vol ii of iii technical part i section 1 process piping c

229
GAIL (INDIA) LIMITED BID DOCUMENT FOR COMPOSITE LAYING TENDER FOR PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA VOLUME – II of III TECHNICAL (PART –I) SECTION – 1 - PROCESS, PIPING AND CATHODIC PROTECTION (BID DOCUMENT NO. 11/0226A/JPK/GAIL/01-R0) COMPOSITE CONSTRUCTION PACKAGE ISSUED BY .

Upload: gautam-ghoshal

Post on 11-May-2017

220 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Vol II of III Technical Part i Section 1 Process Piping c

GAIL (INDIA) LIMITED

BID DOCUMENT FOR

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

VOLUME – II of III TECHNICAL (PART –I) SECTION – 1 - PROCESS, PIPING AND

CATHODIC PROTECTION

(BID DOCUMENT NO. 11/0226A/JPK/GAIL/01-R0) COMPOSITE CONSTRUCTION PACKAGE

ISSUED BY .

Page 2: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

1 Section - I - Invitation for Bid (IFB)

a) Bidder's Evaluation Criteria

b) BEC Technical Checklist

c) BEC Commercial Checklist

d) Acknowledgement-cum-consent Letter

e) Submission of Bid

2 Section - II - Instruction to Bidders (ITB)

a) Evaluation / Comparison of Bids

b) List of Formats

c) Commercial Questionnaire

d) Check List

3 Section - III - General Conditions of Contract

a) Proforma of Indemnity Bond for supply of Materials by Employer

b) Proforma of Contract Agreement

4 Section - IV - Special Conditions of Contract (Commercial)

6 Section - V - Schedule of Rates

IOCL, Gurgaon

IGL, Greater Noida

13 Schedule of Rates (Section - I & II) 110226A/SOR-Part -I/GAIL/01 - 110226A/SOR-Part -II/GAIL/01 0

14 List of Recommended Vendors 11-0226-01-02-02-001 B 40

VOLUME - I of III - COMMERCIAL

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

Document:Table of Contents ofCombined- Rev.0.xls Page 1 of 13

Page 3: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

SECTION - 1A

1 Process Design Basis 11-0226A-02-03-04-201 1 6

2 Scope of Pipeline Laying works 11-0226A-01-09-02-001 B 21

B

Piping Material Specification 11-0226A-01-08-02-001 B 29

Technical Specification for Ball Valves 11-0226A-01-08-02-002 B 17

Technical Specification for Gate and Globe valves 11-0226A-01-08-02-003 B 8

Technical Specification for Insulating Joints 11-0226A-01-09-02-003 B 8

Technical Specification for Flow tee 11-0226A-01-09-02-004 B 7

Technical Specification for Long .Radius Bends 11-0226A-01-09-02-005 B 7

Technical Specification for Gasket, Bolts & Nuts 11-0226A-01-08-02-007 B 4

Technical Specification for Fittings & Flanges 11-0226A-01-08-02-008 B 5

Technical Specification for Welding for Station Piping System 11-0226A-02-08-02-011 B 8

Technical Specification for Launcher / Receiver 11-0226A-01-09-02-002 B 15

Technical Specification for Basket Filter 11-0226A-01-09-02-009 B 6

Data Sheet for Pig Launcher / Receiver 11-0226A-01-09-03-002 A 3

Data Sheet for Monolithic Insulating Joint 11-0226A-01-09-03-003 A 2

Data Sheet for Flow Tee 11-0226A-01-09-03-004 A 2

Data Sheet for Basket Filter 11-0226A-01-09-03-009 A 2

C

Design Basis of CP System 11-0226A-01-10-04-101 B 8

Technical Specification for TCP & PCP 11-0226A-01-10-02-102 B 49

PROCESS, PIPING AND CATHODIC PROTECTIONVOLUME - II of III TECHNICAL (PART - I) - IOCL, GURGAON

PIPING

PROCESS

CATHODIC PROTECTION

Document:Table of Contents ofCombined- Rev.0.xls Page 2 of 13

Page 4: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

SECTION - 2

1 Design Criteria-Pipelines 11-0226A-01-07-02-001 A 21

2 Technical Specification for 3LPE Coatings for Line Pipes 11-0226A-01-07-02-002 A 28

3 Technical Specification for Bare line Pipes (ERW) 11-0226A-01-07-02-003 B 31

4 Technical Specification for Transportation, handling and storage of Coated Line Pipe 11-0226A-01-07-02-004 A 10

5 Technical Specification for Long Radius Bend 11-0226A-01-07-02-005 A 10

6 Technical Specification for Precommissioning & Commissioning of Pipeline System 11-0226A-01-07-02-006 A 9

7 Technical Specification for Cleaning & Drying 11-0226A-01-07-02-007 A 5

8 Technical Specification for Inspection and Testing of Production Weld 11-0226A-01-07-02-008 A 6

9 Technical Specification for Documentation of Pipeline Construction. 11-0226A-01-07-02-010 A 7

10 Technical Specification for pipeline concrete weight Coating 11-0226A-01-07-02-011 A 12

11 Technical Specification for Field Joint Coating 11-0226A-01-07-02-013 A 11

12 Technical Specification for Onshore Pipeline Construction 11-0226A-01-07-02-014 A 16

13 Technical Specification for pipeline Crossing roads, rail and Minor Waterways 11-0226A-01-07-02-015 A 10

14 Technical Specification for Major Water crossing by Trenching 11-0226A-01-07-02-016 A 10

15 Technical Specification for Pipe Line Hydrotesting 11-0226A-01-07-02-017 A 18

16 Technical Specification for Welding of Onshore Pipeline For Gas Transportation 11-0226A-01-07-02-019 A 22

17 Technical Specification for casing and end seals 11-0226A-01-07-02-021 A 4

18 Technical Specification for Caliper Pigging 11-0226A-01-05-02-029 A 8

PIPELINES

Document:Table of Contents ofCombined- Rev.0.xls Page 3 of 13

Page 5: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

SECTION - 3

Technical Specification for Topographic & Route Survey 11-0226A-01-05-02-001 B 16

Technical Specification for Geotechnical Investigation 11-0226A-01-05-02-002 B 7

Technical Specification for Site Clearing,Area Grading, Excavation and Earthwork 11-0226A-01-05-02-003 B 6

Technical Specification for Structural Concrete 11-0226A-01-05-02-005 B 22

Technical Specification for Masonry Work 11-0226A-01-05-02-006 B 16

Technical Specification for Plumbing & Building Drainage 11-0226A-01-05-02-007 B 8

Technical Specification for Water Supply 11-0226A-01-05-02-008 B 5

Technical Specification for Clean Agent system 11-0226A-01-05-02-009 B 9

Technical Specification for Plaster & Pointing 11-0226A-01-05-02-010 B 7

Technical Specification for Roof Treatment 11-0226A-01-05-02-011 B 4

Technical Specification for Sewer & Drainage System 11-0226A-01-05-02-012 B 7

Technical Specification for Structural Steel 11-0226A-01-05-02-013 B 14

Technical Specification for Sheet Roofing 11-0226A-01-05-02-014 B 7

Technical Specification for Wood Work 11-0226A-01-05-02-015 B 8

Technical Specification for Doors, Windows Ventilators And Rolling Shutters 11-0226A-01-05-02-016 B 16

Technical Specification for Floor finishing 11-0226A-01-05-02-017 B 8

Technical Specification for False ceiling, false Flooring,Underdeck insulation partitioning 11-0226A-01-05-02-018 B 9

Technical Specification for Painting, Colour Washing and Polishing 11-0226A-01-05-02-019 B 7

Technical Specification for CO2 Flooding System 11-0226A-01-05-02-020 B 10

Technical Specification for GEO Technical Investigation & Hydrogaraphic Investigation for Water Crossing 11-0226A-01-05-02-021 B 11

Technical Specification for Diversion, Beams, Gabions and Geo Log Sack Breakers 11-0226A-01-05-02-022 B 4

Technical Specification for Sesmic Design of Buried Pipelines 11-0226A-01-05-02-023 B 14

Technical Specification for Miscellaneous Items 11-0226A-01-05-02-024 B 7Technical Specification for Dismantling and demolition of existing concrete, steel and masonry structure 11-0226A-01-05-02-025 B 4

Technical Specification for Road Work 11-0226A-01-05-02-026 B 20

Technical Specification for Standard Field Quality Plan 11-0226A-01-05-02-028 B 18

Technical Specification Fire Fighting System 11-0226A-01-05-02-030 B 25

Technical Specification for Barricades 11-0226A-01-05-02-032 B 3

CIVIL

Document:Table of Contents ofCombined- Rev.0.xls Page 4 of 13

Page 6: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

SECTION - 4

A

1 Electrical Design Criteria 11-0226A-01-10-3-001 A 8

2 Scope of Work for Electrical 11-0226A-01-10-02-001 A 4

3 Technical Specification of MV Switch Boards/ MDB 11-0226B-01-10-2-001 A 11

4 Technical Specification of AC UPS System 11-0226A-01-10-2-002 A 17

5 Technical Specification of Power and Control Cables 11-0226A-01-10-2-004 A 10

6 Technical Specification of Lighting System 11-0226A-01-10-2-005 A 8

7 Technical Specification of Earthing & Lightning Protection System 11-0226A-01-10-2-006 A 6

8 Technical Specification of Lighting Fittings for Hazardous area 11-0226A-01-10-2-007 A 5

9 Technical Specification of Split Air Conditioning 11-0226A-01-10-2-008 A 5

10 Specification of Electrical Equipment Installation 11-0226A-01-10-02-009 A 6

11 Technical Data Sheet for MV Switch Board 11-0226A-01-10-03-001 A 6

12 Technical Data Sheet for UPS & ACDB 11-0226A-01-10-03-002 A 7

Technical Data Sheet for Power & Control Cables 11-0226A-01-10-03-004 A 2

Technical Data Sheet for Lighting/Power Panel 11-0226A-01-10-03-005 A 2

ELECTRICAL & INSTRUMENTATIONELECTRICAL

Document:Table of Contents ofCombined- Rev.0.xls Page 5 of 13

Page 7: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

B

Design Criteria -Instrumentation 11-0226A-01-11-01-001 B 11

Technical Specification for Local Control Panel 11-0226A-01-11-01-002 B 4

Technical Specification for Pig Signaller 11-0226A-01-11-01-003 B 4

Technical Specification for Pressure Gauges, Differential Pressure Gauges 11-0226A-01-11-01-004 B 4

Technical Specification for Pressure Relief Valves 11-0226A-01-11-01-005 B 6

Technical Specification for Field Transmitters 11-0226A-01-11-01-006 B 4

Technical Specification for RTD / Thermowells 11-0226A-01-11-01-007 B 4

Technical Specification for OFC and HDPE Duct 11-0226A-01-11-01-008 B 28

Technical Specification and Scope of Work for Telecom 11-0226A-01-11-01-009 B 12

Technical Specification for PLC / HMI 11-0226A-01-11-01-010 B 27

Technical Specification for Fire & Gas Detection System 11-0226A-01-11-01-011 B 6

Technical Specification for Instrument Cable 11-0226A-01-11-01-012 B 2

Technical Specification for Junction Boxes & Cable Gland 11-0226A-01-11-01-013 B 2

Technical Specification for Stainless Steel Tubes & Fittings 11-0226A-01-11-01-014 B 5

Technical Specification for Instrument Valves & Manifold 11-0226A-01-11-01-015 B 4

Data Sheet for Junction Boxes 11-0226A-01-11-03-007 B 2

Data Sheet for Signal Cable 11-0226A-01-11-03-008 B 2

SECTION - 5

P&ID for Launcher at SV63 110226A-GU-03-01-001 0 1

P&ID for Receiver at IOCL Bottling Plant 110226A-GU-03-01-002 0 1

P&ID for Metering at IOCL Bottling Plant 110226A-GU-03-01-003 0 1

Piping GAD for PIG Launcher AT SV -63 110226A-GU-08-01-002 C 1

Piping GAD AT iocl BOTTLING Plant 110226A-GU-08-01-004 B 1

APlot Layout Plan For LPG Conectivity To IOCL LPG Bottling Plant, At Gurgaon 11-0226-GU-05-01-001 B 1

Site Development and Plot Layout 11-0226-GU-05-01-002 B 1

Architectural Drawings Of Control Room For LPG Conectivity To IOCL LPG Bottling Plant, At Gurgaon 11-0226-GU-05-01-003 B 1

Boundary Wall Layout For LPG Conectivity To IOCL LPG Bottling Plant, At Gurgaon 11-0226-GU-05-01-004 B 1

Boundary Wall Detail For LPG Conectivity To IOCL LPG Bottling Plant, At Gurgaon 11-0226-GU-05-01-005 B 1

Cross Section of Road & Pavment For LPG Conectivity To IOCL LPG Bottling Plant, At Gurgaon 11-0226-GU-05-01-006 B 1

G.A. Of Porta Cabin For LPG Conectivity To IOCL LPG Bottling Plant, At Gurgaon 11-0226-GU-05-01-007 B 1

Standard Drawing for Details of Road Curves & Crossings 1-05-001 A

Standard Drawing for Details of Cable Trench 1-05-002 A

DRAWINGS & STANDARDS

CIVIL/STRUCTURAL

INSTRUMENTATION

Document:Table of Contents ofCombined- Rev.0.xls Page 6 of 13

Page 8: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

Standard Drawing for RCC Flooring Details 1-05-003 AStandard Drawing for Chain Link Fencing 1-05-004 A

Standard Drawing for Boundary Wall with Barbed Wire 1-05-005 A

Standard Drawing for Hand Rail on Steel Platform 1-05-006 A

Standard Drawing for Soak Pit 1-05-007 AStandard Drawing for Septic Tank 1-05-008 AStandard Drawing for URINAL FIXING DETAIL 1-05-009 A

Standard Drawing for WASHBASIN FIXING DETAIL 1-05-010 A

Standard Drawing for EUROPEAN TYPE W.C FIXING DETAIL 1-05-011 A

Standard Drawing for SILIDING T-SUPPORT 1-05-012 A 2

Standard Drawing for GLAZED ALUMINIUM DOOR 1-05-013 A

Standard Drawing for WOODEN FLUSH DOOR 1-05-014 AStandard Drawing for FALSE FLOORING DETAIL 1-05-015 A 3

Standard Drawing for GLAZED ALUMINIUM WINDOW 1-05-016 A

Standard Drawing for PLATFORM DETAIL 1-05-017 AStandard Drawing for FALSE CEILING DETAIL 1-05-018 AStandard Drawing for STORM WATER DRAIN 1-05-019 AStandard Drawing for TRENCH SAND BEDDING 1-05-020 AStandard Drawing for PIPE CULVERT FOR STORM WATER DRAINAGE 1-05-021 A 2

Standard Drawing for CONCRETE BEDDING AND ENCASEMENT FOR PIPE 1-05-022 A

Standard Drawing for GRATING DETAIL 1-05-023 AStandard Drawing for CROSS OVER DETAIL 1-05-024 AStandard Drawing for MISCELLANEOUS DETAIL 1-05-025 A

Standard Drawing for TYPICAL DEAIL OF CAT LADDER 1-05-026 A

Standard Drawing for INSERT PLATE DETAIL 1-05-027 AStandard Drawing for SAFE SIGNING 1-05-028 AStandard Drawing for VALVE PIT 1-05-029 AStandard Drawing for Barricades 1-05-030 AStandard Drawing for Cantilever Pipe Support 1-05-031 AStandard Drawing for Gate Details 1-05-032 A

BPipeline Schematic 11-0226A-S1-07-01-001 A

CRoute Map Chainage 00/000.00 Km To 18/552.93 Km 11-0226A-S1-07-01-051 A

DAlignment Sheet Chainage 0/000.00 Km To 1/650.00 Km 11-0226A-S1-07-01-101 A

Alignment Sheet Chainage 1/650.00 Km To 3/300.00 Km 11-0226A-S1-07-01-102 A

Alignment Sheet Chainage 3/300.00 Km To 4/950.00 Km 11-0226A-S1-07-01-103 A

Alignment Sheet Chainage 4/950.00 Km To 6/600.00 Km 11-0226A-S1-07-01-104 A

Alignment Sheet Chainage 6/600.00 Km To 8/250.00 Km 11-0226A-S1-07-01-105 A

Alignment Sheet Chainage 8/250.00 Km To 9/900.00 Km 11-0226A-S1-07-01-106 A

ALIGNMENT SHEETS

PIPELINE SCHEMATIC

PIPELINE ROUTE MAPS

Document:Table of Contents ofCombined- Rev.0.xls Page 7 of 13

Page 9: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

Alignment Sheet Chainage 9/900.00 Km To 11/550.00 Km 11-0226A-S1-07-01-107 A

Alignment Sheet Chainage 11/550.00 Km To 13/200.00 Km 11-0226A-S1-07-01-108 A

Alignment Sheet Chainage 13/200.00 Km To 14/850.00 Km 11-0226A-S1-07-01-109 A

Alignment Sheet Chainage 14/850.00 Km To 16/500.00 Km 11-0226A-S1-07-01-110 A

Alignment Sheet Chainage 16/500.00 Km To 18/150.00 Km 11-0226A-S1-07-01-111 A

Alignment Sheet Chainage 18/150.00 Km To 18/552.93 Km 11-0226A-S1-07-01-112 A

EAsphalted Road Chainage 1/067.51Km. 11-0226A-S1-07-01-501 A

National Highway -71B Chainage 2/565.88 Km. 11-0226A-S1-07-01-502 A

Nala Chainage 3/558.88 Km. 11-0226A-S1-07-01-503 A

Asphalted Road Chainage 3/668.37Km. 11-0226A-S1-07-01-504 A

Nala Chainage 3/886.31 Km. 11-0226A-S1-07-01-505 A

Asphalted Road Chainage 4/324.29Km. 11-0226A-S1-07-01-506 A

Asphalted Road Chainage 4/897.23Km. 11-0226A-S1-07-01-507 A

Nala Chainage 5/597.26 Km. 11-0226A-S1-07-01-508 A

Nala Chainage 7/871.80 Km. 11-0226A-S1-07-01-509 A

Asphalted Road Chainage 8/488.69 Km. 11-0226A-S1-07-01-510 A

Asphalted Road Chainage 10/330.79 Km. 11-0226A-S1-07-01-511 A

Asphalted Road Chainage 12/443.01 Km. 11-0226A-S1-07-01-512 A

Asphalted Road Chainage 14/686.83 Km. 11-0226A-S1-07-01-513 A

Nala Chainage 14/796.53 Km. 11-0226A-S1-07-01-514 A

Asphalted Road Chainage 16/846.19 Km. 11-0226A-S1-07-01-515 A

Asphalted Road Chainage 17/332.17 Km. 11-0226A-S1-07-01-516 A

Asphalted Road Chainage 17/777.59 Km. 11-0226A-S1-07-01-517 A

F1 EXISITING UNDER GROUND PIPE CROSSING 1-07-001 02 UNDERGROUND CABLE CROSSINGS 1-07-002 03 OVERHEAD POWER LINE CROSSINGS 1-07-003 04 HDD WITH CASING PIPE FOR HDPE 1-07-004 05 TRENCH DETAILS 1-07-005 06 RAIN CAP 1-07-006 07 CASED CROSSING PIPELINE- ROAD / HIGHWAY 1-07-007 08 PARALLEL PIPELINE IN SAME TRENCH 1-07-008 09 ROU FOR FOREST AREA 1-07-009 0

10 PIPELINE WARNING SIGN 1-07-010 011 DIRECTIONAL MARKER 1-07-011 012 RIGHT OF USE FOR PIPELINES 1-07-012 013 K.M. POST MARKER 1-07-013 014 TEST STATION WITH FOUNDATION DETAILS 1-07-014 015 AERIAL MARKER 1-07-015 0

16 NAVIGABLE WATERWAY PIPELINE CROSSING WARNING SIGN 1-07-016 0

17 ROW BOUNDARY MARKER 1-07-017 018 DETAILS OF CASING VENT AND DRAIN 1-07-018 019 STREAM CROSSING 1-07-019 020 CASED CROSSING PIPELINE-CANAL 1-07-020 021 CASED CROSSING PIPELINE-RAILWAY 1-07-021 0

PIPELINE STANDARD DRAWINGS

CROSSING DRAWINGS

Document:Table of Contents ofCombined- Rev.0.xls Page 8 of 13

Page 10: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

G1 Cu PLATE ELECTRODE IN TEST PIT 110226-01-10-1-001 B2 GI PIPE ELECTRODE IN TEST PIT 110226-01-10-1-002 B3 INSTALLATION OF GI EARTH PLATE 110226-01-10-1-003 B4 INSTALLATION OF FLOUROSCENT FIXTURE IN FALSE CEILING 110226-01-10-1-004 B

5 INSTALLATION OF CEILING MOUNTING FLOUROSCENT LIGHT FIXTURE 110226-01-10-1-005 B

6 TYP.INSTALLATION OF POWER/LIGHTING PANEL FLUSH MOUNTED 110226-01-10-1-006 B7 INSTALLATION OF ELECTRICAL PANELS ON CABLE TRENCH 110226-01-10-1-007 B8 INSTALLATION OF DIRECTLY BURIED CABLE 110226-01-10-1-008 B9 INSTALLATION OF LIGHT FIXTURE AT GROUND LEVEL 110226-01-10-1-009 B10 INSTALLATION OF POST TOP LANTERN ON GATE 110226-01-10-1-010 B11 EARTHING CONNECTION FOR LIGHTING POLE 110226-01-10-1-011 B

SECTION - 1A1 Process Design Basis 11-0226A-02-03-04-201 1 6

2 Scope of Pipeline Laying works 11-0226A-01-09-02-001 B 21

B Piping Material Specification 11-0226C-01-08-02-001 A 18

Piping Design Basis 11-0226C-01-08-06-002 B 8

Technical Specification for Ball Valves 11-0226C-01-08-02-002 B 16

Technical Specification for Globe Valves 11-0226C-01-08-02-003 B 11

Technical Specification for Fitting & Flanges upto 16" 11-0226C-01-08-02-006 B 5

Technical Specification for Gasket, Bolts & Nuts 11-0226C-01-08-02-007 A 4Technical Specification for Inspection,Flushing & Testing of Piping Systems 11-0226C-01-08-02-009 B 8

Technical Specification for Fabrication and Erection 11-0226C-01-08-02-012 B 13

Data Sheet for Ball Valve 11-0226C-01-08-03-002 B 3

Technical Notes for Gate & Globe Valve 11-0226C-01-08-02-010 B 8

CDesign Basis of CP System 110226-00-CP-4-001

Technical Specification for TCP & PCP 110226-00-CP-1-001

SECTION - 2

1 Design Criteria - Pipelines 110226C-02-07-04-001 A 12

2 Technical Specification for Bare line Pipes (ERW) 110226C-01-07-02-003 B 31

3 Technical Specification for Transportation, Handling and Storage of Coated Line Pipe 110226C-01-07-02-004 B 10

4 Technical Specification for Precommissioning & Commissioning of Pipeline System 110226C-01-07-02-006 B 9

5 Technical Specification for Cleaning & Drying 110226C-01-07-02-007 B 5

6 Technical Specification forInspection & Testing of Production Welds 110226C-01-07-02-008 B 6

7 Technical Specification for Documentation of Pipeline Construction. 110226C-01-07-02-010 B 7

8 Technical Specification for Pipeline Concrete Weight Coating 110226C-01-07-02-011 B 12

9 Technical Specification for Field Joint Coating 110226C-01-07-02-013 B 11

ELECTRICAL STANDARD DRAWINGS

VOLUME - III of III TECHNICAL (PART - II) - IGL, GREATER NOIDAPROCESS, PIPING AND CATHODIC PROTECTION

PROCESS

PIPING

CATHODIC PROTECTION

PIPELINES

Document:Table of Contents ofCombined- Rev.0.xls Page 9 of 13

Page 11: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

10 Technical Specification for Onshore Pipeline Construction 110226C-01-07-02-014 B 16

11 Technical Specification for Pipeline Crossing Roads, Rail and Minor Waterways 110226C-01-07-02-015 B 10

12 Technical Specification for Major Water Crossing by Trenching 110226C-01-07-02-016 B 10

13 Technical Specification for Pipe Line Hydrotesting 110226C-01-07-02-017 B 18

14 Technical Specification for Welding of On shore Pipeline for Gas Transportation 110226C-01-07-02-019 B 22

15 Technical Specification for Casing and End Seals 110226C-01-07-02-021 B 4

SECTION - 3

1 Technical Specification for Topographic & Route Suirvey 110226C-01-05-02-001 B 16

2 Technical Specification for Geotechnical Investigation 110226C-01-05-02-002 B 7

3 Technical Specification for Site clearing ,area grading, excavation and earthwork 110226C-01-05-02-003 B 6

4 Technical Specification for Structural Concrete 110226C-01-05-02-005 B 22

5 Technical Specification for Water supply and sanitary works 110226C-01-05-02-008 B 5

6 Technical Specification for Plaster and Pointing 110226C-01-05-02-010 B 7

7 Technical Specification for Structural steel work 110226C-01-05-02-013 B 14

8 Technical Specification for Painting, Colour washing and Polishing 110226C-01-05-02-019 B 7

9 Technical Specification for GEO Technical Investigation & Hydrogaraphic Investigation for Water Crossing 110226C-01-05-02-021 B 11

10 Technical Specification for Miscellaneous items 110226C-01-05-02-024 B 7

11 Technical Specification for Dismantling and demolition of existing concrete, steel and Masonry structure 110226C-01-05-02-025 B 4

12 Technical Specification for Road work 110226C-01-05-02-026 B 20

13 Technical Specification for Health,Safety & Environment 110226C-00-05-02-027 A 25

14 Technical Specification for Standard Field Quality Plan 110226C-01-05-02-028 B 18

SECTION - 4

A1 Electrical Design Basis 110226C-01-10-03-001 A 8

Scope of Work Electrical 110226C-01-10-02-001 B 4

2 Technical Specification for AC UPS System 110226C-01-10-02-002 A 18

3 Technical Specification for Power and Control Cables 110226C-01-10-02-004 A 10

4 Technical Specification for Lighting System 110226C-01-10-02-005 A 8

5 Technical Specification for Earthing & Lightning Protection System 110226C-01-10-02-006 A 6

6 Technical Specification for Lighting Fittings for Hazardous Area 110226C-01-10-02-007 A 5

7 Technical Specification for Split Air Conditioning 110226C-01-10-02-008 A 5

8 Technical Specification for Electrical Equipment Installation 110226C-01-10-02-009 A 7

9 Technical Specification for Main Distribution Board 110226C-01-10-02-010 A 12

10 Technical Data Sheet for UPS & AC DB 110226C-01-10-03-002 A 7

ELECTRICALELECTRICAL & INSTRUMENTATION

CIVIL

Document:Table of Contents ofCombined- Rev.0.xls Page 10 of 13

Page 12: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

11 Technical Data Sheet for Power & Control Cables 110226C-01-10-03-004 A 3

12 Technical Data Sheet for Lighting / Power Panel 110226C-01-10-03-005 A 2

13 Technical Data Sheet for Main Distribution Board 110226C-01-10-03-006 A 6

B1 Design Criteria -Instrumentation 11-0226C-01-11-01-001 B 11

2 Technical Specification for Pressure Gauges 11-0226C-01-11-01-004 B 4

3 Technical Specification for Field Transmitters 11-0226C-01-11-01-006 B 4

4 Technical Specification for Resistance Temperature Detectors/Thermowell 11-0226C-01-11-01-007 B 4

5 Technical Specification for OFC & HDPE Duct 11-0226C-01-11-01-008 B 24

6 Technical Specification for Fire & Gas Detection System 11-0226C-01-11-01-011 B 67 Technical Specification for Instrument Cable 11-0226C-01-11-01-012 B 28 Technical Specification for Junction Boxes & Cable Gland 11-0226C-01-11-01-013 B 29 Technical Specification for Stainless steel Tubes& Fittings 11-0226C-01-11-01-014 B 5

10 Data Sheet for Signal Cable 11-0226C-01-11-03-002 B 2

11 Data Sheet for Junction Boxes 11-0226C-01-11-03-007 B 2

SECTION - 5

P&ID TAP OFF 11-0226C-GN-03-002 0 1

PIPING GAD FOR IGL GREATER NOIDA SV- 12 11-0226C-GN-08-01-002 C 1

PIPING GAD FOR IGL GREATER NOIDA RECEIVING STATION 11-0226C-GN-08-01-004 B 1

PLAN FOR CITY GATE STATION 11-0226-GN-05-01-001 C 1

SCHEMATIC, IGL G NOIDA 11-0226C-S1-07-01-001 A 1

SV-12 TO LADPUR (CH 00+ TO 01/750 KM) 11-0226C-S1-07-01-101 A 1SV-12 TO LADPUR (CH 01/750 TO 3/500KM) 11-0226C-S1-07-01-102 A 1SV-12 TO LADPUR (CH 3/500 TO 3/803 KM) 11-0226C-S1-07-01-103 A 1

ASPHALTED ROAD CROSSING AT CH 00/854.83 11-0226C-S1-07-01-501 A 1ASPHALTED ROAD CROSSING AT CH 01828.44M 11-0226C-S1-07-01-502 A 1ASPHALTED ROAD CROSSING AT CH 02925.31M 11-0226C-S1-07-01-503 A 1

AStandard Drawing for Details of Road Curves & Crossings 1-05-001 A

Standard Drawing for Details of Cable Trench 1-05-002 AStandard Drawing for RCC Flooring Details 1-05-003 AStandard Drawing for Chain Link Fencing 1-05-004 A

Standard Drawing for Boundary Wall with Barbed Wire 1-05-005 A

Standard Drawing for Hand Rail on Steel Platform 1-05-006 A

Standard Drawing for Soak Pit 1-05-007 AStandard Drawing for Septic Tank 1-05-008 AStandard Drawing for URINAL FIXING DETAIL 1-05-009 A

Standard Drawing for WASHBASIN FIXING DETAIL 1-05-010 A

Standard Drawing for EUROPEAN TYPE W.C FIXING DETAIL 1-05-011 A

Standard Drawing for SILIDING T-SUPPORT 1-05-012 A

Standard Drawing for GLAZED ALUMINIUM DOOR 1-05-013 AStandard Drawing for WOODEN FLUSH DOOR 1-05-014 A

INSTRUMENTATION

DRAWINGS & DATA SHEETS

CIVIL/STRUCTURAL

PIPELINE ALIGNMENT SHEETS

PIPELINE SCHEMATIC

PIPELINE CROSSING DRAWINGS

Document:Table of Contents ofCombined- Rev.0.xls Page 11 of 13

Page 13: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

Standard Drawing for FALSE FLOORING DETAIL 1-05-015 A

Document:Table of Contents ofCombined- Rev.0.xls Page 12 of 13

Page 14: Vol II of III Technical Part i Section 1 Process Piping c

Sl.NO. DESCRIPTION DOCUMENT/DRAWING NOS. REV.NO. PAGES

COMPOSITE LAYING TENDER FOR

PIPELINE CONNECTIVITY AT IOCL, GURGAON & IGL GREATER NOIDA

TABLE OF CONTENT

Standard Drawing for GLAZED ALUMINIUM WINDOW 1-05-016 AStandard Drawing for PLATFORM DETAIL 1-05-017 AStandard Drawing for FALSE CEILING DETAIL 1-05-018 AStandard Drawing for STORM WATER DRAIN 1-05-019 AStandard Drawing for TRENCH SAND BEDDING 1-05-020 AStandard Drawing for PIPE CULVERT FOR STORM WATER DRAINAGE 1-05-021 A

Standard Drawing for CONCRETE BEDDING AND ENCASEMENT FOR PIPE 1-05-022 A

Standard Drawing for GRATING DETAIL 1-05-023 AStandard Drawing for CROSS OVER DETAIL 1-05-024 AStandard Drawing for MISCELLANEOUS DETAIL 1-05-025 AStandard Drawing for TYPICAL DEAIL OF CAT LADDER 1-05-026 AStandard Drawing for INSERT PLATE DETAIL 1-05-027 AStandard Drawing for SAFE SIGNING 1-05-028 AStandard Drawing for VALVE PIT 1-05-029 AStandard Drawing for Barricades 1-05-030 AStandard Drawing for Cantilever Pipe Support 1-05-031 AStandard Drawing for Gate Details 1-05-032 A

B1 EXISITING UNDER GROUND PIPE CROSSING 1-07-001 02 UNDERGROUND CABLE CROSSINGS 1-07-002 03 OVERHEAD POWER LINE CROSSINGS 1-07-003 04 HDD WITH CASING PIPE FOR HDPE 1-07-004 05 TRENCH DETAILS 1-07-005 06 RAIN CAP 1-07-006 07 CASED CROSSING PIPELINE- ROAD / HIGHWAY 1-07-007 08 PARALLEL PIPELINE IN SAME TRENCH 1-07-008 09 ROU FOR FOREST AREA 1-07-009 0

10 PIPELINE WARNING SIGN 1-07-010 011 DIRECTIONAL MARKER 1-07-011 012 RIGHT OF USE FOR PIPELINES 1-07-012 013 K.M. POST MARKER 1-07-013 014 TEST STATION WITH FOUNDATION DETAILS 1-07-014 015 AERIAL MARKER 1-07-015 0

16 NAVIGABLE WATERWAY PIPELINE CROSSING WARNING SIGN 1-07-016 0

17 ROW BOUNDARY MARKER 1-07-017 018 DETAILS OF CASING VENT AND DRAIN 1-07-018 019 STREAM CROSSING 1-07-019 020 CASED CROSSING PIPELINE-CANAL 1-07-020 021 CASED CROSSING PIPELINE-RAILWAY 1-07-021 0C1 Cu PLATE ELECTRODE IN TEST PIT 110226-01-10-1-001 B2 GI PIPE ELECTRODE IN TEST PIT 110226-01-10-1-002 B3 INSTALLATION OF GI EARTH PLATE 110226-01-10-1-003 B4 INSTALLATION OF FLOUROSCENT FIXTURE IN FALSE CEILING 110226-01-10-1-004 B

5 INSTALLATION OF CEILING MOUNTING FLOUROSCENT LIGHT FIXTURE 110226-01-10-1-005 B

6 TYP.INSTALLATION OF POWER/LIGHTING PANEL FLUSH MOUNTED 110226-01-10-1-006 B7 INSTALLATION OF ELECTRICAL PANELS ON CABLE TRENCH 110226-01-10-1-007 B8 INSTALLATION OF DIRECTLY BURIED CABLE 110226-01-10-1-008 B9 INSTALLATION OF LIGHT FIXTURE AT GROUND LEVEL 110226-01-10-1-009 B10 INSTALLATION OF POST TOP LANTERN ON GATE 110226-01-10-1-010 B11 EARTHING CONNECTION FOR LIGHTING POLE 110226-01-10-1-011 B

PIPELINE STANDARD DRAWINGS

ELECTRICAL STANDARD DRAWINGS

Document:Table of Contents ofCombined- Rev.0.xls Page 13 of 13

Page 15: Vol II of III Technical Part i Section 1 Process Piping c

- 1 of 215 -

Page 16: Vol II of III Technical Part i Section 1 Process Piping c

- 2 of 215 -

Page 17: Vol II of III Technical Part i Section 1 Process Piping c

- 3 of 215 -

Page 18: Vol II of III Technical Part i Section 1 Process Piping c

- 4 of 215 -

Page 19: Vol II of III Technical Part i Section 1 Process Piping c

- 5 of 215 -

Page 20: Vol II of III Technical Part i Section 1 Process Piping c

- 6 of 215 -

Page 21: Vol II of III Technical Part i Section 1 Process Piping c

- 7 of 215 -

Page 22: Vol II of III Technical Part i Section 1 Process Piping c

- 8 of 215 -

Page 23: Vol II of III Technical Part i Section 1 Process Piping c

- 9 of 215 -

Page 24: Vol II of III Technical Part i Section 1 Process Piping c

- 10 of 215 -

Page 25: Vol II of III Technical Part i Section 1 Process Piping c

- 11 of 215 -

Page 26: Vol II of III Technical Part i Section 1 Process Piping c

- 12 of 215 -

Page 27: Vol II of III Technical Part i Section 1 Process Piping c

- 13 of 215 -

Page 28: Vol II of III Technical Part i Section 1 Process Piping c

- 14 of 215 -

Page 29: Vol II of III Technical Part i Section 1 Process Piping c

- 15 of 215 -

Page 30: Vol II of III Technical Part i Section 1 Process Piping c

- 16 of 215 -

Page 31: Vol II of III Technical Part i Section 1 Process Piping c

- 17 of 215 -

Page 32: Vol II of III Technical Part i Section 1 Process Piping c

- 18 of 215 -

Page 33: Vol II of III Technical Part i Section 1 Process Piping c

- 19 of 215 -

Page 34: Vol II of III Technical Part i Section 1 Process Piping c

- 20 of 215 -

Page 35: Vol II of III Technical Part i Section 1 Process Piping c

- 21 of 215 -

Page 36: Vol II of III Technical Part i Section 1 Process Piping c

- 22 of 215 -

Page 37: Vol II of III Technical Part i Section 1 Process Piping c

- 23 of 215 -

Page 38: Vol II of III Technical Part i Section 1 Process Piping c

- 24 of 215 -

Page 39: Vol II of III Technical Part i Section 1 Process Piping c

- 25 of 215 -

Page 40: Vol II of III Technical Part i Section 1 Process Piping c

- 26 of 215 -

Page 41: Vol II of III Technical Part i Section 1 Process Piping c

- 27 of 215 -

Page 42: Vol II of III Technical Part i Section 1 Process Piping c

- 28 of 215 -

Page 43: Vol II of III Technical Part i Section 1 Process Piping c

- 29 of 215 -

Page 44: Vol II of III Technical Part i Section 1 Process Piping c

- 30 of 215 -

Page 45: Vol II of III Technical Part i Section 1 Process Piping c

- 31 of 215 -

Page 46: Vol II of III Technical Part i Section 1 Process Piping c

- 32 of 215 -

Page 47: Vol II of III Technical Part i Section 1 Process Piping c

- 33 of 215 -

Page 48: Vol II of III Technical Part i Section 1 Process Piping c

- 34 of 215 -

Page 49: Vol II of III Technical Part i Section 1 Process Piping c

- 35 of 215 -

Page 50: Vol II of III Technical Part i Section 1 Process Piping c

- 36 of 215 -

Page 51: Vol II of III Technical Part i Section 1 Process Piping c

- 37 of 215 -

Page 52: Vol II of III Technical Part i Section 1 Process Piping c

- 38 of 215 -

Page 53: Vol II of III Technical Part i Section 1 Process Piping c

- 39 of 215 -

Page 54: Vol II of III Technical Part i Section 1 Process Piping c

- 40 of 215 -

Page 55: Vol II of III Technical Part i Section 1 Process Piping c

- 41 of 215 -

Page 56: Vol II of III Technical Part i Section 1 Process Piping c

- 42 of 215 -

Page 57: Vol II of III Technical Part i Section 1 Process Piping c

- 43 of 215 -

Page 58: Vol II of III Technical Part i Section 1 Process Piping c

- 44 of 215 -

Page 59: Vol II of III Technical Part i Section 1 Process Piping c

- 45 of 215 -

Page 60: Vol II of III Technical Part i Section 1 Process Piping c

- 46 of 215 -

Page 61: Vol II of III Technical Part i Section 1 Process Piping c

- 47 of 215 -

Page 62: Vol II of III Technical Part i Section 1 Process Piping c

- 48 of 215 -

Page 63: Vol II of III Technical Part i Section 1 Process Piping c

- 49 of 215 -

Page 64: Vol II of III Technical Part i Section 1 Process Piping c

- 50 of 215 -

Page 65: Vol II of III Technical Part i Section 1 Process Piping c

- 51 of 215 -

Page 66: Vol II of III Technical Part i Section 1 Process Piping c

- 52 of 215 -

Page 67: Vol II of III Technical Part i Section 1 Process Piping c

- 53 of 215 -

Page 68: Vol II of III Technical Part i Section 1 Process Piping c

- 54 of 215 -

Page 69: Vol II of III Technical Part i Section 1 Process Piping c

- 55 of 215 -

Page 70: Vol II of III Technical Part i Section 1 Process Piping c

- 56 of 215 -

Page 71: Vol II of III Technical Part i Section 1 Process Piping c

- 57 of 215 -

Page 72: Vol II of III Technical Part i Section 1 Process Piping c

- 58 of 215 -

Page 73: Vol II of III Technical Part i Section 1 Process Piping c

- 59 of 215 -

Page 74: Vol II of III Technical Part i Section 1 Process Piping c

- 60 of 215 -

Page 75: Vol II of III Technical Part i Section 1 Process Piping c

- 61 of 215 -

Page 76: Vol II of III Technical Part i Section 1 Process Piping c

- 62 of 215 -

Page 77: Vol II of III Technical Part i Section 1 Process Piping c

- 63 of 215 -

Page 78: Vol II of III Technical Part i Section 1 Process Piping c

- 64 of 215 -

Page 79: Vol II of III Technical Part i Section 1 Process Piping c

- 65 of 215 -

Page 80: Vol II of III Technical Part i Section 1 Process Piping c

- 66 of 215 -

Page 81: Vol II of III Technical Part i Section 1 Process Piping c

- 67 of 215 -

Page 82: Vol II of III Technical Part i Section 1 Process Piping c

- 68 of 215 -

Page 83: Vol II of III Technical Part i Section 1 Process Piping c

- 69 of 215 -

Page 84: Vol II of III Technical Part i Section 1 Process Piping c

- 70 of 215 -

Page 85: Vol II of III Technical Part i Section 1 Process Piping c

- 71 of 215 -

Page 86: Vol II of III Technical Part i Section 1 Process Piping c

- 72 of 215 -

Page 87: Vol II of III Technical Part i Section 1 Process Piping c

- 73 of 215 -

Page 88: Vol II of III Technical Part i Section 1 Process Piping c

- 74 of 215 -

Page 89: Vol II of III Technical Part i Section 1 Process Piping c

- 75 of 215 -

Page 90: Vol II of III Technical Part i Section 1 Process Piping c

- 76 of 215 -

Page 91: Vol II of III Technical Part i Section 1 Process Piping c

- 77 of 215 -

Page 92: Vol II of III Technical Part i Section 1 Process Piping c

- 78 of 215 -

Page 93: Vol II of III Technical Part i Section 1 Process Piping c

- 79 of 215 -

Page 94: Vol II of III Technical Part i Section 1 Process Piping c

- 80 of 215 -

Page 95: Vol II of III Technical Part i Section 1 Process Piping c

- 81 of 215 -

Page 96: Vol II of III Technical Part i Section 1 Process Piping c

- 82 of 215 -

Page 97: Vol II of III Technical Part i Section 1 Process Piping c

- 83 of 215 -

Page 98: Vol II of III Technical Part i Section 1 Process Piping c

- 84 of 215 -

Page 99: Vol II of III Technical Part i Section 1 Process Piping c

- 85 of 215 -

Page 100: Vol II of III Technical Part i Section 1 Process Piping c

- 86 of 215 -

Page 101: Vol II of III Technical Part i Section 1 Process Piping c

- 87 of 215 -

Page 102: Vol II of III Technical Part i Section 1 Process Piping c

- 88 of 215 -

Page 103: Vol II of III Technical Part i Section 1 Process Piping c

- 89 of 215 -

Page 104: Vol II of III Technical Part i Section 1 Process Piping c

- 90 of 215 -

Page 105: Vol II of III Technical Part i Section 1 Process Piping c

- 91 of 215 -

Page 106: Vol II of III Technical Part i Section 1 Process Piping c

- 92 of 215 -

Page 107: Vol II of III Technical Part i Section 1 Process Piping c

- 93 of 215 -

Page 108: Vol II of III Technical Part i Section 1 Process Piping c

- 94 of 215 -

Page 109: Vol II of III Technical Part i Section 1 Process Piping c

- 95 of 215 -

Page 110: Vol II of III Technical Part i Section 1 Process Piping c

- 96 of 215 -

Page 111: Vol II of III Technical Part i Section 1 Process Piping c

- 97 of 215 -

Page 112: Vol II of III Technical Part i Section 1 Process Piping c

- 98 of 215 -

Page 113: Vol II of III Technical Part i Section 1 Process Piping c

- 99 of 215 -

Page 114: Vol II of III Technical Part i Section 1 Process Piping c

- 100 of 215 -

Page 115: Vol II of III Technical Part i Section 1 Process Piping c

- 101 of 215 -

Page 116: Vol II of III Technical Part i Section 1 Process Piping c

- 102 of 215 -

Page 117: Vol II of III Technical Part i Section 1 Process Piping c

- 103 of 215 -

Page 118: Vol II of III Technical Part i Section 1 Process Piping c

- 104 of 215 -

Page 119: Vol II of III Technical Part i Section 1 Process Piping c

- 105 of 215 -

Page 120: Vol II of III Technical Part i Section 1 Process Piping c

- 106 of 215 -

Page 121: Vol II of III Technical Part i Section 1 Process Piping c

- 107 of 215 -

Page 122: Vol II of III Technical Part i Section 1 Process Piping c

- 108 of 215 -

Page 123: Vol II of III Technical Part i Section 1 Process Piping c

- 109 of 215 -

Page 124: Vol II of III Technical Part i Section 1 Process Piping c

- 110 of 215 -

Page 125: Vol II of III Technical Part i Section 1 Process Piping c

- 111 of 215 -

Page 126: Vol II of III Technical Part i Section 1 Process Piping c

- 112 of 215 -

Page 127: Vol II of III Technical Part i Section 1 Process Piping c

- 113 of 215 -

Page 128: Vol II of III Technical Part i Section 1 Process Piping c

- 114 of 215 -

Page 129: Vol II of III Technical Part i Section 1 Process Piping c

- 115 of 215 -

Page 130: Vol II of III Technical Part i Section 1 Process Piping c

- 116 of 215 -

Page 131: Vol II of III Technical Part i Section 1 Process Piping c

- 117 of 215 -

Page 132: Vol II of III Technical Part i Section 1 Process Piping c

- 118 of 215 -

Page 133: Vol II of III Technical Part i Section 1 Process Piping c

- 119 of 215 -

Page 134: Vol II of III Technical Part i Section 1 Process Piping c

- 120 of 215 -

Page 135: Vol II of III Technical Part i Section 1 Process Piping c

- 121 of 215 -

Page 136: Vol II of III Technical Part i Section 1 Process Piping c

- 122 of 215 -

Page 137: Vol II of III Technical Part i Section 1 Process Piping c

- 123 of 215 -

Page 138: Vol II of III Technical Part i Section 1 Process Piping c

- 124 of 215 -

Page 139: Vol II of III Technical Part i Section 1 Process Piping c

- 125 of 215 -

Page 140: Vol II of III Technical Part i Section 1 Process Piping c

- 126 of 215 -

Page 141: Vol II of III Technical Part i Section 1 Process Piping c

- 127 of 215 -

Page 142: Vol II of III Technical Part i Section 1 Process Piping c

- 128 of 215 -

Page 143: Vol II of III Technical Part i Section 1 Process Piping c

- 129 of 215 -

Page 144: Vol II of III Technical Part i Section 1 Process Piping c

- 130 of 215 -

Page 145: Vol II of III Technical Part i Section 1 Process Piping c

- 131 of 215 -

Page 146: Vol II of III Technical Part i Section 1 Process Piping c

- 132 of 215 -

Page 147: Vol II of III Technical Part i Section 1 Process Piping c

- 133 of 215 -

Page 148: Vol II of III Technical Part i Section 1 Process Piping c

- 134 of 215 -

Page 149: Vol II of III Technical Part i Section 1 Process Piping c

- 135 of 215 -

Page 150: Vol II of III Technical Part i Section 1 Process Piping c

- 136 of 215 -

Page 151: Vol II of III Technical Part i Section 1 Process Piping c

- 137 of 215 -

Page 152: Vol II of III Technical Part i Section 1 Process Piping c

- 138 of 215 -

Page 153: Vol II of III Technical Part i Section 1 Process Piping c

- 139 of 215 -

Page 154: Vol II of III Technical Part i Section 1 Process Piping c

- 140 of 215 -

Page 155: Vol II of III Technical Part i Section 1 Process Piping c

- 141 of 215 -

Page 156: Vol II of III Technical Part i Section 1 Process Piping c

- 142 of 215 -

Page 157: Vol II of III Technical Part i Section 1 Process Piping c

- 143 of 215 -

Page 158: Vol II of III Technical Part i Section 1 Process Piping c

- 144 of 215 -

Page 159: Vol II of III Technical Part i Section 1 Process Piping c

- 145 of 215 -

Page 160: Vol II of III Technical Part i Section 1 Process Piping c

- 146 of 215 -

Page 161: Vol II of III Technical Part i Section 1 Process Piping c

- 147 of 215 -

Page 162: Vol II of III Technical Part i Section 1 Process Piping c

- 148 of 215 -

Page 163: Vol II of III Technical Part i Section 1 Process Piping c

- 149 of 215 -

Page 164: Vol II of III Technical Part i Section 1 Process Piping c

- 150 of 215 -

Page 165: Vol II of III Technical Part i Section 1 Process Piping c

- 151 of 215 -

Page 166: Vol II of III Technical Part i Section 1 Process Piping c

- 152 of 215 -

Page 167: Vol II of III Technical Part i Section 1 Process Piping c

- 153 of 215 -

Page 168: Vol II of III Technical Part i Section 1 Process Piping c

- 154 of 215 -

Page 169: Vol II of III Technical Part i Section 1 Process Piping c

- 155 of 215 -

Page 170: Vol II of III Technical Part i Section 1 Process Piping c

- 156 of 215 -

Page 171: Vol II of III Technical Part i Section 1 Process Piping c

- 157 of 215 -

Page 172: Vol II of III Technical Part i Section 1 Process Piping c

- 158 of 215 -

Page 173: Vol II of III Technical Part i Section 1 Process Piping c

- 159 of 215 -

Page 174: Vol II of III Technical Part i Section 1 Process Piping c

- 160 of 215 -

Page 175: Vol II of III Technical Part i Section 1 Process Piping c

- 161 of 215 -

Page 176: Vol II of III Technical Part i Section 1 Process Piping c

- 162 of 215 -

Page 177: Vol II of III Technical Part i Section 1 Process Piping c

- 163 of 215 -

Page 178: Vol II of III Technical Part i Section 1 Process Piping c

- 164 of 215 -

Page 179: Vol II of III Technical Part i Section 1 Process Piping c

- 165 of 215 -

Page 180: Vol II of III Technical Part i Section 1 Process Piping c

- 166 of 215 -

Page 181: Vol II of III Technical Part i Section 1 Process Piping c

- 167 of 215 -

Page 182: Vol II of III Technical Part i Section 1 Process Piping c

- 168 of 215 -

Page 183: Vol II of III Technical Part i Section 1 Process Piping c

- 169 of 215 -

Page 184: Vol II of III Technical Part i Section 1 Process Piping c

- 170 of 215 -

Page 185: Vol II of III Technical Part i Section 1 Process Piping c

- 171 of 215 -

Page 186: Vol II of III Technical Part i Section 1 Process Piping c

- 172 of 215 -

Page 187: Vol II of III Technical Part i Section 1 Process Piping c

- 173 of 215 -

Page 188: Vol II of III Technical Part i Section 1 Process Piping c

- 174 of 215 -

Page 189: Vol II of III Technical Part i Section 1 Process Piping c

- 175 of 215 -

Page 190: Vol II of III Technical Part i Section 1 Process Piping c

- 176 of 215 -

Page 191: Vol II of III Technical Part i Section 1 Process Piping c

- 177 of 215 -

Page 192: Vol II of III Technical Part i Section 1 Process Piping c

- 178 of 215 -

Page 193: Vol II of III Technical Part i Section 1 Process Piping c

- 179 of 215 -

Page 194: Vol II of III Technical Part i Section 1 Process Piping c

- 180 of 215 -

Page 195: Vol II of III Technical Part i Section 1 Process Piping c

- 181 of 215 -

Page 196: Vol II of III Technical Part i Section 1 Process Piping c

- 182 of 215 -

Page 197: Vol II of III Technical Part i Section 1 Process Piping c

- 183 of 215 -

Page 198: Vol II of III Technical Part i Section 1 Process Piping c

- 184 of 215 -

Page 199: Vol II of III Technical Part i Section 1 Process Piping c

- 185 of 215 -

Page 200: Vol II of III Technical Part i Section 1 Process Piping c

- 186 of 215 -

Page 201: Vol II of III Technical Part i Section 1 Process Piping c

- 187 of 215 -

Page 202: Vol II of III Technical Part i Section 1 Process Piping c

- 188 of 215 -

Page 203: Vol II of III Technical Part i Section 1 Process Piping c

- 189 of 215 -

Page 204: Vol II of III Technical Part i Section 1 Process Piping c

- 190 of 215 -

Page 205: Vol II of III Technical Part i Section 1 Process Piping c

- 191 of 215 -

Page 206: Vol II of III Technical Part i Section 1 Process Piping c

- 192 of 215 -

Page 207: Vol II of III Technical Part i Section 1 Process Piping c

- 193 of 215 -

Page 208: Vol II of III Technical Part i Section 1 Process Piping c

- 194 of 215 -

Page 209: Vol II of III Technical Part i Section 1 Process Piping c

- 195 of 215 -

Page 210: Vol II of III Technical Part i Section 1 Process Piping c

- 196 of 215 -

Page 211: Vol II of III Technical Part i Section 1 Process Piping c

- 197 of 215 -

Page 212: Vol II of III Technical Part i Section 1 Process Piping c

- 198 of 215 -

Page 213: Vol II of III Technical Part i Section 1 Process Piping c

- 199 of 215 -

Page 214: Vol II of III Technical Part i Section 1 Process Piping c

- 200 of 215 -

Page 215: Vol II of III Technical Part i Section 1 Process Piping c

- 201 of 215 -

Page 216: Vol II of III Technical Part i Section 1 Process Piping c

- 202 of 215 -

Page 217: Vol II of III Technical Part i Section 1 Process Piping c

- 203 of 215 -

Page 218: Vol II of III Technical Part i Section 1 Process Piping c

- 204 of 215 -

Page 219: Vol II of III Technical Part i Section 1 Process Piping c

- 205 of 215 -

Page 220: Vol II of III Technical Part i Section 1 Process Piping c

- 206 of 215 -

Page 221: Vol II of III Technical Part i Section 1 Process Piping c

- 207 of 215 -

Page 222: Vol II of III Technical Part i Section 1 Process Piping c

- 208 of 215 -

Page 223: Vol II of III Technical Part i Section 1 Process Piping c

- 209 of 215 -

Page 224: Vol II of III Technical Part i Section 1 Process Piping c

- 210 of 215 -

Page 225: Vol II of III Technical Part i Section 1 Process Piping c

- 211 of 215 -

Page 226: Vol II of III Technical Part i Section 1 Process Piping c

- 212 of 215 -

Page 227: Vol II of III Technical Part i Section 1 Process Piping c

- 213 of 215 -

Page 228: Vol II of III Technical Part i Section 1 Process Piping c

- 214 of 215 -

Page 229: Vol II of III Technical Part i Section 1 Process Piping c

- 215 of 215 -