Volcanic Crisis Management and MitigationStrategies: A Multi-Risk Framework CaseStudy Giulio Zuccaro, Mattia Leone
Study Centre PLINIVS – University of Naples “Federico II”, via Toledo, 402 – 80134 Naples, IT
[email protected], [email protected]
Background
Natural phenomena such as earthquakes, mud floods, landslides, volcanic eruption or industrial accidents may
cause huge disasters. Each crisis generally determines consequences in multiple sectors and systems (e.g. building
and infrastructures, roads and public transport, lifelines and telecommunication, society and emergency
management.) that are singularly affected by the triggering event, but also may be hit by effects following the
main one, the so-called “cascading effects.”
Therefore, the methodological approach to the risk analysis of a single event made by the classical probabilistic
convolution of Hazard, Vulnerability and Exposure has to be appropriately modified. Consequently, in order to
produce effective tools addressing these issues, dynamic multi-hazard evaluation, time-dependant vulnerability
functions of the element at risk under examination, and its exposure evolving in time and space, are required.
Systemic studies on hazard, vulnerability and exposure have become the main field of investigation and have to
be embedded within a multi-risk assessment approach. Multi-risk in fact is more than a simple aggregation of
single risks, due to the possible amplification of risk indexes due to interactions among different hazards and/or
cascade events. In this field, only few studies have been conducted and ongoing research still needs considerable
efforts.
The tools available for foreseeing crisis evolution are specific to each hazard and therefore the actual best practice
for decision makers involved in extreme crisis management is to evaluate possible management sub-plans by
comparing potential losses starting from a synoptical view of single risks. Nevertheless, the single risk modeling
approaches, based on different hazard models and on the estimation of impacts on typologically different systems
at risk, often referring to different space and time scales that determines different model scales and input/output
data, may lead to incomparable estimations of risk, ranging from mere indices to complex assessments.
Moreover, often only the average of the estimated risk distribution is provided, not accounting for confidence
boundaries of the estimation, and at the same time heterogeneity of available input data and models could be
accompanied by inhomogeneous uncertainties invalidating risk comparability.
The volcanic hazard represents a relevant research issue in the field of multi-risk assessment and management, as
it embodies a possible well-defined sequence of disastrous events (i.e. a Sub-Plinian event is characterized by thefollowing phases: several seismic tremors and earthquakes during the unrest phase, ash fall, bombs and gas
emission during the eruption, pyroclastic flows at the end of the eruption and lahars after the eruption), which in
turn can lead to cascading effects in multiple systems.
An effective Disaster Operations Management (DOM) tool and its support to decision-makers should then be
focused on a dynamic evolution of the risk, in order to minimize the physical and economic losses, especially in
the case of Low probability of Occurrence of main event (LO) and High socio economic Impact (HI) of the
expected losses. In this case, the effect of long-term mitigation strategies, as well as short-term recovery sub-
plans, depending on existing capabilities and on their possible altered availability during the event, should be
8/3/2019 Volcanic Crisis Management and Mitigation Strategies
http://slidepdf.com/reader/full/volcanic-crisis-management-and-mitigation-strategies 2/9
fully evaluated with a decision management perspective. In this sense a crucial aspect of the dynamic predictive
model is the time-dependant vulnerability curves able to estimate the cumulative damage of the considered
element at risk by combining the actions of a sequence (seismic crisis) or of the contemporaneity of events
(earthquakes with ash on the roofs).
Volcanic Crisis and Disaster Management
Research activities about the effects of a volcanic eruption on existing buildings and infrastructures have
produced in the last 15 years a comprehensive framework of studies, surveys and simulations, showing the
several uncertainties related to the exact prediction of the eruption type which should be expected (especially in
the case of active volcanoes in rest phase), and the many implications that different eruptive phenomena can have
on emergency-plan strategies and on built-environment planning and refurbishment.
Nevertheless, in order to address possible DOM (Disaster Operation Management) actions and mitigation
strategies in volcanic risk-prone areas, a different approach is needed, starting from the basic consideration that
the cumulative effects given by a complex eruptive scenario (such as a Sub-Plinian or Plinian eruption) produce
extremely variable impacts on the territory, and depending on the specific time history of the event (i.e. the
specific sequence of hazards, from precursory seismic tremors, to ash fall and pyroclastic flows), the prevailingbuilding typologies in the invested areas, and their level of vulnerability (i.e. masonry or R.C. structures).
Figure 1: Hypothetical Time History for a Sub-Plinian Eruption at Vesuvius.
This peculiar approach has been recently formalized in order to evaluate the impact of a Sub-Plinian eruption in
Vesuvius and Campi Flegrei area (Zuccaro et al., 2008, 2009, 2010, Baxter et al. 2008), through the development
of a numeric model for the definition of impact scenarios.
8/3/2019 Volcanic Crisis Management and Mitigation Strategies
http://slidepdf.com/reader/full/volcanic-crisis-management-and-mitigation-strategies 3/9
The case of a possible volcanic crisis at Vesuvius or Campi Flegrei Caldera can be defined as LO-HD event, since
it has very low absolute probability to occur in short time (Low Occurrence – LO), but in that case the impact
should be extremely heavy (High Damage – HD). This kind of crisis determines a time-dependent development
of the hazard and involves five temporal phases characterized by different types of emergency. The first time-
window starts with the unrest phase and is determined when the Vesuvian Observatory of the INGV ( National
Institute for the Geophysics and Volcanology) records considerable variations of the monitored parameters
(seismic activity, geodetic alteration, geochemical variation, etc.). The second phase starts when the eruption
happens, with heavy ash-fall, and the third phase consists of possible pyroclastic flows (for large eruption Plinian
or Sub Plinian type, Fig.1). Thefourth phase is the post-event period up to the end of the volcanic crisis,
characterized by lahars and a possible long waiting period until the monitored parameters come back under
prefixed threshold, when the alarm is over. The fifth possible phase concerns the progressive normalization and
the coming back to the regular life.
The decisions and activities are then time-dependent and related to hazard phases. As an example, those related to
the first time window are basically connected to the population evacuation, while after the main eruptive event,
rescue issues also have to be considered in some part of the territory hit by the disastrous phenomena. The fourth
phase is very delicate, since it could last years.
Figure 2: Impact scenario of a Sub-Plinian Eruption at Vesuvius (cumulative effects: EQ+AF+PF).
It is then clear that many are the scenarios that the decision-makers could be faced with, all in a dynamic time-
dependent evolution. The emergency management should be conditioned by several factors. Some of these are
not predictable before the eruption starts, such as the intensity of the eruption. Others are potentially predictable
in very short time during the unrest phase by using impact scenario models developed in the last 15 years in other
UE projects (Vesuvius, EXPORIS etc.) with the contribution of PLINIVS Centre (Università di Napoli Federico
II).
Fig. 2 reports a cumulative damage scenario for a Sub Plinian-like eruption at Mount Vesuvius. However, in spite
of the prediction capability, many uncertainties arise on how the crisis has to be managed to minimize the impact.
In fact, the simulated scenarios are very much influenced by the dynamic modification of the systems along the
8/3/2019 Volcanic Crisis Management and Mitigation Strategies
http://slidepdf.com/reader/full/volcanic-crisis-management-and-mitigation-strategies 4/9
crisis and this could affect sensibly the actuation of the Civil Protection Management Plan (CPMP) up to his
failing.
In order to clarify the level of complexity of disaster-management planning in case of volcanic eruption, it is
possible to highlight the main issues associated only with the first phase of the emergency. In fact, during the
unrest phase (of which the duration is the first uncertainty) many premonitory tremors and possibly some
damaging earthquakes are expected. Therefore, the actual vulnerability assessment of the buildings in the area issupposed to change along the unrest phase by cumulating damages due to the seismic actions that precedes the
eruption (Figs 3a and 3b). This could affect the success of the evacuation because of:
• lack of practicability of the road system obstructed by building rubbles;
• emotional pathos of the population disrupted by an emergency (seismic) in another emergency
(volcanic);
• management difficulties to rescue the people trapped;
• management difficulties to evacuate relatives of missing people;
• lifeline failures during the management of the seismic crisis preceding the evacuation;
• over-loading of the health facilities in the area and surrounding areas to be evacuated;
• critical management of the information system.
Figure 3a: Detail of Vesuvius Red Zone: Impact of pre-event seismic actions on evacuation roads practicability.
In this case, the decision-makers are faced with the necessity to evaluate the dynamic changes of the system status
along the crisis. Therefore, a time-dependent risk assessment is required, along with the evaluation of the
variation laws that govern the status along the time history assumed for the several involved systems, such as:
• seismic hazard probability and the dependent eruption probability;
• vulnerability of the buildings facing the escaping ways;
• roads network vulnerability (practicability, redundancies, etc.);
• social preparedness and the probability of bad reactions of the population;
• vulnerability of the information system and management of the media;
• lifelines network vulnerability and its influence on the emergency management;
• rescue system efficiency, time of intervention, capability, etc;
• health system efficiency, time of treatment, capability; etc.
8/3/2019 Volcanic Crisis Management and Mitigation Strategies
http://slidepdf.com/reader/full/volcanic-crisis-management-and-mitigation-strategies 5/9
Figure 3b: Probability of impracticability of evacuation paths.
A DOM Tool for Volcanic Events
PLINIVS, as Centre of Competence of the Italian Department of Civil Protection (DPC), has developed a
complex model to evaluate damage impact scenarios consequent to a volcanic eruption in Vesuvius and Campi
Flegrei area. The tool is based on realistic data for volcanic hazard, vulnerability and losses model that, once
translated into possible time-dependent impact scenarios, allows us to simulate the evolution of the crisis, helping
decision-makers to choose the possible alternative policies while being aware of the possible consequences in
each foreseen evolving scenario. As stated before, the volcanic eruption itself is a sequence of disastrous events,
thus determining a significant variation of the vulnerability curves of the element at risk along the eruptive time
history. The tool available at PLINIVS simulates the progression of the damage along the crisis, considering the
damage variations of the element at risk considered (buildings, people, roads, etc.) in time and space.
The input data of the simulation model are basically:
Hazard data
• seismic activity and his distribution in space, achieved by a sequence of shaking maps representing the
damaging seismic event expected during the unrest phase taking into account the geological local effect
(Convertito et al. 2008);
• ash fall intensity and spatial distribution according wind speed and direction during the eruption are
defined by 3D fluid dynamic simulation model developed at Osservatorio Vesuviano (OV) of INGV
(Macedonio et al. 2008);
• dynamic pressure and temperature of the pyroclastic flows and their distribution in time and space at
the end of the eruption are defined by 3D fluid dynamic simulation model developed at Centre of
Research of INGV in Pisa (Neri et al. 2003);
• potential area invaded by lahars following gas emissions and subsequent heavy rainfall, their dynamic
pressure and spatial distribution are defined by overlapping DEM with ash fall distribution obtained by
OV simulations;
Inventory data (exposure of the element at risk)
8/3/2019 Volcanic Crisis Management and Mitigation Strategies
http://slidepdf.com/reader/full/volcanic-crisis-management-and-mitigation-strategies 6/9
• distribution of building class typologies on the territory;
• total inhabitants and occupants per building type during day/night hours, etc.;
• roads network and critical facilities inventory: lifelines, resources system and their capacity data
(hospitals, fire stations, ambulances, helicopters, etc.);
• additional usable resources in “peace time.”
The model can be used as a DOM (Disaster Operation Management) tool, to build up a framework of interactionsbetween the systems involved in the specific crisis considered. The model provides, by means of a full
probabilistic approach, the variation of the impact scenario according to the variation during time of the single
sub-system, its distribution in space and its influence on the others subsystem interrelated.
Out-of-service road system branches and related no-escape areas are determined. Making use of the hypothetic
flow models, traffic intensifications also are determined. Moreover, hypothetical electrical service disruption and
gas lines breakings for potential serious inconveniences and/or cascading hazardous effects are determined
(systemic vulnerability) involving air transport, trains, etc.
Based on this set of information, the model is able to produce several alternative scenarios at selected times along
the event time history, in order to compute an impact evaluation (expressed as casualties, direct physical
damages, costs, indirect economic consequences, etc.) to compare the consequences of potential decisions taken
(i.e. evacuation of population) during the crisis. The model considers also the probability of variations in damage
scenarios consequent to assumed mitigation actions, including the evaluation of the direct, indirect and social cost
of each single management action.
The results should be the potential evaluation of a dynamic risk assessment in time and space along the crisis,
giving elements to the decision-makers for steering the action to undertake.
Mitigation Strategies and Cost-Benefit Assessment
Studies carried out at PLINIVS, in collaboration with DPC and Campania Region, show how the implementation
of mitigation strategies can significantly decrease the expected damage after an eruptive event. Even the impacts
of high destructive type of eruptions, such as Sub-Plinian, can be strongly reduced by effective planning strategiesor mitigation measures on buildings and infrastructures, responding to the different eruptive phenomena, such as
earthquakes (EQ), pyroclastic flows (PF), ash fall (AF) and lahars (LH).
The first domain, related to territorial planning strategies for volcanic risk-prone areas, is connected to some basic
regulatory issues that should be faced within local planning and development, introducing the volcanic risk
mitigation opportunities into existing or updated building codes.
This raises new issues previously only slightly treated in territorial planning. Incentives to the population to leave
the area should be supported by new strategies for the Red Zone, considering how moving many people requires
intensive studies for delocalization of residential and productive areas. Some industries and sensible functions
would need to be delocalized. But at the same time, having in mind the financial assessment of such operations, it
should be clear which kind of use could be envisaged for the new “free” areas in the Red Zone (i.e. urban parks,seasonal and touristic structures, etc.), in order to limit the economic damage to the area due to the loss of people
and productive activities. In territorial contexts different from Vesuvius and Campi Flegrei area (characterized by
high environmental and archeological constraints to transformation), damage scenarios also can be integrated in
advanced territorial planning, suggesting densification and a-densification strategies based on expected impact on
the different areas.
A second field of intervention is the one related to the strengthening and protection of building and infrastructures
at risk. PLINIVS model considers different mitigation technologies for building structures and envelopes as
8/3/2019 Volcanic Crisis Management and Mitigation Strategies
http://slidepdf.com/reader/full/volcanic-crisis-management-and-mitigation-strategies 7/9
variable parameters that, if implemented, can reduce vulnerability of technical elements and therefore the
expected damage in the area.
In order to define the effectiveness of the technical solutions, the main design data to be considered are:
• construction types and prevalent building technologies in risk-prone areas;
• cumulative effects given by the expected time history of the eruptive event.
The design parameters assumed come from the elaboration of data by SPeeD (DPC supported) project (Hazard
and Damage Scenarios for Campania Region Volcanoes) and Exploris (EU-FP6) project; the proposed retrofit
technologies are directly referred to conventional building types inside Vesuvius and Campi Flegrei area and
summarized in a technical solutions database. The technical sheets are classified in four categories: SE-elevation
structures; SV-vertical surfaces; SO-horizontal structures; and AP-openings.
The study proposes a design approach for the mitigation of risk, considering the cumulative effects given by the
eruptive scenario and highlighting both technical and economical implications, through the definition of
performance indicators for the effectiveness of each technical option and a cost-benefit evaluation.
An effective design approach aims to put in relation technological features of existing buildings, parameters and
data from probable scenarios, opportunities given by mixing together conventional technologies and advanced
materials, highlighting also the additional benefits coming from volcanic risk mitigation such as energy saving
issues in case of interventions on building envelope and openings (PF), or value added for householders in case of
attic refurbishment overlapping of pitched roof (EQ, AF) with m3
increase.
The analysis of technological options considers performances expressed by the employed materials and
technologies, according to some primary requirements (safety, reliability, durability, integrability) and additional
selection criteria such as quick installation, storability, lightness, cost, preservation of constructive and
architectural features, and multi-functionality (ability to respond to different volcanic phenomena).
Figure 4: Tephra fall: vulnerability curves and mitigation strategies for building roofs.
In order to transfer this kind of analysis into DOM strategies, it is important to separate “damage connected”
mitigation issues (i.e. general strengthening of building structures and roofs, provisional protection systems for
windows and openings, etc.) from those that are “emergency management connected” (i.e. seismic mitigation on
8/3/2019 Volcanic Crisis Management and Mitigation Strategies
http://slidepdf.com/reader/full/volcanic-crisis-management-and-mitigation-strategies 8/9
buildings curtains facing escape routes). With the same perspective, envisaged pre or post-event Civil Protection
activities can be supported by “logistic related” mitigation strategies (i.e. protection of railways and train stations
as preferred connection system before and after the eruption; protection of strategic buildings in the Red Zone as
emergency headquarter, etc.). The envisaged strategies need finally to be supported by cost-benefit analysis.
It is then clear that mitigation strategies must be put in relation with:
• Damage Scenario(s);• Emergency Management;
• Economic Assessment.
In particular, economic assessment becomes a guideline for future strategies and technical policies. Considering
that nobody can predict the duration of a possible volcanic crisis, the cost of the emergency will be very high and
strongly dependent from the number of people living in the area.
Scenarios accounting for possible long term mitigation action then have to be considered, such as preventive
delocalization of activities, delocalization of entire communities, enlargement of escape roads, population training
for emergency situations, “ensafing” established percentages of the buildings through the seismic strengthening of
the building facing the escaping roads, or the realization of a pitched roof over the existing flat roof (fig. 4), etc.
Figure 5: Structure of the Economic Assessment Model.
The economic assessment tool developed within PLINIVS model enable compares the total financial investment
of mitigation measure with the total economic damage after the possible event (Fig. 5).
As an example, a cost-benefit analysis was carried out to evaluate possible mitigation scenarios for ash fall
impacts, involving 11 of 59 municipalities in the areas surrounding Vesuvius.
The aim was to “ensafe” about 50% of the buildings through the realization of a pitched roof over the existing flat
roof through CFS (Cold Formed Steel) technologies. This solution can significantly reduce the number of victims
from a roof collapse, assuming that the people occupying unsafe buildings can find a shelter in buildings subject
to mitigation action. The intervention is provided only for the municipalities where the vulnerable roofs areas
exceed 50% and the collapsed roof areas exceed 5%. The study has shown that with a total investment of around
182 million Euros, it is possible to reduce of about 35% the number of roof collapsed after the ash fall.
Comparing the expected mitigation cost with the cost of avoided rehabilitation interventions on non-collapsed
roof, it is possible to provide a cost-benefit assessment. The results in this case show that the option of such
mitigation actions would bring to considerable economic savings in case of a Sub-Plinian eruption of the
Vesuvius, varying from about 90.000.000 € (considering an average rehabilitation cost of 500 €/sm) to about
283.000.000 € (average rehab. cost 850 €/sm).
8/3/2019 Volcanic Crisis Management and Mitigation Strategies
http://slidepdf.com/reader/full/volcanic-crisis-management-and-mitigation-strategies 9/9
Future Developments and Needs
A dynamic tool that provides the probabilistic evaluation of the consequences of the possible strategies adopted
by the decision-makers, before/during/after the crisis (false alarm included), is missing at the moment. Different
decisions could affect the damage scenarios consequent to a single eruptive event (that represents a cascade of
events by itself). In this aim, the simulation models already available, and mentioned in this paper, consider the
cumulative damage on the elements at risk phase after phase (time-dependent vulnerabilities are considered).However, they do not take into account cascading effects that could be triggered during a crisis because of lack of
decision or inappropriate decisions.
At the moment, there aren’t models able to describe as a whole the multi-sectorial consequence of an intervention
action of the civil protection along the crisis, nor established models able to describe the risk associated to
cascading events (multi-risk models) triggered by a wrong managing of an originating adverse event. The
decision-maker should be supported by a tool able to represent, through a number of scenarios, what would be the
effects of each action. Those scenarios ought to be built considering evolving risk in a multi-risk dynamic
approach where the input is also the alternative action of the crisis management.
Future research projects at the European level should take into account this new approach in order to give a first
answer to the need of standardization of emergency management, especially when for Low Hazard a High Impact
is expected.
References
• Neri, A., Esposti Ongaro, T., Macedonio, G., Gidaspow, D., 2003. Multiparticle simulation of collapsing
volcanic columns and pyroclastic flows. J. Geophys. Res. Lett. 108, 2202.
• Macedonio G., Costa A., Folch A. 2008 Ash fallout scenarios at Vesuvius: numerical simulations and
implications for hazard assessment, J. Volcanol. Geotherm. Res.
• Convertito, V. and Zollo, A. 2008. Assessment of pre- and syn-crisis seismic hazard at Vesuvio and Campi
Flegrei volcanoes, Campania region southern Italy.
• G. Zuccaro, F. Cacace, R. J.S. Spence, P. J. Baxter, “Impact of explosive eruption scenarios at Vesuvius”,
Journal of Volcanology and Geothermal Research 178 (2008) 416–453.
• P.J. Baxter , W.P. Aspinall , A. Neri , G. Zuccaro, R.J.S. Spence, R. Cioni, G. Woo, “Emergency planning and
mitigation at Vesuvius: A new evidence-based approach”, Journal of Volcanology and Geothermal Research 178
(2008) 454–473.
• G. Zuccaro, 2009 “A probabilistic Model for the evaluation of the impact of explosive eruption scenarios at
Vesuvius”, in Urban Habitat Constructions under Catastrophic Events – COST action C26 – F. Mazzolani et al.
Editors. Conferenza COST 26 in Malta 2008 – Pubblicata 2009.
• G. Zuccaro, F. Cacace – 2010, “Seismic impact scenarios in the volcanic areas in Campania” , Proceedings of
“COST Action C26- Final Conference” Urban Habitat Constructions under Catastrophic Events – Mazzolani
(Ed). © 2010 Taylor & Francis Group, London, ISBN 978-0-415-60685-1
• Nezih Altay, Walter G. Green III, OR/MS research in disaster operations management, European Journal of
Operational Research 175 (2006) 475–493
• Kweku-Muata (Noel) Bryson, et al., Using formal MS/OR modeling to support disaster recovery planning,
European Journal of Operational Research 141 (2002) 679–688
• Hiroyuki Tamura, et al., Modeling and analysis of decision making problem for mitigating natural disaster risks,
European Journal of Operational Research 122 (2000) 461±468