

EstSeminar Volume XVIII Page 4

KEY WORDS FOR JAB/AEROSPACE COST DATA REFERENCE

See Reference Numbers Listed Below From Page 5-24 Ref. No. of Est. Tool Page CD ROM 16 CSI Division 1, 13 p 70-73 F3-F12 #1, 3 60 minutes 19 Low Bidder Video #3 AACE 13, 139 #39 AACEI 23, 139, 13 37 #39 Abbreviations 23 p. 515, 13 37 #3,38 Abstract of Bid Summaries By JAB 23 p. 569-570, #17 pg 120

& 171 Also #28 117 pages of BU Data #12E - 2004

#3/29/31 #2

Accuracy of Estimates 13, 21, 31, 33, p. 27-33 #3, 5, & 7 Activation [Estimate] 17 242 #3 Aerospace 17, 130 #1, #6/14 [Aerospace] Cost Factors 17 255 #3 Architects 13, 130 #3 Architectural 13, 130 #1, 3 Awards 22, 23 “On the Spot

Awards” #1, 3, 18

BFC – Better, Faster, Cheaper 14, 29, 31 #3 Bid Strategy 19 Low Bid Video #3 Bidding 14, 19, 39, 124, 125 Video AACE Big Challenge 14, 19, 123 #3 Blue Prints 13 #3 Blue Prints Reading Test 13 #3 Books 23 #3, 18, 19 Brainstorming 19 #3 Budgets 175, 177, 179, 182 33 #5/19 Budget Comparison Summary 17 Pg. 32 #3 Building Construction Cost Index 12C p. 29-41 #8, 2004 CAD 14, 16, 61 #3, 18 Case Studies 19 #3, 18 CD ROMs 16-27-38, 21 #3, 18 Change Orders 15, 21, 38 #6/14 Change Orders 21, p. 108-118 #23, #28 #1, 2, 3, 5 Churches 14, 19 #3, 18 Civil 1, 2, 3, 5, 13 #1, 3 Claims 15, 21 #3, 18 CM – Construction Management 15, 19 #3, 18 Computer Cost Escalation Program 18, 23, 87, 89 #3, 18 Computer Estimating 16, 31 #3 Computers 16, 31 #3 Conceptual Estimating 22, 23, 5 21 p. 183 22, 23 #38 Concrete 13, 14, 5 #1, 3, 18 Construction 13, 14, 5 #1, 3, 18 Construction Methods 14, 15 #3, 18 Consultants #3, 18 Contingencies 13, p128 21 Vol. 9 P 25 – Ref 32 #3, #5 Contractors 72, 73 #3, 18 Contractors Estimating 72, 73 #3, 18 Cost Analysis 8, 71 #3, 18, 19 Cost Control 15, 21, p 58-75 #3, 19

09/29/2005

EstSeminar Volume XVIII Page 5

Ref. No. of Est. Tool Page CD ROM Cost Data 18, 22, 23 Cost Engineering 13, p31 #3, 19 Cost Estimating 13, 14 21 p 9-13 #3, 19 Cost Factors 17 Pg. 62 & 63 Cost Index 21, p 193-202 #5 Cost Models 21, 23 #38 Costs Alert 2004 12 C p 29-41 #8, PP CPM 15 #3, 19 Cranes 7A #1, 3 Design Cost Studies 21 p. 26-29, 34 #5 Detail Estimates 13, 14 Dormitories 13, 19, E #18, 3 Drawing Sheets Bonds Electrical 2, 14 #18 Electrician 2, 14 #18 Engineers 13, 14 Equipment 14 Escalation 23, 24 Estimators 13 Excel™ (MS) 16 Fabricators 18 -? Facilities O&M Costs 18, p. 174-A-E 29/31 Faster Estimating 21, p.43-45 #3 Fees A&E Performance Fiber Optics 18 Forms 16 Funny (Spec.) 13 p82 #3 Government Estimating 1-17 Helium 3 – Moon Mining 110 Vol. 5 Pg. 256 Sem. 6 #18, 19 High Schools 13, 19, E Incentive 15, 21 Indexes 24 - Installation 11 Insurance 13 Iron-Workers 14, 14 JAB Vol. I pg. 37 #3m 18 Janitorial Cleaning For Clean Rooms 5, p 250 #1, 27 Keys, Keyword Index 19, 12H #18, 19 Labor and Material 17 Pg. 32 Labor Productivity 14, 19, 49 Low Bidder 124, 125 Low Bidder Ways 124, 125 Make Money 124, 125 Manual Estimating 13, 14, 31 #3 Mark-ups 1, 2, 3 #3 Mark-Ups 13, 14 Materials 13, 14 Mechanical 6 Methods (Construction) 13 p88, 14, 15 #3 Moon Mining H3 110 Vol. 5 Pg. 256 Sem. 6 #18, 19 Motivation 15 MS Project™ 15 Number of Bidders Fine Tune 151, 168, 206 Vol. 5 pg. 123 #3, 19

09/29/2005

EstSeminar Volume XVIII Page 6

Ref. No. of Est. Tool Page CD ROM Offices 14, 19 E, 10 Overhead – General 1, 2, 3, 21, 22, 24 Overhead – Office 3, 24 Payroll taxes 24, 13, 14, 17 PERT 15, Semin, 3, 5 Pipelines 126, Video 800 Miles Planning and Scheduling 15 #3, #5 Platforms System Summaries for Platforms

7A

Plumbers 14, 2, 24 14 Pre Conceptuals 21, 183-121, Seminar #6 #38 Prices – Where & How 21, p. 46-51 #5 Primes 7, 8 Processing Facilities 1, 2, 3 Profit 1, 2, 3 Projects 15 Project Management 21, p. 86-88 #5 Reading – Blue Prints 13 Rebar (Reinforcing Steel) 13, 14 Retail/Shops 14 Runways 7A #1 Scaffolding 5, p. 50 22, 23 Schools 19 Searchable Key Words Vol. 18 pg 1-40, 12H 254 Secrets – Cost Data COC 21, p. 146; 151; 169A-K 2, 3, 5 Seminars 21, p. 6 #5 Vol. 6 Seminar #6 21, 22, 38 #5/14 Shoring Space Shuttle Horiz 13, 23 #3 Space Station (SSPF) Process Fac. 8, 11, 9 306 #1, #3 Speeds 13, 14 Spreadsheets 16 Structural Engineering Permit TR 1511 Structural Steel 13, 14 Study Problems (21) 13 #3 Sub-Contractors 13-14 Success 19 Summaries 20, 15 System Summary 15 12 Take Off 13 58 #3, 18 Taxes 24, 13, 17 Teamwork 123, 12B Templates 16 #3 Theme Parks 15 Tools 91, 110 75, 76 #18 Towers 15 Tunnels 15 Unique 123 VAB – Vertical Assembly Building 19, 40, 94, 123, 124, 125 29, 31 Value Engineering 15 264 #3, 18 Videos 123, 124-125 Workman’s Compensation – Rates 13 & 24

09/29/2005

EstSeminar Volume XVIII Page 7

AEROSPACE/JAB COST DATA BOOKS TECHNICAL PAPERS, SPECIAL REPORTS, & TOOLS

REFERENCE NUMBERS FOR BOOK INDEX/KEY WORDS – KSC Estimating Specifications 1. KSC Construction Estimating Spec-G0002 Date 9/27/1976 pages 120 Has CSI Specintact Lists Supplement 17 Div & 100 plus sections 2. KSC Estimating Spec-G0002 Rev. A Compiling Construction Estimates Date 8/20/1980

pages 85. Detail Samples, P.E.R. Preliminary Engineering Report (PER) – Code A, B, C, Summaries, Glossery – General Terms 4 pages.

3. KSC Spec-G0002 Rev. B July 1, 1986 – Compiling Construction Cost Estimates – 101

pages. –GFE Estimating pages F-6, also Supplement Ref. #25. (Also see TR1495) 4. KSC Spec-G 0003. July 5, 1977 PCN 80111 Ground Support Equipment Cost Estimating

48 pages. JAB 10 Commandments page 7/8, - 20 sample GSE Estimates, Sample Labor, Engineering, G&A Handling & Production Rates from Major Electronic R&D Firm.

Aerospace Price Books 5. Vol. I Specintact Div. 1-14 – 390 pages 7/22/94 – Arch., Struct., Civil 6. Vol. II Specintact Div. 14-15 326 pages 10/13/93 Mech. & Electrical 7. A. Vol. III System Summaries 345 pages 4/28/94 1974 – 1994 Major Projects B. Vol. III System Summaries 344-379 5/3/96 C. Vol. III System Summaries pg. 380-389 6/13/97 See Ref. #20 p51 D. Vol. III System Summaries pg. 390 – E. Vol. III System Summaries OSB #2 F. Vol. III System Summaries Activation Price Book (22) Oct. 1, 2003 G. Vol. III System Summaries 30 yr. Spec. Edition (11) 4/21/04 H. 8. Vol. IV – Space Station Processing FAC (SSPF) 144 pages 12/14/92 (Mini Summary of

Gov. Estimate with Major Summaries, Cost Data, Quotes. 9. Vol. V – 1st. Quarter Update Metric English 252 pages 9/8/93 10. Vol. XII Study “Operation Support Buildings” Date Jan 22, 2003 – 75 pages Preliminary 11. Vol. XIII Aerospace Activation Price Book Oct. 1, 2003 – 238 pages with Mod. Man.

Cosum. (Cost Summaries) 12. A. Vol. XVI – Special Edition 30 years Cost Index Cost Alert April 21, 2004, 180 pages

1934 – 2004 Prices, “Remember When” KSC Cost Index Labor & Material Prices USA Edition.

B. Vol. XVI – Special Edition for NASA use only. Cost Alert April 1, 2004 May 10, 2004 Limited Edition 185 pages, Revised – Update – Note several pages deleted as USA cost sensitive.

09/29/2005

EstSeminar Volume XVIII Page 8

C. Vol. XVI – Special Edition Cost Alert April 2004, July 26, 2004 – 209 pages included KSC Cost Index June 30, 2004. New System Summaries, & Keyword Index for JAB/Aerospace Cost Data References 220.

D. CD – ROM ‘X’ – New Tool Being Developed by D.R.L. for APB Vol. 3 System

Summaries to Hyperlink New Index of Near Over 400 projects to Detail System Summaries 1974 – 2004 July – Dec. 2004.

E. CD – ROM ‘Y’ – New Special Electronic File (PDF) of JAB Special Unique Asbract of

Bid Summaries Jan 1974 – 1998 By. D.R.L. Completed July 2004. F. Vol. XVI Special Edition Cost Alert. Oct. 5, 2004 KSC Cost Index and USA Cost Data

Nov. 15, 2004 JAB. G. Vol. XVI Special Edition Cost Alert dated Feb. 17, 2005 – with KSC Cost Index Dec.

31, 2004 – total 241 pages. H. Volume 18 Key Word Index; tools, books & CD-ROM Indexes List Aug. 2005. I. Volume XVI – Second Cost Alert Edition Oct – 2005 – KSC Cost Indexes March –

2005 and June 2005.

09/29/2005

EstSeminar Volume XVIII Page 9

Joe A. Brown Cost Data Books 13. JAB’s Vol. I, JAB’s Estimating/Intro – To take off (TO, Price Out (PO) Mark up (MU), 206

pages – 1975-2004 14. JAB’s Vol. II JAB’s 33 Ways to BFC Estimating 340 pages 1986-2005 15. JAB’s Vol. III Cost Engineering Escalation & CM Cost Control, CPM, CO’s, 324 pages

1985-2005 16. JAB’s Vol. IV Jab Computer CAD Estimating CAD/ACCE 39 Steps 310 pages 1983-

2005 17. JAB’s Vol. V Aerospace Gov. & Contractor Estimating Aerospace, GSE, Space Station

333 pages 1990-2005 18. JAB Vol. VI Aerospace Indexes Cost Data 250 Index, 50 Tools, Spin-Off 374 pages

1996-2005 19 JAB Vol. VII Video Book 110/138 Low Bidder Ways – 17 Keys to Successful Bidding

Labor Productivity 266 Project – 6 Continents 196 pages 1986-2002. 20. JAB/KSC Vol. VIII Work book Supplement Aerospace Estimating Budget Assessment

Case Study 160 pages. 1996-2005 21. JAB Volume IX, Best of 6 Volumes Aerospace Mini Seminar #5 – 1999 – July 23, 2002,

287 pages 22. JAB Volume XIV Preconceptual Cost Estimating Mini Seminar #6 – 53 Cost Factors,

Estimating Tools, “How to Sharpen Your Bidding thru Blue Print Reading Cost Estimating & Cost Engineering” Cost Control, & Scheduling March - 2004 335 pages

23. JAB Vol. XV – Futuristic Cost Estimating “Facility Cost Modeling, Change Orders, KSC

Computerized Cost Escalation Excel Program, Shuttle 6 Locations, New Launch Pads, Runway, Assembly & Processing Facilities 7 Conceptual Ways. July 2004 pages 312-643 – part 2 – also page 1-62 – total 393 pages.

Other Reports 24. KSC Cost Indexes, Jan. 1974 to Jan. 31, 2005 – Near 300 Indexes. About 3000 pages

of Cost Data, Reports, Indexes, etc. 25 TR1495 – Estimating Orientation Estimates Rules, Samples etc. Date Nov. 2, 1976

pages 40 – with fold-out Summary Forms & Rules. 26. NASA/KSC Quarterly Real Property Report 1967? – Mar. 31, 2004, 30 plus pages.

Accounts for 21,838,438 Square Feet of CCAFS, KSC & Tals Facilities with current replacement value CRV of $4,481,518,579 - $4.5 Billion.

09/29/2005

EstSeminar Volume XVIII Page 10

CD ROM INDEX REFERENCE NUMBERS Joseph Andrew Brown, CCE, President Con$truction Co$t Con$ultant, Inc. _____________________________________________________________________________________________ 1695 Vega Avenue, P.O. Box 540453, Merritt Island, FL 32954-3175 (321) 452-4909 Licensed July 1968 Certified Sept. 1976 AACE “Fellow” 1982 November 29, 2003 BBC 1959 – BCN Incorporated 11/17/96 AACE Int. 1967 Bidding Video – 1997 Ret. NASA 1/95 CD-ROMs 1998-2004 CD-ROM INDEX Item No.

27. CD-ROM #1 – KSC Historical Cost Data. 2nd Edition – August 20, 1999. Reference Items # 1-9

28. CD-ROM #2 – KSC Sensitive Construction & GSE Cost Data, Report, October 1999.

Construction & GSE Abstract Summary Reports 4000 Projects

29. CD-ROM #3 – Cost Engineering Seminar. Nine (9) volumes.

30. #1 of 3 – 2nd Edition – CCCI – List Price ______ – Commercial date - 2000.

31. CD-ROM #3 – 8 Volumes – September 19, 2001, by CCCI, copyright ©, List Price ______ + 10%., by Media Dynamic. Reference Items #13-21

32. CD-ROM #5, Version 7, September 9, 2002, for mini-seminar #5 – CPP; JAB Volume 9

– Best of 6, CD-ROM #1, Historical Cost Data, (Version 6 – Date: July 6, 2002).

33. CD-ROM #5/9 – CCCI Commercial – List Price _____ - Mini-Seminar #5, plus Volume 9, 2002 – 8 PowerPoint, plus KSC Historical Cost Data, Release 2004.

34. CD-ROM #7, Version 8, February 4, 2003, SDF Est. Briefing, OSB Cost Study, January

22, 2003, RPR – December 31, 2002, 8.12 MG

35. CD-ROM – #8 – Activation Cost Est. for GSDE / SDE, July 15, 2003. CD-ROM - #8A – Activation Cost Est. for GSDE / SDE July 30, 2004

36. CD-ROM #2/10 – JAB’s PowerPoint (5-W) for Cost Model, October 14, 2003, and

sensitive Cost Data copyright © CCCI. CCCI commercial List Price _______ - release date, January 2004, copyright ©, CCCI (exception – Government publications).

37. CD-ROM #12 / Mini-Seminar #6 – Volume 14 – JAB’s Tools, Futuristic – PowerPoint 12-

plus Volume 9, Parts 1 and 2 – June 20, 2002. List price _______ shipping, handling, and taxes. Date July 2004. Copyright © CCCI.

38. CD-ROM #6/14 – Seminar #6, Volume 14, Futuristic Cost Est / Cost – Model for

Facilities & GSE – Next Generation Shuttle 10 PowerPoint presentation – October 14, 2005.

NOTE: Plus AACE International & Space Congress Transactions

09/29/2005

EstSeminar Volume XVIII Page 11

PUBLISHED/PRESENTED TECHNICAL PAPERS BY JOSEPH A. BROWN, CCE (with brief summary/comments on 22 papers)

39. AACE International “Professional Practice Guide to Cost Engineering in Aerospace &

Aviation” by S.A. Samad. Note 5 JAB Technical Papers 1998 – (1) 12 New tools, (2) 240 Cost Indexes, (3) Estimating & Bidding SSPF (4) Bid Cost of KSC Space Shuttle Facilities, (5) Challenges Developing CAD/ACE. Ref #76, 75, 71, 48, & 65

40. Launch Pad to the Moon - Construction Bidding Cost of Launch Complex 39, VAB, 12th

Annual AACE Meeting, Houston, Texas, June 17-19, 1968 Construction bidding costs, methods, bid strategy, and breakdown for eight bid packages for $111,730,473, World’s Largest Building and First Aerospace Construction Management Project, first in series of Aerospace Government Estimating Series (GES)

41. Construction Cost Escalation & Labor Productivity, What Can We Do About It?, 1st

international Cost Engineering Symposium, Montreal, Canada, 1971 42. How Does the Successful Low Bidder Get Low and Make Money? 17th Annual AACE

Meeting, St. Louis, Missouri, June 17-20, 1973 Four aerospace case studies of construction projects and low bidder strategy for successful world famous LC 17, Delta Launch Pad, LC 34, Mobile Service Structure, and LC 39, VAB. #2 AGES

43. How to Sharpen Your Bidding, 18th Annual AACE Meeting, Los Angeles, CA, July 1-3,

1974,#3 AGES (“How to” aerospace case studies for propellant office lab. 72 item unit price labor and material - 13 session college credit course

44. KSC Cost Index for Construction Management, 19th Annual AACE Meeting, Lake Buena

Vista, Florida, June 29 - July 3, 1975 Describes creation and purpose of monthly aerospace cost index using 27 special materials and 19 labor/crew rates for KSC Launch Facility, Edwards Air Force Base, and Palmdale, California, escalation-measurement for improvements and construction management of shuttle facilities. #4 AGES

45. The Why, How, and When of Certified Cost Engineering, dated March 10, 1977, (outline

presented to meetings of Florida Section AACE on December 11, 1976, and March 11, 1977)

46. KSC Estimating Format for Construction Cost Engineering for Space Shuttle Facilities

Construction Management, 21st Annual AACE Meeting, Milwaukee, Wisconsin, June 26-29, 1977, (describes KSC Specification G-0002) Overview of KSC Estimating Specification G-0002. How to make detailed aerospace government cost estimates, budgets, PER, design and final for cost and value engineering. #5 AGES

47. Construction Cost Control After Bidding, Florida Section AACE 5th Symposium, Miami

Beach, Florida, January 20-24, 1978 (14 pages - dated 11/7/77) #6 AGES

09/29/2005

EstSeminar Volume XVIII Page 12

Case studies of 2 aerospace projects - O&C Astronauts Facility and unit prices for Orbiter Landing Facility

48. Construction Bidding Cost of KSC’s Space Shuttle Facilities, 23rd Annual AACE

Meeting, Cincinnati, Ohio, July 15-18, 1979 (31 pages) Bid analysis of OPF, SRB, Shuttle Landing Facility (SLF), LC-39 - PADS A and B, Mobile Launcher Pad (MLP), and miscellaneous modifications VAB, LCC, and GSE, pneumatic control panels, SRM hold down posts, bid abstracts, and system summary - 30 pages. #7 AGES. See Ref. #39 for PDF, copy of Tech. Paper.

49. Conceptual Cost Estimating Using KSC Cost Index for Construction Management, 24th

Annual AACE Meeting, Washington, DC, July 5-9, 1980 (13 pages) Provides over 230 aerospace rules of thumb, unit costs - part of the most important communication tool for timely, more accurate cost data for CM with 11 detailed breakdown (ET-H2 ARM, RSS, PCR LC 39, Pad B) 7-year graphic escalation chart. #8 AGES

50. Labor Productivity - Measurement & Improvement, Florida Section, 10th Annual AACE

Symposium, Winter Park, Florida, January 28 - February 1, 1981 51. Conceptual Estimating Using Kennedy Space Center’s Price Book for Construction

Management of Aerospace Facilities, Florida Section, 11th Annual AACE Symposium, Miami, Florida, Florida, February 12-13, 1982 (17 pages - dated 12/21/81)

52. Aerospace Construction Price Book for Construction Management of Aerospace

Facilities, 7th International Cost Engineering Congress, London, England, October 3-6, 1982 (reduced 7/11 pages) Bid prices and government estimate of $230 million summaries, detailed breakdown of 18 aerospace projects/MLP #2, Pad piping and cable/how to make conceptual estimate for construction management (CM). #9 AGES

53. Construction Management Problem of Murphy’s International Airport, Florida Section,

12th Annual AACE Winter Symposium, Orlando, FL, January 13-14, 1983 54. Cost Containment and Aerospace Construction, (P 12-15) 22nd Space Congress, Cocoa

Beach, FL, April 23-26, 1985 55. Cost Containment and KSC Shuttle Facilities, AACE 29th Annual Meeting, Denver,

Colorado, July 1-3, 1985 (11 pages) Control at four levels of project management of aerospace facilities with five examples at conceptual, criteria, and site; eight ways at Level II design, nine ways at Level III construction, and seven ways at Level IV operations and maintenance (O&M). #10 AGES

56. Estimating Labor Productivity, 30th Annual Meeting, AACE Transaction, Chicago, IL,

1986 Productivity survey of over 190 bid projects, location factors, with over 20 aerospace projects - Guam to West Africa, how to estimate labor efficiency. #11 AGES

09/29/2005

EstSeminar Volume XVIII Page 13

57. Construction Economies of Rialto Hotel Office Complex, Florida Section AACE at mini--seminar, Melbourne, FL, January 11, 1986

58. Government Conceptual Estimating for Contracting and Management, (P 11-9 to 18),

23rd Space Congress, Cocoa Beach, Florida April 22-25, 1986 (8 pages) 59. Government Conceptual Estimating for Aerospace, AACE 30th Annual Meeting,

Chicago, IL, June 29 - July 2, 1986 (10 pages) Describes three volume aerospace construction price books with over 200 unit prices/elements and 100 system summaries 1974-1985, and sample conceptual estimate “how to do it.” #12 AGES

60. Manual and Computer Estimating Trends, Florida Section 19th Annual Cost Engineering

Symposium, Orlando, Florida, 1988, #13 AGES Discusses surveys of aerospace, commercial computer estimating programs with a list of 14 computer estimating programs and trends towards computer estimating.

61. Construction Government Bid Estimates Compared to General Contractor Bid

Estimates, 33rd Annual AACE Meeting, San Diego, California, June 25-28, 1989 (12 pages sent 1/28/93), #14 AGES Shows twenty-one steps for making aerospace government bid estimates and compares to general contractors with mark-ups, feed back, and types of future estimates

62. Challenges in Computer Aided Design/Automatic Cost Estimating for Government and

Aerospace Construction, PROCIEM ‘89 - Second annual conference on productivity through computer integrated engineering and manufacturing sponsored by the Florida High Technology and Industry Council, Orlando, FL, November 13-15, 1989

63. The Challenges in Development of Automatic CAD for Government and Aerospace

Construction Cost Estimating Systems, 11th International Cost Engineering Congress and the 6th Annual Meeting of the Association Francaise Des Ingenieurs ET Technicians D’Estimation et de Planification (AFITEP), Paris, France, April 22-25, 1990. (72 pages) CAD history, development of automatic computer cost estimating with thirty-nine steps to make CAD/AACE case study of propellant lab with CAD quantities and price using minicomputers by NASA/KSC/EG&G/Intergraph Team. #15 AGES

64. 250 Cost Indexes and Escalation for Faster and More Accurate Cost Estimating, 33rd

Space Congress, Cocoa Beach, Florida, April 23-26, 1996. #23 AGES 65. The Challenges in Developing CAD/ACE - 34th Annual AACE International Transaction,

June 24-27, 1990, presented and published, Boston, Massachusetts. See Ref. #39 66. The Challenges in Developing CAD/ACE With Six Accomplishments - 22nd Annual Cost

Engineering Symposium on CADD Estimating Systems, March 2, 1991, Florida Section AACE, Lake Buena Vista, Florida

67. Challenges Developing PC Workstation CAD Estimating, Knoxville, TN, February 19,

1991 (27-53 pages, 1/1/91, copy of view graph presentation) Wattex

09/29/2005

EstSeminar Volume XVIII Page 14

68. KSC Estimating Specifications - G0002, overview KSC Cost Index, Lecture/

presentation, University of Florida GCN-5625, March 31, 1994, Masters Program, Mark Meyer

69. Aerospace Construction Cost Estimating, First World Cost Engineering and Project

Management Congress, 12th International Cost Engineering Congress, Marriott’s World Center, Orlando, FL, July 1, 1992. (20 pages sent 1/28/93) Overview of twenty-one unique aerospace government estimating tools for more accurate government estimating with utilities, operations, and maintenance costs, wage rate analysis, efficiency and location factors. #17 AGES

70. SSPF Government Estimate Cost Analysis, KSC Cost Index and Escalation and Why,

AACE and Certification Lecture/Presentation, Florida Institute of Technology, Melbourne, FL, April 1995

71. Estimating and Bidding Space Station Processing Facility, 37th Annual AACE

International Meeting, Dearborn, MI, July 13, 1993 (29 pages - dated 4/9/93) Case study of SSPF showing the successful application of over twenty aerospace estimating tools with 13 reasons how government estimates are accurate within 1.2% of low bidder with special summaries and some new exciting tools. #18 AGES. See Ref. #39

72. Space Station Facility Government Estimate, Society of Cost Estimates and Analysis,

Orlando, FL, October 38, 1993 (26 pages - updated 8/31/93) #18 AGES Over ten aerospace cost analysis used developing government estimates, such as, number of bidders, structural steel, mark-ups, special conditions summary, projected low, medium, and high bids, cost per fiber foot, permis

73. Government Contractor and Computer Estimating Seminar Workbook - North Florida

AACE Section 19th Computer Symposium, 1988 How to Do It Workbook for Making Estimating Better and Faster - over fifteen ways, including spreadsheet analysis, for faster takeoff of unique aerospace government estimates for propellant lab

74. Steps for Making Bid Estimates, 45th Space Wing Construction Conference, Patrick Air

Force Base, FL, June 22, 1994 (11 pages) How to make government, aerospace, and contractor bid estimates with forty references, PT&I, mark-ups and Davis Bacon rates - advantages and disadvantages of government contractor estimating (4 & 6) #19 AGES

75. 240 Aerospace Cost Indexes and Escalation, AACE International 39th Annual Meeting,

St. Louis, Missouri, June 25 - 28, 1995, (10-16 pages) Ten purposes, four reasons why, ten special features, analysis for long term escalation, ten summary comments, some surprising and exciting tools (16 references). #20 AGES. See Ref. #39

09/29/2005

EstSeminar Volume XVIII Page 15

76. 12 New Exciting Tools, AACE International 40th Annual Meeting, Vancouver, British Columbia,1996 (#21 AGES)

77. 33 Aerospace Spin-Offs in Construction For More Accurate Cost Estimating, 33rd Space

Congress, Cocoa Beach, FL, April 23-26, 1996, #22 AGES (on CD ROM) Includes 10 volumes of Aerospace Price Book, IV and VI Volumes of Seminar Workbooks, 4 Aerospace Estimate Seminars - 250 Cost Indexes

78. Construction Estimating and Bidding Strategy (Part II of Low Bidder Series), 41st Annual

AACE International Meeting, Dallas, Texas, July 13-16, 1997 (9 pages - #24 GES) 79. “34th Aerospace Spin-Off in Construction Cost Estimating” - a video, 34th Space

Congress, Cocoa Beach, FL, April 29 - May 2, 1997 (#24 GES - 12 pages) 80. Estimating Analysis and Bidding Strategy of Space Station Facility Using KSC

Aerospace Spin-Off Tools, 33rd Space Congress, Cocoa Beach, FL, April 23 - 26, 1996, #25 GES

81. Tools and Spin-Offs in Estimating and Bidding - National Conference and Educational

Workshop, Society of Cost Estimating and Analysis (SCEA), June 27, 1996, Sheraton World, Orlando, Florida

82. 50 Engineer, Contractor, and Government Estimating Tools for Faster and More

Accurate Cost Estimates, August 1997, Seminar IV Workbook, Vol. IV, pages 177-192, #25 AGES

83. “16 Keys to Successful Bidding and Construction,” Part V of video series - 1997-1998,

for AACE, International, Cincinnati, Ohio, for 35th Space Congress - submitted to AACE, #26 GES

84. 25 Aerospace Cost Factors – 37th Space Congress, Radisson Resort, Cape Canaveral,

Florida, May 3, 2000, #26 AGES 85. 50 Aerospace Cost Factors or 20 Ways to Reduce Aerospace Cost Factors – 2nd World

Cost Engineering Congress, and 44th Annual Meeting AACE International & 16th ICEC Congress, Calgary AB Canada, June 25-28, 2000, Poster Presentation, #27 AGES

86. “Estimating & Bidding Strategies” to Florida Section AACEI at Siemens/Westinghouse

Research Park, University of Central Florida, 3/16/2000 87. “Estimating Tools, References, Videos, Studies, Seminars, Secrets, Computer

Programs, CD ROMs and Books,” to NASA Cost Modeling for 2nd and 3rd Generation Shuttles, Video Conference to other NASA Centers, Nov. 6 – 7, 2001.

88. “Government Computerized Cost Index for Logistics,” Presented by Gene Hajdaj and

Joe Brown of Florida LOG 2001, March 9, 10, 2001, Orlando, Florida at Delta Resorts. 89. “52 Cost Factors for Facilities, GSE, and O&M/Hardening for Terrorist and Hurricans,” by

Gene Hajdaj and Joe Brown for Florida LOG –2002, February 5-16, 2002, Orlando, Florida at Delta Resorts.

09/29/2005

EstSeminar Volume XVIII Page 16

90. “Computerized Cost Index for Escalation, 1974 - 2000, for Unit Prices and Multi-Billion

Dollar Projects,” by Gene Hajdaj and Joe Brown – 45th AACE International Meeting, Pittsuburgh, PA, June 24-27, 2001.

91. “Proven Ways to Reduce Change Order Costs,” by Gene Hajdaj and Joe Brown,

Abstracts and Outline – Feb. 14, 2004, Fla Section AACE – 472 Projects, 6235 Change Orders, $276 milllion, 27 charts.

92. Estimating Tools past, present and future 1962 – 2050 for AACE Internatinal 47th Annual

meeting Walt Disney World June 22-25, 2003 by Joe A. Brown and Gene Hajdaj. Teck paper in transation.

93. Aerospace Estimating tools to Society Cost Estimating Analysis (SCEA) Melbourne, Fl.

Power Point Presentation 63 Charts July 23, 2003.

Abstracts, Papers, Reports

94. Canaveral District CofE, Estimating Record July 9, 1963 to Dec. 7, 1965, 11 pages – 207 Bid Projects $257,356,489.

95. J.H. GSE Space Station Processing Facility Report 3146 Items Cost $32,633,071 - 1997

96. “17 Educational Tools for the 21st Century – with 17 Keys for Successful Bidding and Construction”

97. “How to Measure Labor Productivity, & Efficiencies with Location Factors from 260 Projects from 17 Countries for International, Government, and Aerospace”

Other

98. SDE Estimating Briefing Work Book Vol. X Nov. 22, 2002 – GSE Estimating

99. Activation Briefing July 15, 2003 – 45 pages CD-ROM #8, Vol. 13

100. JAB Abstract of Bid Summaries; Technical Report; 1974-1996 – 120 pages – 1080 Project

101. Shuttle GSE Final Report $190 Million – 117 pages, Oct. 18, 1986 – 1384 GSE Items

16 COLOR GRAPHICS POWER POINT PRESENTATION, EDUCATIONAL, ESTIMATING TOOLS

101. 53 Cost Factors for Facilities, GSE & O&M 2/15/2002 - 21 pages JAB/G. Hajdaj

102. Computerized Cost Index for Escalation 1974 – 2012 – 6/24/2001 JAB/G. Hadjaj 19 Pages Jan 2004.

103. Recollection – LETF Fab./Testing Contract Hajdaj/JAB Change Orders $25 Million

104. 20 Cost Control Problems & 119 Answers – 23 Pages Data 8/2002 JAB

105. Change Orders – Cost Study – Ways to Reduce CO Cost = 472 Projects, 6235 CO, Summary of 75 Page Report – 9 Pages April 2002 plus GSE now 27 pages Feb. 2004

09/29/2005

EstSeminar Volume XVIII Page 17

106. 12 Road Sign to Success or Bankruptcy JAB – 9 Pages

107. Cost Control – Cost Time Performance, Tools – 40 Pages – Sept. 2002 – JAB

108. Ground Support Equipment Cost Estimating (24 Color Pictures), July 23, 2002 - 34 Pages JAB Part I

109. SDE’s Estimating Briefing KSC Estimating Requirements for GSE Budget/Conceptual 30% and Final Design 9/24/2002 11/22/2003 38 Pages JAB – Part II

110. “Estimating Tools, “References, Videos, Studies, Seminars, Secrets, Computer Programs, CD ROMs, 20 Books over 200 References and Power Point JAB April 2002 – 21 Pages. Update June 22-25, 2003, Jan. 1, 2004 – 62 Charts

111. Activation Cost Estimating for GSDE Briefing 45 pages, July 15, 2003 Preliminary GSE Part III 10 pages

112. Seminar 6 – Futuristic Cost Estimating Oct. 14, 2003 48 Charts

113. How to sharpen your bidding – 145 Charts Oct. 14, 2003 Manual & Computer Cost Estimating Seminar Introduction

114. Cost Control Construction, GSE Projects JAB Oct. 2002, Nov. 4, 2003, 31 charts

115. Cost Control Tools & 5 stages 10/21/2002 – 40 pages. 115A. KSC Cost Alert 2003 – 2004 Index Comparison June 28, 2004, 9 Charts, July 27, 2004, 19 Charts

Estimating Seminars I - VII

116. I. Introduction to Cost Estimating PO-TO-MU – Estimating Cost of Design

117. II. Detail Cost Estimating Arch. Struct Mech & Elect., Bid Strategy, Productivity

118. III. Cost Engineering Construction Management & Computer Estimating, Cost Control

119. IV. Aerospace Construction & GSE Estimating, Estimating Specifications

120. V. Aerospace/GSE Mini Compact 12-20 Hrs. - 2002

121. VI. Aerospace Futuristic Estimating Seminar Oct. 14, 2003 – 6-20 Hrs.

122. VII. Aerospace Planning Scheduling (Future)

Videos & DVD

123. The Big Challenge 28 Min. Movie Converted to Video by JAB/CCI - 1986

124. Low Bidder – 15 Aerospace Projects – 63 Min. CCI/CCCI 1997

125. SSPF & VAB – Low Bidder – 10 Min. – Communication Concept Inc. (CCI) & JAB

126. A. 800 Miles of Winter Movie Converted to Video by JAB/CCI 1986 Sample Pipeline GSE B. Cost Engineering, Bid Strategies Estimating Tools, DVD 2005

09/29/2005

EstSeminar Volume XVIII Page 18

NASA TECK BRIEF

127. KSC Cost Index Aids in Conceptual-Design Cost Estimates, NASA Tech Brief, KSC 11252, Summer 83, Vol 7, No. 4, Oct. 1983 – p.. 482

128. KSC Cost Dat Aid in Efficient Construction Cost Management, NASA Tech Brief, KSC 11253, Summer 83, Vol 7, No. 4, p. 482

129. Updated Conceptual Cost Estimating, NASA Tech Brief, KSC 11344, March 1987, Vol 11, No. 3, p. 77, (18 pages)

130. Progress Towards Automated Cost Estimation, NASA Tech Brief, KSC 11578, 1993, 18 pages, Vol. 16, No. 4 p. 99, April 1992.

131. Aerospace Construction Cost Estimating NASA Tech Brief, KSC 11604, (Award dated Aug. 18, 1994), Vol. 18, No. 2, p. 93

AGES = Aerospace Government Estimating Series 1-27, GES = Government Estimating Series These books, references, estimating tools have been created, developed, supported, and documented by CCCI, JAB, & KSC Cost Engineering Team work efforts.

JAB Cost Engineering Studies – These studies occurred from 1961-2004 132. Budget vs Cost Study - $37 billion vs $181 billion – 38 construction projects of 1961-

2002 133. Successful Ways Low Bidder Got Low and Made Money – 20 projects 134. Cost Escalation and Labor Productivity – “What we can do and did about it” – 1357 votes

– 1970-1999 135. 14 Common Aerospace cost estimating problems. See GSE Estimating. 136. Labor Productivity and Location Factors Study – 260 projects in 17 countries (Refs 13,

26, 32, 33, & 34) 137. Design and Estimating Cost Study – 38 projects – 1.4 to 212% of construction cost /

M.H. per sheet 138. Closeout costs of 1629 project bids (CD ROM #2) 139. Eight Change Order Studies: (Refs #30, 33, & 34) Some are: 140. 174 Projects – 4 years 141. 53 Different change orders 142. 43 Ways – Designers can reduce CO cost 143. Recollections – 1083 Changes to a $25 million contract (for other detail studies, see

JAB’s books and CD ROMs) 144. Manual Vs Computer Estimating – 174 engineers were surveyed – 29 estimating

programs – 76% Want to make and use computer-estimating programs (Refs #33 & 34)

145. Cost Control Study of 20 problems with 119 types of corrective actions (Ref #34) 146. Shuttle Facilities – Cost at 6 United States locations - $7.4 billion (JAB’s Vol I) 147. Rule of Thumb Cost Study – Facilities - $45 to $656 /SF and $1.86 to $18.31 /CF 148. Operations and Maintaining Cost Study $4.22 to $15.78 /Sq/Ft per year – 31 Bldg 149. Fiber Optics Cost Study – Unit cost (11 cents to 45 cents per Fiber Foot)

09/29/2005

EstSeminar Volume XVIII Page 19

150. Aerospace Panels – cost per components - 15 to 31 hrs / component 151. Number of bidders – bid price variations (-31% to +5%) (See Ref #10, 4, and 29) 152. Facility Estimated Replacement Cost Vs Actual ($3.4 – 6.343 billion) (CD ROM - #1

JAB/CCCI) 153. ELV 1985 thru 1995 – Multi billion dollar project 154. EELV DOD 1994 thru 2004 – Multi billion dollar projects

Boeing Delta IV, Lockheed Martin Atlas V, LC-41, LC-37 155. Government Cost Factors (#53) hardening cost due to hurricane/terrorist threat OSB #2

Cost Study – 1/22/03 – Operations Support Building #2 156. GSE Change Order Study 296 Projects 1998 – 2003 – 692 Changes 157. Fiber Optics Cable – A) Cost per fiber foot & fiber meter– John Shramko and Bob

Lupo/DF-FED-22, J. A. Brown/NASA, team leader, Austin Durett/EG&G 15 New Exciting Estimating Tools Spin-Offs

158. Cost per Panel Component Chart – Labor, Material & Fabrication – for Budget and Cross Checking – E. Jones/EG&G, J. A. Brown/NASA, team leader

159. Chart Cost Per Panel Component Only – Kim Ballard/DM-MED-42 160. Work Hours Per Panel Component Chart and Summary Analysis – J. A. Brown/NASA,

E. Jones 161. Fine Tuning Labor Payroll Taxes & Insurance (PT&I) since rates vary from 15.8% to

150% or an average of 45%. We are now re-evaluating each project and using appropriate taxes, such as, Office O/H – 15% to 24%, Elec – 26%, Carp/Conc – 45%, Steel – 57%, Civil –23% to 31%, & Marine – 60% to 100%, J. A. Brown.

162. Avoid Sole Source/limited competition by making an additional or double design and bidding alternates and options.

163. “CAD/Automatic Cost Estimating,” J. A. Brown, Hank Perkins/NASA 164. Chart for Detail Estimating Pneumatic and Hydraulic Panels and Tubing – Work Hours

and Materials – E. Jones/EG&G, S. Thomason/PRC, J. A. Brown/NASA 165. “Work Hours for Welding SS Tubing – Astro Heliarc Welding Machine,” Jones/Brown 166. “OFE/GFE Estimating Cost for Handling, Storage and Insurance, 1 – 10%,” J. A.

Brown/NASA KSC Estimating Specification G-0002 & G-0003 167. “Cost Analysis for Adjusting Cost Indexes for Long Term Escalation,” by J. A. Brown 168. Fine tuning number of bidder’s concept, J. A. Brown 169. Computerized Cost Escalation Program – January 21, 2002, Gene Hajdaj, J. A. Brown –

1974-2012. 170. How Does the Successful Low Bidder Get Low and Make Money,” by Communication

Concepts, Cape Canaveral, Florida and Con$truction Co$t Con$ultant, Inc., 63 minute video, estimating, construction bid strategies and Cost Engineering.

171. A. CD ROMs #1, 2, 3, 4, 5, and 7, 1998 – 2003, Government, Cost Data, 13 seminar books, MS PowerPoint™ presentations and computer programs, MS Excel™, MS Project™ Documenting many of these government estimating tools. B. D.R.L. Hyer-Link Excel Index APB Vol. 3 to System Summaries July-Dec. 2004?

09/29/2005

EstSeminar Volume XVIII Page 20

Computer Programs MS Excel™

172. System Summaries, 16-CSI Divisions 173. System Summaries, GSE 174. Budget Comparison - Construction and GSE 175. Design Costs - Construction and GSE 176. Budgets 1509 / 1510 177. Estimating Design Costs – Design Hours for each Design Drawing Sheet 178. Budget Conceptual - ROM 179. Detail architectural, structural, mechanical, and electrical cost estimates 180. Labor, material, and fabrication 181. Budget quotes for estimating MS Project™

182. Planning and Scheduling PSCOL – 10 Activities 183. Cost Control PSCOL 184. CPM – PSCOL – 37 Activities 185. PERT- PSCOL 186. Design Implementation – CPM – Government Design and Construction (See

References 27-39 – 158 Days 26 Activities Unique/Specialized Summaries and Analyses

187. Construction Summaries 188. Budget Comparison – Manual and Excel™ Template 189. Labor and Material – Manual 190. System – Buildings – 16 CSI Division Manual and Excel™ 191. Element – Buildings Elements Manual 192. General Conditions and Overhead Manual and Excel™ 193. Ground Support Equipment 194. Budget Comparison Manual and Excel™ Template – 2003 195. System Summaries – Specialized 44 Different SDEs 196. General Conditions 197. Activation Summaries Analysis For Cost Engineering & Aerospace

198. Cost Index Matrix Analysis – for lump sum, fixed priced contracts, and unit price data 199. Budget/Conceptual Mark-Ups 40% to 300% Volume 15 CD ROM p 200. System Summaries vs Real Property Report Vol. 15 – CD ROM #6/14 p62 201. G-0002 vs G-0003 Construction Spec. vs GSE Spec. GSE Estimating CD ROM #6/14 –

Vol. 15 p. 461.

09/29/2005

EstSeminar Volume XVIII Page 21

202. Aerospace Processing Facility Cost Reduction Seminar 6 p52 – 10/14/03 – Hand out 203. Activation & GSE Cost Analysis 0-735% - Ave. 50.2% of Construction Seminar #6 p54 204. Sub-Contractor Analysis VAB Ref. No. 19, 29,123, - Bidding Strategy 205. Analysis Matrix for Escalation JAB Vol. 6 p194 – CD ROM 206. Number of Bidders, Type and Kind, etc. 0-685 Potential Bidder from Sourse List. See

JAB Vol. 5 p123, 130 Ref. #18 207. Structural Steel – 4,544 tons - $1,5000- $4,000/ton – Used averge $2,155 208. Mark-ups – Profit-Bond, Prime Mark-Ups, Mtaerial Discounts 209. Overhead/General Conditions – 5-20%, analysis – 9.9%, used 10% 210. Payroll Tax and Insurance Rate Fine Tune – Used 25-30% - Varied with each Trade –

Not Average for all Trades 211. Special Conditions Analysis – 45 Days Downtime, 190- of 915 Days, Joint Occupancy,

and Escalation 212. Analysis of Bids, Low Bids, and Government Estimates 213. Summary Analysis of Detail Study on Government Estimating, Number of Bidders, Low

Bidders, Estimating and Construction Economy Market 214. Review of A&E/Government Estimate – High, Low Items, Need for More and Better

Quotes, Break Downs, furniture, steel, equipment, 1,025,020 LF Premise Wiring, GFE, Sprinkle System Breakdown, etc., others

215. Cost Per Fiber Foot of Fiber Optics Cable 216. Cost Per Panel Component 217. Work Hours Per Panel Component 218. When SSPF Complete, Analysis of Design, Construction, and Change Orders – 1309,

$14 million. See JAB Vol. 15 p337 219. NASA Video Tapes Set ‘Reviewing Blue Prints/Plans’ Feb. 9, 1990 LMT/KSC DF

Speakers Roger Hall Propellants & Gases, Allen Littlefield 321-867-7810 – 1.3 Hrs. Set of 6 Tapes.

220. Estimating Templates – 1509, 1510. Design Cost Estimating forms Arch. Structural, Mech. And Electrical, and System Summary etc. by Phil Kocol.

221. CD ROM Index to Cost Data Section, Volumes 1-9, 15 and 16, and PDF Files Drawings. 222. CD ROM Index to Power Point Presentations 223. A Bibliography of Aerospace Publication, July 1994. AACE Int. Aerospace Committee,

54 Publication sorted by Author, & Date, with Description, Comments, 15 by JAB. Committee Chairman Frank Postula – AACE past President.

224. CD ROM Index to Power Point Presentations

09/29/2005

EstSeminar Volume XVIII Page 22

Construction Cost Summary by System Intro By Dallas Lee

About System Summaries – In 1974 Mr. Joe Brown, NASA Cost Engineer, started summarizing the construction cost of many of the major construction projects at Kennedy Space Center in an effort to document and capture cost data. He felt that this historical data would be a rich resource for cost analysis of future KSC projects as well as the basis for the development of estimating tools unique to KSC. Without his diligence this collection of project costs would not have been possible. Over the years, Mr. Brown employed NASA subcontract personnel to assist him in the collection and development of the system summaries on this CD. Through their hard work and under his guidance, over 380 plus NASA projects were cost documented. That documentation is continuing today adding more information to the already rich data base. It is the hope of all who have worked on this data base that this information will be used to assist estimators, administrators, managers and engineers in the development and management of future KSC construction projects and programs. What is a System Summary – It is a breakdown of the construction cost by Construction Specification Institute (CSI) divisions which in most cases is the same as NASA’s SpecsIntact number. It is not meant to be a detailed cost of the project but, as the name indicates, a summary of cost by major components of the project. With this information, cost by unit can be developed for particular components, CSI divisions and projects. This unit cost can then be used to analyze future project costs, estimate new construction, and assist in the budgeting for new construction programs. For each system summary a common unit of measure is used to gauge the cost of the project. This unit may be the building square feet (BSF), tons of air conditioning (Ton), lineal feet (LF), etc. By examining the system summary, the make up of the common unit can be determined and adjusted so it can be compared with other parameters for project cost analysis. System summaries can be mined for raw cost which can be used for cost analysis, rough order of magnitude (ROM) estimating, and parametric estimating. Most system summaries also list the bidders and bids which can be used to measure the quality of the bids, the estimating and the value of the project. How to Use this CD – On the CD is a Microsoft EXCEL file which contains the index of all the system summaries completed to date. Use this index to quickly search for projects system summaries with the desired parameters. The EXCEL file can be sorted by any of the columns or can be filtered by using the filter feature in EXCEL. The cost obtained from the summary and/or summaries can be adjusted by the cost index also on this CD. See the KSC Cost Index page 10 for how to apply and use the index factors. Because the creation of the system summary is not an exact science and the source information is not always reliable the raw data in the system summary can not be used directly for cost estimation, however each summary does provide the parameters of that project which can be compared to other projects for cost and scope. In turn, this comparison will assist the

09/29/2005

EstSeminar Volume XVIII Page 23

cost analyst or estimator in validating various construction costs, performing ROM estimates and developing parametric estimates. Use in the Future – In the process of parametric estimating there are two basic phases: data “collection” and data “application”. Once the data has been collected it must be refined in order for it to be used by the estimator in the “application” phase. Mr. Brown has made an excellent start on data collection and has pioneered many data formats used at KSC. Now it is time to start refining this raw data and feeding it into data banks where it can be utilized by planners, managers, and estimators. This refined information will be used to expand the present commercial data base and to provide KSC with a unique estimating data base. This will allow KSC to move into the data “application” phase of parametric estimating.

DEDICATION This first edition of the KSC Construction System Summaries is dedicated to Etheroy Jones, Clyde Pierce and Richard Varndell, who spend many years developing many of the summaries in this edition. Thank you. Grateful acknowledgement goes out to Susan Zimmerman and L.A. Durette who assisted in this effort.

CONGRATULATIONS To Dallas R. Lee, Susan Zimmerman & L. A. Durette Thank you for your great Aerospace Cost Engineering effort, with this great effort you have added 4 more Aerospace Cost Engineering tools to our over 220 tools. We, JAB/CCCI, KSC Cost Engineering team work has documented since 1961 including Aerospace Price Books, Estimating Specs, technical papers, reports, studies, CD ROMs, video’s, and now a DVD on bidding stragety. These 4 new tools: 224. A CD ROM, System Summaries for KSC 1974-Dec. 2004 – Dated Dec. 8, 2004 225. A PDF Bid Abstract of Bid Summary of 1975 project, 110 pages. 226. An Excel Electronic searchable summary of 438 detail bid summaries. 227. A search index hyper linked to each of the detail one page system summaries o the 438 projects. This CD-ROM is a great money and time saver as KSC goes for my dream goal of CAD estimating. I believe this recognition should serve as notice for CCE Recertification credit and it was above your normal Cost Engineering effort. A special thank you with God’s blessings and prayers for a great Christmas and Happy New Year for 2005. Signed Joseph A. Brown CCE., AACE Fellow, Space Pioneer, Advocate, and Cost Data Historian.

09/29/2005

EstSeminar Volume XVIII Page 24

Other Cost Data Reports/Seminars, Misc, Videos, DVDs, Reports A. 12 Reasons for ‘Back to the Moon’ – Vol. 16 pg. 155 B. 15 Computer Templates – CD Roms #30-38 C. Seminar VI Hand outs – 10/14/03 – p. 1-66, p. 1-75? 2005 New Tools 228. Perametic Analysis Office Support Buildings using JAB cost data allows variations based

on building size, 5000 SF to 50,000 SF Escalation, number of bidders etc. - $135 - $275.00/SF – by NASA P.A. Glenn Butts – email Jan 12, 2005 Excell program.

229. Estimating labor productivity, construction and design engineering PPT 94 charts, March 25. 2005 JAB Seminar #2 CD-ROM #18 – PDF 6.2 MG. Power point 18.3 MG – Glenn Butts

230. “Bidding strategies & cost engineering” 138 lo bidder ways – 3/8/2005 update 128 charts – PPT JAB 19.135 MG CD-ROM #18 Seminar #2.

231. CD-ROM #18 – Seminar #1 TO-PO-MU (Take off, price out, and mark-up). Scan in color/bw 205 pages. Seminar #2 Detail Cost Estimating, Mech., Electrical, 35 BFC ways to estimate, prices, bidding with over 15 PPT presentation and Estimating Excel Templates, Escalation Program April 21, 2005.

232. Estimating the cost of design, cost estimating – facilities and GSE Excel template, problems P.PT 49 charts Jan. 2005 (Seminar #1)

233. “Construction Problems” Power Point Cost Engineering and Construction Management June 7, 2005 – 132 charts Seminar III – 26.5 MG

234. “Cost Escalation & labor productivity what can we do about it? Cost alert – 2004 – 2005 June 2005 56 charts Seminar III – 7.6 MG

235. System summaries why & how to make them cast studies. OSB #2, SRB, GSE automatic locking device and power point June 8, 2005 – 36 charts – Seminar III. – 4.5 MG

236. “Construction Management” & “Cost Engineering” power point – June 16, 2005 – 34 charts, Seminar III – 2.9 MG CD-RoM #19

237. Shuttle Cost Control (SCC) power point – June 14, 2005, 67 charts Seminar III – 11.5 MG.

238. Planning and scheduled June using MS project power point – 3 projects – June 2005 – 20 charts. Seminar III – 900 KB. PSCOL sample

239. Orange County Convention Center power point – Change order truss crack – June 28, 2005 – 60 charts – Seminar III – JAB Vol. 3, - 13.3 MG

240. Murphy’s International Airport (MIA #1) power point – Construction plaque ‘CM’ project June 21, 2005 – 35 charts Seminar III – 6.9 MG CD-ROM #19

241. Conceptual Design Conceptual Estimate – Prices, Seminar #2 – March 14, 2005 – 48 Charts Power Point 1.7 MG.

242. Introduction to Manual and Computer Cost Estimates Seminar #1 – 38.67 MG Power point Nov. 29, 2004 – 169 Charts.

243. Estimating Basics Seminar #1 Lession 1 8.7 MG, Nov. 29, 2004, 37 Charts – Power Point.

244. Introduction to Seminar #2 Aerospace Estimating Tools 20.8 MG 4/4/2005 – 81 Charts.

09/29/2005

EstSeminar Volume XVIII Page 25

245. KSC Construction Cost Alert JAB & Glenn Butts 34 Charts, 3/8/2005 –d Seminar #2 – 7.8 MG

246. “CAD Estimating Development, Challenges”, #1 6.7 MG Seminar #2, July 14, 2005 – Auto Cad- Revit. 106 Charts.

247. “Impact of CAD on Cost Engineering” #2 by E. Zamolski & B.E. Seals, AACE Int. with updated comments by JAB – 42 Charts – 1982/ 6/23/205.

248. Computer Estimating – History, background, reference, studies” JAB Vol. 4, Seminar #3 – 1936 – 2005 – Worlds First CAD Estimating Symposium 72 charts, 17.4 MG – 6/28/2005 part 3.

249. Value Engineering Seminar #3 – 2.7 MG, 6/23/2005 – 28 Charts, CD ROM #19 – MSS Case Study.

250. Cost Studies A “New VAB” – Small $160 million, Ideal – 1Bay 5 Segment Booster, $360 million Super payload processing, $1.3 billion, 2004, Replace existing $1.99 billion 3/29/03 – JAB Vol. 15.

251. Cost Study B New launch Pads - $6 million, $20 million, $40 million, $121 million, $300 million, EELV, $1.021 billion LC-39June 30, 2003 JAB Vol. 15.

252. Cost Comparison Analysis conventional vs C.M. JAB Vol. 3 page 68-70 – Seminar 3 – Why or Why Not Use Construction Management.

253. CD-ROM #19 – Seminar III JAB Vol. 3 & 4 – with over 20 power point presentations, Cost Engineering, C.M., & Computer Estimating & CAD/ACCE.

254. Searchable Key Word Index, Tools JAB Books & CD-ROM Indexes

255. Copies of technical papers are available at: (1) Kennedy Space Center Library in vertical files under KSC papers

(2) AACE International, 1-800-858-COST, Morgantown, West Virginia (3) NASA Scientific and Technical Information (STI), BWI Airport, MA 21240 (4) KSC Technical Library Hdq. Bldg. KSC Fla 32899 (5) NASA Technical Briefs (6) Space Congress, Cocoa Beach, FL, transactions 1985, 1986, 1996, 1997, & 2000, CD ROM (7) Center for Aerospace Information, telephone 301-621-0156.

(8) KSC Technical Library Web Site (9) Con$truction Co$t Con$ultant, Inc. (CCCI) Joseph A. Brown (JAB) 256. For many Cost Data Books & Reports visit KSC Technical Library Web Site:

www-lib.ksc.nasa.gov/lib/gp364numeric.html Index of Kennedy Space Center Specifications and Standards Is prepared by the Kennedy Space Center Library Documents, Specifications and Standards Department. Mail Code: LIBRARY-D. Phone: 321-867-3613. Email: [email protected]

These Books, References, Reports, Technical Papers, CD Roms, Videos, Estimating Tools – (now over 240) have been created, developed, supported, documented, and/or tested by, Con$truction Co$t Con$ultant, Inc. (CCCI) Joseph A. Brown (JAB), & KSC Cost Engineering team work efforts.

Joseph A. Brown – CCE Retired NASA KSC Lead Cost Engineer for Facilities & GSE wwwLobiddervideo.com July 20, 2005 or e-mail [email protected] For Power Point Presentation visit web site “Estimating Tools” 62 Charts; Index of JAB Volume 1-9, Seminar 1-4 Descriptions, & Computerized Cost Index – CD Rom – ‘Read More’

09/29/2005

EstSeminar Volume XVIII Page 26

KSC COST INDEX 44 SOURCES AND REFERENCES

1. Con$truction Co$t Con$ultant, Inc. – wwwlobiddervideo.com 2. R.S. Means Construction Cost Data 3. Richardson Construction Estimating Standards 4. ENR (Engineering News Record) McGraw Hill Construction 5. Brevard Lumber Titusville 267-3831. 2X4, ¾” Plywood Plyform., Roll Roofng 90# 6. Scotty’s Lumber and Supply* - Batt Insulation Roll 88.12 SF – 7,000 SF, Wood 7. East Coast Lumber & Supply Co., Cocoa 636-0411 – Wood, Drywall, Roll Rooing 8. Don Bell, Inc. 9. Snyder Steel, Inc. 10. Rinker Materials Corp. – Concrete, Rebar, Masonry Products* 11. Florida Mining – Cocoa 631-6200, 636-3551* Concrete, Rebar, Block 12. VA Paving – 3,000 SY or 250 Ton 13. Brant Bros. Co. Tim Brant, Orlando 658-1925* 7,000 SF 3 ½” X 16” Foil Back

Fiber Glass Insulation 14. Lowe’s Home Warehouse 15. Carpet & Drapery Fashion Commercial 632-6440* Vinyle Tile 16. Purcell’s Flooring Cape Canaveral Fla. 17. Suncoast Acoustical Contractors Inc. 18. Acousti Engineering Co. – Cocoa 636-4042 Orlando 425-3467* - 1000 SF

Pedestal Floor 19. Accurate Door 20. Allied Door 3’ X 7’ Anodized Alum Exterior Door with Glass, Frame Panic

Hardware 21. ESP Windows 22. 123 Products 23. Blinds of All Kinds 24. Barnes Drapery & Floor Covering 25. UTP 26. U.S. Filter & Supply Co. 27. Hughes Supply, Inc. – Orlando, Fla 291-1545* - 100’ 6: Slip Joint Class 50 DIP 28. Pameco

09/29/2005

EstSeminar Volume XVIII Page 27

29. Baker Bros. – M.I. 452-5010, Titusville – 264-0070* ½” O.D. Type L Hard Drawn Cooper Tube

30. McJunkin Corp. – 1000’ – 1” Schedule 40-304 S.S. Welded (1.68#/LF) & Seamless

31. Sims Crane Rental Orlando 851-2930 – 30 Ton Crane per HR with operations & without

32. Ryerson Ducommon NC 704-392-1321 10 Sheets 33. Reynolds Aluminum – 10 Sheets Alum 606IT-6- .063 thick, 4’ X 12’ 42.67#/SH

Orlando 293-6430 34. Home Depot 35. Ivey Steel M.I. Fla. 36. Color Tile Supermart, Melbourne 768-1000 1/8” X 12 Vinyl Composite 45/Box 37. WW6 Asphalt 632-4340 Tom Goodson* Asphalt Paving 1½” Fine Type 2 11.92

SY/Ton 38. Coastal Windows 636-2673* - 3’ X 3’ SH Alum, Screen, Insulated 39. Borrel (Computer Floor) Orlando 788-3335* 40. Davis Meter & Supply Co. Orlando 297-6147 – 6” Dip* 41. R&R Supply Cocoa 632-2128* - 500’ Copper Tubing ACR (1.98 lbs/LF) 42. McJunkin Corp. Lakeland 800-282-8204* 43. Belco Steel Cord. Orlando 293-6177 – Tower Steel A-36 – Shop Fab. Install, Fab

& Errect 44. Tube Sales – Orlando 648-1550* - 1” – Schedule 40. Welded & Seamless SS

304 Pip Ref. #28 – CD Rom #2 Misc. Data* Jan 1995 Some of these sources have supported KSC Cost Indexes data for over 30 years – A Special Thank You for your Cost Data Support. Joseph A. Brown, CCE The KSC Team Work Effort

09/29/2005

EstSeminar Volume XVIII Page 28

Joseph Andrew Brown, (CCE) Con$truction Co$t Con$ultant Inc. ____________________________________________________________________ 1695 Vega Avenue, Merritt Island, FL 32953-3175 (321) 452-4909

COST ENGINEERING - SEMINAR BOOKS INDEX Page Volume I - “JABs Estimating Intro - To TO, PO, MU” General Estimating Take-Off, Price-Out Mark-Up -3, 7, & 21 steps..................... 1-206 Outline Specifications Propellant Office (pg. 70) Sketch to Reality (pg 105) Horizontal Shuttle Volume II - “JABs 33 Ways To B.F.C. Estimating” . Mechanical Electrical Division 15 & 16 (pg. 63) Prices, Bid Strategy, Conceptual Estimates (pg. 88)............................................ 1-340 Labor Productivity - Survey Location Factors (pg. 133) How to Get Low and Make Money (pg. 164) – Some Color Charts Volume III - “JABs Cost Engineering, Escalation, & CM” (pg. 3) and Cost Control (pg .27) Construction Management (pg. 53) ...................................................................... 1-324 Planning and Scheduling CPM, PERT, M.S. Project Cost Index Charts (pg. 194) Change Order Study (pg. 133) Volume IV. - “JABs Computer CAD Estimating” Challenges, Develop CAD/ACCE - 39 Steps, 14 Challenges, Charts, and PSCL (pg. 14) New Keyword Index ......................... 1-310 Volume V - “JABs Aerospace, Government, & Contractors, Estimating” ....................................... 1-333 General Contractors vs Government Estimates (pg. 3) Aerospace and Ground Support Equipment (pg. 15) Major Elements, 19 Considerations, 21 Steps,. Significant Cost Factors Aerospace Price Book, Vol. 1 - Conceptual Estimating (pg. 71) Space Station Facility Estimating Analysis (pg. 121) Revised Aerospace Price Book - Vol. IV (pg. 141) Global Competition Volume VI - “JABs Aerospace Indexes and Cost Data” ................................................................. 1-374 250 Cost Indexes and Escalation How to Make Over 30 Budget Cost Estimates (pg. 13) KSC Cost Index January 1995, p 1-50 - Unit Price Index (pgs. 20-95) Index of 37 System Summaries, Bid Dates, Costs (pgs. 135-155) Aerospace Construction Cost Estimating (pgs. 158-176) 50 Tools Spin-Off Volume VII - Video Book “110 Low Bidder Ways” .......................................................................... 1-196 Low Bidders Get Low & Make Money The 34 Aerospace Spin-Off A Video Estimating, Analysis, And Bid Strategy SPPF - Space Station Processing Fac. 129 Ways & 17 Keys to Successful Bidding and Construction Volume VIII - Work Book Supplement - Aerospace Estimating ...................................................... 1-160 USA Cost Data, Budget Cost Assessment, Computer Forms, Templates, GSE Case Study, Seminar Survey Problems Volume IX - Aerospace Mini Seminar - Summary - “The Best of Six” - (Volumes) ....................... 1-287 Volume XIV – Cost – Estimating, control, Tools, Factors ............................................................... 1-343 Volume XV – Aerospace Futuristic Cost Estimating (Pre Conceptual........................................ 312-642

Copyright @ Joseph A. Brown, 1990, 1996, 1997, 1998, 1999, 2004, 2005 U.S. Government Publications, such as, GSA, NASA, U.S. Army Corps of Engineers, etc. not subject to copyright. Joseph Andrew Brown, CCE, President Con$truction Co$t Con$ultant Inc.

09/29/2005

EstSeminar Volume XVIII Page 29

____________________________________________________________________________ 1695 Vega Avenue, Merritt Island, FL 32953-3175 (321) 452-4909 Licensed July 1968 Certified Sept. 1976 AACE “Fellow” 1982 BBC 1959 - BCN Incorporated 11/7/96 INDEX AACE Int. 1967 Bidding Video - 1997 Ret. NASA 1/95

CONSTRUCTION: VOLUME I JAB’S ESTIMATING INTRO to TO., PO, & MU

SECTION PAGES I. General Information - Seminar Programs Reference ............................................................ 1-8 How to Read Plans Better & Faster II. How to Sharpen Bidding - Course Outline, Prices, Slides ................................................... 9-14 Better and Faster Estimating Overview Estimating Overview - 3 - 7 - 21 Steps III. General Estimating Take-Off, Price-Out, Mark-Up ............................................................ 15-42 Estimating the Cost of Design and Engineering ............................................................32 IV. Basic Blueprint Reading, 3 Speeds, 3 Steps - 13 Study Methods...........................................43 V. Specifications - Outline PSCL - Propellant Office Lab Facility.................................................70 VII. Lectures: 2 Sitework; 3 - Concrete; 4 - Masonry; 5 - Structural and........................ (see Vol. II) Misc. Steel; 6 - Decks; 7 - Carpentry, Man-hours, Crews; 8 - Roofing & Sheet Metal; 10 - Finishes, J.A.B. System T.O., Materials T.O. VIII. Sketch to Reality - Horizontal Shuttle - 6 Sites ......................................................................105 IX. Study Problems - List of 21 Problems & Estimated Time ........................................................89 Study the Drawing Quiz - PSCOL ............................................................................ 90-92 Contractor’s Exam Problems; Fill, Stairs, Additions................................................. 93-94 Labor Productivity Survey II ...........................................................................................95 Design Costs ..................................................................................................................96 Field Office - Bid Problems.............................................................................................98 Glossary of Terms ..........................................................................................................99 Pop Quiz.......................................................................................................................101 PT&I Rates, Workman’s Compensation, DB Wage Rates...........................................102 KSC Estimating Spec. G-0002 Summary ....................................................................112 Charts 3 - 7 - 20 Steps .................................................................................................119 How to Sharpen Your Bidding, 160 Slides & Misc. Data .............................................121 X. Keyword Index For JAB/Aerospace Estimating Tools (220)..................................................135 XI. NASA Procedures & Guidelines – Cost Estimating ...............................................................158

Copyright @ Joseph A. Brown, 1990, 1996, 1997, 1998, 2001, 2004 U.S. Government Publications, such as, GSA, NASA, U.S. Army Corps of Engineers, etc. not subject to copyright.

09/29/2005

EstSeminar Volume XVIII Page 30

Joseph Andrew Brown, (CCE) Con$truction Cost Con$ultant Inc. ___________________________________________________________________________________ 1695 Vega Avenue, Merritt Island, FL 32953-3175 (321) 452-4909 Licensed July 1968 Certified Sept. 1976 AACE “Fellow” 1982 BBC 1959 - BCN “Low Bidder” Video 1997 AACE Int. 1967

INDEX

CONSTRUCTION: Volume II

JAB’s 33 WAYS TO B F C ESTIMATING

Construction Cost Estimating SECTION PAGE I. Chapter IV - The Estimate Arch./Struct. CSI 1-14.........................................................................1 CSI Divisions 9 Finishes .............................................................................................50 JAB System Summary ................................................................................................53 33 Ways to Faster, Better & Cheaper Estimating .......................................................59 II. Chapter VIII - Mechanical and Electrical Estimating ...................................................................63 CSI Division 15 and 16 III. Chapter V - Prices, Estimate Summary, Bid Strategy, 39 Ways.................................................88 and Conceptual Estimating

• PDQS Budget Quotes page 129A-I ..........................................................................128 IV. Chapter XII - Labor Productivity – Measurement, Improvement, Location ...............................133 Factors - 266 Projects, 17 Countries, 6 Continents V. Chapter X - “How to Get Low and Make Dough” 45 Ways ......................................................164 VI. Problems - Field Office Estimating IV - 35 ................................................................................178 Location Productivity Survey (Surveys) ............................................179 Budget Quotes page 130 JAB Quote Form Template ..............................................180 Architectural and Structural Bid Summary................................................................181 Seminar Critique .......................................................................................................183 VII NASA Procedures & Guides NPR 8820.2E 10/7/2003 .............................................................203

Copyright @ Joseph A. Brown, 1986, 1990, 1996, 1997, 1998, 2005

U.S. Government Publications, such as, GSA, NASA, U.S. Army Corps of Engineers, etc. not subject to copyright.

09/29/2005

EstSeminar Volume XVIII Page 31

Joseph Andrew Brown, (CCE) Consultant Cost Engineer ____________________________________________________________________________________ 1695 Vega Avenue, Merritt Island, FL 32953-3175 (321) 452-4909 Licensed July 1968 Certified Sept. 1976 AACE “Fellow” 1982 BBC 1959 - BCN AACE Int. 1967

VOLUME III INDEX “JABs COST ENGINEERING, ESCALATION & CM”

COST CONTROL, CPM - PLANNING & SCHEDULING - PERT. SECTION PAGES* Typical Seminar General Description and Program Schedule..................................................... 1 I. Cost Escalation and Labor Productivity-Problems and Solutions ................................... 3 II. Labor Productivity - Measurement and Improvement - See Volume II, & VII III. Construction Cost Control* ............................................................................................ 25 Tools, Systems, Corrective Actions, Road to Success IV. Construction Management and Cost Engineering......................................................... 53 A. Construction Management ...................................................................................... 53 B. Cost Engineering..................................................................................................... 56 C. Planning and Scheduling - CPM ............................................................................. 82 D. PSCOL Using Microsoft Project .............................................................................. 93 E. Value Engineering ................................................................................................. 124 F. Super Project Management ........................................................................................ G. Change Order Estimation, Prevention, and Negotiation ....................................... 134 H. KSC Design Construction & Change Orders 5 Years Study, 5540 CO................ 135 I. OCCC Truss Change Order Cost ......................................................................... 165 V. Surveys/Problems........................................................................................................ 132 Labor Productivity Survey (Moved to Work Book Supplement) ................................. 135 Conceptual Estimate Problem ........................................................................................... Estimating CM vs. A&E Costs ........................................................................................... Problems of Construction .................................................................................................. Project Management Life Cycle......................................................................................... VI. 250 Cost Index Charts ................................................................................................. 184 Apollo/Saturn V Center (Museum)............................................................................... 201 AACE Value Engineering Problem .................................................................................... LETF - GSE, Operation Maint. & Testing Constraint Study ........................................ 169 VII. JAB Volume 1-16 Indexes ........................................................................................... 223 * Consecutive page numbers on right hand side, text reference paging in bottom center

Copyright @ Joseph A. Brown, 1985, 1986,1996, 1998, 2005

U.S. Government Publications, such as, GSA, U.S. Army Corps of Engineers, NASA, etc., not subject to copyright.

09/29/2005

EstSeminar Volume XVIII Page 32

Joseph Andrew Brown, (CCE) Con$truction Co$t Engineer __________________________________________________________________________________

1695 Vega Avenue, Merritt Island, FL 32953-3175 (321) 452-4909 BBC 1959 - BCN Licensed July 1968 AACE Int. 1967 AACE “Fellow” 1982 Bidding Video 1996/97 Certified Sept. 1976

VOLUME IV INDEX

“JAB’s COMPUTER AND CAD ESTIMATING” SECTION PAGE I. The Challenges in Development of Automatic CAD Cost 2 Estimating Systems for Government Aerospace Construction - 39 Steps - 14 Challenges. II. CAD/Computerization Chart 16 III. OLF 60 Hertz Power Design Computer Estimating 22 IV. PSCOL - CAD Design Case Study Intergraph CAD Drawings 26 V. PSCOL CAD/ACCE Detail Cost Estimate 30 VI. PSCOL Reduced Drawings - Manual, Arch. Struct., Mech. & Elect. 46 VII. CAD/ACCE Charts - APDP, AQUA, Correlation Table, Quantity Report, 58 CES Data Base, Flow Chart, KSC Cost Est. System VIII. 6 Accomplishment, Misc. Program, Report 70 IX. Manual vs. Computer Estimating - Intro. Trends, 76 Survey, Results, CAD Programs, Matrix Analysis, Comparisons 3 - 11 Computer Programs, PSCOL Sample Budget Estimate X. PSCOL Excel Estimate - Architectural & Structural 95 Mechanical & Electrical Detail Estimate 105 XI. Steps For Making Excell Computer Estimates 113 By J. Brown and P. Kocol XII Desk Instructions, Draft Excel Estimating Templates 122 XIII. Four CD - ROMs - Cost Data, Template, Workbook 150 XIV. 80 Estimating Tools, Spin-Offs For BFC Estimating 175 XV. Excel Escalation Chart Computerized - 1974-2002 Unit Price, Project 164 XVI. Requirements for New Computer Estimating Program 216

Copyright © Joseph A. Brown, 1983, 1986, 1997, 1998, 1999, 2005

U.S. Government Publications, such as NASA etc., not subject to copyright. Proprietary Data such as Intergraph, IBIS-CALC PMA, etc. not subject to copyright.

09/29/2005

EstSeminar Volume XVIII Page 33

Joseph Andrew Brown, (CCE) Consultant Cost Engineer ____________________________________________________________________________________ 1695 Vega Avenue, Merritt Island, FL 32953-3175 (321) 452-4909 Licensed July 1968 Certified Sept. 1976 AACE “Fellow” 1982 BBC 1959 - BCN 5/22/97 AACE Int. 1967

INDEX FOR VOLUME V

JAB’S AEROSPACE, GOVERNMENT, & CONTRACTORS, ESTIMATING SECTION Page I. A. Government and General Contractor Cost Estimating anatomy of Cost Estimate - 5 Divisions: General Construction - O.H. Taxes, Insurance, Take Off, Price-Out, Mark-Ups. (See JAB Seminar Workbook Volume I page 3-42................................................ II. General Contractors vs Government Estimating ....................................................................3 Differences, Purposes - 21 Steps Government Mark-Ups References & Charts III. Ground Support Equipment (GSE) Cost Estimating.............................................................14 A. Introduction, Examples, Types, etc. B. Jim Hart Final Shuttle GSE Report KSC, VAFB - 1384 Items $190,700,000.......................23 C. J. H. Space Station GSE Report Part II 3/18/97 - 3146 Items $32,633,071 ..................... 29A D. Orbiter GSE Inventory Report - 358 pages $192,420,522 ................................................29H E. USA Equipment & Property Management System - 4017 Items $303,635,504................29M F. Summary Formats ................................................................................................................36 G. Examples of GSE Detail System Estimate ...........................................................................41 IV. Aerospace cost Factors ........................................................................................................62 V. Computerized Estimating A. Manual and Computer Estimating Survey (Also see JAB Vol. 4)...................................... 68A B. Matrix of Computer Estimating Programs.............................................................................67 C. Budget Computer Estimate - Input/Output ...........................................................................68 VI. A. Aerospace Price Book, Volume I - Conceptual Estimating ..................................................71 B. KSC Cost Indexes 1974 - 1998 Special ...............................................................................96 C. Install GSE Instrumentation Work Hours Table..................................................................113 D. NASA KSC Cost Estimating Challenge Briefing 1/20/95....................................................114 E. Space Station Facility Estimating Analysis page 121 Revised...........................................121 F. Aerospace Price Book - Volume IV page 141 ....................................................................141 G. Sample of Quote Sources For SSPF..................................................................................156 H. Global Competition Low Bidder Estimating and Bid Strategy ............................................159 VII. Key Word Index, 240 Aerospace Estimating Tools...................................................................230 A. Lesson Plan Seminar 4.......................................................................................................252

Copyright @ Joseph A. Brown, 1990, 1996, 1997, 1998, 1999, 2005

U.S. Government Publications, such as, GSA, NASA, U.S. Army Corps of Engineers, etc. not subject to copyright.

09/29/2005

EstSeminar Volume XVIII Page 34

Joseph Andrew Brown, (CCE) Consultant Cost Engineer ___________________________________________________________________________________ 1695 Vega Avenue, Merritt Island, FL 32953-3175 (321) 452-4909 Licensed July 1968 Certified Sept. 1976 AACE “Fellow” 1982 BBC 1959 - BCN AACE Int. 1967

SECTION V – GSE COST ESTIMATING SECTION PAGE I. Introduction – SSPF GSE Platforms, Panels, Miscellaneous .............................................. 15 What is GSE? – Example: Structure, Mechanical and Electrical ......................................... 17 14 Major Cost Elements/Outline Format Checklist .............................................................. 18 19 Important Considerations for GSE Cost Estimating........................................................ 19 21 Steps for Making GSE & Government Bid Cost Estimates............................................. 21 Mark-Ups. (See JAB Seminar Workbook Volume I page 3-42......................................... II. 8 GSE Estimating References.............................................................................................. 22 Jim Harts’ GSE Report ......................................................................................................... 23 Cost Data Formats – Types & Estimates ............................................................................. 30 Summaries Formats – Project L&M System ........................................................................ 31 Estimating GSE Panel/Tubing/KC Fitting Chart (Volume II, Page 21, 4/5/90)..................... 37 20/17 KSC Significant Cost Factors for Design, Construction & GSE................................. 38 III. KSC GSE Cost Estimating Tools IV. Example of GSE Cost Estimates in Aerospace Price Book – Volume II & III A. Breathing Air, GN2 Panels – System Summary......................................................... 41 B. Detail Labor & Material Estimate with Mark-Up.......................................................... 44 C. Premise Writing (page 191)........................................................................................ 46 D. Crane Bridge, X-Ray Position (pages 174, 175, 173, 110) ........................................ 47 E. Battery Back-Up System Charger 43 Set (page 161) ................................................ 50 F. Guided Telescoping Tube (page 140)........................................................................ 51 G. SRB Case Segment Dollies (page 97, 98) ................................................................. 52 H. Flare Stack System (page 92) .................................................................................... 54 I. LRU PGHM Platform (page 91).................................................................................. 55 J. Portable Purge Unit (page 86)........................................................................................ K. Pad B – Payload Ground Handling Mech. (PGHM) (page 84) – Volume VI ............ 134 V. (For Section V, see APB, Volume III) M. Hypergol Vapor Scrubber Fuel & Oxidizer (page 75) N. PGHM From End Launch EO (page 76) O. PGHM Instrument Hydraulic GN2 Gas Bottle (page 75) P. Biospecimen VAN (page 72) Q. Orbiter Access Arm Environmental Chamber (page 71) R. Rail Car Special Purpose & End Ring Racks (page 70) S. Mid-Body Umbilical Unit (page 67)

Copyright @ Joseph A. Brown, 1985, 1986,1996, 1998, 2005 U.S. Government Publications, such as, GSA, U.S. Army Corps of Engineers, etc. not subject to

copyright.

09/29/2005

EstSeminar Volume XVIII Page 35

T. LETF Support Contact > TSMs Hold-down Posts, etc. (page 64) 64 U. Hydraulic Test Kits (page 60) V. Electrical Power System Pallet (page 59) W. SRB Segment Lifting Beams (page 58) X. ECS Station ECS Fixed Facility (page 48) Y. OPF Activation Mods. Orbiter Processing Facility Platforms (page 31) 60 Z. Cryogenic Umbilical Components LOX-LH2, Flex Hose, Hard Line on MLP (page 30-33) AA. ET H2 Vent Umbilical & Innertank Access Arm (page 28) AB. MLP Tail Service Masks (page 10) AC. Orbiter Access Arm Environmental Chamber (page 5) AD. Mid Body Umbilical Unit (page 8) AE. 6000 psi ¼” SST Tubing (page 22-24, Vol. II, 4/9/90) AF. APS-PBK N202 Pressure Purged OD Activation Panel (page 40-43, Vol. II) AG. Vacuum Jacked Pip Assembly (page 52-53, Vol. II) AH. Panel Assembly GHe Charging Regulator (page 64-66, Vol. II) AI. Special Clean Room Equipment (page 129-131, Vol. II) AJ. Halon System Fluid Test Complex (page 129-131, Vol. II) AK. Adapter Cable Assemblies 770 & Break-up (page 174, Vol. II) *Page Numbers are from Aerospace Price Book Vol. I, Pages 1-314, Date 3/28/90, Division 1-14 Vol. II, Page 1-222, Date 4/5/90, Division 15 & 16 Vol. III, Page 1-193, Date 12/15/89 – System Summary 1974-1989

WHAT IS GSE? AS SHOWN IN KSC-STA-67, REV. A 6/19/90

GROUND SUPPORT EQUIPMENT (GSE) Items or units used to transport, access, handle, protect, service, or checkout flight hardware/software on the ground. GROUND SUPPORT EQUIPMENT ITEM DESCRIPTION (GSEID) The GSEID defines and describes the physical and functional characteristics of the system/subsystem/equipment to be design, developed, procured, fabricated/assembled, tested, checkout and used. All interfaces with other systems and equipment, flight and ground, are identified. Performance requirements are included and verification testing identified. KSC SPEC G-0003 JULY 5, 1977 FURTHER GSE FUNCTION DESIGNATIONS (TR 12871) Servicing Checkout & Test Handling & Transportation Auxiliary Uncategorized

09/29/2005

EstSeminar Volume XVIII Page 36

Joseph Andrew Brown, (CCE) Con$truction Co$t Con$ultant Inc. ___________________________________________________________________________________ 1695 Vega Avenue, Merritt Island, FL 32953-3175 (321) 452-4909 Licensed July 1968 Certified Sept. 1976 AACE “Fellow” 1982 BBC 1959 - BCN 7/2`/97 AACE Int. 1967

AEROSPACE CONSTRUCTION/GSE COST ESTIMATING SEMINAR BOOKS INDEX VOLUME VI

Volume VI - JAB Aerospace Indexes & Cost Data and Cost Data PAGES

1. 250 Cost Indexes and Escalation - 14 pages............................................................... 2 A. How to Make Budget Estimates Conceptual ...................................................... 13 B. KSC Cost Index, January 1995 - page 1-80 - Unit Price Index. .......................... 20 C. KSC Cost Index - June 15, 1999 ......................................................................... 96 D. 40 Escalation Problems, Manual & Excel Escalation Chart .............................. 112 E. Index of 40 System Summaries, Bid Dates, Costs, Estimates .......................... 113 F. Over 30 System Summaries - “How to Make Over 30 Budget .......................... 119 Cost Estimates*

2. Aerospace Construction Cost Estimating - 21 General Estimating Tools................ 158 3. Aerospace, Utilities O&M Costs ............................................................................... 174 4. Over 250 Cost Estimating Tools, Spin-Offs 20 New Exciting Tools (See pg 200)... 177 5. Aerospace Construction Price Book Volume I Introduction - Vol. V page 71 Conceptual Estimating Using KSC Cost Index Vol. V page 83 Florida Sales Tax for Construction and GSE Vol. V page 91 Historical Budget Cost Data Square Foot and Cubic Foot Vol. V page 95, 96 7. Aerospace Price Book, Volume II (not used) Unit Prices, Sample - Mechanical, Electrical, Labor and Material 8. Aerospace Price Book Volume IV - Space Station Processing Facility Cost Data, Index - Vol. V page 141 9. Aerospace Estimating Tools Past, Present, and Future .......................................... 200 10. Key Word Index/Over 250 Estimating Tools ............................................................ 211 11. KSC Cost Index June 30, 2005 ................................................................................ 217 12. JAB Book Indexes Volumes 1, 2, 3, 4, 5, 6, 7, 8, 9, 14, 15, & 18 ............................ 240 13. JAB Cost Alert History & Escalation Jan 2004 – Aug. 2005 .................................... 251 14. Misc. Next Generation Launch Vehicles? CEV/SDLV ............................................ 305 15. Analysis Matrix & Workbook Dedication .................................................................. 317

Copyright © Joseph A. Brown, 1996, 1997, 1998, 1999, 2005

U.S. Government Publications, such as, NASA, U.S. Army Corps of Engineers, etc., not subject to copyright.

09/29/2005

EstSeminar Volume XVIII Page 37

Joseph Andrew Brown, (CCE) Consultant Cost Engineer ____________________________________________________________________________________________ 1695 Vega Avenue, Merritt Island, FL 32953-3175 (321) 452-4909

Licensed July 1968 Certified Sept. 1976 AACE “Fellow” 1982 BBC 1959 - BCN Incorporated 11/7/96 AACE Int. 1967 Bidding Video – 1996/1997 Ret. NASA 1/95

“110 /138 Ways Low Bidders Got Low” Video Book Volume VII This book includes estimating and bidding strategy, How Does the Low Bidder Get Low and Make Money?; sixteen case studies; over 110 ways low bidders get low for offices, warehouses, churches, schools, big buildings, VAB, Space Station Processing Facility, airports, tunnels, pipelines, and aerospace launch and landing facilities with 17 keys to successful bidding and construction, including “11 Detail Cost Estimate Summaries”; 19 Lists of Bids”; 15 Ways to Make Government Estimating More Accurate.” INDEX Page 1. “How Does the Low Bidder Get Low and Make Money?” 6 2. “The 34th Aerospace Spin-Off in Construction Cost Estimating” – a video – Part II 25 presented at the 34th Space Congress, or “Construction Estimating and Bidding Strategies,” including Ways #46 - #63 and #108 – #111 with three system summaries of detail government estimates with bidders’ names and 40 references. 3. “Estimating, Analysis, and Bidding Strategy of Space Station Facility” using KSC 39 aerospace spin-off tools with Ways #63 - #107 – bidders’ list, number of bidders’ concepts, and system summary of government estimates from Seminar Workbook. 4. “Keys for Successful Bidding and Construction” and updated list of Ways #1 - #54, 59 Tests, Questions, and Answers. 5. Labor Productivity Estimating, Measure and Improve with Sample Surveys – Key #10. 70 6. Construction Bidding Costs of LC-39, The World’s Largest Building – Ways 100 # 34 - #45, Case Study of FIRST Aerospace Construction Management Project. 7. Construction Management – Key #3, Ways #1 and #2 109 8. Estimating Tools by Joseph A. Brown and Miscellaneous Surveys, Tests, 130 and indexes of 6 Volumes of Seminar Workbooks. 9. Quick Summary References – “#138 Low Bidder Ways” with 6-story office 147 Summary

Copyright © Joseph A. Brown 1997, 1998, 1999, 2000 ,2002 Joseph A. Brown, CCE, President • Con$truction Co$t Con$ultant, Inc.

09/29/2005

EstSeminar Volume XVIII Page 38

VOLUME EIGHT INDEX JOE BROWN’S SEMINAR WORK BOOKS SUPPLEMENT (WBS) 1999 - 2005

Page 1. USA Cost Data Charts: a) P.T.&I Construction Workers Trades........................................................................ 1 b) General Contractors Home Office P.T. &I 1999 ....................................................... 2 2. Workman’s Compensation Chart 1979 - 1998 .............................................................. 3 3. Estimated Average KSC Davis Bacon Labor Rate Construction Workers..................... 4 4. Planning the Project - 18 More Ways to Better Estimates - ........................................... 5 5. a) Fidelity & Time Chart - GSWT - 100% FPC.............................................................. 6 b) GSWT - System Design Checklist ............................................................................ 7 c) EACE Form 2-131 Cost Data - Proposed - .............................................................. 8 6. Budget Cost Assessment, August 1996, 10 Pages by Joe Brown................................. 9 7. FY98 SFOC Labor Rates - 2/13/98 - Paul F. Nemitz, Manager................................... 19 8. EXCEL Computer Estimating Forms: a) Estimating Design Cost - Joe Brown/Phil Kocol ..................................................... 20 b) Detail L&M FPC M.U. - Sudhakar Bhide (Labor dollars)......................................... 21 c) Detail Labor-Hours and M. FPC - M.U. - Phil Kocol/Joe Brown.............................. 22 d) Preliminary L&M Combined Total - Phil Kocol/Joe Brown ...................................... 23 e) Budget Quote For Estimating.................................................................................. 24 f) Excel/PSCOL Detail Labor & Mat. Computer Est. Kocol/Brown ............................ 25 g) General Condition Overhead Summary Form, Sample.......................................... 26 9. Labor Productivity (See Volume II & JAB Seminar Book) & page 84 .......................... 28 10. Labor Productivity Survey (2 pages) ............................................................................ 84 11. Construction Management-Problems of Construction ................................................. 30 12. Manual and Computer Estimating Survey.................................................................... 32 13. JAB Proposed Bentley Micro-Station CAD/ACE .......................................................... 34 14. Construction Management - Cost Comparison CM vs Conventional. .......................... 35 15. Seminar Critique .......................................................................................................... 36 16. Personal Information Survey........................................................................................ 37 17. Excell 1510 Computer Template & Sample PSCOL (4 pages) (70) ............................ 38 NASA 1510 Flow Diagram - Facility Project ± 200,000 (74) ........................................ 42 18. Cost Index Adjustment Matrix Analysis (p79) .............................................................. 79 19. CofF USA Burdens & Fees, Main Types of GSD&O Estimates................................... 44 20. KSC - 1997 10 System Summaries ............................................................................. 57 21. List of 67 Tools - Survey (3 pages) After Seminar Completed..................................... 64 22. Estimating Check List By Mod. Management .............................................................. 68 23. List of 67 Tools Survey Before Seminar Starts ............................................................ 70 24. Video Survey 15 Keys - 70 Ways Low Bidder Got Low ............................................... 74 25. Over 30 Different KSC/USA.GSDE - Types of Estimates ............................................ 76 26. Short Video Quiz/Matrix Analysis................................................................................. 79 27. FPC Cost Growth Study............................................................................................... 86 28. BAD Platform GSE Case Study ................................................................................... 93 29. List of Seminar Report ............................................................................................... 101 30. Change Orders - Construction & Design - Type & Prevention................................... 103 31. GSE Design Charts 44 GSWT List ............................................................................ 128 32. Misc. Surveys, Forms, Votes & Quiz.......................................................................... 138

09/29/2005

EstSeminar Volume XVIII Page 39

Joseph Andrew Brown, (CCE) Consultant Cost Engineer ____________________________________________________________________________________________ 1695 Vega Avenue, Merritt Island, FL 32953-3175 (321) 452-4909

Licensed July 1968 Certified Sept. 1976 AACE “Fellow” 1982 BBC 1959 - BCN Incorporated 11/7/96 AACE Int. 1967 Bidding Video – 1996/1997 Ret. NASA 1/95 7/2/97

“JAB’s The Best of Six Volumes” Volume IX

Index Section Title Volume IX Page # A. “Seminar & Estimating Introduction” – 160 slides ............................................................. 5 Vol. I Types of Estimates – pg 16 Mark-Ups PT&I, Overhead, Problems – pg 21 Estimating Design Costs – pg 26, ABC – 36 Problem Contingencies – pg 25 – Pop Quiz – Pg. 101 B “The Estimate” ................................................................................................................... 38 Vol. II 33 Ways to BFC Estimating – pg 43 Prices – How to Get Them – pg 46 Estimate Review – Manual & Computer – pg 53 ROM Unit Prices – pg 55 C “Cost Control” .................................................................................................................... 58 Vol. III What Can Be Done At Each Project Stage – pg 72 Project Management – pg 86 CPM – pg 89, Problem – pg 96 Change Orders – pg 108 D “Computer Excel Template”............................................................................................... 130 Vol. IV CD ROM Indexes – pg 146 90 Estimating Tools – pg 154 Excel Escalation Chart – pg 158 E “Ground Support Equipment (GSE) Estimating” ............................................................... 161 Vol. V J.H. Shuttle GSE Report – pg 169 J.H. Space Station GSE Report – pg 169-H Orbiter GSE – pg 169-O USA GSE Report – pg 169-R GSS Cost Control – pg 32-B, C, 62-65 Smoky Panel Chart – pg 173 Panel Problem No. of Hours, Cost – pg 191 GSE Aerospace Factors – pg 170 Aerospace Price Book – Vol. 1 – pg 70-A-77F F “250 Cost Indexes & Cost Data”........................................................................................ 193 Vol. VI Cost Index of Prices – pg 35-68 50-80 Estimating Tools/Spin Offs – pg 202 KSC Cost Index Low-High Prices – Volume I, II, & III APB – pg 218 Misc Indexes of other 7 Volumes of JAB’s Workbooks – pg 255

Copyright © Joseph A. Brown – 1999, 2000, 2002 Joseph A. Brown, CCE, President, Con$truction Co$t Con$ultant, Inc.

Cost Engineering Construction Estimating Seminars Changes Videos Websites

09/29/2005

EstSeminar Volume XVIII Page 40

Joseph A. Brown, CCE, President Con$truction Co$t Con$ultant, Inc. ____________________________________________________________________________________________ 1695 Vega Avenue, P.0 Box 540453, Merritt Island, FL 32954-3175 (321) 452-4909 Licensed July 1968 AACE “Fellow” 1982I I N D E X – Part I Certified Sept. 1976 Incorporated 11/7/96 BBC 1959 - BCN Bidding Viedeo-1996/1997 AEROSPACE FUTURISTIC COST ESTIMATING AACE Int. 1967 CD-ROMs 1998-2003 Ret. NASA 1995

VOLUME 14 / SEMINAR 6

Costs – Estimating, Control, Tools, and Factors Vol. 14 Section Page I. Introduction / Outline – 20 Sections, Volume 14 Index 1– 4 II. Aerospace Cost Estimating Tools – Over 140 (PowerPoint) 5-67 III. Color Slides – “How to Sharpen your Bidding” or “Cost Estimating Engineering & Construction Management” (PowerPoint) Sample Color Slides 68-230 IV. 53 Aerospace Cost Factors for Facility, GSE, and Activation (PowerPoint) 231-250 V. Cost Estimating Take-off, Price out, Mark-up, & Estimate Design Cost Lecture Vol. 9 251-311 VI. Importance of Cost Control on any Project (PowerPoint) VII. Planning and Scheduling Vol. 9; Vol. 14 VIII. Aerospace / GSE Futuristic Cost Engineering Vol. 15 IX. Change Orders, Studies, Prevention, Reductions & Negotiations, (PowerPoint) 2/4/2004 312-323 X. Computer Estimating using templates for Budget, PER, Detail Cost Estimate XI. KSC Computerized Cost Escalation (PowerPoint) 324-342 XII. Background – Shuttle Model 6 Locations (PowerPoint) 343-397 XII. Video – “The Big Challenge” (28 min) XIII. Facilities Cost Model – General XIV. Facilities Cost Model – New VAB (Assembly Building) Real Property Report CRV $4.77 Billion XV. 15 New Exciting Estimating Tools (Lecture. Volume 9) XVI. GSE Cost Estimating – Conceptual (Volume 9) and Activation (Volume 13) (PowerPoint I, II, & III) 400-495 XVII. New Launch Pad – Space Shuttle and LC-41 (Unmanned) (PowerPoint) XVIII. Questions and Answers XIX. Summary – List of Major Projects for Modeling / Site / Future XX. Video – “How Does the Low Bidder Get Low” – Aerospace Cost Engineering XXI. Misc. Background Data Indexes, Oral History, Questions & Answers 1-4, 1-14 500-522 XXII. Seminar 6 Questions & Answers Backup Data, Location – Factors – Book Indexes 525-550 XXIII. Supplements APB Volume 3 Index and System Summaries 550-643

Copyright © 2004 Con$truction Co$t, Inc. U. S. Government Publications not subject to Copyright

Cost Engineering • Construction • Estimating • Seminars • Changes • Videos • Websites • CD ROMs

09/29/2005

EstSeminar Volume XVIII Page 41

Joseph A. Brown, CCE, President Con$truction Co$t Con$ultant, Inc. ____________________________________________________________________________________________ 1695 Vega Avenue, P.0 Box 540453, Merritt Island, FL 32954-3175 (321) 452-4909 Licensed July 1968 Certified Sept. 1976 AACE “Fellow” 1982 BBC 1959 - BCN Incorporated 11/7/96 AACE Int. 1967 Bidding Viedeo-1996/1997 Ret. NASA 1995

CD-ROMs 1998-2003

Volume 15 Index

Of

Miscellaneous Cost Data Supplements Background Page

• Seminar 6 – Volume 14 – Questions, Answers, and Comments 511

• List of GSE Estimating Steps and 67 Terms and Abbreviations 514

• A. Oral History Interview – April 3, 2003 Dr. S. Middleton – 20 questions, 5 pages 516

• B. Dr. Lori Walters, March 20, 2002 – 14 pages 522

• 12 System Summaries – Samples for Future Facilities & GSE 536

• Survey CCCI Order Form, Books, CD, Video, CD ROMs, and Description of Indexes, and Instructions 538

• Abstract of Bids, Summary, Sample, Awards 560

• Area Costs/Location Factors – JAB and C of E 564

• Computerized Index of APB System Summaries by Building, Communication, Electrical, GSE, Marine, Mechanical, Mods, PEMB, Roads, Refurb, Roofs, Site Steel, and Utilities 573

• KEY WORDS: Index for JAB/Aerospace Cost Data 594

• Aerospace/JAB Cost Data Books – Reference No. 1-12 APB,; 13-23 JAB, CD-ROM, 27-38 Technical Papers and miscellaneous reports – 200 resources 597

• Con$truction Co$t Alert 2004 – (NA some Editions) PPT. Vol. 14, pg 320-340? 611

• Cost Alert Supplement Cost Data 1934 – 2004 (NA some Editions) 631

• Futuristic Space Exploration Comments and Dedications 641

Copyright © 1999, 2001, 2002, 2003, 2004 Con$truction Co$t Con$ultant, Inc., (CCCI), Joseph A. Brown

U. S. Government Publications not subject to Copyright Cost Engineering • Construction • Estimating • Seminars • Changes • Videos • Websites • CD ROMs

09/29/2005

EstSeminar Volume XVIII Page 42

--For Reference Only

(From Vol. 16) (Pages 42 & 43)

Special Edition For NASA Use Only 30 Year Cost Alert Dated Oct. 1, 2005

VOLUME XVI COST INDEX COST DATA LIMITED EDITION

AEROSPACE PRICE BOOK

REFERENCE PCN 77406 / 80111 &TR-1511, & 1508

Part I: New KSC Cost Index March 31, 2005 pages______

Part 2: USA / KSC Cost Data Supplement pages 30 to 243 (see page 30 Index)

Cost Alert pages 29 thru 41 – Prices, Chart, ‘Less We Forget’

Page 32 – Labor Cost Comparison 1974 – 2004 Page 33 – Material Cost Comparison 1974 – 2004 Page 34 – ‘Remember When’ Cost Comparison$ 1934, 1961, & 2004 Page 35 – Construction Co$t Escalation 1960 – 2004 Page 37 – Payroll Tax & Insurance Rates 1979 – 2004 Page 39 – Labor Rates Summary October 8, 2004 Page 40 – Labor & Material up 10% - 110% Time Line Dec. 15, 2003

to February, 2005 Page 49 – Mod Management Construction 238 Projects $61,553,494 Page 69 – timSpecialized Concrete & Masonry Products Page 155 – New Keywords Index & 232 JAB/APB References Page 175 – New GSE & Construction System Summaries Page 195 – KSC Construction Cost Alert Nov. 2004 PPT

Part 3 KSC Cost Index June 30, 2005 page _______

Cost Engineering Facilities and Ground Support Equipment

________________________________

Joseph A. Brown, CCE 2005 USA Senior Engineer Telephone: 321-264-8419 USK: T30 Caution: Most of these prices and cost need to be escalated using KSC Cost Index.

09/29/2005

EstSeminar Volume XVIII Page 43

FOR REFERENCE ONLY SPECIAL EDITION FOR NASA USE ONLY

USA/GSS COST DATA SUPPLEMENT – 30 YEAR SPECIAL EDITION

VOLUME XVI USA COST INDEX COST DATA SUPPLEMENT TO KSC COST INDEX TR-1511 – Feb. 17, 2005 Pg. 28-243

This GSS Cost Data Supplement is meant to supplement KSC Cost Index TR1511, PCN 77406/80111 with an emphasis on Ground Support Equipment (GSE) & GSS Cost Data needs.

GSS Supplement Cost Data Index Description Section Page • Modification Management USK 5624. New Current Labor Rate Summary A 39 • FY04 – FY2010 SFOC CCBD Labor Rate. See Joe Brown or PM New Higher Rates • USA PT&I Labor Rates KSC, Fla. Standard, JUA C 37 • USA Cost Data PT&I Labor Rates, General Contractors - Home Office D • GSS Cost Control of GSE what you can do at each stage E 45 • Budget Conceptual ECBC Prices USA - GSE Cost Data Index Low to High Unit Budget Estimates F 47 Also List of Completed Mod Management Projects/COC also page 230 49 • Installation of Instrumentation Hours Table/Chart G 63 • Aerospace Cost Factors (Vol. IX page 296-317) (See 53 Cost Factors Report) H 64 • Budget Quote for Estimating Specialized Concrete & Masonry KSC Delivery I 69 • GSS Engineers that can help you make better cost estimates J 72 • GSS - GSE Sample Budget to Actuals Cost Comparisons K 73 • Sample Cost Engineering Review Comments Sheet with Attachment Mark-Ups L 79 • Computer Cost Estimating, Templates, Instructions & Power Point Presentations See Oct. 21, 2002 Cost Data Supplement • Spaceport Hangar, Admin. Office, “T” Shelter Cost Report N 127 • Office/Administrations Support Building Cost Study Draft Vol. XII Brief Update 88 • Aerospace Activation Price Book Vol. XIII Report, & Sample Cost Estimate 97 • CD-ROM & JAB Seminar Book Indexes 126 • Historic Facility Unit Cost Data SF/CF 122 • New Excel Index of APB Vol 3 System Summary Report – 400 projects 144 • New Draft Sample Unit Cost Price Data Report (9 pages) See May 6, 2004 Vol. 16 • New Draft Sample Project Cost Summary 200 Project (7 pages). See JAB Sample • New 1 page System Summaries Eleven Projects 174 • Area Location Cost Factors –World-Wide See Vol. 16 May 6, 2004 • New Cost Alert Construction Labor & Materials page 31-41 & 65 • NASA Audit Cost Engineering Report, NASA Handbook Summary Report 113 • Searchable Key Word Index and 250 Estimating Tools Caution: Most of these prices and cost need to be escalated using KSC Cost Index. Latest Report on KSC Electrical Energy Cost. 12/2/03 Cost per KWH 0.0485 per KWH per Chris Iannello 861-3276 Please note this Cost Data is from Volume VIII, XII and XIII. It is being renumbered to Vol. XVI for computerization, storage and retrieval. This is part of JAB Cost Data Books - 39 Volumes & CD Roms Joe A. Brown, USA GSS Cost Engineer USK-T30 264-8419 – Titusville 2A7

09/29/2005

EstSeminar Volume XVIII Page 44

Joseph A. Brown, CCE, President Con$truction Co$t Con$ultant, Inc. ____________________________________________________________________________________________ 1695 Vega Avenue, P.0 Box 540453, Merritt Island, FL 32954-3175 (321) 452-4909 Licensed July 1968 Certified Sept. 1976 AACE “Fellow” 1982 BBC 1959 - BCN Incorporated 11/7/96 AACE Int. 1967 Bidding Video – 1997 Ret. NASA 1/95 CD-ROMs 1998-2005

CD-ROM INDEX

1. CD-ROM #1 – KSC Historical Cost Data. 2nd Edition – August 20, 1999. 2. CD-ROM #2 – KSC Sensitive Construction & GSE Cost Data, Report, October

1999. 3. CD-ROM #3 – Cost Engineering Seminar. Nine (9) volumes. Date __________. 4. CD-ROM #1 of 3 – 2nd Edition – CCCI – List Price $100.00 + $30.00 S&H –

Commercial date – 2000. Limited edition – Call before ordering.*

5. CD-ROM #3 – 8 Volumes – September 19, 2001, by CCCI, copyright ©, List Price $400.00 + 10%., by Media Dynamic/Shaun.

6. CD-ROM #5, Version 7, September 9, 2002, for mini-seminar #5 – JAB Volume 9 – Best of 6, CD-ROM #1, Historical Cosr Data, (Versin 6 – Date: July 6, 2002).*

7. CD-ROM #5/9 – CCCI Commercial – Kist $500.00 + 10% - Mini-Seminar #5, plus Volume 9, 2002 – 8 PowerPoint, plus KSC Historical Cost Data, Release 2004.*

8. CD-ROM #7, Version 8, February 4, 2003, SDF Est. Briefing, OSB Cost ????, January 22, 2003, RPR – December 31, 2002., 8.13 M.G.

9. CD-ROM – not numbered – say #8 – Activation Cost Est. for GSDE / SDE, July 15, 2002, July 2004.

10. CD-ROM #10 – JAB’s PowerPoint (5-W) for Cosr Model, October 14, 2003, and sensitive Cost Data copyright ©, CCCI * (except Government publications).

11. CD-ROM #12 / Mini-Seminar #6 – Volume 14 – JAB’s Tools, Futuristic – PowerPoint- 5 plus Volume 9, Parts 1 and 2 – June 20, 2002. List price $400.00 _ $50.00 shipping, handling, and taxes; date Sept. 2004. Copyright © CCCI* (exception – Government publications).

12. CD-ROM #6/14 – Seminar #6, Volume 14, Futuristic Cost Est / Cost – Model for FAC & GSE – Next Generation Launch Vehicles, 10-12 PowerPoint presentations – October 14, 2003, July 2004.*

* Call for Delivery Schedule.

09/29/2005

EstSeminar Volume XVIII Page 45

Joseph A. Brown, CCE, President Con$truction Co$t Con$ultant, Inc. ____________________________________________________________________________________________ 1695 Vega Avenue, P.0 Box 540453, Merritt Island, FL 32954-3175 (321) 452-4909 Licensed July 1968 Certified Sept. 1976 AACE “Fellow” 1982 BBC 1959 - BCN Incorporated 11/7/96 AACE Int. 1967 Bidding Video – 1997 November 29, 2003 Ret. NASA 1/95 CD ROMs 1998-2002

New Index

CD ROM #2/10 – Update 1999 – Upadte 2004

Sensitive Cost Data – Facilities & GSE Cost Reports 1. Aerospace Cost Estimation Tools – Over 140 – P.P.T. – October 14, 2004 – 2. 53 Aerospace Cost Factors for Facilities, GSE, and Activation – P.P.T 3. Cost Control Construction, GSE, Projects 1. Ten (10) Tools, Estimates, P&S, Cash Flow, Contracts, Computers 2. GSE Cost Estimating Process – 18 Stages, 78 Ways 3. Cost control & KSC Shuttles, Facilities 4. 20 Cost Control Problems & 119 Solutions 5. Twelve Road Signs to Success or Bankruptcy 4. Change Order Cost Study – Prevention, Reduction, P.P.T. 5. KSC Computerized Cost Escalation Index – October 14, 2003 6. Aerospace Futuristic Cost Estimating for Facilities and GSE, Octobe 14, 2003 – Cost

Modeling and Preconceptional Estimating. 7. GSE Cost Estimating Requirements Budget Preliminary, Conceptuals 1. GSE Estimating Problems. 2. GSE Cost Estimating Tools, Secrets 3. How to Make Conceptual GSE Cost Estimates KSC Sensitive Construction and GSE Cost Data 8. GSE Shuttle Cost – 1384 Items - $190M – 117 pages 9. GSE Space Station Cost – 3146 Items - $32 M – 61 pages 10. JAB Abstract of Bid Costs Summaru – 1974 – 1977 - $1,215M – 7858 Bids – 107 pages See CD-ROM #2. Not Available (NA) 11. KIMS Report with Cost – Orbiter Inventory Report 4/1/91, $292,420,522 – 538 pages. See

CD ROM 32 (Not Available) (NA)

09/29/2005

EstSeminar Volume XVIII Page 46

12. USA / CSO GSE Report – USA Equipment & Property Management System – 7/31/98 – 4027 Items / Projects - $303,635,504 – 162 pages – See CD ROM #2 (NA)

13. Seminar Computer Problems and Answers BAP – Seminar Answer (Excel) BAP – Seminar Problem (Excel) 14. Canaveral District Office Corps of Enginers 1963 – 1965. 11 Pages – 207 Projects for $257,356,489 with Bid Dates for Escalation, Number of

Bidders, Low Bid, Government Estimate, Relationship of Low Bidder to the Government Estimate and Position of the Government Estimate

15. Miscellaneous Cost Data – G.C. – O.H. Rates, Cost Indexes, Real Property Cost 1996,

1997, 1998, 1999 (see CD ROM #2) (NA) 16. KSC CRV 06/29/99, #4,600,914,224 (See CD ROM #2) (NA) 17. Quick ROM Analysis Est. USA SFOC KSC Estimate Correct Replacement Value Facilities

GSE and Miscellaneous 7/7/99, $6,343,000,000. (See CD ROM #2) (NA) Copyright © 2004, Con$truction Cost Consultant, Inc., Joseph A. Brown, President. Government Publications not subject to copyright. This CD=ROM #2/10 is Sensitive Data and is available on a “need to know” basis only. List Price $999.00, plus 10%. Send Order Form & Justification Purpose.

09/29/2005

EstSeminar Volume XVIII Page 47

CCCI COST ENGINEERING CD ROM #7

CD ROM #7 VERSION 8 FEB. 4, 2003

FOR

SDE ESTIMATING BRIEFING – KSC COST ESTIMATING REQUIREMENTS FOR GSE & CONSTRUCTION FOR BUDGET/CONCEPTUAL – COST ESTIMATES/30%

DESIGN/90% FINAL DESIGN – 8.12 MB ITEM INDEX #1 GSDE – SDE Briefing Power Pt. 41 pages #2 Cost Escalation Program – GHE/GN2 Panel April 1976 to Nov. 2002 $23,200 to

63,351 ECBC #3 Design Costs GSS Briefing 9/17/02 GN2 Service Panel #4 KSC From 1510 GSE Template – GN2 Panel Budget #5 Cost Control Construction GSE Project Power Pt 41 pages #6 Construction Escalation Chart 1960 – 2002 JAB’s Vol. 3 #7 Contingencies Chart Why – JAB Vol. 1 #8 Escalation Only – Chart 1960 - 2002 #9 A. Other Composition Escalation Chart – 1960-1998

B. Other Composition Escalation Chart – 1960-1998 #10 Misc. chart anti-inflation Rd table. Vietnam, Orange County Court House – #11 Scan-In Volume VIII USA Cost Data Supplement, KSC Index, Oct. 21, 2002 –

Pages 1-127 – Desk Instructions, Ground Support Equipment Cost Estimating – July 2002, 34 Pages.

#12 Scan-In USA Cost Data Supplement KSC Index – OSB Cost Study Special Jan. 31, 2003 – 1-131 pages – OSB Study Pages 81-129.

#13 Office/Administration Support Building Cost Study Draft, 1/22/03 – Pages 1-75 – Please scan-in.

#14 NASA/KSC Quarterly Real Property Report Sept. 30, 202 – 33 Pages. Please scan-in.

Other References for briefing KSC Spec. G0003, G0002 Joseph A. Brown, CCE

09/29/2005

EstSeminar Volume XVIII Page 48

CD ROM #8 VERSION 2 AUG. 10, 2004 ACTIVATION & GSE COST ESTIMATING

File #1 Activation & GSE Estimating 1.9 MG PDF File 47.4 MG Power Point File July 15, 2003 – 46 Charts #2 Scan-In-Activation Aerospece Price Book Vol. XIII Updates from Oct. 2003 – with 190 Cost

Summaries, thru June 2004.\ #3 Scan-In Vol. XVI Cost Index Cost Data Updated Aerospace Price Book 30 Year Special Edition #4 Electronic Files of Construction Cost Summaries From Phil Kocol F5-209* #5 Electronic File of Vol. 13 From Documentum* #6 Electronic File of Vol. 16 From Documentum* #7 Electronic File of Separate Page 30-45 (Vol. 16) April 2004 Cost Alert From Documentum #8 Electronic File of Separate Page 150-170 Key Word Index and List of 150 Plus Aerospace Cost Estimating From Documentum #9 PK Excel Cost Summary File11 Pages TAB1 Construction Data by award date TAB2 Numerical

by ‘F’ numbers #10 PK Excel Material Cost Data #11. Sample Excel Activation Cost Estimating #12 Sample Excel Activation Template #13 Excel File APB Vol. 13 – Updated System Summaries Index – Unit Cost Per Classification XLS –

12/9/2003 #14 Scan-in KSC SPEC. G-0002 Compiling Construction Costs Estimates 9/27/1976 – 120 pages #15 Scan-in KSC SPEC-G-0002 Revision A Specifications for Compiling Construction Cost Estimates

Aug. 20, 1980. 85 pages #16 Scan-in TR1495 – KSC Estimating Orientation Nov. 2, 1976 40 pages 6-Summary Foldout

Charts #17 Electronic File Vol. 9 from Documentum #18 Miscellaneous File* Has 20 Excel Projects, & 4 word files, and cost alert power point. Source of much of this cost data is based on JAB Copyrighted Material *These files are to large to hyper-link, so close out HTM and look for yellow file folder by name. Joseph A. Brown, CCE President Construction Cost Consultant Inc. www.lobiddervideo.com e-mail [email protected]

09/29/2005

EstSeminar Volume XVIII Page 49

CD-ROM #18 INDEX

Cost Estimating Seminar #1. Introduction & Blue Print Reading JAB Vol. I Cost Estimating Seminar #2. Detail Cost Estimating Mech & Elec Estimating Pricing Bid Strategy, Labor Productivity, Conceptual Cost Estimating. JAB Vol. II Seminar 1,2,3 & 4 Power Point Presentations 1. Scanned in Estimating Vol. 1 Take Off Price Out Mark-Up (TO PO MU) 2. Detail Cost Estimating Vol. II Scanned in 3. Seminar one thru four – Power point presentation A. Seminar #1 – Dec. 2004 B. Seminar #2 – March 2005 C. Seminar #3 – June 2005 D. Seminar #4 – July, Aug. 2005 Future 4. Scanned in PSCOL drawings 12 sheets 5. LC39 VAB Vol. 33. Drawings, and abbreviations scanned in 6. File system summaries 1974 – 2004 CD-ROM 2004 Excel & PDF file 7. Key word index & 230 Estimating tools electronic file 8. Misc Files – 6 tenth rule, Kens e-mail comment 9. Computer Excel Templates 10. Major Power Point Presentation A. Introduction to Cost Estimating – 150 charts – in seminar 1 – 38.6 mg PDF & Power

point B. Cost Estimating tools – 1963 – 2050 Seminar II – 81 charts, Feb. 28, 2005 – 21.3 mg

PDF & Power Point C. Bidding strategies and cost engineering 19 mg – 138 lobidder ways – Seminar II – 128

charts Power Point D. Estimating labor productivity construction and design. Seminar II 75 charts 8.5 mg

Power Point E. Construction Cost Alert – Feb. 2005 – 7.7 mg 34 charts – Seminar III Power Point F. Concrete, rebar, form work, sample take off and pricing out estimate sheet 1.8 mg

Power Point G. CSI Div. 16 Electrical Estimating – 42 charts 1.1 mg March 2005 Power Point H. Ways to reduce Change Order Costs? Power Point These books, cost data, power by presentation etc. are based on Joe A. Brown/Con$truction Co$t Con$ultant Inc. Copyrighted Cost Data 1974 – 2005 Joe A. Brown, CCE President Con$truction Co$t Con$ultant, Inc., www.lobiddervideo.com e-mail [email protected]

09/29/2005

EstSeminar Volume XVIII Page 50

CD-ROM #19 INDEX Seminar #3: Cost Engineering Construction Management and Computer Estimating which covers

Cost Control, Planning and Scheduling, CPM, PERT – Microsoft Project, Value Engineering, Cost Escalation, Project Management, System Summaries, Change Orders, Prevention and Negotiations Manual and Computer Estimating, CAD Estimating CAD/AACE, and The Impact of CAD on Cost Engineering. 3 Seminars completed 7/22/2005.

1. JAB Volume #3 scanned in searchable color 324 pages “JAB’s Cost Engineering, Escalation,

CM, Cost Control CPM, PERT.”

2. JAB Volume #4 scanned in searchable color 310 pages “JAB’s Computer, CAD Estimating”

CAD/ACCE

3. Seminar #3 – Power point presentation June 2005 Misc. Lessons/Sessions 1 thru 9

4. Major Power Point Presentation Construction Cost Alert Feb. 2005, 7.75 mg

5. CAD Dev. Challenges 6.7 mg

6. CAD Estimating Part 1 4.6 mg

7. CAD Estimating part 1 17.4 mg

8. Construction Management/Cost Engineering 2.9 mg

9. Estimating Introduction 130 charts – 26.4 mg – “Construction Problems”

10. OCCC – Cracked Truss Co. 13.3 mg Cast Study

11. Orlando Airport – 6.9 mg (MIA #1) Case Study

12. “Cost Escalation & Labor Productivity What We Did About It” 7.66 mg

13. Value Engineering 2.66 mg

14. System Summaries 3.83 mg P.P.

15. System Summaries 4.45 mg PDF

16. Shuttle Cost Control 11.52 mg

17. Excel Computerized Cost Escalation Program 8/11/05 135 KB

18. SFOC Generic Schedule MS Project 2000 Template

19. Searchable Key Word Index 10 ways – Word and/or PDF

20. Misc. Other Files

These books, cost data, power point presentation etc. are based on Joe A. Brown/Con$truction Co$t Con$ultant Inc. Copyrighted Cost Data 1974 – 2005 Joe A. Brown, CCE President Con$truction Co$t Con$ultant, Inc., www.lobiddervideo.com e-mail [email protected]

09/29/2005

EstSeminar Volume XVIII Page 51

LOW BIDDER VIDEO/BOOKS/CD ROM ORDER FORM A new exciting 60-minute video: “How Does The Low Bidder Get Low and Make Money?”; over 85 ways low bidders got low and made money for offices, warehouses, churches, schools, big buildings, tunnels, pipe lines, and aerospace facilities with fifteen keys to successful bidding and construction. A. Video/Book/CD ROMs Order Form 1. “How Does The Successful Low Bidder Get Low and Make Money?” 60 min. video - $350 List Price +10% 2. Video/Book - “110 Ways Low Bidder Got Low” - Vol. VII - $99 List Price + $31 S&H = $130 3. “JAB Estimating Intro” - T.O. - P.O. - M.U. Steps, Methods - Vol. I - $99 List Price + $31 S&H = $130 4. “JAB - 33 Ways to BFC Estimating - Arch. Structural M & E - Vol II - $99 List Price + $31 S&H = $130 5. “JAB Cost Engineering Escalation and CM” - Seminar Book - Vol. III - $130 6. “JAB Computer CAD Estimating” - 39 Steps -Vol. IV - $99 List Price + $31 S&H = $130 7. “JAB Aerospace Cost Estimating” - Construction and GSE - Vol. V - $90 8. PSCOL - Drawing Set - 1/2 Size 17 x 24 - Site Arch. Struct. Mech., Elec. - 12 sheets - $61 List Price 9. “JAB’s Best of 6 Volumes” – Mini Compact Seminars Vol. IX 2000 - $129 10. List of “JAB’s 80 Estimating Tools” – Free – Send Stamped Self-Addressed Envelope 11. List of “138 Low Bidder Ways” - $20 + $10 Shipping & Handling (includes 6 story office bldg summary 12. CD ROM – 8 Volumes – JAB’s Workbooks - $350. + $10 S&H includes EXCEL, MSWORD, & MS Projects 13. CD ROM #1 -Aerospace Historical Cost Data –Construction & GSE –1700 pages -$130 14. Restored Movie/Video “The Big Challenge,” 28 mins. $25 + $22 S&H (VAB Construction) A Video = $47 15. CD-ROM #2/10 Updated 2003/04; 7/8 PowerPoint & cost sensitive; Fac., and GSE Reports - $1,000+10% *Limited, need to know – “e-mail” me for index and purposes. * 16. CD-ROM #9 – Mini Seminar #5 – (2002) 8 pp & Vol 9 & 7, & KSC Historical Cost Data $500 + $50.* 17. CD-ROM #14 – Semi. #6 – Aerospace Future Fac. & GSE Cost Estimating – 8 pp & Vol 9 & 7 $400 + $50 * 18. Book Vol. 14, Seminar #6, Aerospace Futuristic Fac. & GSE Cost Estimating, some color - $400 BW $200 + 10% 19. DVD 150 Estimating Tools, Video, “Cost Engineering Bid Strategy” 2004 - $500 + 10% * 20. Other: *Call for Delivery Time_______________________________________________________________ B. My purpose for buying or recommending: Cost Analysis Cost Engineering Seminars Teaching Estimating Construction Students Contractor Education Aerospace C. Please send Brochure __Add me to your mailing list for new videos, books, & CD-ROMs__ DVDs__ Software JAB Student Discount must Show Date, Place, and Course Title _________ Check /M.O. for __enclosed. Educators/students show colleges, university courses, etc, for special ___ Thank you for your Order and/or Survey. Name: ______________________________Occupation: _______________Learned of Video from: ENR Special Address: _____________________________Title: ______________________ AACE Int. ABC City: ________________________________Company: _________________Website: www.lobiddervideo.com State/Zip:____________________________Type of Business: ____________SCEA “E Bay” College or University: __________________Phone: (_____)______________Joe Brown Letter Location: ____________________________ Other ________________

1. Please Mail to: Do Not Write in Box Below Make Check or Money Order payable to: Con$truction Co$t Con$ultant, Inc. Joseph A. Brown, CCE, President 1695 Vega Avenue – P.O. Box 540453 Merritt Island, FL 32954-3175 (321) - 452-4909

Date Received:________ _____ Order No.: ___________ CK: M.O. AMT: ______________ Cleared Date:____________ SeminaDate:_____________ Mailed Date: ____________ Seminar Place:____________ Priority Mail: ___________ Seminar Proposal:__________ Workbook Index:___________ Other: _________________ Video Book: ______________________________________

Websites: www.lobiddervideo.com & email: [email protected]

09/29/2005

EstSeminar Volume XVIII Page 52

INDEX OF SYSTEM SUMMARIES FROM AEROSPACE PRICE BOOK – VOLUME III

JAB INDEX

NO.

APB

INDEX VOL. 3

TITLE

LOW BID

GOV. EST. OR C.O.C.

BID DATE

1 1 Runway – NASA Space Shuttle Landing Facility $21,812,737 3/5/74 2 2 OPF #1, Phase #1, 52,800 SF ($9,500,146 8,500.128 5/14/75 3 3 OPF #2, 29,200 SF ($3,926,600 Bid) c.o.c. 4,143,706 4/29/76 4 7 Orbiter Mate/Demate, 225 ton steel c.o.c. 1,942,238 3/10/77 5 19 Shuttle Payload VPF, 120’ x 150’ x 121’ High 3,230,112 4/26/78 6 23 Pad B, Shuttle Mods 17,195,000 6/23/78 7 27 RSS/PCR Mods – Pad LC-39B, Task II 17,690,000 6/6/79 8 37 OPF Activation Mods – New Platform – OPF 2 3,963,722 11/25/80 9 42 SRB Rotation Processing Facility 35,216 SF 7,912,762 3/23/82 10 55 Refurb L02, LH2 Tanks LC-39B 102,625 12/2/82 11 56 Payload Canister, #2, 64” – 6” LG, X 21” W X 22” H $45.80/CF 1,364,794 1/25/83 12 64 LETF Support Contractors - $10,898,764 LB 11,921,174 5/16/83 13 69 Multi-Function Facility 1,588,172 6/1/83 14 76 PGHM Front End Facility - $370,674 - $1,153,321 429,905 6/30/83 15 78 Shuttle – Piping, Cabling & Equip Pad B ($19,947,794 c.o.c.) 11,`63,951 7/26/83 16 84 PGHM – Pad B ($3,932,574 c.o.c.) 2,730,285 8/25/83 17 87 Construction & Mod of MLP #3 – Park Site Utilities 14,802,569 11/16/83 18 92 Flare Stacks – GH2 System LC-39 A & B 555,532 5/1/84 19 95 SRB Assembly & Refurb Facility Design Build c.o.c. 25,188,000 5/15/84 20 100 Cargo Hazardous Servicing Facility 7,955,287 9/24/84 21 106 Centaur Payload Operations & Control Center, Phase I 2,994,000 10/31/84 22 107 Centaur Payload Operations & Control Center, Phase II 3,849,225 2/20/85 23 109 Lockheed/SPC Logistics Facility – 333,400 SF 16,390,000 11/15/84 24 122 OMRF Bids Section Bidders and Unit Prices c.o.c. 11,948,974 1/22/86 25 123 OMRF Orbiter Mod & Refurb Facility 3,049,975 CF 3.94 CPCF 1/22/86 26 142 Operation Support Building (OSB) 6 – Story, 299,954 SF neg. 20,950,000 7/7/87 27 142 Operation Support Building – Floor Plan, Elevation c.o.c. 25,207,294 1/31/92 28 172 SRMS High Energy X-Ray Facility 2,006,333 7/19/88 29 215 OMRF Second 30-Ton Bridge Crane 893,048 4/23/90 30 227 Canister Cleaning & Rotation Facility 120’ X 60’ X 141’ 5,682,926 6/25/90 31 229 Processing Control Center – Design/Bldg Tilts up 8,924,000 6/25/90 32 237 Four-Lanning Kennedy Parkway, SR-3 – 37,179 SY Paving 1,403,580 10/19/90 33 239 VAB 325-Ton Crane 174” span – 462” Hook Height 15,473,884 10/22/90 34 295 ASRM Mods to High Bay 1 & 3 – 10 work platforms (adj. Gov. est) 6,900,000 4/2/92 35 296 ASRM Mods to High Bay 1 & 3 – 10 work platforms 6,990,000 4/2/92 36 341 Rotation Processing & Surge Facility 200’ x 122’ X 122’ H 9,703,854 11/92Not

Bid 37 342 Rotation Processing & Surge Facility 200’ X 122’ x 122’ H 9,703,854 11/92

Not bid 38 365 Component Refurb Facility – 3434 M2 Phase I (Ave. bid

$8,091,403) 7,851,155 1/19/95

39 366 Component Refurb Facility – 3434 M2 Phase I (Ave. bid $8,091,403)

7,851,155 1/19/95

40 376 Repair Flame Deflector, 58’ X 39’ (gov. est.) 606,856 7/6/95 132 250 SSPF Vol V. 466,558 SF, low bid $56,215,000 c.c. 62,914,512 1/23/91

09/29/2005

EstSeminar Volume XVIII Page 53

09-3-98 Homework Answers to Dec 1998 Ref. # Low Bid Bid Date Orig Date

Factor Dec 98 Factor

Dec 98 Equiv Bid

% Increase

1 $21,812,737 3/5/74 2000 6245 $68,110,271 312.25% 2 $8,500,128 5/14/75 2461 6245 $21,569,809 253.76% 3 $4,134,706 4/29/76 2599 6245 $9,935,067 240.28% 4 $1,942,238 3/10/77 2721 6245 $4,457,654 229.51% 5 $3,230,113 4/26/78 2939 6245 $6,863,576 212.49% 6 $17,195,000 6/23/78 2963 6245 $36,241,234 210.77% 7 $17,690,000 6/6/79 3239 6245 $34,107,456 192.81% 8 $3,963,722 11/25/80 3646 6245 $6,789,206 171.28% 9 $7,912,762 3/23/82 3674 6245 $13,449,972 169.98% 10 $102,625 12/2/82 3878 6245 $165,264 161.04% 11 $1,364,764 1/25/83 3897 6245 $2,187,054 160.25% 12 $11,921,174 5.16/83 3919 6245 $18,996,614 159.35% 13 $1,588,172 6/1/83 3936 6245 $2,519,851 158.66% 14 $429,905 6/30/83 3936 6245 $682,103 158.66% 15 $11,163,951 7/26/83 3973 6245 $17,548,169 157.19% 16 $2,730,285 8/25/83 3972 6245 $4,292,706 157.23% 17 $14,802,569 11/16/83 4023 6245 $22,978,835 155.23% 18 $555,532 5/1/84 4105 6245 $845,139 152.13% 19 $22,831,871 5/15/84 4105 6245 $34,734,479 152.13% 20 $7,955,287 9/24/84 4152 6245 $11,965,503 150.41% 21 $2,994,000 10/31/84 4153 6245 $4,502,174 150.37% 22 $3,849,225 2/20/85 4148 6245 $5,795,181 150.55% 23 $16,390,000 11/15/84 4158 6245 $24,616,534 150.19% 24 $11,948,974 1/22/864 4179 6245 $17,856,268 149.44% 25 $3.90 1/22/86 4179 6245 $5.83 149.44% 26 $20,950,000 7/7/87 4333 6245 $30,194,496 144.13% 27 $69.34 7/7/87 4333 6245 $99.94 144.13% 28 $2,006,333 7/19/87 4333 6245 $2,891,657 144.13% 29 $893,048 4/23/90 5001 6245 $1,115,194 124.88% 30 $5,682,926 6/25/90 4980 6245 $7,126,480 125.40% 31 $8,924,000 6/25/90 4980 6245 $11,190,839 125.40% 32 $1,403,580 10/19/90 4827 6245 $1,815,902 129.38% 33 $15,473,884 10/22/90 4827 6245 $20,019,558 129.38% 34 $6,990,000 4/2/92 5067 6245 $8,615,068 123.25% 35 $6,990,000 4/2/92 5067 6245 $8,615,068 123.25% 36 $9,703,854 11/1/92 5088 6245 $11,910,489 122.74% 37 $9,703,854 11/1/92 5088 6245 $11,910,489 122.74% 38 $7,851155 1/19/95 5550 6245 $8,834,318 112.52% 39 $7,851,155 1/19/95 5550 6245 $8,834,318 112.52% 40 $606,856 7/6/95 5693 6245 $665,697 109.70%

09/29/2005

EstSeminar Volume XVIII Page 54

2. New Exciting IT, Tool #16 2.1 Searchable – Files, Index, Tools Now with 255 tools, and over 20,000 pages of $222 Billion cost data and the new CEV and space exploration program to the moon and mars this tool is even more important. Tool #254 or new exciting tool #16 goal is to help search for Information Technology (IT)/Data, Cost, In many new ways, such as:

1. By key word index pages 4, 5, and 6

2. By list of over 250 tools pages 7 to 25

3. By reviewing 21 books & CD-ROM indexes pages 28 to 50

4. By MS word search “Control F”

5. By excel search “Control F”

6. By special excel search p 22-23 of key word index special aerospace cost search

7. By hyperlink – keywords, system summaries and abstract of bids

8. By special direction notes where to find data, programs, CD-ROM DVDs

9. By calling Joe A. Brown JAB 321-452-4909 – 321-264-8419

10. By ‘E’ mailing JAB [email protected]

11. Visit JAB/lobidder Web Site http://www.lobiddervideo.com/

See back cover and note “Estimating Tools” on home page (free) and under CD

ROM “read more” technical paper on Computerized Cost Escalation” is also free.

12. Note on tools bars binocular, search and find

13. By Wild Card?*

14. By Filters, GSE, Building, etc.

15. By Sorts

16. By Matrix Index – APB Volume 3 System Summaries

17. Excel Search – Go to data, then filter, then auto filter click on down arrow

example, B project classification then select category see pages 55 and 56 for

example

18. For Aerospace Unit Cost Data pages 57 – 83, assemblies from Aerospace Price

Book (APB) Volumes 1, 2, & 3 Cost per ton, SF, LF, SY CY, Hour, etc.

Note: Estimating templates are on CDs - #3, 9, 12, 18, 19, 20 System summaries on CD #1, 3, 12, 18 GSE secret reports on CD-ROM #2, & 2/12.

09/29/2005

EstSeminar Volume XVIII Page 55

Excel Application Search / Filtering Process

09/29/2005

EstSeminar Volume XVIII Page 56

Excel Application Search / Filtering Process

Down Arrow

CategoriesForSelection

Down ArrowDown Arrow

CategoriesForSelection

09/29/2005

EstSeminar Volume XVIII Page 57

ABBREVIATIONS (Common to J.A.B. Estimating)

Square Foot SF Welded Wire Mesh WWM Lineal Foot LF Welded Wire Fabric WWF Per / 3 Ply Built-up Tar & Gravel 3 Ply BUT&G Cubic Yard CY Tongue & Groove T&G Cubic Foot CF On Center OC Plus or Minus ± Pressure Treated PT Square Foot Contact Area SFCA Centerline CL Each EA Plate PL Piece PC Foot ‘ Block B,BK,BLK Inches “ Brick BRK Length L Tons T Width W 1000 Board Foot MBF Height H 100 Square Foot SQ Base B Pounds Lbs Triangle Δ Number # Circle Hardware Sets Sets At @ Pair Doors PR Architect/Engineer A/E Anchor Bolts AB Assoc. General Contractors AGC Hour Hr Assoc. Building Contractors ABC Man-Hour MH American Inst. of Architects AIA Pounds per Square Foot PSF Critical Path Method CPM Lump Sum LS Estimated Construction Bid Cost ECBC Gallon Gal Subcontractors Subs Reinforcing Steel REBAR American Assoc. of Cost Eng. AACE Percent % American Society of Professional Concrete Conc Estimators ASPE Aluminum Alum Construction Specification Institute CSI Vinyl Composition Tile VCT Kennedy Space Center KSC Vinyl Asbestos Tile VAT American Society of Testing Materials ASTM Acoustical Tile AT Propellant System Components Propellant System PSCL Office Laboratory PSCOL Components Laboratory Design Engineering D.E. Construction Management CM Double Entry D.E. Design Build DB United Space Alliance USA Design Bid Build DBB U. S. Dollars $ Ground System Design Eng. GSDE Ground Support Services GSS Association for Advancement Program Evaluation Review Technique PERT of Cost Engineering AACE Personal Computer PC Ground Support Equipment GSE Joe A. Brown CCE J.A.B. Facilities FAC Next Generation Launch Technology NGLT Facility Ground Operation Analysis

FGOA Next Generation Launch Vehicle Society Cost Estimating/Analysis

NGLV SCEA

Aerospace Price Book APB Orbiter Space Plane OSP Crew Excursion Vehicle CEV Construction Specification Institution

CSI Cover Your Bottom CYA

Abbreviations are important in learning estimating and should be memorized, as in learning a new language. Some other more common abbreviations and symbols are listed in Building Construction Cost Data by R. S. Means and also in The Building Estimator’s Reference Book by F. R. Walker. In the construction of the Vertical Assembly Building, the A/E (URSAM) used a whole volume of drawings (LC-39 Volume 33) for general notes and symbols because of the many different people involved in the construction, to ensure that they had the same meaning for their abbreviations.

09/29/2005

EstSeminar Volume XVIII Page 58

CD-ROM #20 INDEX Seminar #4: This seminar is titled: Aerospace Construction & GSE Cost Estimating covering

Government Contractors & Aerospace Estimating & Bidding Estimating Overview, 50 Tools & Spin-Offs, Ground Support Equipment Costs & Installations & Estimating Specification, Cost Analysis, KSC Cost Index, Escalation, and Use in Conceptual Estimating & Computerized Excel 1510. SSPF Analysis & GSE, Low Bidding & Analysis. Including Activation Cost Estimating, Fiber Optics Costs and Pneumatic Remote Control Panels. 3 Seminars completed 9/22/2005. (AACE worth 2.4 recertigication credits*).

1. JAB Volume 5 scanned in searchable color 334 pages “JAB’s Aerospace Government &

Contractors Estimating.”

2. JAB Volume 6 scanned in searchable color 374 pages “JAB’s Aerospace Indexes & Cost Data.”

3. Seminar #4 – Power point presentation June August & September 2005 Misc. Sessions –

Agenda, searchable.

4. Major Power Point Presentation “21 New Exciting Tools.” 11.5 mg – 113 Charts.

5. Florida LOG – “53/71 Cost Factors for Facilities, GSE, & O&M” 9.0 mg – 28 Charts.

6. Aerospace Cost Estimating Tools over 240 19.8 mg 80 Charts.

7. “Aerospace Activation Cost Estimating” part 3 48.5 mg 50 Charts.

8. “GSE Cost Estimating Requirements” part 2 44.0 mg 50 Charts.

9. “Ground Support Equipment Cost Estimating” Part 1 – 2.97 mg – 34 Charts.

10. “Government Computerized Cost Index for Logistics” Excel Program 1974 – 2020 1.37 mg 45

Charts.

11. Excel Computerized Cost Escalation Program 8/11/05 135 kb – 1974 – 2020.

12. SFOC General Schedule M.S. Project 2000 Template.

13. Searchable Key Word Index P.D.F. – 85 pages.

14. Attendence Charts Seminar 1-4.

15. Template Excel Word 28 – 2.2 mg.

16. Final Exam - Answers

17. Shuttle Cost Control 11.5 mg

18. Where is my dozer 692 kb - GSE

19. Misc. Other Files

These books, cost data, power point presentation etc. are based on Joe A. Brown/Con$truction Co$t Con$ultant Inc. Copyrighted Cost Data 1974 – 2005 Joe A. Brown, CCE President Con$truction Co$t Con$ultant, Inc., www.lobiddervideo.com e-mail [email protected]

09/29/2005

EstSeminar Volume XVIII Page 59

AEROSPACE CONSTRUCTION PRICE BOOK FIRST QUARTERLY UPDATE (Assumed Data Date 6/15/1992)

TABLE OF CONTENTS PAGE CIVIL UNIT PRICES - ENGLISH/METRIC 1 - ARCHITECTURAL ASSEMBLY SHEETS 7 - DEMOLITION OF SLAB & REHAB OF AREA 6 INCH REINF. CONC. W/THICK EDGE, 5,000 SF 1 DEMOLITION CONCR. MASONRY WALLS ( CAVITY) 40' X 80' X 9' HIGH, 2,160 SF OF WALL 2 DEMOLITION REINFORCED SOLID CONCRETE FOUNDATION 3 TYPICAL SINGLE-WIDE TRAILER RELOCATION 4 SINGLE WIDE TRAILER MOVE - RELOCATION AND NEW HOOKUPS - LOW COST 5 SINGLE-WIDE TRAILER MOVE - RELOCATION AND NEW HOOKUPS - HIGH COST 6 DEWATERING - SMALL JOB EXCAVATION 14' X 17' X 25 7 HORIZONTAL DEWATERING 24,400 SF 8 EXCAVATION - TRENCH HAND AND MACHINE 9 ORDNANCE BLDG. LC-39 - BORROW FILL BUILDING OR SITE FILL 10 FILL UNCLASSIFIED BORROW PIT (ORBITER LANDING VIEWING SITE 11 POWER DISTRIBUTION SYSTEM MSBLS T3-T4 BACKHOE EXCAVATION 12 JACK AND BORE PIPE UNDER ROAD BORING 36" DIA. PIPE 13 JACK & BORE ROADWAY 12 INCH PIPE 14 LIME ROCK BASE FOR PAVING ROAD & PARKING 15 STORM DRAIN REINFORCED CONCRETE PIPE STORM DRAIN 1200 LF 16 STORM DRAIN SYSTEM - OPEN TRENCH 1000 LF, 8' BOT, 12' TOP, 6' DP 17 CHAIN LINK FENCE FENCE 300 X 600 AREA 18 GRASS - SEED & MULCH SEED & MULCH 1 ACRE 19 STRUCT. STEEL BLDG (LG JOB) COMPLEX FABRICATION 1 ACRE INC. FINE GRADE & WATER 20 PAVE ROADS & PARKING INCL. FILL & DITCHES BIT. PAVING 21 CONCRETE FOR 6 INCH SLAB WITH THICK EDGE 22 CONCRETE WALLED TRENCH WITH SUPPORT BLOCKS AND GRATING 23 FONDU FYRE COATING/MODS TO LAUNCH PADS MODS TO LAUNCH PADS 24 LIGHTWEIGHT INSULATION CONCRETE ROOF SLAB 25 STRUCT. CONC. PIERS, BEAMS, COLUMNS, 12" X 12" INCL. FORMWORK 26 FORMWORK - ELEVATED FLOORS 27 PRESTRESS ROOF SYSTEM DOUBLE TEE, 50' X 100' BLDG 50 LB LIVE LOAD 28 VIBERPROOF NON-SHRINK GROUT 29 STRUCTURAL STEEL-LARGE JOB 3000+ TONS AVG. COST MATERIAL FORM WAREHOUSE 30 STRUCTURAL STEEL-LARGE JOB 3000+ TONS AVG. COST FABRICATION 31 STRUCTURAL STEEL-LARGE JOB 3000+ TONS AVG. COST FIELD ERECTION 32 5A STRUCTURAL STEEL SERVICE STRUCTURES MAT. FROM WHSE. 1-36 33 5A STRUCTURAL STEEL SERVICE STRUCTURES FABRICATION 34 5A STRUCTURAL STEEL SERVICE STRUCTURES FIELD ERECTION 35 STRUCT. STEEL BLDG (LG JOB) COMPLEX FABRICATION STRUCT. STEEL, MATERIAL FROM MILL 36 STRUCT. STEEL BLDG (LG JOB) COMPLEX FABRICATION FABRICATION 37 STRUCT. STEEL BLDG (LG JOB) COMPLEX FABRICATION FIELD ERECTION 38 ROOF STRUCTURAL STEEL 39 14 GA. GALV. DECK "Q" DECK PLATFORM FLOOR GALV. DECK O&C TEST STANDS 40 ALUMINUM DECK 1/4" RAISED PATTERN 3.7 LB/SF, 500SF 41 METAL SIDING, FRAMING & DRYWALL 42 MECHANICAL UNIT PRICES - ENLGISH/METRIC

09/29/2005

EstSeminar Volume XVIII Page 60

Vol I Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

xxi-li 1A Description 01002 Index Space Shuttle Facility Construction Bids 7,179 91,619,7011 - 19 1A 533 Projects 01002 0.00 0.0020 1B General Conditions. 01002 Florida Sales Tax Requirements for GSE & Const. 0.00 0.1021 1B General Conditions. 01002 Wage Rates PT&I - Avg. 45% 0.39 0.9822 1B General Conditions. 01002 Wage Rates PT&I - Home Office Avg. 23% 0.24 0.3723 1C General Conditions. 01002 Overhead & General Condition - Avg. 10 - 15% 0.13 0.4124 & 25 1C General Conditions. 01002 Historical Budget cost - Warehouse - Complex 2.54 CF 24.84 CF24 & 25 1C General Conditions. 01002 Control Center 61.28 SF 887.97 SF26 -32 1D Graphs 02002 KSC Monthly Construction Cost Index 1974 to 1991 3,260 7,93733 -36 2D Civil Unit Price 02002-1 Civil Unit Prices English/Metric - Excavation, Fill, Pipe, 0.00 0.00

Civil Unit Price Thru 4 Fencing, Stabilization, Headwalls, Drainage 0.00 0.00Civil Unit Price Paving, Traffic Signals, etc. 0.00 0.00

37 2A Demolition 02050-1 Demolition of slab (no rehab of area) 171.29 CY 3.88 SF38 2A Demolition 02050-2 Demolition of slab and rehab area 179.26 CY 4.06 SF39 2A Demolition 02050-3 Demolition - Conc. masonry walls (cavity) 3.29 CF 2.20 SF40 2A Demolition 02050-4 Demolition - Drywall/steel stud 10 SF 2,363 EA 2.36 SF41 2A Demolition 02050-5 Demolition - Reinforced solid conc. Found. 11,526 EA 230.52 CY42 2A Demolition 02050-6 Demolition - Asbestos. Removal. Bid 2-24-82, 6,000 SF 6.13 SF 36,773 EA43 2A Demolition 02050-7 Heavy Equipment Are Restoration 171,955 EA 47.69 CY44 & 45 2A Trailer Relocate 02051-1&2 Single wide, move, set-up AC, elect., steps-deck 10.68 SF 6,407 EA46 2A Trailer Relocate 02051-3 High & low Costs 2,934 EA 14,342 EA47 2A Demolition 02051-4 Relocation of Bldg. from LC 39a to LC-39b 27.69 SF 138,439 EA48 & 49 2A Demolition 02051-5&6 Move and alteration cost estimate guide (FC54) 8.31 LF 105.94 LF50 & 51 2A Rental 02051-7&8 Equipment Rentals 13.04 WK 12,713 WK52 2A Site Work 02210-1 Re-grade Ransom Road 220,119 EA 27,514 Acre53 2B Site Work 02229-1 Earth work clearing and grubbing - Easy-Hard 2,011 Acre 5,814 Acre54 2D Site Work 02229-2 Dewatering (excavate) KSC 1A Heating Sys, Rehab. 4,503 EA 45.03 LF55 2D Site Work 02229-3 Dewatering Large Job 43,467 EA 8.69 LF56 2D Site Work 02229-4 Dewatering portion (LC-39) pot. Water sup 5220 LF 78,001 EA 14.95 LF57 2D Site Work 02229-5 Horizontal Dewatering 26,168 EA 1.08 SF58 2D Site Work 02229-6 Horizontal well dewatering (SSPF) 107,118 EA 16.69 LF59 2D Site Work 02229-7 Excavation (machine, hand) 8.30 CY 59.73 CY60 - 61 2D Site Work 02229-8&9 Fill- Unclassified borrow pit, Ordnance Building. 11.70 CY 46,805 EA62 2D Site Work 02229-10 Fill- Unclassified borrow pit, Orbiter Landing 7.55 CY 12.04 CY63 2D Site Work 02229-11 Backfill - Compacted w/vibrator plate 10.25 CY 3.42 SF64 16V-40 Trench 02229-12 Power distribution system MSBLS, ditch witch 20.45 CY 1.01 LF65 16V-40 Trench 02229-13 Power distribution system MSBLS, back hoe 27.23 CY 2.71 LF66 16V-40 Trench 02229-14 Excavate & backfill trench 6" X 24" X 5000 LF 1.43 LF 38.76 CY66A Dredging 02229-15 Dredging under 50,000 CY 20.98 CY 150,475 Acre67 Dredging 02229-16 Barge Terminal Facility 651,229 EA 13.02 CY68 16V-40 Trench 02229-16 Cable trench - S-Band 5.90 LF 13.04 LF

Index to Volume 1 JAB Price Book

Glenn Butts Volume XVIII Page A-1

Vol I Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

69 2D Site Work 02229-17 Re-grade Road Landfill 261,211 EA 10.82 CY70 2D Site Work 02284-1 Orbiter Landing Viewing Stand - Basic 750' 13.36 CY 18.53 CY71 Jack & Bore 02284-2 Jack & Bore Pipe Under Road 88,852 EA 288.48 LF

72 2D Crushed Rock 02287-1Soil Cement 18870 Sy Fill & Drain, 6" soil cement Bit Seal $411,307 23.01 SY 35.53 SY

73 2Q Crushed Stone 02289-1 Lime Rock Base for Paving Road & Parking 22.04 ST 2.44 SF74 2GKH Piling 02345-1 OPF piling wood conc. St. 8" conc. Piling 14"sq 28.82 LF 55.02 LF75 2HK Piling 02364-1 Pad B piling conc. - steel 14" - 16" Rd 64.48 LF 75.69 LF76 2HK Piling 02364-2 Pad B piling 12" X 12" concrete 34.75 LF 45.44 LF76 2HK Piling 02364-2 OMRF - 500 LF Precast 0.0076 2HK Piling 02364-2 OMRF 14" Precast concrete 5000LF 26.70 LF 53.60 LF76 2HK Piling 02364-2 OMRF 12" conc. filled steel pipe 1800LF 45.18 LF 94.24 LF76 2HK Piling 02364-2 OMRF 14" auger cast pile 23,500 LF 14.37 LF 32.09 LF*77 2V Drainage 02435-1 Storm drain reinforced concrete pipe 1200 LF 41.92 LF 50,294 EA78 2V Drainage 02435-2 Storm drain system - open trench 1000 LF 7.32 CY 156.27 LF79 2V Drainage 02435-3 Storm drain corrugated. Metal pipe 1000 LF 40,608 EA 40.61 LF*80 Jack & Bore 02435-4 Jack & Bore roadway 145,053 EA 1,451 LF*81 Fence 02444-1 6'H chain link fence, 300'X600' area-w/barb wire 18.89 LF 3.15 SF81 2V Fence 02444-1 6'H Chain link fence w/ razor tape 300' x 600-OH 38.45 LF 6.42 SF81 2V Fence 02444-1 7'H X Extra-strong w/barb wire 300'x600' area 20.37 LF 2.92 SF81 2V Fence 02444-1 4'W X6"h personnel gate 391.15 EA 96.99 LF81 2V Fence 02444-1 45'W X 6'H access gate, sliding 4,400 EA 96.99 LF81 2V Fence 02444-1 45'w X 6'H motor operated gate 17,276 EA 383.92 LF82-83 2V Fence 02444-2 Man barrier fence, curved posts, 18'3" high/gate 86.72 LF 285.22 LF*84 2T Seeding 02485-1 Grassing - seed and mulch 6,896 Acre 1.45 SY*85 2T Topsoiling 02485-2 Grassing - sod, 14,428 acre 5.36 SY 0.60 SF86 2A Tunnel/Tow way 02511-1 Tow way Crossing, VAB Area 91'L X 40'9"W X 8"DP 1,990 LF 449.45 CY*87 2P Paving 02513-1 Paving System - Roads and Parking 36.74 SY 4.07 SFRef 02613 2E Excavate & Fill (02613) Earthwork for paving road and parking 13.58 SY 1.52 SF87 2Q Paving 02513-1 Sub-base 3" for paving road and parking 6.23 SY 0.68 SFRef 02289 2Q Crushed Stone (02289) Lime-rock base for paving road and parking 22.04 SY 2.44 SF88 2P Paving 02513-2 1-1/2" Bit. Asphalt for paving roads & parking 6.37 SY 0.70 SF89 2P Paving 02513-3 Resurface Section of NASA Parkway 43,950 SY 7.38 SY 88.19 TON90 2P Paving 02513-4 Resurface section of NASA Parkway-Bid Abstract 6.63 SY 73.72 TON91 2P Paving 02513-5 Kennedy Parkway Paving - North Lane 6.98 SY 8.74 SY92 2P Paving 02513-6 Road Mods to SRB Area196,075 SY 4,402,552 EA 22.46 SY93 2P Paving 02513-7 Resurface SLF Runway Overrun for FOD Control 553,762 EA 8.26 SY94-99 2P Paving Canaveral National Seashore Project 6,385,249 EA 9,420,295 EA94 02513-8 Tabulation of Major Bid Items 824,965 MI 1,140,366 MI

Site work 02110 Clear & Grub 6.8 ACRE 5,541 Acre 32,596 Acre95 Demolition 02051 Remove Railroad Track, 4 MI 73,341 MI 130,385 MI95 Demolition 02051 Remove 36" Pipe, 1,137 LF 5.43 LF 48.89 LF95 Demolition 02210 Roadway Excavation, 56,550 CY 4.56 CY 11.41 CF

Glenn Butts Volume XVIII Page A-2

Vol I Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

95 Temp. Controls 01500 Silt Fence 37,930 LF 0.57 LF 3.26 LF95 Temp. Controls 01500 Floating Silt, 17,335 LF 7.25 LF 11.41 LF95 Paving 02513 Hot asphalt conc., 1,800 TON 66.82 TON 81.67 TON95 Paving 02286 Ballast, 18,500 TON 37.57 TON 40.75 TON95 Paving 02293 Lime rock Base, 29,395 TON 27.71 TON 37.49 TON95 Site work 02286 Stabilization Sub grade, 72,500 SY 2.85 SY 4.56 SY95 Site work 02287 Railroad Sub base, 23,500 SY 2.04 SY 5.70 SY95 Site work 02296 Temporary Road, 179 STA 361.82 STA 1,630 STA95 Site work 02286 Stabilized Soil, 175 SY 8.15 SY 16.30 SY96 Drainage 02435 15" AL Pipe Culvert, 125 LF 32.60 LF 65.19 LF96 Drainage 02435 24" AL Pipe Culvert, 185 LF 42.38 LF 81.49 LF96 Drainage 02435 42" AL Pipe Culvert, 1,970 LF 81.49 LF 97.79 LF96 Drainage 02435 6" PVC Perforated Pipe, 21,800 LF 14.67 LF 32.60 LF96 Security 02444 Chain Link Fence, 220 LF 19.56 LF 31.78 LF96 Carpentry 06100 Wood Fence, 2 Rail, 230 LF 9.78 LF 24.45 LF96 Carpentry 06100 Wood Gate, 5 EA 325.96 LF 1,356 LF96 Carpentry 02444 22' Chain Link Double w/Operator 8,149 EA 22,980 EA96 Carpentry 02444 8' Gate, Double 8" Swing 928.99 EA 1,467 EA97 Sidewalk 02580 Conc. Sidewalk, 215 SY 26.73 SY 37.49 SY97 Curb/Gutter 02528 Conc. Curb, 380 LF 8.96 LF 16.30 LF97 Site work 02287 Conc. Riprap in Bags, 50 CY 195.58 CY 431.90 CY97 Grass/Seed 02485 Seed & Mulch, 16.8 ACRE 1,630 Acre 2,608 Acre97 Trees/Plants 02490 Yellow Jasmine, 665 EA 7.33 EA 31.21 EA97 Trees/Plants 02490 Dwarf Holly, 110 EA 11.41 EA 24.45 EA97 Trees/Plants 02490 Laurel Oak, 35 EA 81.49 EA 575.32 EA97 Trees/Plants 02490 Florida Wild Honeysuckle, 21 EA 6.52 EA 22.82 EA97 Trees/Plants 02490 Cabbage Palm, 41 EA 97.79 EA 267.29 EA97 Trees/Plants 02490 Saw Palmetto, 200 EA 11.41 EA 73.34 EA97 Trees/Plants 02490 Sea Oats, 12,275 EA 0.81 EA 7.01 EA98 Trees/Plants 02490 Wedelia, 746 EA 6.52 EA 8.15 EA98 Trees/Plants 02485 Bear Grass, 81 EA 11.41 EA 22.82 EA98 Grass/Seed 02485 Strip Sodding, 4,400 SY 2.04 SY 4.07 SY98 Paving 02500 Pavement Marking, Solid, 23,735 LF 0.33 LF 0.98 LF98 Paving 02500 Pavement Marking, Thermoplastic, 8,475 LF 0.33 LF 0.98 LF98 Paving 02500 Construction Sign, 396 SF 4.89 SF 24.45 SF98 Paving 02500 Barricade Type 3, 2 EA 130.38 EA 2,673 EA98 Material/Equip 01600 Barricade Drum, Type B, 202 EA 40.75 EA 285.22 EA98 Material/Equip 01600 Barricade Cone, Type A, 20 EA 13.04 EA 37.49 EA98 Material/Equip 01600 Barricade, Warning Light, 20 EA 17.93 EA 285.22 EA98 Control Sys. 16103 Flagmen , 400 HRS 11.41 HR 38.30 HR98 Electrical 16050 Conduit 4" Galvanized. Rigid, 1,122 LF 35.04 LF 52.15 LF98 Electrical 16050 Elec. Installation, 1,150,000 LF 20.37 LF 40.75 LF98 Communications 16050 Relocate Comm. Cables, 7,645,000 LF 5.38 LF 40.75 LF

Glenn Butts Volume XVIII Page A-3

Vol I Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

99 Material/Equip. 01600 Field Office 4,889 EA 48,894 EA99 Spec. Const. 13200 Install GFE Railroad Ties & Rails, 20,845 TRFT 28.60 TRFT 32.60 LF99 Control Sys. 16103 Install GFE Grade Crossing, 470 LF 50.52 LF 70.08 LF99 Control Sys. 16103 Ranger Station, 1 EA, 1,411 SF 114,087 EA 208,616 EA99 Guard Shack 01500 Entrance Booth, 1EA 24,447 EA 61,933 EA99 Sewage 02722 Septic Tank Sys., 1EA 4,889 EA 32,596 EA99 Reverse Osmosis Filter Sys., 4,889 EA 48,894 EA99 Well Drilling, 20 LF 8.15 LF 334.11 LF100-101 Paving 02515-1&2 Resurface of NASA Causeway, Conc. Paving, 5,328 SY 540,991 EA 1.11 SF102 Paving 02515-3 Four Laning Kennedy Parkway 2,411,154 EA 32.43 SY103 &104 2P Paving 02579-1&2 Parking Area Mods, OPF II Lot B 217,648 EA 38.45 SY105 2P Paving 02579-3 Parking Lot North Side VAB incl. Alt, 6,562 SY 223,113 EA 34.00 SY106 02579-4 Paving Three Tasks, RPSF & CMF, Pad A, 12 Trailers 203,896 EA 31.52 SY107 Paving 02579-5 Repair Industrial. Area Four Lane Road & First Street 74.21 TON 5.88 SY108 2E Excavate & Fill 02613-1 Earthwork for Paving Road & Parking 13.58 SY 1.52 SF109 Site Mech 02713-1 Modify Waterlines 313,246 EA 93.50 LF110 15Q Sewage 02722-1 1,500 GPD Treatment Plant Incl. Lift St. Total 61,613 EA 12.32 GAL111 15Q Small Sewage 02722-1 Sewage Treatment Plant 1000/5000 GPD 56.02 GAL. 11.20 GAL112-113 15Q Sewage 02722-2 Sewage Lift Station, 900 GPD System Total 50,588 EA 56.21 GAL- 15Q Sewage 02722-3&4 Sewage Lift Station 900 GPD System Structural 29,244 EA 32.50 GAL- 15Q Sewage 02722-3&4 Sewage Lift Station 900 GPD System Mech 11,901 EA 39.67 LF- 15Q Sewage 02722-3&4 Sewage Lift Station 900 GPD System Electrical 9,443 EA 36.31 LF114 THRU 1A Description 03002-1 Architectural/Structural Unit Prices 0.00 0.00120 1A Description THRU 7 Conc., Masonry, Steel, Roof, Insulation, Finishes, etc. 0.00 0.00121 3A Concrete 03300-1 Slab 6" grade w/thickened edge 3/ply mopped vapor bar. 498.72 CY 9.24 SF*122 3A Concrete 03300-2 Concrete for 6" slab on grade w/thickened edge 337.37 CY 6.24 SF*123 3A Concrete 03300-3 Concrete walled trench w/support blocks, grating 1,615 CY 613.79 LF124 3A Formwork 03300-4 Form work for concrete walled trench 562.46 CY 202.49 LF125 3A Rebar 03300-5 Rebar for concrete walled trench 29.87 CY 1.60 LB126 3A Concrete 03300-6 Concrete for concrete walled trench 280.69 CY 46.78 SF127 3A Grating 03300-7 Grating for concrete wall trench 2" C.I. 4.37 CY 221.67 SF

26" X 48" PAT R-4857 449 LB EA 0.00 0.00128 2N Concrete 03300-8 Concrete runway 14" thick, 200,000 SF 73.42 SY 187.54 FT*129 2N Concrete 03300-9 Massive Pour X-Ray Facility. 12,228 SF6'8" Thick 2110 CY 75.90 SF 439.82 CY129 2N Wall 03300-9 Includes Conc. Freezing 0.00 0.00129 2N Concrete 03300-9 Formwork 24,456 SFCA 13.46 SF 155.96 CY129 2N Concrete 03300-9 Rebar 69.3 Ton 11.56 SF 67.02 CY129 3A Concrete 03300-9 Concrete 2110 CY conc. only w/freezing 37.19 SF 216.86 CY129 3A Concrete 03300-9 Concrete Wall Total Cost in Place Freezing Only 6.29 SF 44.43 CY129 3A Concrete 03300-9 Concrete - No Freezing Total Cost 59.83 SF 403.35 CY129 3A Form 03300-9 Formwork 24,456 13.46 SF 155.96 CY129 3A Rebar 03300-9 Rebar 69.3 Ton 11.56 SF 67.02 CY129 3A Concrete 03300-9 Concrete 2110 CY 31.06 SF 180.39 CY

Glenn Butts Volume XVIII Page A-4

Vol I Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

130 3D Fondu Fyre 03305-1 Fondu fyre coating/mods to launch pads 46.94 SF 143,107 EA131 3D Concrete 03341-1 Lightweight insulation concrete roof slab 5000 SF 241.52 CY 3.00 SF132-133 3C Precast Conc. 03413-1 Pre-cast conc. Bldg.- Multiuse 12'X16'10"X9'H 57.52 SF 189.07 SF*134 3C Precast Conc. 03413-2 Structural concrete, piers, beams, columns 1,930 CY 71.47 SF*135 3C Precast Conc. 03413-3 Form work for piers, beams, columns, etc 9.63 SF 35.68 SF136 3C Precast Conc. 03413-4 Rebar for piers, beams, columns, etc 254.25 CY 9.42 SF137 3C Precast Conc. 03413-5 Concrete for piers, beams, columns, etc 211.88 CY 7.84 SF

03413-6 SRB Retrieval Wharf a CCAS 553,561 EA 251.50 SF138 3B Precast Conc. 03430-1 Tilt panel exterior wall 658.88 CY 11.82 SF139 3E Precast Conc. 03461-1 Pre-stressed roof system (5000 SF) Double Tee 52,672 JOB 10.53 SFRef Vol. II 3E Precast Conc. 03461 Electrical , Enclosure, 4800 SF Double Tee 300,705 JOB 62.65 SF SS pg.14 0.00 0.00 SF*140 3M Grout 03606-1 Viberproof grout, 1/4" thick, 48 CF 305.10 CF 6.36 SF*141 4A CMU 04200-1 Concrete block wall system 11.10 SF 9.26 Block143 4A Composite 04200-2 Block & mortar 8" x 8" x 16" 7.11 SF 5.92 BLOCKRef 04200-1 7J Insulation (07210) Insulation 1" polystyrene 1.03 SF 0.86 BLOCK144 4A Drywall 04200-3 Drywall 1/2" thick fire resistant 2.92 SF 2.43 BLOCKRef 04200-1 9A Paint & Finish (09900) Paint (2 sides exterior & interior) 1.66 SF 1.39 BLOCK145 4/5 Bldg. System 04200-4 Orbiter Processing Facility. Ph. 1 Structural. 52,800 SF 25,857,523 EA 489.72 SF146 Bldg. System 04200-1 Upgrade helium compressor sys., 975 SF 856,082 EA 128.48 SF*147 5K Structural Steel 04200-2 Large Job Steel Breakdown 3,102 TON 15.52 SFRef. Lift Assy. (05002) Cargo Element Lifting Assembly 32,396 TON 1,822 SFSEE Lift Assy. (05002) Structural portion 15.3 TON 134,699 EA 8,804 TONMARCH Lift Assy. (05002) Attachment Link Assy., 6ea 155,687 EA1993 Lift Assy. (05002) Brace Rod Assy., 3ea 22,266 SET 7,422 EACOST Lift Assy. (05002) Misc. Bearings, shackles and lexan, 30 ea 47,457 SET 1,583 EAINDEX Lift Assy. (05002) Protective Coating, 2,000 sf 12,680 SET 6.34 SF

Lift Assy. (05002) Electrical, 375 lf 22,514 EA 60.04 LFLift Assy. (05002) Mechanical Counterweight, 12,980 lb 179,398 SET 13.82 LBLift Assy. (05002) Required Stenciling, 600 ea 6,255 SET 9.88 EALift Assy. (05002) Spares, 13ea 8,605 SET 655.69 EA

*148 5J Structural Steel 05120-1 5A Structural steel service structures 37.91 SF 7,582 TON149 5J Structural Steel 05120-2 Platform west test cell, fluid test complex 28.46 SF 4.37 LB150 5J Structural Steel 05120-3 ET hydrogen vent umbilical, & Intertank access arm 23,666 TON 11.83 LB151 5J Structural Steel 05120-4 Storage mezzanine 2,600 SF - 2.44/LB 52.50 SF 72.22 SF152 5J Structural Steel 05120-5 Mezzanine. Office Space, 2 FL, 5520 SF - 1FL 2760 SF 68.47 SF 34.23 SF153 Structural Steel 05120-6 SRM Segment Pallets & Adapters, 37 EA @ $35,549 1.86 LB 5.57 LB154 5K Misc. Metals 05120-7 VAB HB 2&4 Mods for External Tanks 23,487 TON 194.09 SF 5J Structural Steel 02510-1 Structural Steel, OMRF 4,705 TON 2.35 LB*156 5B Structural Steel 05210-2 Structural steel building, Complex 6,244 TON 3.19 LB*157 5C Steel Joists 05210-3 Roof Structural steel (1200 SF) 18,652 EA 15.55 SF158-162 Bldg. System 05210-4-8 Main Building Space Station Processing Facility 40,117,051 Building 88.97 SF*163 5F Metal Floor 05310-1 14 Ga. Galvanized. Deck 16.05 SF 0.73 LB

Glenn Butts Volume XVIII Page A-5

Vol I Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

*164 5F Metal Floor 05310-2 Aluminum Deck, VAB platform mod. 68.22 SF 16.77 LB165 7A Roof 05320-1 Roofing/decking, insulation and S.M. OPF II Built Up 13.74 SF 1,374 SQ*166. 7C Metal Siding 05320-2 Metal siding/insulation and drywall 19.35 SF 5.23 LB167 Metal Decking 05320-3 VAB HB 2&4 Mods for external tank 2,018,507 EA 194.09 SF168 Metal Decking 05320-4 VAB Roof Maintenance Platform Task IV, Alt. 1-2-3 7,140,158 EA 36.04 SF169 5K Steel Misc. Metals 05503-1 Typical Breakdown Structural. Steel, VAB 5,121 TON 2.56 LB170 5K Steel Misc. Metals 05501-1A Typical Breakdown Structural. Steel 3,793 TON 1.89 LB171 5K Misc. Metals 05503-2 Typical Breakdown Structural. Aluminum 19,590 TON 9.80 LB172 5K Steel Misc. Metals 05503-3 Typical Breakdown Structural. Stainless Steel 12,805 TON 6.41 LB173 5K Misc. Metals 05503-4 Crawler Transp. Tread belt shoe, detail breakdown 2,315,541 JOB 4.97 LB174 5K Misc. Metals 05503-5 Low Bid for tread belt shoes Low Bid $839,879 1.91 LB 16.23 LB175 5K Misc. Metals 05503-6 SRB Hold-down Posts - MLP 8 total required MLP 4.16 LB 8.33 LB176 5K Misc. Metals 05503-7 Machine steel, rod end, 51 lbs 1,222 EA 23.97 LB177 5K Misc. Metals 05503-8 Steel grating - Painted 16.75 SF 1.86 LB178 5K Misc. Metals 05503-9 Stainless steel grating 91.84 SF 10.17 LBREF 5K Misc. Metals (05503) Machine Telescoping Tube SY (Ref. SS) 73,341 EA 24.77 LB179 5K Misc. Metals 05503-10 Aluminum, grating 29.56 SF 8.52 LB180-181 5K 05503-11-12 Electronic Screening, CPOCC, Ph. I, Shield. Only 69.71 BSF 7.94 LB182 5K Misc. Metals 05503-13 Metal Shielding for Building 50' x 100' x 15'H, 5,000 SF 70.54 BSF 3.72 LB183 Scaffold 05503-14 Scaffolding - Steel Tubular 140' x 60' x 26' Bldg. 0.67 SF 28.08 FRM184 5L Stair Sys. 05510-1 Metal Stairs including handrails, 16LF 19.49 LF 311.96 TREAD185 5L Stair Sys. 05510-2 Ladders - steel 20 VLF, No Cage 95.83 VLF 7.99 LB186 5F Stair Sys. 05510-3 Safety Ladder, with cage 20 LF 154.10 VLF 3,082 EA187 5H Arch Metal 05700-1 Steel Industrial handrails with toe plate 3,661 EA 76.26 LF188 05700-2 Alum. - Industrial handrails with toe plate 20 FT 4,744 EA 98.85 LF189 Roof 07110-1 VAB Roof Rehab. Cocoon Roofing Sys. 8.93 SF 893.92 SQ190 07160-1 OPF Annex Task III - Roofing System (5200 SF) 156,864 EA 30.18 SF

OPF #2 Base Bid roofing System (29,200 SF) 299,930 EA 9.83 BSF191 4A Wall Composite 07210-1 Insulation conc. Block wall 1" polystyrene 0.98 SF 0.81 BLOCK192 7J Insulation 07210-2 Building Insulation - foam roof (1000 SF) 4,257 EA 4.25 SF193 7J Insulation 07210-3 Building Insulation - rigid roof (1000 SF) 2,512 EA 2.51 SF194 7J Insulation 07210-4 Building Insulation - batts (1000 SF) 1,010 EA 1.01 SF195 7J Insulation 07250-1 Roof Insulation - vermiculite 250.63 CY 2.25 SF196 7J Insulation 07250-2 Roof Insulation - polystyrene (1000 SF) 1,579 EA 1.58 SF197 7J Insulation 02750-3 Roof Insulation - foam glass 2" THICK (1000 SF), R-16.7, R-30 1.63 SF 3.28 SF198 7J Roof 07250-4 Building Insulation 2" Rehab Roof 2.97 SF 296.90 SQ199 7J Roof 07250-5 Repair Base Support Facility Roof insulation, 740 SQ 378,627 EA 511.66 SQ200 7J Roof 07530-1 Repair CIF Bldg. Roof insulation, Ph. I & II 831,977 EA 1,801 SQ201 7J Roof 07530-2 Roof Repair O&C Roof System. - Traffigard & PIB 674,780 EA 1,181 SQ202-203 7A Roof 07562-1-2 5-Ply Roof & 2-1/4" Insulation System BUT&G 7.69 SF 7.69 SQ202 7A Roof 07562-1 Removal of Roof & Insulation , 25,000 sf BUT&G 1.99 SF 198.84 SQ202 7A Roof 07562-1 2-1/4" insulation, 25.000 sf BUT&G 2.61 SF 260.77 SQ202 7A Roof 07562-1 Sheet Metal (gutter, dsm gutter stop, flashing) BUT&G 0.37 LF 37.49 SQ

Glenn Butts Volume XVIII Page A-6

Vol I Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

202 7A Roof 07562-1 5-ly but&g roof, 25,000 sf BUT&G 2.74 SF 273.81 SQ203 7A Roof 07562-2 5-ply but&g roof rehab 5.22 SF 521.54 SQ204-205 7A Roof 07562-3&4 Roof Repair VAB - Low Bay Roof 115,600 SF 13.45 SF 1,345 SQ206 7A Roof 07562-5 Roof Repair VAB - Low Bay section 1E & 2E, 28,784 sf 11.46 SF 1,146 SQ207 7A Roof 07562-6 Roof Repair Headquarters roof 7.25 SF 725.26 SQ208 0.00 0.00209 8A Door 08110-1 Steel door, frame, hardware, panic Hollow Steel 1,543 EA 73.50 SF210 8G Door 08120-1 Exterior door, anodized aluminum 3'X7" sm window 2,736 EA 130.30 SF211 8G Door 08120-2 Exterior door, aluminum glass store front 2,142 EA 101.98 SF212 8B Door 08221-1 Interior door, wood, louvered bottom 1,082 EA 51.53 SF213 8B Door 08221-2 Exterior door, solid core wood 938.77 EA 44.71 SF214 8D Door 08221-3 Orbiter Processing Facility Phase 1, rolling door 229,075 EA 280.56 SF

4 Rolling Doors 916,300 BUILDING 0.00215-216 8D Door 08331-1&2 Replacement of doors on bldg. 50801 & 50803 Motor Operated 64,071 EA 74.16 SF217 13K Structural Steel 08364-1 Mod to Launch Pad 39B/Space Shuttle Structural. Only 11.69 LB 256.17 SF218 8D Mech 08364-2 Mod to Launch Pad 39B/Space Shuttle Mech Only 1,180,699 EA 431.07 SF219 8D Door 08364-3 Mod-Pad 39B, PCR Main Doors Bidders Avg Tot. 2,328,508 EA 978.78 SF220 Door 08364-4 Vertical Lift Door, SSPF 41'5"W X 50'H Special Steel 839,391 EA 206.14 SF221 8A Door 08391-1 Automatic door, frame, hardware, handicap 8,607 EA 409.86 SF222 8G Door 08391-2 Special Hanger Door steel siding (Edwards) 571,121 EA 68.34 SF

223 8D Door 08391-3 Rolling Door Special hanger door, steel, insulation, sliding - OPF 810,626 EA 175.47 SF

224 8D Door 08393-1Radiation Shielding Rolling Door, X-Ray Facility, conc. door w/steel frame, 24'x22'x6' THICK = 528 SF 511,157 EA 968.11 SF

225 8D Door 08394-1 1/4" blast resist. Slide doors, ordinance., storage., mag. 122,022 EA 254.22 SF226 8D Door 08394-2 Rolling fire door, Orbiter Processing Facility. PH. II OPF 1,076,311 UNIT 243.74 SF227 8G Door 08394-3 Special hanger door, steel insulation sliding-VAB 509,284 EA 243.10 SF228 13K Door 08395-1 Special hinge door, steel, PCR< LC39A Special Steel 836,669 EA 327.85 SF229 8J Window 08510-1 Steel window, glass, screen, etc. 493.83 EA 41.15 SF230 8J Window 08520-1 Window, 3'X3' with Venetian blind-stop 347.15 EA 28.93 SF231 8J Window 08520-2 Aluminum frame windows 365.08 EA 24.33 SF232-233 8J Replace Window 08520-3&4 LCC Mods to Firing Rm. & Vestibule Windows 928.99 EA 49.89 SF234 8M Glazing 08810-1 Glass & Glazing 10" x 10" x 1/2" wire glass 26.86 EA 38.92 SF234 8M Glazing 08810-1 Bullet Resistant - G.E. Lexan 3/8" - 1-1/4" 10.51 SF 30.75 SF235 Glazing 08810-2 Bullet Resistant - 1-3/16", 510 sf 57,346 EA 112.44 SF236 8M Glazing 08840-1 Glass & Glazing 1/4" tempered glass 614.44 EA 19.20 SF237 8M Glazing 08840-2 Glass & Glazing 3/16" plate glass 198.84 EA 13.25 SF238 8M Glazing 08440-3 Plastic & Glazing 1/4" Plexiglas 435.16 EA 13.59 SF239 9C Plastering 09200-1 3 Coat Plaster on metal lath 60.65 SY 6.73 SF240 6C/9C Drywall 09260-1 Stl. Stud/drywall 2 sides partition-10' stud only 3.59 EA 6.57 SF241 6C Drywall 09260-2 Wood stud/drywall 2 sides partition - stud only 0.67 BF 6.13 SF242 9E Ceramic Tile 09310-1 Ceramic tile, floor - wall 14.26 SF 14.26 SF243 9D Acoustic Tile 09515-1 Acoustic ceiling tile only - total incl. grid 2.98 SF 3.93 SF

Glenn Butts Volume XVIII Page A-7

Vol I Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

244 9D Acoustic Tile 09516-1 Acoustical ceiling, clean room (800 SF) 9,943 EA 12.44 SF245 9D Drywall 09517-1 Ceiling & floor replacement SAEF-2 99,969 EA 11.77 SF246 9D Resilient Floor 09611-1 Floor tile, composite vinyl material - installed 4.55 SF 40.04 SY247 9B Resilient Floor 09662-1 Sheet vinyl, clean room floor 3.00 SF 27.05 SY248 9B Resilient Floor 09682-1 Carpeting 28 oz Antron III w/1/2" sponge pad 45.08 SY 5.00 SF249 9B Resilient Floor 09682-2 Commercial Carpeting - Carpet only - with padding 40.40 SY 62.29 SY

Incl. removal 28 oz Acrylic w/3/4"sponge pad 0.00 0.00250 9A Clean Room 09800-1 Janitorial cleaning, OPF (29,500 SF) 119,049 BAY 4.17 SF251 9A Sandblast/Paint 09800-2 Sandblasting SP-10, Inorganic Zink + Contr. MU 1.55 SF 2.36 SF

Two-Part Epoxy, Polyurethane 0.00 0.00252-254 9A Paint & Finish 09890-1 System - sandblast, zinc, epoxy, urethane 500 sf 2,899 EA 5.80 SF253 9A Paint & Finish 09890-2 Sandblast, 500 sf 826.31 EA 1.65 SF254 9A Paint & Finish 09900-1 Zinc coating, 500 sf 629.11 EA 1.25 SF

Epoxy, 500 sf 629.11 EA 1.25 SF Polyurethane finish, 500 sf 756.23 EA 1.52 SF

255 9A Paint & Finish 09900-2 Paint, 2 sides, exterior and interior 1.97 SF 1.65 BLOCK256 4A 09900-3 Sandblasting steel (324 SF) 545.99 EA 1.68 SF257 9A Paint & Finish 09900-4 Painting and epoxy and regular (7,360 SF) 11,614 EA 1.60 SF258 9A Paint & Finish 09900-5 Painting and regular (7300 SF) 8,053 EA 1.11 SF259 9A Paint & Finish 09900-6 Paint Fiberglass Panels South Side VAB 30,000 SF 61,000 EA 2.04 SF260 9A Paint & Finish 09900-7 Paint stainless steel AR-7 500 sf 1,141 EA 2.28 SF261 10B Toilet Acc. 10161-1 Plastic Laminated toilet partition, floor mounted 963.22 STALL 0.00262 Toilet Acc. 10161-2 Metal toilet partition, painted, floor mounted 870.07 EA 0.00262 Toilet Acc. 10161-2 Screen for metal toilet partition 290.02 EA 0.00263 10F Accessories 10161-3 Mirror - bathroom 36 X 24 X 1/14 254.84 EA 42.47 SF264 Air shower 10174-1 Air shower installation, 90' x 53', X 95" 30,161 EA 1,676 SF265 Airlock 10174-2 O&C airlock cost est., 90' x 53', 95'H = 4,800 SF 3,259,189 EA 678.99 SF

266 Elevated Floor 10271-1 Elevated floor system, high/low (4800 SF), Steel No Rails or Ramps 24.45 SF 30.92 SFElectrical. Floor Sys. W/Carpet/Alum. 26.08 SF 0.00

267 10F Accessories 10500-1 Locker System (6 tier locker, lock/key built in) 574.70 SECTION 95.78 EA268 10Q Mesh Part. 10601-1 Mesh partition - industrial 688 SF W/2 gates 9,500 EA 13.01 SF269 10Q Mesh Part. 10601-2 Mesh partition - Logan fence W/2 gates 2.40 LB 17.19 SF270 10Q tack board 10617-1 Magnetic wallboard 4' X 6' X 1/4" 2,412 EA 100.51 SF271 10Q Toilet Acc. 10800-1 Repair VAB restroom, 3582 SF 345,402 EA 96.42 SF272 Furniture 12304-1 Office Wall Sys. Furniture, Typical. Unit Ea. Person 3,126 EA 14.33 SF273 Furniture 12304-2 Office Wall Sys. - Incl. units, labor & MU 8,426 EA 10,478 EA274 THRU Furniture 12304-3 System furniture mods. For Op. Support Bldg. 887,684 EA 4,598 PERS277 Furniture 12304-4 Total cost sq. ft. bldg./sq. ft. office 29.58 SFB 36.98 SFO- Furniture 12304-5 panel/elect. Only 2,525,007 SYS 1,308 PERS- Furniture 12304-6 Total cost sq. ft. bldg./sq. ft. office 8.41 SFB 10.53 SFO

Furniture only 6,372,298 SYS 3,302 PERSTotal cost sq. ft. bldg./sq. ft. office 21.24 SFB 26.55 SFO

Glenn Butts Volume XVIII Page A-8

Vol I Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

278 Trailer 13121-1 Install Office Trailer 12' X 60' (720 SF) 25,868 EA 35.92 SF279 Clean room 13036-1 Hubble space telescope pallet system clean room 316.51 SF 11.51 CF280 Clean room 13036-2 Clean room mechanical elec., 1,351 SF 47,251 MECH 14,251 ELECTRICAL281 Clean room 13036-3 MECH 28992 / 1351 = 21.46 ELEC. 8477 / 1351 = 6.47 SF 34.98 SF 10.54 SF282-283 Outfit box car 13121-2&3 Install 10 box cars (found., arch. St. Me & EL) 273,950 EA 55.90 SF284-285 13B PEMB 13121-4&5 Pre fab steel bldg., 10,000 SF 100' x 100' X 14' 686,135 EA 68.61 SF284-285 13B PEMB 13121 Slab 10,000 SF 70,316 EA 7.02 SFB284-285 13B PEMB 13121. Building 10,000 SF 239,468 EA 23.94 SFB284-285 13B PEMB 13121 Doors, 250 SF doors, 10,000 sfb 8,398 EA 33.59 SFB284-285 13B PEMB 13121 Insulation, 16,000 sfi, 10,000 sfb 0.83 SF 1.32 SFB284-285 13B PEMB 13121 Ceiling/floors & finishes 56,724 SF 5.67284-285 13B PEMB 13121 Air conditioners. 30 ton, 10,000 sfb 66,786 EA 6.68 SFB284-285 13B PEMB 13121 Elec. 10,000 sfb 56,261 EA 4.38 SFB286-287 16V Shielded Room 13121-6&7 R.F. shielded enclosure, screen rm. Exotic 170 SF 69,836 EA 410.79 SF288 16V Shielded Room 13121-8 R.F. shielded enclosure, screen rm. Basic 216 SF 44,608 EA 206.51 SF289-290. 13B PEMB 13121-9&10 Addition to Payload Control Room 1,308,622 EA 225.01 SF291 13B PEMB 13121-11 DE Prototype Austere Design 620,791 EA 35.48 SF292-294 13B Service Bldg. 13121-12-14 Merritt Is. STDN Support Service Bldg. 640,147 EA 145.48 SF295 Service Bldg. 13121-15 Base elec. Shop for BOC Ph. II 539,128 EA 89.85 SF296 PEMB 13121-16 SSPF Chiller Building, 60X101X32'10" X 20X60 Mezzanine 305,658 EA 50.44 SF297-298 Modular Office 13121-17 Modular Office Bldg., 2,850 SF, 60'x47'6"x8' 169,445 EA 59.46 SF299 13B PEMB 13121-18 Heavy Equipment Area Restoration 410,951 EA 52.69 SF300-301 13B PEMB 13121-19-20 KSC Industrial Area News Facility Addition, 980 sf 87,742 EA 89.53 SF302 13B PEMB 13121-21 Construct Innovative Sciences Tech. Exp. Facility, 4200 sf 478,985 EA 114.04 SF303 13B PEMB 13121-22 Construction of Emergency Response Facility, LC-39, 4500 sf 300,974 EA 6,689 SF304 13B PEMB 13121-23 Mechanical for LC-39 Emergency Response Facility, 10-ton AC 94,656 EA 9,466 TON305 13B PEMB 13121-24 Elec. For LC-39 Emergency Response Facility. 545,578 EA 121.24 SF306-308 13b PEMB 13121-25-27 Construct Evaluation Board Facility 717,116 EA 111.35 SF309 Data sys. 14002-1 Real Time Data sys. Facility. E&O Building. Mod., 2324 sf 559,750 EA 240.85 SF310 14D Elevator 14213-1 Elevator System RSS/PCR (7 floors) 825,813 EA 117,974 Floor311 14D Elevator 14223-1 Office Building Elevator (3 floors) 259,668 EA 86,556 FLOORIII. SS pg. 142 Elevator (14213) OSB elev. 6 floor, 5 elev. Total estimated cost 589,555 192,172 EA 32,029 FLOOR Ref SS pg 42 Elevator (14213) SRB Pass. Elevator, 6stops, 90 ft (not escalated) 267,932 EA 44,657 FLOOR312 Elevator 14223-2 SSPF - Passenger Elevator (four floors) 133,944 EA 33,486 FLOOR313 Elevator 14223-3 SSPF - Freight Elevator (three Floors) 338,743 EA 112,915 FLOOR Ref SS pg. 42 OH Crane (14380-1) SRB - RPS (2) 200-ton cranes (not escalated) 2,930,396 EA 7,326 TON314 5K Truck Assembly 14370-1 Machine Steel, PCR truck assyemblys., 2 req. 977,127 EA 1,954,255 SETV. III-234 14J OH Crane 14380 325 ton bridge crane RP&SF - VAB, 146' span 462'H 14,717 TON 23,815 TON315 14J OH Crane 14380-1 125 ton bridge crane VAB for SRB (2) 596,800 EA 4,774 TON316 14J OH Crane 14380-2 OPF bridge crane, 30 ton, 141' span 1,450,792 CRANE 48,360 TON317 14J OH Crane 14380-3 Bridge crane, 25 ton, 100' span, 100' lift 1,338,562 EA 53,542 TON318 14J OH Crane 14380-4 Bridge crane, 25 ton 199,593 EA 7,984 TON319 14J OH Crane 14380-5 Bridge crane, 12 ton 360,316 EA 30,026 TON

Glenn Butts Volume XVIII Page A-9

Vol I Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

320 14J OH Crane 14380-6 Hydraulic crane, 6ton 290,722 EA 48,454 TON321 14J OH Crane 14380-7 Bridge crane, 2 ton 73,576 EA 36,788 TON322 14J OH Crane 14380-8 20 ton hoist, OPF, Orbiter Access Platform 63,563 EA 3,178 TON323 14J OH Crane 14380-9 Hoist, 50 ton, 50'lift, explosion proof 217,286 EA 4,345 TON324 14J Electrical. O.H. Cran 14380-10 Drive trucks, OPF, Orbiter access platform, 2 req. 263,419 EA 526,837 SET325 14J OH Crane 14380-11 90-ton hoist, PCR/RSS, LC39B, 5200 SF 523,651 EA 5,818 TON326 5K Access Platform 14380-12 HB2 OPF Plat. & cable - piping 9,484,979 EA 324.82 SF327 5K Access Platform 14380-13 Bridge Hinged column bearing assy. PCR LC-39A 4,291,811 EA 30.44 LB328 5K Access Platform 14380-14 Bridge hinged column bearing assy. RSS/PCR LC-39B 4,237,265 EA 30.05 LN329 5K OH Crane 14380-15 OMRF 30 ton bridge crane 1,542,378 EA 51,412 TON330 14J OH Crane 14380-16 5-ton Bridge Crane for SSPF, Intermediate Bay Crane 225,623 EA 45,125 TON331 14J OH Crane 14380-17 15-Ton Bridge Crane for SSPF, Airlock Crane 267,515 EA 17,835 TON

332 14J OH Crane 14380-18 15-Ton Bridge Crane SSPF & STRF< hardware Inspection Crane 113,717 EA 22,744 TON333 14J OH Crane 14380-19 20-Ton Bridge Crane for SSPF & STRF 375,096 EA 18,754 TON

0.00334 5K Access Platform 14451-1 OPF - Orbiter access platform HB-1,21 req. 27,130 EA 569,734 SET335-336 5K Access Platform 14551-2-3 ASRM-Mods. To HB1 & 3 VAB Roof Maintenance Platform 3,492,925 EA 155.24 SF337 5K Access Platform 14999-1 34'X16" Sq Precis. Guided Telescope. Tube, 1324 LF 90,943 EA 29.63 LB

Glenn Butts Volume XVIII Page A-10

Volume II Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION SPEC. REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

1A thru 17 15A-Z 15002-1-17

Mechanical detail labor and material unit prices English and metric for carbon steel, stainless steel, pace, galvanized, M.J.& D.I. pipe, SS double wall pipe, valves, pipe fitting, ductwork, stainless steel tubing, kick fittings, halo, plumbing fixture, w 0.00 0.00

18 15Y Waterline 15050-1 6" DIP waterline laid in trench (100 FT) 82.14 LF 8,866 TOTAL19 15Y Waterline 15050-2 8" DIP waterline laid in trench (100 FT) 101.55 LF 10,155 TOTAL

19A-19B 15Y Waterline 15050-3-4 48:,36" & 24" DIP suction line 2,055 LF 501,127 TOTAL20 15Y Waterline 15061-1 Galvanized. Pipe waterline laid in trench 2" (100FT) 57.87 LF 5,787 TOTAL21 15Y Waterline 15061-2 Galvanized. Pipe waterline laid in trench 4" (100FT) 75.90 LF 7,590 TOTAL22 15Y Waterline 15061-3 Water piping Pad A to Pad B (9,000 LF) 571.25 LF 5,141,198 TOTAL

23-24 15Y Waterline 15061-4-5 Replace. HTHW, LTWH, CWH Piping & Boilers Ind./HMF Area 245.22 LF 855,586 TOTAL25-27 15Y Unistrut 15061-6-8 Unistrut Pipe Support (Ceiling Type and Wall Type) 348.78 EA 436.79 EA28-29 15Y Waterline 15061-9-10 AHU/Chill Water Distribution System For Space Station 191.68 LF 585,017 TOTAL

30 15Y Waterline 15064-1 Modify LC-39A Portable Water Supply 14,600 LF PVC 58.04 LF 847,452 TOTAL PNEUMATIC SYSTEMS 0.00 0.00

31 15Y Pneumatic tube 15066-1 Est. MH for SS tubing, pneumatic. & hyd. Panels & long tube runs 0.00 0.0032-33 15Y Pneumatic tube 15066-1A-1B Est. MH for SS butt-weld tubing (labor hours 1/4" & 2" cross 0.68 HR 4.68 HR32-33 15Y Pneumatic tube 15066-1A-1B Butt weld tubing linear foot (labor only in dollars 1/4" & 2") 13.85 LF 31.86 LF

34 15Y Pneumatic tube 15066-2 SST tubing line 1/4", (4000 LF 6,000 psi) 33.74 LF 134,940 TOTAL35 15Y Pneumatic tube 15066-3 SST tubing line (1/2" x .049"W, 4,000 psi) 40.47 LF 161,860 TOTAL35 15Y Pneumatic tube 15066-3 SST tubing line (1/2" x .072"W, 6,000 psi) 41.15 LF 164,581 TOTAL36 15Y Pneumatic tube 15066-4 SST tubing line (3/4" x .065"W, 3,500 psi) 52.69 LF 210,790 TOTAL36 15Y Pneumatic tube 15066-4 SST tubing line (3/4" x .109"W, 6,000 psi) 53.54 LF 214,188 TOTAL37 15Y Piping 15066-5 Buried SS pipe 4" Sch.40 44,900 LF (5,035,861 TOTAL) Oxygen 45.70 DILF 182.80 LF38 15Y Piping 15066-6 Buried SS pipe 5" Sch.40 44,900 LF (6,433,163 TOTAL) Oxygen 46.71 DILF 233.52 LF39 15Y Piping 15066-7 Buried SS pipe 6" Sch.40 44,900 LF (7,584,833 TOTAL) Oxygen 45.90 DILF 275.32 LF40 15Y Piping 15066-8 Buried SS pipe 8" Sch.40 44,900 LF (11,913,973 TOTAL) Oxygen 54.06 DILF 432.45 LF41 15Y Piping 15066-9 2"XXS, 304SS, seamless pipe run, w/supports 100 LF Oxygen 290.22 LF 29,022 TOTAL42 15Y Piping 15066-10 2" XXS, 304SS, seamless pipe run, pipe only 100 LF Oxygen 161.91 LF 16,191 TOTAL43 15Y Piping 15066-11 Pipe fitting for 2" XXS 304 SS pipe Oxygen 35.99 LF 3,599 TOTAL44 15Y Piping 15066-12 Concrete pipe support, 10 EA Oxygen 63.01 LF 630.08 EA45 15Y Piping 15066-13 Cleaning for 2" 304 SS pipe level 100 - 100 LF Oxygen 29.34 LF 2,934 TOTAL46 15Y Piping 15066-14 4" XXS, 304SS, seamless pipe run, w/supports 100LF Oxygen 549.34 LF 54,934 TOTAL47 15Y Piping 15066-15 4" XXS, 304SS, seamless pipe run, pipe only 100LF Oxygen 372.61 LF 37,261 TOTAL48 15Y Piping 15066-16 Pipe fitting for 4" XXS 304 SS pipe 100 LF Oxygen 84.41 LF 8,441 TOTAL49 15Y Piping 15066-17 Concrete pipe support, 10 EA Oxygen 63.01 LF 631.71 EA50 15Y Cleaning 15066-18 Cleaning 4" XXS 304 SS pipe, level VC- level 200 19.56 LF 29.34 LF51 15Z.2 Piping 15066-19 Cross-country pre-insulated pipe run 10,000 LF Oxygen 162.36 LF 1,623,660 TOTAL

52-55 15Z.2 Panel 15066-20-23 APS-PBK N202 Press. Purge & OD Actuation Panel Nitrogen/Oxygen 15,270 SF 702,430 EA56 15Y Pneumatic 15066-24 2" XXS 304L SS seamless pipe run (buried) - 100 LF 317.42 LF 31,727 TOTAL

57-58 15Y Piping & tank 15066-25-26 Double wall waste tanks & piping sys 4"x8" 304L SS 67.07 GAL 1,980 LF59-62. 15Y Piping & tank 15066-27-30 Double wall waste tanks & piping sys VPF site 76.89 GAL 1,831 LF

Glenn Butts Volume XVII Page A-11

Volume II Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION SPEC. REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

62A 15Y Ricwill pipe 15066-31 Double wall pipe 4" x 8" 304L SS, schedule. 10, 210 LF 329.07 LF 69,107 TOTALCRYOGENIC SYSTEMS 0.00 0.00

63-64 15Y Cryogenic System 15066-32-33 1" X 2-1/2" vacuum jacket spool 11' Long, cold shock 1,178 LF 12,963 TOTAL65-67 15Y Cryogenic System 15066-34-36 8" X 10" vacuum jacket hard line 23' LONG, cold shock 3,139 LF 72,205 TOTAL68-70 15Y Cryogenic System 15066-37-39 8" x 10" vacuum jacket flex hose 6' LONG cold shock 6,242 LF 37,455 TOTAL

71 15Y Piping 15100-1 Globe shut -off valve SST Grayloc ends 168.73 LB 12,823 EA72-74 15Y Panel 15100-2-4 Panel assembly GO2 ECLSS GFE NIC (per valve 3,005 EA) 3,809 SF 34,283 EA75-78 15Y Panel 15100-5-8 Panel Assy. GHe charging/regulator. HMF GFE NIC (per valve 2,700 E 5,868 SF 52,809 EA79-81 15Y Panel 15100-9-11 GN2 panel, OPF 37.25" x 25 " GFE NIC 6,110 SF 39,533 EA

82 15Y Panel 15100-12 Breathing air panels (without GFE) (with GFE) 3EA 26,903 EA 66,982 EA83 15Y Panel 15100-13 GN2 reg. panel 6,000-750 psi (without GFE) (with GFE) 39,133 EA 76,039 EA

84-94 15Y Panel Assy. 15100-14-24 Breathing Air Distribution System (total 178,436) 1,965 COMP 3,904 SF95 15T SS tank 15196-1 Tank SS, 5,000 gallon (24,742 EA) 8.07 GAL 9.96 LB

96-97 15T SS tank 15196-2-3 SS Tanks - Above ground 20,000 gallon 3.65 GAL 4.55 LB15T SS tank SS Tanks - Above ground 50,000 gallon 3.10 GAL 3.44 LB15T Oblatoid Tank Steel tank 500,000 gallon 1.30 GAL 2.00 LB

(62) 15T Storage Tank 15196 Double wall tank 304L SS, 5,000 gallon Labor & Material only 18.73 LB 93,593 GAL98-99 15T Storage Tank 15197-1-2 OPF Hypergol Catchment tank w/Pipe (double wall) 10,000 Gal 50.56 LB 81.39 GAL

100-101 15T Storage Tank 15197-3-4 Underground Hazardous Waste Tank w/Pipe (doublewall)2-5,000 GAL 48.86 GAL 488,571 TOTAL102 15T Storage Tank 15197-5 Install Double wall STAINLESS STEEL. Tank 1,500 gal 34.71 LB 69.41 GAL103 15T Storage Tank 15197-6 Install Double wall STAINLESS STEEL. Tank 7,500 gal 22.75 LB 30.33 GAL104 15T Storage Tank 15197-7 Install Double wall STAINLESS STEEL. Tank 10.000 gal 16.71 LB 26.88 GAL105 15 Comp. Air Sys 15250-1 SSPF Compressed Air System (Main Bldg) 1.78 SF 217.91 LF106 15 Comp. Air Sys 15250-2 SSPF Compressed Air System (Cafeteria) 0.44 SF 43.29 LF107 15C HVAC System 15258-1 Duct- work 1" fiberglass w/mastic & cloth, 2,254 sf 10.43 BSF 19.05 SF

108-109 15Y Cryogenic System 15280-1-2 Flex hose assy. LH2- ET vent Stainless Steel 6 ft. 4,926 LF 29,557 TOTAL110 15 Vacuum System 15280-3 SSPF Vacuum Cleaning System 0.65 SF 45.23 LF

111-112. 15M Air Compressor 15300-1-2 4 ea 150 hp air compressors, total 600 hp 1,165 EA 174,768 HP113 15Q Sewer System 15309-1 Sewer line vitrified clay 6" laid in trench, 100 FT 66.20 LF 6,620 TOT 114 15Q Sewer System 15309-2 Sewer line 8" vitrified clay, 100 FT 69.23 LF 6,923 TOT

115-116 15Q Sewer System 15309-3-4 Sewer, force main (PVC, class 200) 9,600 LF, 4"/6" 61.41 LF 69.28 LF117 15Q Sewage Treat. 15380-1 Mod to LC37 Blockhouse, 500 Gal. Cap. 7'11"X5'7"X5'7" 26.42 GAL 13,210 EA118 15Q Sewage Treat. 15380-2 Replace sewage treatment plant 8 & STP 14, 1,500 Gal per day capac 20.50 GAL 61,501 TOT

119-123 15 Plumbing System 15400-1-5 SSPF Plumbing System (Main Bldg.)(45.94 LF) 4.38 SF 8,726 FIX(123) 15 Plumbing System (15400-5) Elect. Water cooler, handicapped (only) 2,336 EA 35,047 TOTAL

124-127 15 Plumbing System 15400-6-9 SSPF Plumbing System (Cafeteria) (32.81 LF) 8.33 SF 13,436 FIX128-130 15A Plumbing 15407-1-3 HTHW, CW&CA lines to TPS & OMRF facilities 173.26 LF 1,842,652 TOT

131 15A Plumbing Comp. 15407-4 Plumbing - water closet 94.11 LF 3,294 FIX132 15A Plumbing System 15407-5 Rough -in for plumbing - water closet 60.68 LF 2,124 EA133 15A Plumbing System 15407-6 Water closet and fittings (regular - handicap) 1,173 EA 1,261 EA134 Plumbing System 15407-7 Heating/chill water line w/insulation, 1000 LF 1-1/2"c.st 92.56 LF 92,549 TOT

135-136 Plumbing System 15407-8-9 HTHW piping system w/insulation 5100 LF 3",8" & 10" carbon steel 156.64 LF 798,887 TOT

Glenn Butts Volume XVII Page A-12

Volume II Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION SPEC. REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

137 15A Plumbing System 15418-1 Plumbing Summary - PSCL, 4,100 SF 17.18 BSF 70,408 TOTAL138-139 15A Plumbing System 15418-2-3 Water piping - galvanized. Schedule. 40 1/2"-3" diameter. PSCL 4.91 BSF 30.22 LF140-141. 15A Plumbing System 15418-4-5 San. Waste piping c.I. soil & pace 1-1/4" - 4" diameter. 3.86 SF 67.38 LF142-143 15A Plumbing System 15418-6-7 Acid waste piping - pace schedule cd. 80 1-1/2" - 4" diameter. 2.00 BSF 20.16 LF144-145. 15A Plumbing System 15418-8-9 Plumbing fixture schedule - PSCL 18 each 6.41 BSF 1,458 EA

146 15A Plumbing System 15418-10 P-2 Crane urinal (stall type) 0.81 BSF 3,313 EA147 15A Plumbing System 15418-11 Plumbing - Lavatory and rough-in 0.77 BSF 3,163 EA148 15A Plumbing System 15418-12 Lavatory & faucet 0.16 BSF 695.93 EA149 15A Plumbing System 15418-13 Rough-in for lavatory 0.60 BSF 2,466 EA150 15A Plumbing System 15418-14 P-4 Crane service sink 0.93 BSF 3,791 EA151 15A Plumbing System 15418-15 P-5-6-7-8 Double S/S sink w/drain bd. 6.50 BSF 26,672 TOT152 15A Plumbing System 15418-16 Plumbing - Drink fountain & fittings free standing 0.67 BSF 2,723 EA153 15A Plumbing System 15418-17 Rough-in for drinking fountain 0.26 BSF 1,098 EA154 15A Plumbing System 15418-18 Water cooler wheel chair 0.44 BSF 1,816 EA155 15A Plumbing System 15418-19 Emergency. Shower and eye wash 1.30 BSF 5,334 EA156 15A Plumbing System 15418-20 Elect water heater glass lined 86 gal. 0.91 BSF 3,731 EA157 15B Plumbing System 15432-1 Emergency shower and eye wash 87.81 LF 8,781 EA

158 15 Clean room, acc. 15432-2Clean room accessories, ceiling, *lockers, ** air shower, shoe cleaner, hoods, mats, vacuum, table lights, & filters 143.42 EA 26,640.85 EA

159 15 Water System 15432-3 Water Reclaim Sys Oil Separator, Mod, XL, 1,000 Gal 147.76 GAL 147,765 TOTAL160-161 15 Compressed Air 15489-1-2 Repair the compressed air systems at Pad A & B 1,182 HP 945,260 TOTAL162-163 15 Compressed Air 15489-3-4 Scrubber for compressed air systems at Pad A & B 751.31 LF 30,803 EA164-166 15 HVAC System 15500-1-3 SSPF HVAC System (Main Bldg.) 31.72 SF 5,901 TON167-168 15 HVAC System 15500-4-5 SSPF HVAC System (Cafeteria) 19.80 SF 3,254 TON

169 15 HVAC System 15500-6 SSPF HVAC System (WG.) 38.89 SF 4,455 TON170 15P Fire 15501-1 Wet sprinkler system Installation 12.76 SF 1,868 HD171 15P Fire 15501-2 Fire protection - sprinkler 8.69 SF 868.69 HD172 15P Fire 15501-3 Heat detector 2.23 SF 895.17 EA

173-175 15P Fire 15501-4-6 Fire Protection System M6-138, M6-794 & M7-505 17.19 SF 603.86 HD176-178 15P Fire 15501-7-9 Automatic sprinkler System For HMF storage bldg. 10.02 SF 952.66 HD179-180 15 Fire 15501-10-11 SSPF Fire Protection System (Main Bldg.) 4.06 SF 387.85 HD

181 15 Fire 15501-12 SSPF Fire Protection System (Cafeteria) 2.72 SF 437.98 HD182 15 Fire 15501-13 SSPF Fire Protection System VVG) 3.24 SF 324.25 HD

183-184 15P Fire 15504-1-2 Wet sprinkler system Inside 3.88 SF 567.17 HD185-186 15P Fire 15504-3-4 Wet sprinkler system Outside 8.52 SF 1,247 HD

187 15P Fire 15508-1 S-Band bottle, Halo, $39,73 SF 145.95 LB 14,504 Bottle.188-190 15P Fire 15508-2-4 Halo System Fluid test Comples M7-1061,$69.14 LB $8,988 BOTTLE. 21.95 SF 3,995 Nozzle.

191 15P Fire 15508-5 Halo System (CPOCC) 18 bottle, 340 LB each 18.68 SF 26,818 BOTTLE.192-194 15U Boiler/Generator 15620-1-3 HTHW Boiler/Generator No. 3, VAB Utility Annex 19.23 LB 596,323 TOTAL195-196 15U Boiler/Generator 15620-4-5 Hot Water Boiler Generator No. 3, VAB Utility Annex 29,765 MBTU 595,304 TOTAL

197 15 Compressor Sys 15658-1 Upgrade of CCF Helium Compressor System 2,183 CFM 873,062 TOTAL198 15J HVAC System 15674-1 HVAC Chillers 2-160 Tons (EDL) 1,030 TON 329,725 TOTAL

Glenn Butts Volume XVII Page A-13

Volume II Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION SPEC. REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

199 15 HVAC System 15674-2 SSPF 2,500 Tons Chiller Only, Add. Alt., Task VI 947.15 TON 2,367,848 TOTAL200-201 15 HVAC System 15674-3-4 Pad A Water Chiller and Controls Only 1,266 TON 1,139,544 TOTAL202-203. 15W Cooling Tower 15684-1-2 Repair to East 3 Cell Cooling Tower 178,953 ALT ERN 1,073,850 TASK I

204 15W HVAC System 15684-3 VAB/Utility Annex Cooling Tower, 10,000 Ton 4 Cell @ 796,837 EA 519.47 TON 5,194,765 TOTAL205-207 15W HVAC System 15684-4-6 West Cooling Tower, 2-Cells Ceramic, O&C Bldg. 576.37 TON 2,878,596 TOTAL

208 15H Elec. Heat System 15756-1 Infrared Radiant Heaters, Surplus Storage. Bldg. 4 EA 4,878 EA 19,514 TOTAL209 15V Steam Heat 15756-2 Heating - PSCL, 164K BTUH 11.77 SF 294.08 MBTU210 15C HVAC System 15763-1 OPF Phase 1 Mech. Summary 7,463 TON 4,224,041 TOTAL211 15C HVAC System 15763-2 AHU's for LCC Computer Room 1,196 TON 92,717 TOTAL

212-213 15C HVAC System 15763-3-4 AHU Roof top replacement (CIF Bldg.) 250 ton 2,652 TON 663,006 TOTAL214-215 15C HVAC System 15763-5-6 Air Condition & Heating - PSCL, $107,080 total 43.74 SF 8,968 TON

216 15C HVAC System 15763-7 Air Condition - PSCL 20 ton $80,454 total 31.98 SF 6,556 TON217-218 15 HVAC System 15763-8-9 Replace HVAC System at OPF - 4 Units 145,460 EA 581,842 TOTAL219-220 15 HVAC System 15763-10-11 Replacement of VAB Air Handling Unit 1,455 TON 2,199,875 TOTAL221-222 15 HVAC System 15763-12-13 Mod. Supply Warehouse #1 w/Two New 30-Ton A/C Units 6,175 TON 370,521 TOTAL223-225 15S Vent System 15830-1-3 APU/ammonia exhaust system installation, 4" - 6" Stainless Steel 1,339 LF 120,508 TOTAL

226 15S Vent System 15830-4 APU/ammonia exhaust system 193.15 LF 17,384 TOTAL227 15S Vent System 15830-5 Ventilation - PSCL< 150-380 cgm 3.03 SF 12,419 TOTAL228 15C HVAC System 15841-1 Alum. Duct - PSCL 14.77 LB 19,193 TOTAL

229-230 15C HVAC System 15841-2-3 Galvanized. Duct work and support - installation cost 14.15 LB 40,132 TOTAL229-230 15C HVAC System 15841-2-3 Galvanized. Duct work and support - installation cost 2,007 TON 0.00

231 15 HVAC System 15844-1 Fixed ECS Facility, alum. Duct (special Duct) 536.16 LF 243,955 TOTAL232-233 15 HVAC System 15844-2-3 ECS duct, 8" - 18" alum. (special Duct) 1,337 LF 574,755 TOTAL

DIVISION 16 ELECTRICAL 0.00 0.00233A Metric Units SI Metric Units for Engineering Use 0.00 0.00

234-243A 16 Elec. Units 16002-1-11 Electrical Detail Labor & Material Unit Prices for conduit & wire, light fixtures, cable tray, disconnect switches, sand encased duct bank, fiber optic cable, strut, uv/ir flame detectors, utility poles, pace conduits 0.00 0.00

244 16V Boxes & Enclos 16105-1 Receptacle and plug - Russel/Stoll 1,085 EA 7.48 SF245 16J Low Voltage 16105-2 Duplex receptacle 332.48 EA 2.66 LF246 16J Low Voltage 16105-3 Wire - standard bldg. wire 265.66 TOTAL 0.00247 16V Boxes & Enclos 16105-4 Receptacle & plug explosion proof - Crouse/Hinds 7,130 EA 0.00248 16V Switch 16105-5 Explosion proof tumbler switch 581.84 EA 0.00

248A 16V 16105-6 EDO Pallet & Storage Facility (Elec.) 128,124 TOTAL 5.09 LF249 16V Cable Tray 16114-1 4" H tray - 18"W - 9" rung spacing x 12' alum. 10,501 TOTAL 87.50 LF250 16V Cable Tray 16114-2 4" H tray - 24"W - 9" rung spacing x 12' alum. around obstacles 11,374 TOTAL 94.79 LF251 16V Cable Tray 16114-3 4" H tray - 24"W - 9" rung spacing x 12' alum. straight run 7,936 TOTAL 66.11 LF252 16V Cable Tray 16114-4 4" H tray - 18"W - 9" rung spacing x 12' alum. straight run 6,775 TOTAL 56.46 LF253 16V Panel Board 16160-1 Lighting panel board, 225A, MLO, 3 Ph., 4W, 240V,32C 2,979 EA 1.86 SF254 16V Safety SW 16183-1 Safety switch - NEMA 4 enclosures 100 AMP 3 pole 3,514 EA 0.00255 16J Cable Assy. 16183-2 Cable assemblies (770) & 50 ea breakup boxes 133,310 TOTAL 2,666 EA

Glenn Butts Volume XVII Page A-14

Volume II Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION SPEC. REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

256 Control System 16183-3 HVAC control system for O&C SSPF chiller plant 522,970 TOTAL 32.94 LF257 Control System 16183-4 VAB HB 2 & 4 Mods to External Tank 27.36 LF 324,200 TOTAL

258-259 16Q MCC 16184-1-2 Motor control center, SAEF 2 800 AMP & 1200 AMP 51.96 AMP 157.44 TON258-259 16Q MCC 16184-1-2 2,000 total Amps, 600 tons cooling 0.00 103,905 TOTAL

260 16V UPS 16290-1 UPS-102-1B-04 (uninterruptible power supply) 20,845 TOTAL 20,845 KVA261 16V UPS 16290-2 UPS-302-1B-04 fluid test complex 27,544 TOTAL 9,181 KVA262 16V Load Break 16301-1 15 KV Gas Insulated 5-way load break SW 77,173 TOTAL 15,434 EA263 16C Substation Stat. 16311-1 500 KVA Substation, 13.2 KV pad Mounted 227,124 TOTAL 454.24 KVA264 16 Switch Gear 16325-1 Switch gear - 600 amps - 2,000 amps 20,611 EA 47,049 EA265 16V Duct bank 16343-1 Duct bank, 4W x 4" Concrete Encased 5,385 TOTAL 53.85 LF265 16V Duct bank 16343-1 duct bank - concrete fill/100LF (1 way-4" 20 way-4") 15.55 LF 155.11 LF266 16V Duct bank 16343-2 Concrete for Conduit encasement 3.26 TO 32.60 CONDUITS

266A Duct bank 16343-3 Directional boring 74.53 LF 244.36 M266B Duct bank 16343-4 Pipe push 282.02 LF 925.67 M266C Communication Sys16343-5 Pre-cast concrete bldg for comm. Cross connect 488.31 SF 165,426 EA

267-268 16B 15 KV Cable 16390-1-2 Install. Of KV cable UCS 9 & 10 in trench 304,350 TOTAL 11.42 LF269-270 16V Elec. Power 16390-3-4 Electric power mods to Hanger 'L' 195,681 TOTAL 5.18 LF

271 16W 15 KV Cable 16391-1 15 KV Aerial Power Line total $ 445,654 5,188 POLE 31.59 LF272 Conduit System 16405-1 Conduit & cable - standard bldg. materials 3,160 TOTAL 31.60 LF273 16V Battery System 16450-1 Orbiter Ground Power Buss-Backup Battery System 154,856 TOTAL 537.69 EA274 16V Transformer 16460-1 Transformer - Square D, 45 KVA 480/208/120 3 Ph. 3,403 TOTAL 75.64 KVA275 16V Transformer 16460-2 Transformer - Square D, 112.5 KVA 480/208 3 Ph. 6,920 TOTAL 61.51 KVA276 16V Light 16511-1 Recessed fluorescent fixture (four 40 watt lamps) 325.96 EA 3.26 SF277 16P Light 16511-2 Energy saving light fixture with miser ballast 396.04 EA 0.00278 16P Light 16511-3 Fluorescent light fixtures 128,312 TOTAL 1,210 EA279 16V Light 16550-1 Floodlight (1000 watt dual) HP Sodium & HLX fixture. 9,316 TOTAL 4,658 EA280 16V Light 16550-2 Floodlight (400 watt single) sodium & HLX fixture. 7,712 EA 0.00281 16V Light 16550-3 Mods to VAB Floodlighting - Bid List 453.09 EA (LOW) 1,118 EA (HI)281 16V Light 16550-3 Mods to VAB Floodlighting - Bid List 254,182 LOW 627,225 HIGH282 16X Protection 16601-1 Lighting Protection System, 66,000 SF Elevated 105' Grid System 167,645 LOW 377,744 HIGH283 16N ESS 16721-1 Electronic security system single & double door sensor 860.54 EA 1,504 DBL284 16N ESS 16721-2 Electronic security system double door sensor 11,114 EA 53.41 SF285 16X Fire 16721-3 Fire Alarm system, CCAFS Hanger "L" - 24 devises 9,723 TOTAL 405.17 EA286 16X Fire 16721-4 Fire Alarm system, M.I. STDN Facility 18,319 EA 4.16 SF287 16X Fire 16721-5 Fire Alarm system pad B 424,216 TOTAL 10.54 LF288 16X Fire 16721-6 Fire Alarm system SSPF total $ 306,954 1,147 EA 1.12 SF289 16X Fire 16721-7 Conceptual estimate UVIR flam detectors 9,414 EA 0.00

290-291 16X Fire 16721-8-9 Rehab LC-39 Detection & Alarm System 815,162 TOTAL 3,041 EA290-291 16X Fire 16721-8-9 total 683,104 99,389 EA MLP 0.00

292 16J Cable Assy. 16905-1 2 pr. #22 comm. Cable assy.- 10 ft. 281.96 TOTAL 28.15 LF293 16J Cable Assy. 16905-2 Control cable assy. 10 ft. 1,649 TOTAL 164.95 LF294 16V Paging 16905-3 OMRF Paging & area Warning System 162,829 EA 3.28 SF

Glenn Butts Volume XVII Page A-15

Volume II Assumed Data Date 6/15/1992 Escalated To 12/30/2005PRICE BOOK PAGE

SEC. DIV. DESCRIPTION SPEC. REF DESCRIPTION

Escalated Low Cost Unit

Escalated High Cost Unit

295 16J Communication Sys16905-4 Telephone, video, Data System Conceptual Estimate 1,840 EA #VALUE!296 16 Communication Sys16905-5 Premise wiring telephone System, SSPF 475,124 5.59 BSF 4.56 LF297 16 Communication Sys16905-6 Premise wiring low speed data System SSPF 555,380 6.54 BSF 2.22 LF298 16 Communication Sys16905-7 Premise wiring high speed data System SSPF 443,675 5.22 BSF 1.66 LF299 16 Fiber Optic Cable 16905-8 Premise wiring fiber optic System SSPF 38,698 - 1.05 FF Exterior sy 0.46 BSF 20.50 LF300 16 Communication Sys16905-9 Premise wiring thin net System, SSPF 9,445 0.11 BSF 2.66 LF301 16 Communication Sys16905-11 Premise wiring BCDS System, SSPF 262,025 3.08 BSF 4.04 LF302 16 Communication Sys16905-11 Premise wiring general purpose sus. SSPF total 31,229 2.74 BSF 9.31 LF303 16 Communication Sys16905-12 Premise wiring recap sheet Total 1,841,302 21.64 BSF 2.64 LF303 16 Communication Sys16905-12 Per Work Station 2,223 Per Work Station 0.00304 Communication Sys16905-13 Premise wiring, SSPF 3,000,970 TOTAL 2.64 LF305 Security System 16905-14 Electronic Security Facility Installation, SSPF 167,683 TOTAL 4.27 LF306 Control System 16905-15 Integrated Environmental Monitoring System, SSPF 938,146 TOTAL 2.93 LF307 Power Feeder 16905-16 Orsino power feeder, SSPF 573,719 TOTAL 29.50 LF

308-309 16 Fiber Optic Cable 16906-1-2 Fiber Optic cable system, 31,750 LF, 10 Fiber 1.12 FF 21.48 LF308-309 16 Fiber Optic Cable 16906-1-2 Exterior System total $418,452 Inner duct 201,226 TOTAL 1.42 LF310-311 16 Fiber Optic Cable 16906-3-4 Fiber optic system 15,640 LF, 30 fiber, press. 0.86 FF 25.73 LF310-311 16 Fiber Optic Cable 16906-3-4 Fiber optic system 15,640 LF, 30 fiber, press. Exterior system 383,082 TOTAL 0.00

312 16 Fiber Optic Cable 16906-5 Fiber optic system, 30 fiber, press. - Bid List 13.58 LF (LOW) 37.16 LF (HI)312 16 Fiber Optic Cable 16906-5 Supply Contract 0.46 FF 1.29 FF313 16 Fiber Optic Cable 16906-6 Fiber optic cable projects (non-pressurized) 0.77 FF 33.18 LF313 16 Fiber Optic Cable 16906-6 Fiber optic cable projects (non-pressurized) Exterior Total 2,247,532 TOTAL 0.00314 16 Fiber Optic Cable 16906-7 Fiber optic cable system - 72 fiber non-press. 0.28 FF 20.45 LF314 16 Fiber Optic Cable 16906-7 Fiber optic cable system - 72 fiber non-press. Exterior Total 3,568,766 TOTAL 0.00315 16 Fiber Optic Cable 16906-8 Fiber optic cable - Fiber Foot Graph 10, 30, 36, 72 & 144 fiber 0.18 FF 1.12 FF316 16 Fiber Optic Cable 16906-9 Fiber optic cable, Phase VII 0.36 FF 21.14 LF316 16 Fiber Optic Cable 16906-9 Exterior System Total $555,000 904,544 Total 0.00

SPECIAL REPORT ON SPACE STATION PROCESSING FACILITY See Volume IV

Glenn Butts Volume XVII Page A-16

Vol III Escalated To 12/30/2005PRICE BOOK PAGE SYS./BLDG. TYPE SYS. BLDG. USES PROJECT TITLE BID DATE

Escalated Cost Unit

1 Runway Shuttle Landing NASA Space Shuttle Landing Facility 03/05/74 17.78 SF2 Metal Siding & Concrete Hanger Orbiter Processing Facility, Phase I 52,800 SF 05/14/75 565.63 BSF3 Metal Steel Frame Hanger OPF, Phase II (29,200 SF steel hanger) 04/29/76 439.56 BSF4 Steel Access Platform OPF, Obiter access platform HB-1 (service platform) 06/11/76 249.27 PSF5 Cable & Piping For Platforms HB-2 OPF platform and cable-piping (service platform) 02/02/77 73.46 LF6 Concrete & Masonry Office & lab OPF Annex, Task III (concrete masonry office lab.) 02/02/77 159.93 BSF7 Steel 225 Ton Mate/Demate Stands Orbiter mate-demate and miscellaneous site work 03/10/77 28,106.75 TON8 Steel & Utilities Access Platforms PCR mid body umbilical unit (structural steel) 04/26/77 443.12 LF9 Alum & steel Access Platforms OAA Environmental Chamber (aluminum room) 160 SF 05/10/77 4,484.23 BSF10 Steel Service Masts MLP Tail Service Masts 05/11/77 1,248.95 BSF11 Masonry Supply Operation. Bldg Fire Protections Operations Support Building 3,638 SF 05/19/77 22.25 BSF12 Crane Material Handling Mate/Demate Stiff Leg Crane 50 Ton 86'H 07/20/77 9,030.21 TON13 PEMB Storage/Personnel LC-39a housing additions (two 5,000 SF metal bldg.) 10,000 SF 9'4" 08/18/77 28.38 BSF14 Cross Country Lines HTHW Lines HTHW mods zones 1 and 2 (3/8" to 8" pipe 10,156 LF) 09/07/77 202.90 LF15 PEMB Storage/Personnel Operational Support Building - Tech. Support Bldg. 10,000 SF 9'4" H 10/26/77 69.80 BSF16 Alum. Vents Roof Ventilators Rebuild Gravity Roof Ventilators, VAB 03/09/78 3,316.29 EA17 Steel/Utilities Test Equip. Cargo Integration Test Equipment, O&C 04/04/78 969.05 BSF18 Steel Metal Siding Hi Purity Oxy Facility High Purity Oxygen Facility, LC-39 04/11/78 422.33 BSF19 Steel/Ins. Siding Hanger W/High Bay Shuttle Payload Vertical Processing Facility 04/26/78 430.95 BSF20 Steel Pipe & Cable Blast deck MLP #2 Piping and Cabling, Blast Deck -System. Summary 05/24/78 89.89 BSF21 Piping & Cabling Labor & Material. Sum. MLP #2 Piping and Cabling, Blast Deck L&M Summary 05/24/78 5,953,115.12 LS22 Piping & Cabling Comp. of Cost Est. MLP #2 Piping and Cabling, Blast Deck -Budgeted Cost 05/24/78 6,249,271.58 LS23 Concrete & Metal Launch Pad Pad "B" mods 06/23/78 3,406.41 BSF24 Roofing system Cocoon Roofing VAB Roof Rehabilitation, High Bay 01/31/79 8.11 BSF25 PEMB News Facility News Facility Bid $217,930 6000 SF 12'H 03/23/79 92.59 BSF26 PEMB Patrol Office Facilities for Security Patrol 1706 SF 19'H 03/28/79 104.79 BSF27 Steel & Mechanical & Elect Launch Pad Mod RSS/PCR mods to Pad, Task II 06/06/79 431.88 BSF28 Steel Frame/Mechanical Access Arm for H2 ET H2 vent umbilical and Intertank access arm 08/31/79 1,186.88 LF29 PEMB Maintenance. Facility Crawler Transporter Maintenance Facility 7494 SF 15'H 04/16/80 254.37 BSF30 Piping & Fittings Cryogenics Cryogenics Umbilical Comp. LOX_LH2 Flex Hose Hard line 05/22/80 3,249.53 LF31 Piping & Fittings Cryogenics Flex Hose 482 LF 1" to 10" MLP 05/22/80 3,420.56 LF32 Piping & Fittings Cryogenics Hard Line 316' LF 3" to 10" MLP 05/22/80 2,452.21 LF33 Piping & Fittings Cryogenics Comb Flex & Hard line 1" to 10" MLP SS 798 LF 05/22/80 3,037.56 LF34 Piping & Cabling Pad B Mods to Launch Pad 39B for Space Shuttle (pip.& cable) 06/18/80 41.32 LF35 Concrete/Masonry Para. Facility. Mod Mods to Parachute Facility, 33,290 SF 08/12/80 8.17 SF36 Steel/CMU Support Facility Life Science, D.I. Support Facility 09/15/80 154.78 BSF37 Steel Work Platform OPF Activation mod pkg. 7a, 8 & 8a, Steel Platforms 11/25/80 318.54 BSF38 Mechanical/Elect Inst. Mobile Launcher MLP-2 Mech. & Elect Inst. Phase II 12/12/80 81.54 LF39 PEMB Vertical Proc. Facility Operations Support Bldg. for the Vertical. Process. Facility 10X60X14 02/26/81 174.29 BSF

Glenn Butts Volume XVII Page A-17

Vol III Escalated To 12/30/2005PRICE BOOK PAGE SYS./BLDG. TYPE SYS. BLDG. USES PROJECT TITLE BID DATE

Escalated Cost Unit

40 PEMB Medical Storage Medical Storage Facility40X20X12'H 07/16/81 114.87 BSF41 PEMB Process. Facility Horizontal Processing Facility., 6,100 SF 122X50X22'H 02/26/82 119.53 BSF42 Steel/Ins. Siding Rotation/Process. SRB Rotation/Processing Facility., 35,216 SF 03/23/82 483.91 BSF43 Steel/Ins. Siding Office SRB Rotation/Processing Support Bldg. 03/23/82 106.22 BSF44 Steel/Ins. Siding SRB Storage SRB Rotation/Processing Facility. Storage/Surge Bldg. 03/23/82 238.4845 Steel/Ins. Siding Budget Comparison SRB Rotation/Proc. Facility. R&P Bldg/Storage. Surge Bldg. 03/23/82 106.22 BSF46 Steel/Ins. Siding L&M Summary SRB Rotation/Processing Facility. and Surge Facility. 03/23/82 106.22 BSF47 Masonry 4836SF 30'H Control Room Mods to South Lean-to & LSSF Data Control Room 04/20/82 52.16 BSF48 CMU/Steel 3000SF ECS Facility ECS Station & ECS Fixed Facility 08/19/82 168.59 LF49 STEEL/Siding Cleaning 3 Bays OPF Contamination Control & Orbiter TPS Platform 09/13/82 469.81 BSF50 Concrete/Steel Test Tower STS/Centaur Umbilical. Test Tower, 74 ft High 10/07/82 101.54 PSF51 Dredging Maintenance Dredging in the Banana river Channel Cargo 10/19/82 32.01 CY52 Cont. Control Hanger OPF Contamination Control Mods 10/19/82 47.44 BSF53 Plumb & Electrical Mod Data Collect Facility. Baseline Data Collect facility 10/21/82 72.54 BSF54 Trailer Complex Personnel Housing Cargo personnel Housing 11/24/82 22.86 BSF55 Steel Tanks Storage Refurbish & Paint LO2, LH2 Tanks 12/02/82 93,693.71 EA56 Steel/Alum Canister MMSE Payload Canister 01/25/83 2,346,075.97 EA57 Steel/CMU Theater Theater Complex - VIC-TWA Expansion 01/11/83 187.21 BSF58 Steel Lifting Beams Handling Mat 6-SRB Segment Lifting Beams & 128 Brackets. 02/11/83 11,297.9359 Steel Enclosure Elect. Power System Pallet 02/17/83 18.30 BSF60 Hydraulic Test Kits Testing Hydraulic Test Kits - 6 Orbiter, 8 SRB Etc 02/18/83 20,728.65 EA61 Concrete/Steel SRB Refurbish. Task I-II--SRB Refurbish. Sub Assembly Facility. VAB Hanger N 04/01/83 71.43 BSF62 Mechanical/Elect Inst. Wash down Sys Facility Wash down System Pad A MLP-1 & MLP-2 05/10/83 105.45 LF63 Paving Roadway Resurface Kennedy Pkwy. NASA Causeway. To Gate 2 05/10/83 6.02 SY64 Support Contract Service Masts LETF Supt. Contractor Launch Accessories Contr. Supt. 05/16/83 44.86 MH64 Support Contract Service Masts Fabricate., Test, Install LS65 Structural Electrical Mecha Mods to O&C Flight Kit Facility 05/19/83 42.30 BSF66 Landscaping/ Outfitting Office Task I--LC-39 VAB Area Interim Housing, Outfitting/ Landscaping, 19 05/17/83 9.61 BSF67 Steel/Mechanical Electrical Support Orbiter Mid body Umbilical Unit, LC-39B 05/18/83 6.67 PSF68 Steel/Mechanical Electrical Latch Back/Hinge Task I--Latch Hook Tower & Hinge Support Tower 05/25/83 398.77 PSF69 Conc & steel Food Service Multi-Function Facility VAB Area, 14,000 SF 06/01/83 218.01 BSF70 Rail Car & Racks Office Railcars, Special Purpose & End Ring Racks 06/21/83 547.92 BSF71 Steel/Alum Environmental. ChambeLC-39 Orbiter Access Arm 06/21/83 522.14 BSF72 Special Truck Bio specimen Van Bio specimen Transportation Van 06/14/83 179,312.07 EA73 Structural/Mechanical ElectLaunch Control LCC Fourth Floor Addition 06/22/83 148.46 BSF74 Mechanical electrical Floor Operation/Support Task I--Pad 39B Operations Support Bldg., KSC 06/22/83 73.22 LF75 Panel Testing PGHM Instrumentation Panels, 168 ea. & VAFB 06/23/83 219.04 LF76 Strong back Access Plate PGHM Front End Hardware, VAFB 06/30/83 17.98 LB77 Data Sys Testing MLP-3 P/L Data Sys. Interface Equip. & Lighting Induced Voltage Ins 07/05/83 17,419.61 EA

Glenn Butts Volume XVII Page A-18

Vol III Escalated To 12/30/2005PRICE BOOK PAGE SYS./BLDG. TYPE SYS. BLDG. USES PROJECT TITLE BID DATE

Escalated Cost Unit

78 Piping /Cabling Equip. Install Task I & II-- Piping Cabling & Equip. Instakk to Launch Pad 39B for S 07/26/83 90.13 LF79 Hyper Scrubber Cleaning 14 Hypergol Vapor Scrubbers for Pad B LC39 07/28/83 728.37 LF80 90 Ton Hoist Handling Material Hoist, 90-Ton Payload Canister. Fab/Insat/Test-LC-39 07/29/83 53.54 TON81 Sling Assembly Handling Short Trunnion Support Fixtures & Sling Assy. 08/11/83 380,028.72 EA82 Steel/CMU Painting SRB Paint Facility 143'6"X70'X30' H 08/22/83 273.27 BSF83 Waste Treatment Waste Disposal Chemical Waste Treatment Facility, CCAS 08/25/83 146.74 BSF84 Steel Equip. Handling Pad B Payload Ground. Handling Mec. 08/25/83 10.90 BSF85 PEMB Shop Pneumatics Shop LC-39 (Option) Additional 20'X50' Bay 81X50X12' 09/14/83 104.84 BSF86 Purge Unit Testing 83-Tone AC Portable Purge Unit, GSE, VAFB 09/15/83 199.24 BSF87 Steel/Alum MLP 3 Parking MLP-3 Mods & Mobile Launcher Park Site 3 Utilities 11/16/83 58.62 BSF88 Cone Stand Storage Orbiter Tail Cone Handling, GSE 12/21/83 89,143.65 EA89 Fill & Paving Site Work Site Work for Future SRB Facility Includes Electrical, Mechanical & R 02/07/84 1,660,338.97 ACR90 Steel/Siding Storage Hazardous Waste Storage Facility 02/09/84 81.02 BSF91 Steel Access Platform Line Replacement Unit (LRU) PGHM Platform 03/01/84 13.48 LB92 Flare Stack Vent GH2 Flare Stacks for Space Shuttle ET & Facility. (2) 05/01/84 649.09 LF93 Fiber Optic Communication Audio & Fiber Optic Cable System to CHSF & VPF 05/02/84 31.97 LF94 Steel & Siding Storage Hazardous Waste Staging Facility., 2 Bldg. Total 7480 SF0 05/03/84 111.02 BSF95 Concrete/CMU Refurbish of SRB Solid Rocket Booster Assy. & Refurbish. Facility 05/15/84 166.26 BSF96 PEMB Deserviceing Thrust Vector Control Deserviceing Facility, Hangar AF Processing 06/16/84 237.74 BSF

97-98 Segment Dollies Storage 8 SRB Case Segment. Dolly Programs, 32 Candles & Tow Bar 07/26/04 270,257.35 EA99 Firex Skip line Fire Protection Firex Sys. - Hypergolic Maintenance. & Cargo Process. Area 09/22/84 202.14 LF100 Steel & CMU Cargo Servicing Cargo Hazardous Servicing Facility with Airlock 09/24/84 846.04 BSF101 Metal/Ins Siding Process. Payload Cargo Hazard. Ser. Facility. Without Airlock, 65'X110X95'H 09/24/84 913.72 BSF102 Steel Airlock Cargo Hazard. Ser. Facility. - Airlock Ibly, 61'4"X88'6"X87'H 09/24/84 688.31 BSF103 PEMB Storage Operations Support Facility., LC-39, LES Area 50'X110'X14' H 09/27/84 209.16 BSF104 CMU/Concrete Destruction . Class. MatClassified Material Destruction Facility 10/09/84 233.08 BSF105 Roof Repairs Repair Roof & Construct R.R. Dock CSW 10/18/84 9.82 SF106 Precast/Steel Control Center Centaur Payload Operations & Control Center, Structural 125X106X 10/31/84 209.28 BSF107 Precast/Steel Control Center Centaur Payload Operations & Control Center, Outfit 02/20/84 237.55 BSF108 CMU 2 Building 7526 SF 12Office Refurbish. Launch Control - 36 Ready Room Offices, CCAS 11/15/84 119.01 BSF109 Steel CMU Office/Warehouse Lockheed SPC Logistic Facility 25,210 SF 453/X570'X50' 11/15/84 106.39 BSF110 Crane Mat. Handling Furnish/Install 15 & 50 Ton OH Bridge Crane, CHSF 01/07/85 16,838.99 TON111 Fencing Security Security Fence, Grounding & Lighting 01/22/85 75.98 LF112 Lighting Protect Safeguard Spacecraft Assembly Bldg. Lighting Protection Sys. 01/23/85 3.05 LF113 Holding Pond Conc. Storage Mod to Pad B Holding Ponds Concrete W/Liner 01/24/85 292.00 CF114 PEMB Airlock High Bay Airlock - Addition to Bldg. Lighting Protection Sys. 110'X40 02/07/88 79.59 BSF115 PEMB Service Facility Cargo Hazardous Servicing Facility., Phase II B 60X164X17'8" H 02/08/85 215.97 BSF116 PEMB Dormitory Addition to Fire Station #2, LC-39 50X100'X16'H 02/13/85 141.61 BSF117 CMU 41'X30'X36"h Testing Missile Research Test Building. 1.137 SF 04/30/85 370.24 BSF

Glenn Butts Volume XVII Page A-19

Vol III Escalated To 12/30/2005PRICE BOOK PAGE SYS./BLDG. TYPE SYS. BLDG. USES PROJECT TITLE BID DATE

Escalated Cost Unit

118 Precast/steel Testing Addition to Test Group Support Facility 05/02/85 367.53 BSF119 PEMB Maintenance & Storage MMSE Transporter/Canister Recon., Maintenance & Story. Facility. 08/29/85 91.86 BSF120 Paving Roadway Road Modification in SRB Area 12/05/85 21.37 SY121 Cable Fiber Optic FY 85 Fiber Optic Cable Protection 01/21/86 32.03 LF122 Steel/Metal Deck Refurbish. Obiter Bid Abstract - Orbiter Mod & Refurbishment Facility 01/22/86 0.00123 Steel/Metal Deck Processing Facility Orbiter Modification and Refurbishment Facility 01/22/86 468.00 BSF124 PEMB Shop DE Prototype Shop Phase I 100X175X16 03/07/86 34.16 BS 125 PEMB Control Room Addition to Bldg. M7-1061 - Payload Rooms 33LPG/5816SF 03/27/86 190.41 BSF126 Reinforced. Conc./CMU Storage Ordnance Storage Facility, 4,992 SF 04/09/86 138.84 BSF127 Air Conditioner Cooling Towers Repair to East 3 Cell Cooling Tower O&C Cost per Ton 04/10/86 2.00 BSF128 PEMB Tile Processing Tile Processing Facility. For Thermal Protection Sys. Facility. 100'X3 04/17/86 107.61 BSF129 Paging & Warning Hanger OMRF Paging & Area Warning 07/08/86 3.00 BSF130 CMU/Steel Office & Conf. Rooms OPF Annex Addition, 34,020 SF 08/18/86 193.01 BSF131 Mechanical/ Piping Water Supply HTHW, CW&CA Lines to the TPS & OPRF Facilities 09/09/86 168.11 LF132 Paving Parking Lot Improved OPF Parking Lot "b" 09/17/86 38.94 SY133 PEMB Maintenance Shop Generator Maintenance Shop 550 SF 20'H 02/03/87 111.49134 Roof Repair Storage Repair VAB Low Bay Roof - Bldg. k6-848 03/03/87 0.57 SF

134A Generator/Boiler Air Condition Replacement of HTHW Generator/Boiler #1 03/05/87 29,176.22 MBTU135 Air Compressors Utility Replace 360 HP Compressor at Utility Annex 04/01/87 1,120.28 HP136 Air Conditioner Payload Servicing Payload Hazard. Ser. Facility. HVAC Mods 04/07/87 44.31 BSF137 HVAC Chillers Flight Crew Support Replacement of Engineering Development Laboratory (EDL) HVAC C 04/08/87 974.65 TON138 PEMB Tracking Support Merritt Island STDN Facility Support Service Bldg. 4400 SF 04/10/87 137.61 BSF139 Cooling Tower Air Condition Replacement VPF Cooling Tower 05/26/87 865.00 TON140 Platforms Testing Fabricate. Of a Precision Guided Telescoping Tube 06/25/87 2,825.99 LF141 Mod to A/C Sys. Air condition HVAC Mods Repair Bldg. AE 07/21/87 31.53 BSF142143 Pre-Stress & Conc. Office Operation Support Building (OSB), 6-Story, LC-39 07/07/87 129.45 BSF144 Switch Station Protective Encl. Protective Enclosure for Switching Gear 08/19/87 44.44 BSF145 Concrete/Steel Shop Mods to Launch Equipment Shop 08/19/87 57.52 BSF146 PEMB Storage HMF-GSE-Metal Storage Building 53X123X24' 09/11/87 67.56 BSF147 Fiber Optic Electrical Fiber Optic Cable - Outside Cable Sys. CD&SC 09/15/87 26.21 LF148 Concrete Office & Checkout Mods to Payload Checkout Equip. Room 1289 O&C 10/06/87 263.41 BSF149 CMU & Metal Hangar Mod Hanger L. Support Process Bio specimen STS 10/27/87 248.70 BSF150 Site Work Roadway Construction of Launch Complex 39A&39B Sup. Facility. 11/03/87 78.76 SY151 Concrete/steel Security New Security Patrol Building LC-39 11/27/87 155.94 BSF152 Conductive Floor Hazard-Cargo PHSF Resilient Conductive Flooring 12/23/87 9.06 SF153 Site Work Viewing Site VIP Viewing Site Phase I 01/12/88 53.32 BSF154 PEMB Maintenance Two PEMB Building - Generator Maintenance Building, Phase II (2 E 01/20/88 206.63 BSF155 Elec. Power Power Line 15KV 60HZ Power Line SR 402 01/20/88 8.82 LF

Glenn Butts Volume XVII Page A-20

Vol III Escalated To 12/30/2005PRICE BOOK PAGE SYS./BLDG. TYPE SYS. BLDG. USES PROJECT TITLE BID DATE

Escalated Cost Unit

156 Helicopter Pad Landing Facility OHF Helicopter Pad, 4,225 SF 01/20/88 30.80 SF157 Concrete/CMU Service Facility OIS-D Battery Room Building, 432 SF 01/26/88 299.18 BSF158 Air Handler Air Conditioning Replace AHU. & Roofing SAEF-2 01/26/88 7,539.37 TON159 Piping HTHW Lines Replacement of HTHW Lines Industrial. Area Heat Plant 02/02/88 251.42 LF160 Roof Office Built Up Roof Sys. E&W Wings of HQ. Bldg. 02/04/88 7.64 SF161 Battery Backup Electrical 43 Set GSE Battery Backup Sys - KSC & VAFB 02/16/88 26,790.33 EA162 HVAC Office Replacement of AHU & Removable of Sys. From CIF Roof 02/18/88 4.69 SF163 HVAC Office BOB HVAC/Thermal Energy Storage to Save Elect. Power 03/21/88 31.05 BSF164 Fiber Optic Electrical Fiber Optic Cable Phase III, 61,539 LF 03/22/88 25.33 LF165 Roof Maintenance Built Up Roof Sys Launch Equip. Shop 04/14/88 8.17 SF166 Roadway Transportation Repair NASA Parkway East Lanes Only 04/15/88 8.66 SY167 PEMB Testing Innovative Science & Technology Experimentation Center, 1,500 SF 05/24/88 158.70 BSF168 Site - Wood Bldg. Security Training Security Training Center 06/15/88 208.64 BSF169 Concrete/CMU Communication CD&SC Bldg. HVAC Upgrade & Addition 06/30/88 703.54 BSF170 Water Line Water Service Modify LC-39A Portable Water Supply 07/05/88 55.69 LF171 Parking Lot Parking OPF Annex Addition to Parking Lot 07/12/88 39.56 SY172 Concrete X-Ray Facility SRMS high Energy X-ray Facility 07/19/88 572.71 BSF173 Crane Material Handling 2nd 50 Ton Crane KSC PHSF Service Bay 08/15/88 17,742.81 TON174 Crane Material Handling 6 Ton - X-Ray Positioning Crane 08/18/88 104,309.58 TON175 Crane Material Handling 25 Ton-Crane High Energy X-Ray Facility. Span 42', 48'High 08/18/88 16,660.21 TON176 Steel Concrete Panels Medical Facility Medical Addition to Multi-Function Facility 08/30/88 251.53 BSF177 Bit Paving Site Work Resurface Kennedy Pkwy. Wilson to Haul over Canal 10/25/88 6.63 SY178 Cooling Tower Air Conditioner Replace CIF Cooling Tower #1 02/06/89 464.85 TON179 Electrical Feed line OLF 60Hz Power T3 & T4 Feeder 02/23/89 17.92 LF180 Electrical Outside Cable Outside Plant Cable Phase 4, 40,995 LF 03/21/89 16.79 LF181 Utilities Electrical & Mech. Mods to Bldg. 1610 Spin Test Facility. VAFB Rebid 9/18/89) 03/28/89 341.93 SF182 Water Line Potable Water 5650 LF of 10" Potable Water Line to HMF Area 04/14/89 49.46 LF183 Hanger Office Modify Hangar L & Little L, 7,319 SF 04/15/89 188.58 BSF184 Utilities Elec. & Water Utilities to Child Care Facility. 04/25/89 97.95 LF185 PEMB Maintenance Generator Maintenance Area Ph. III, Charging & Storage. 20X200 06/16/89 56.99 BSF186 Concrete/Steel Electrical Base Electric Power & Lighting Facility 06/16/89 77.54 BSF187 HVAC Air Conditioner Task I, Replace Propellant Boiler, 89,823 27 MBH 06/21/89 87.62 BSF187 HVAC Air Conditioner Task II, Mod to Comm. Main Storage 560,177 06/21/89 56.84 MBU187 HVAC Air Conditioner 120 TON 06/21/89 81.67 TON188 Electrical Duct Bank Overbuild Comm. New Duct Bank - Dirt-Sand 4X4, 6X4, 8X4, &

16X406/21/89

100.02 LF189190 HVAC Air Conditioner Replace HVAC System at Building A-#, CCAS 07/31/89 4,725.43 TON191 Communication Cable LC-39 Operations Support Building Communications 08/07/89 13.06 BSF

Glenn Butts Volume XVII Page A-21

Vol III Escalated To 12/30/2005PRICE BOOK PAGE SYS./BLDG. TYPE SYS. BLDG. USES PROJECT TITLE BID DATE

Escalated Cost Unit

192 PEMB Storage Covered Storage Area Adj. to Bldg. M6-589 30X50X14 08/14/89 42.04 BSF193 Utilities Elec. & Mech. Mod to Building 1610 Spin Test Facility. Vandenberg AFB 09/18/89 221.38 BSF194 Waste Tanks Storage Retrofit Waste Tanks & Piping, 24,000 Gals., 1,500, 11/27/89 66.94 GAL

3-5,000 & 7,500 Gals. Tanks, Piping 4" X 8"195 Road Access Paving Unified s_Bank Antenna Site 12/21/89 12.02 SY196197 Steel/Concrete Monument Astronaut Memorial 01/24/90 472.46 SF198 Roof & HVAC Air Conditioner Replacement of HVAC System & Roof at SAEF-2 02/06/90 6,901.83 TON199 Clean Room Office Upgrade ATM Clean Room for Hubble Space Telescope 02/07/90 318.49 SF

Pallet System200 PEMB Construction of Emergency Response Facility 02/09/90 123.18 BSF201 PEMB Refurbish. Base Electric Shop for BOC Phase II 02/12/90 69.67 BSF

201A Electrical Fiber Optics Fiber Optic Cable Terminations & Replacement 02/21/90 20.81 LF202 Parking Lot Parking Parking Lot North Side VAB 02/27/90 33.89 SY203 Roof Instrument Facility. Repair CIF Roof Phase I & II, 46,200 SF 02/27/90 18.49 SF204 Concrete Lab & Hp Gas Addition to Propellant Lab & HP Gas Maintenance. 03/06/90 385.97 BSF205 Paving Roadway Repair to Saturn Causeway, 61,078 SY 03/07/90 5.16 SY206 Piping Water & Boilers Replace HTHW< LTHW< Chilled Water Piping & Boilers 03/14/90 244.06 LF207 Concrete/Block Warehouse Design Mod. To Supply Warehouse #1 03/19/90 12.54 SF208 Plumbing Assembly/Storage Renovate Existing Restroom in VAB 03/28/90 98.78 SF209 Air Conditioner Testing Replace HVAC System SAEF-2 02/06/90 6,901.83 TON210 Cooling Tower Air Condition Replacement of VAB Utility Annex Cooling Tower 03/29/90 527.04 TON211 Fiber Optic Electrical Fiber Optic Cable CDSC-VABR/ Industrial area, Ph. VI 04/06/90 18.94 LF212 Air Conditioner Health Facility Replace HVAC System at OHF 04/12/90 7,171.08 TON213 CMU Helium Compressor Upgrade Helium Compressor, Alt. I 04/13/90 1,156.13 SF214 AHU/Chill Water Air Condition Construction Mods. To Bldg.. M7-505 04/19/90 190.48 LF215 Crane Material Handling OMRF Second 30-Ton Bridge Crane 04/23/90 55,195.39 TON216 Roof Maintenance Roof Repair of Base Support Facility 05/03/90 5.27 SF217 Tank/Pipe Storage OPF Hypergol Catchment Tank, 10,000 Gals. (8'-4" Diameter. X 30' 05/04/90 253.76 LF218220 Panel Breathing Air/GN2 Breathing Air Panels & GN2 Panel Assy. 05/08/90 312.62 LF221 Mezzanine Office Mezzanine Office Space EDL. high Bay 05/11/90 49.96 SF222 Roof Office Repair O&C Bldg. Roof Sys. Ph. I 05/18/90 12.26 SF223 Roof Office Replace Built-Up Roof Sys. Headquarters. Bldg. 05/18/90 7.45 SF224-225 Alarm System Electrical RPSF Fire Monitor & Alarm System Update 06/06/90 12.09 SF226 Electrical Orbiter Ground Power Bus Battery 06/14/90 186,246.84 EA227 Steel/Metal Cleaning/Rotation Canister Cleaning & Rotation Facility, 9,900 SF 06/25/90 970.65 SF228 Fiber Optic Communication Fiber Optic Cable, Phase VII, 51,650 LF 07/03/90 18.18 LF

Glenn Butts Volume XVII Page A-22

Vol III Escalated To 12/30/2005PRICE BOOK PAGE SYS./BLDG. TYPE SYS. BLDG. USES PROJECT TITLE BID DATE

Escalated Cost Unit

229 Concrete Control Center Processing Control Center, 99,000 SF 07/09/90 152.46 SF230 Steel/Concrete Storage Shed Water Reclaiming Sys.-Maintenance. Area, POL Storage Shed 07/25/90 66.81 SF231 Piping GN2/Ghe Cross-Country GN2 & Ghe Pipeline, 2,900 LF 08/09/90 98.15 LF232 Siding Office Modular Office Building, 2,850 SF 08/27/90 59.39 SF233 Piping Water System Hanger L Annex Process Chilled Water System 09/06/90 220.50 LF234 Health Facility Health Facility Cape Dispensary Addition, 2,240 SF 09/07/90 283.17 SF235 Roadway/Railroad Transportation Playalinda Beach Access Road, 7.74 Miles Includes R/R 09/11/90 856,182.16 LMIL236 Dirt Duct bank Communication Underground Conduit & Manhole Additions 10/18/90 175.26 LF237 Paving Roadway Four-Laneng Kennedy Parkway, SR-3 (2.6 Miles) 10/19/90 62.73 SY238 AHU Assembly/Storage Replacement of VAB Air Handling Units 10/19/90 1,434.79 TON239-240 Crane Material Handling Vehicle Assembly Bldg. 325-Ton Cranes (4 Cranes) 10/22/90 20,278.68 TON241 243 Bridge Transportation Repair & Rehab Four KSC Bridges 10/26/90 97.21 SF244-245 Concrete/CMU Restroom Facility. VIP Viewing Site, Banana Creek 12/12/90 456.76 SF246 Generator Hot Water Replacement of Utility Annex Hot Water Generator No. 3 12/14/90 29,533.15 MBTU247 AHU Air Conditioner Replace AHU Low Bay Roof, 400 Tons 01/16/91 1,964.70 TON248 Roof Repair Assembly Bldg. Replacement of VAB Low Bay Roof 01/17/91 11.72 SF249 Conc & Steel Processing Facility. Space Station Processing Facility (SSPF) 01/23/91 207.01 SF250 Conc & Steel Processing Facility. SSPF Main Building, 450,908 SF 01/23/91 190.28 SF251 Conc & Steel Food SSPF Cafeteria, 12,900 SF 01/23/91 179.69 SF252 Conc & Steel Viewing SSPF Visitor Viewing Gallery (WG) 01/23/91 541.96 SF253 HVAC Control Sys. SSPF HVAC Control System, Task II 01/23/91 33.02 LF254 Communication Premise Wiring SSPF Administration. & Data Communication. Sys. Premise Wiring 01/23/91 6.57 SF255 Electronics Security Sys. SSPF Electronic Security Facility, Task IV 01/23/91 4.28 LF256 Environmental Monitoring Sys. SSPF Integr. Environmental. Monitoring Sys., Task V 01/23/91 2.92 LF257 Chiller Air Condition SSPF Second 2,500 Ton Chiller, Task VI 01/23/91 940.06 TON258 Circuit Bracket/ Duct bank Power Feeder SSPF Orsino Power Feeder, Task VII 01/23/91 29.54 LF259 PEMB Equipment SSPF PEMB Chiller Building, 7,391 SF 01/23/91 51.74 SF260 Concrete/Steel Processing Facility. Space Station Processing Facility (SSPF) 01/23/91 207.01 SF261 Concrete Health Facility Environmental Health Facility Annex 02/22/91 150.22 SF262 Concrete Health Facility Addition to Health Facility M6-495 03/19/91 138.70 SF263 PEMB News Facility KSC Industrial Area News Facility Addition 04/02/91 93.51 SF264 Chiller Tower Air Condition Replace Pad A Water Chillers and Controls 04/17/91 1,259.49 TON265 Tank/Piping Storage Replace Underground Hazardous Waste Tank & Piping 04/22/91 48.21 GAL266 Fire Detection Sys. Install a New Fire Alarm Detection Sys. Pad "B" 05/13/91 10.53 LF267 VAB Holding Cell External Tank Mods. To Holding Cell for External Tank (ET) 05/15/91 201.36 SF268 HVAC Air Condition Mods to OPF High Bay HVAC/Chilled Water system 05/30/91 2,108.58 TON

Glenn Butts Volume XVII Page A-23

Vol III Escalated To 12/30/2005PRICE BOOK PAGE SYS./BLDG. TYPE SYS. BLDG. USES PROJECT TITLE BID DATE

Escalated Cost Unit

269 SAEF-2 Ceiling and Floor Tile Replacement 06/10/91 11.73 BST270271 Cable Communication Outside Plant Cable CD&SF-TEL IV TFC 06/10/91 2,367.72 LF272 PEMB Storage Heavy Equipment Area Storage Task I & II 06/17/91 119.50 SF273 PEMB Storage Staff Maintenance Bldg. Heavy Equip. Area Task I 09/17/91 117.65 SF274 PEMB Storage High Crew Storage Bldg. Heavy Equip. Area Task II 06/17/91 119.70 SF275 Steel Tank Water Repairs & Mods. To Water Tanks M6-896A, K6-994 06/18/91 17.61 SF276 Sand Landfill Re-grading Ransom Road Landfill, 8 ACR 06/24/91 26,663.84 ACR276 Sand Landfill 24,147 CY 06/24/91 8.84 CY277 Paving Roadway Repairs to NASA Causeway 06/25/91 11.63 SY278 Power Plant Switchgear Upgrade LC-39 Emergency Power Plant Switchgear, 8 EA 07/18/91 82,949.19 EA279 Resurface SLF Runway Overrun Resurface SLF Runway Overrun for FOD Control 07/19/91 8.11 SY280 Storage Checkout Const. EDO Cryogenic Pallet Checkout/storage Facility 07/25/91 314.95 BSF281 HVAC Maintenance Replace HVAC Equipment HMF (400 ton) 09/18/91 5,980.26 TON282 Paving Parking Lot Paving - 12 Trailers, Pad A - Misc. Driveways 09/20/91 30.43 SY283 PEMB Experiments Phase III, Innovation Sciences Technology Experimentation Facility. 11/13/91 134.80 BSF284 Roof Tracking USB OPR Building Roof Sys. Rehab. 11/19/91 9.63 SF285-286 Electrical Fiber Optics Fiber Optic Cable Phase IX 12/20/92 0.19 FF287 Electronics Alarms Detection & Alarm Sys., LCC, VAB, OPF, MLP 2&3 01/16/92 21.29 LF288 Electronics Alarms Alt. Bid Detection & Alarm Sys., LCC, VAB, OPF, MLP 2&3 01/16/92 14.37 LF289 PEMB Office Construct Source Evaluation Board Facility 01/17/92 112.74 BSF290 Concrete/CMU Hanger Hangar AF Modifications for ASRM 02/14/92 15.41 SF291 Storage Classified Storage. Film Storage Facility 03/12/92 244.57 BSF292 Potable Water MSS Park Site Modify Water Lines at MSS Park Site 03/16/92 90.89 LF293 Paving Roadway Highway & Street Const. Cape Rd., Pad B Bypass 03/20/92 7.53 SY294 Paving Roadway Repair Industrial Area Four Lane Roads and First Street 03/26/92 5.73 SY295296 Steel Main. Platform ASRM Mods. To High Bay 1 & 3, VAB Roof Maintenance Platform 04/02/92 30.80 BSF297 Tank Fuel Oil Secondary Containment of Fuel Oil, VAB Utility Annex 04/04/92 298.09 GAL298 Utilities Cooling Tower Replace West Cooling Tower, O&C Bldg. 04/16/92 573.94 TON299 PEMB Office KSC Gateway Facility Bldg. M6-39 Expansion 40' X 44" 04/21/92 187.69 SF300 Paving Runway Restoration of SLF Runway Shoulders 04/24/92 19.00 SY301 Piping Hot Water Refurbish HTHW/LTHW Piping in the Industrial. Area 05/01/92 31.81 LF302 PEMB Heavy Equip. Heavy Equip. Area Restoration HB Addition Building. K6-1995 50' X 05/05/92 103.92 SF303305 Steel & Panels Testing Hazardous Processing Payload Spin Test Facility Replacement 05/15/92 508.78 BSF306 Communication Terminal Comm. Cross Connect Terminal No. 1 05/27/92 545.20 BSF307 Wharf SRB Retrieval SRB Retrieval Wharf 07/13/92 263.40 BSF

Glenn Butts Volume XVII Page A-24

Vol III Escalated To 12/30/2005PRICE BOOK PAGE SYS./BLDG. TYPE SYS. BLDG. USES PROJECT TITLE BID DATE

Escalated Cost Unit

308-309 Crane Material Handling SSPF/PSTF-R 5-15-20 Ton Cranes 07/15/92 24,133.17 TON310-310A Bridge Access Electrical Controls for Four Bridges 07/28/92 1,773,467.94 Tot311312 Panel Air Regulator PSTF-R Breathing Air Distribution., SY 14 Panels/ Spares 09/14/92 1,945.72 EA313 Paving Roadway Repave Black Point Road 09/16/92 11.26 SY314 Pneumatic Compressed Air Repair the Compressed Air Systems at Pad A & B 09/21/92 1,170.00 HP315 Roof Repair VAB Transfer Aisle Replace Roofs, VAB Transfer Aisle 10/15/92 35.06 SF316 Equipment Material Handling Cargo Lifting Assy. (CELA) 10/23/92 31,971.33 TON317 Fire Detection System Upgrade Explosive Safe Area (ESA-60) 11/12/92 242.07 LF

Fire Protection System318 Fiber Optic Communication Outside Plant Fiber Cable, Phase XI 11/19/92 31.29 LF318 Fiber Optic Communication Outside Plant Fiber Cable, Phase XI FF319320 Vent System Toxic Fuel PSTF-R Toxic Fuel Vent System 01/19/93 98.51 LB321 Electrical Perimeter lights Replace Perimeter Lights, Complex 39A, 92 Poles 02/12/93 5,064.72 EA322 Nitrogen Tetroxide Thermal Conditioner. U PSTF-R Thermal Conditioning Unit, 10 Ton 02/26/93 62,069.03 TON323 Conc & Steel Support Station ECLSS Support Station, Pad A & B 03/01/93 533.76 SF324 325 Cable Communication Outside Plant Fiber Cable, Phase X 03/02/93 0.30 FF326327 Piping Chilled Water Modernize Industrial Area HVAC Capacity 03/08/93 257.33 LF328 HVAC Air Conditioner Upgrade VABR Primary Back-up HVAC Subsystems 03/11/93 2,925.36 TON329 Electrical Conduit & Manhole Underground Conduit and Manhole Additions, Phase III 03/23/93 57.80 LF330 Piping Firex Refurbish. Pad B Underground Firex Piping 04/02/93 220.28 LF331 Conveying Sys. Elevators Upgrade O&C Elevators 5,6 & 7 and Controls 05/03/93 101,731.09 EA332333 Steel Plate/Pipe Ground Support Equip. Orbital Replacement Unit Handling Device 05/14/93 30,524.06 TON334 Earthwork & Paving Roadway Widen Kennedy Parkway Southbound Lane 05/19/93 11.57 CY335 Piping Chilled & Hot Water Replace Chilled & Hot Water Piping & Airlock Chiller 05/24/93 181.51 LF336 Structural Mechanical ElectHealth Facility Mod Renovate Occupational Health Facility., East Wing 07/02/93 77.72 SF337 Concrete/CMU Hangar Modification to Hangar Little "L" LSFE/STP ORS Support 07/13/93 73.49 BSF338 Concrete/CMU Power Substations Replace Two ALS Power Substations at the SLF 10/26/93 661.57 BSF339 Steel & Panel Support Bldg. Transporter/Canister Facility. Operations Support Bldg. (Metric) 11/17/93 1,751.95 M^2340 Steel & Panel Support Bldg. Transporter/Canister Facility. Operations Support Bldg. (U.S.) 11/17/93 162.82 SF

Refurbish. LCC AHU's & Replace LCC & VAB LB Reheat CoilsSubstation 926 & 1032 Enclosures 02/11/94 0.00Restore C5 Substation 03/03/94 0.00

Glenn Butts Volume XVII Page A-25

Vol III Escalated To 12/30/2005PRICE BOOK PAGE SYS./BLDG. TYPE SYS. BLDG. USES PROJECT TITLE BID DATE

Escalated Cost Unit

Replacement of the MCC & Upgrade CW Pumping Sys. At UA 04/11/94 0.00VAB/Pad Water Storage Tanks 04/18/94 0.00Refurbish LCC AHU and Replace LCC and VAB LB Reheat Coils 04/29/04 0.00Apollo/Saturn V Display Facility Utilities 05/06/94 0.00Replace Central Heat Plant MCC No. 1 06/23/94 0.00

341 342 Steel & Panel Rotation Processing Rotation Processing & Surge Facility N/A BSF343 Dock/PEMB Receiving Area Barge Terminal Facility for ASRM N/A BSF344 Roadway & Traffic Signal Paving VARB Parking Lot and Traffic Signalization 09/16/91 54.91 SY345 PEMB Storage Covered Storage for SRM Transporter #2 05/26/92 80.42 SF346 Roof Repair O&C Building Roof Repair (Phase III) 09/02/92 992.64 SQ347 PEMB Support VPF Operations Support Building Annex 05/18/93 130.88 SF348 Piping Chill & Hot Water Replace CA, CHW, & HTWH Piping from the VAB Utility Annex to the 11/23/93 255.82 LF349 Roof Hanger Replace Roof, Hanger N CCAS, FL 12/20/93 9.26 SF350 AHU Air Conditioning LC-39A Air Handling Units Replacements and LC-39A & LC-39B Fan 11/17/93 3,095.43 TON351 Electrical Substation Substation 926 and 1032 Enclosures 02/11/94 64.17 SF352 Electrical Circuit Breakers Replace Obsolete FPE and Allis Chalmers Circuit Breakers 02/14/94 9.53 AMP353 Substation Substation Restore C5 Substation 03/03/94 2,321.58 SF354 Fire Protection Sys. Replace the Fire Protection System at NASA-VLSI Bldg. 836 at VAFB 04/08/94 55.32 LF355 Utility Annex Pumping System Replacement of the MCC and Upgrade Chilled Water Pumping Syste 04/11/94 1,263.20 LF356 Storage Tank Water VAB/PAD Water Storage Tanks (refurbish) 04/18/94 1.22 GAL357358 Concrete Hypergol System Construct Hypergol Oxidizer Decontamination Facility. Mods at CCAS 04/19/94 367.23 SY359 AHU/Reheat Coils Air Condition Refurbish LCC AHU's and Replace LCC and VAB Low Bay Reheat C 04/29/94 5,223.27 TON360 Piping Utilities Apollo/Saturn V Display Facility Utilities 05/06/94 119.13 LF361 Starter Control Center Replace MCC No. 1 at Central Heat Plant 06/23/94 6.99 LF362 Office Upgrade for Disabled Upgrade Headquarters Building to Accommodate the Functionally Dis 06/28/94 13,437.81 SF363 Parking Lot/Roadway Paving Repair Base Support Building Parking Lot and Beach Road (S.R. 402 08/26/94 12.04 SY364 Landfill Soil KSC Class III Landfill 12/01/94 16.44 CY365 Refurbish Building Component Refurbish. Component Refurbishment Facility, Phase I 01/19/95 3,005.24 M^2366367 PEMB Corrosion Control Upgrade BOC Corrosion Control Facilities 03/31/95 111.81 SF368369 Landfill Soil Schwartz Road Landfill Closure 05/03/95 32.27 CY370 HVAC A/C Systems PHSF HVAC Systems Modernization 05/08/95 8,615.49 TON371 Bridge Expansion Joints Bridge Expansion Joints 05/25/95 663.29 M 372 Parking Area/Roadway Paving Repair North Parking Area of MC-486 & Beach Road West 05/26/95 8.52 M^2373 Metal Building Chillers KSC Industrial Area Chiller Plant Expansion 06/26/95 1,210.99 SF374

Glenn Butts Volume XVII Page A-26

Vol III Escalated To 12/30/2005PRICE BOOK PAGE SYS./BLDG. TYPE SYS. BLDG. USES PROJECT TITLE BID DATE

Escalated Cost Unit

375 Vertical Processing Facility Roof Roof Repair Vertical Processing Facility, Building M7-1469 07/05/95 226.29 M^2376 SRB/Orbiter Flame Deflector Repair Flame Deflector System at Pad 39A & 39B 07/06/95 165.58 SF377 HVAC/Roof A/C & Roof Repairs Rehabilitate Building M7-505 HVAC and Roof (Phase 1) 07/10/95 12,919.50 TON378 Operation Building Condensers/Chillers Replace Air Cooled Condensers/Chillers MILA Operations Building 07/28/95 327.86 SF379 Ransom Road Hazardous Storage Hazardous Substance Storage Facility at Ransom Road 04/01/96 2,194.39 M^2

Glenn Butts Volume XVII Page A-27

Steel Frame 2-3-18-42-43-44-45-46-49-59-87 Cable & Piping 5-14-20-21-22-34-38-53-78-159-163-179-180Steel/Siding 90-101-123-145-154-227-267-273-280-303-34-305-339-340-341-342 Crane/Handling & Storage 12-58-76-80-81-84-88-94-97-98-110-174-175Conc. & Masonry 6-11-31-35-47-65-95-103-108-117-126-141 178-211-240-241-308-309-316-332-333

142-143-144-151-204-207-229-244-261-262 Paving/Landscaping/Fence 63-64-67-68-84-111-120-132-166-171-177291-290-336-337-338 195-202-205-235-237-249-279-293-294-313-334

Steel - CMU 36-48-57-61-65-82-100-106-114-123 Cleaning/Testing 17-52-60-77-79-86138-186-234-241-249-295-296-323 Roof Systems 24-105-134-159-165-203-216-222-223-248-284-296-315

Pre-Eng. Metal Bldg. 13-15-25-26-29-39-40-41-85-96-109-114-115-116 Waste Treatment 83-194-213-217-265119-122-124-125-128-133-146-167-185-192-201 Service Mast/Test Towers 10-16-50-64258-259-260-263-272-273-274-283-289-299-302-343 Fiber Optic/Communications W93-121-129-130-147-164-210-228-285-286-318-324-325

Trailer Complex 54-66 Lighting Protection 112Airlock 102-114 Holding Pond 113Canister 56 Dredging 51Access Platform 4-7-23-28-49-67-68-71-87-97-140-267-295 Flare Slack 92Revolving Ser. Structura 27 Landing Facility/Overrun 1-279Rail Cars 70 Umbilical Unit 8Bio-specimen Van 72 Environ. Chamber 9Cooling Tower 127-128-139-178-209-298 Fire Protection Water 11-99-224-225-330Tank Refurbish. 55-275-297 Mechanical/Elect Inst. 38-74-75-76-131-134A-136-137-141-155-181PGHM 76 184-193-212-213-214-226-231-246-253-245-255-258Room Rehab 53-65-73-74-148-149-183-208 278-301-321Helicopter Pad 156 Wash Down Sys 62Battery Room 157-160-161 Mobile Launch Platform. 24-38-87Security Training Center 168 HVAC Mod 16-136-158-187-189-190-198-206-211-221-238X-Ray Training 172 247-268-281-328Holding Pond 113 Hypergol Scrubber 79Clean Room 199 Purge Unit 86Mezzanine 221 Lifting Beams 58Water Reclaiming 230 Air Compressor 135-314Panels 75-218-219-220-331-312 Precision Telescope Tube 140Fire Alarm System 266-287-288-317 Site Work/Fill & Paving 89-150-153-171-276-277-282-300Bridges 242-243 Parachute Facility 35Elec. Control Bridges 310-310A Warf/Dock 307

Life Science Support 36OPF Activation Mod 37

Building Use Code Abbreviations Contamination Control 52-90-251Destruct Facility 104

F - Food Service PEMB - Pre-Eng. Metal Building Resilient Conductive Floor 144-152-269H - Hanger HVAC - Heating Ventilation & Air Condition Potable Water 170-182-292M - Mobile Launcher Cryogenics (Flax Line) 30-31-32-33O - Office BSF - Building Square Foot Duct Bank (Dirt)/Concrete. 188-236-329P - Processing PSF - Platform Square Foot Office Building Com System 191-232-306R - Rotation SQ - Square Yard F.O.-Video-Data Tel. 270-271S - Storage Memorial 196-197T - Theater Chiller/Water System 233-257-264-326-327-335U - Landing Facility. Vent System 319-320

Thermal Conditioning Unit 322Conveying System 331

Engineering costs include labor, material, tax, insurance, overhead and profit.Not included: design, special conditions, government contingencies or S&AFor escalation use KSC Cost Index for Bid Date to present to get today's

Volume XVIII Page B-1