(VOL. 2)
2016
GOVERNMENT OF INDIA
-
Price : Rs. 3000/- (for both volumes) excluding postage and forwarding charges etc.
All rights reserved. No part of this publication, either in English or in Hindi, may be reproduced in any form or byany means, electronic or mechanical including photocopy, recording or any information storage and retrieval system,without permission, in writing, from the Director General, CPWD, New Delhi.
DISCLAIMER
The Delhi Analysis of Rates is indicative, as coefficients for labour are likely to vary due to technological innovations,skill of workman and other local factors affecting the efficiency and output of labour. Further its use by Govt.Departments, PSUs, private bodies & individuals shall be at their own discretion. CPWD shall not be responsible forany ambiguity, discrepancy, dispute or financial loss, arising directly or indirectly by using or following items of DelhiAnalysis of Rates by such Govt./Private bodies or individuals.
For feed back and suggestions, please contact SE(TAS),CPWD, Room No. 418, ''A'' Wing, Nirman Bhawan, NewDelhi.Tel No. 01123062339.Email: [email protected]
Also available atAll Leading Booksellers & Authorised Govt. Dealers In India
Books will be delivered next day by COURIER(Payment to courier-boy)
in Delhi, Noida, Ghaziabad, Faridabad & Gurgaon (nominal courier charges extra)
JAIN BOOK AGENCY (SOUTHEND)1, Aurobindo Place Market,
Hauz Khas, New Delhi-110016Phone : 41755666
E-mail : [email protected] : www.jainbookagency.com
JAIN BOOK AGENCY (GURGAON)19, Central Plaza Mall, Sector 53,
Golf Course Road,Gurgaon 122002 Haryana
Phone : 4143020Mobile : 9810666810
JAIN BOOK AGENCY (INTERNATIONAL)RA- 11, Sector- 126,
Opp. Gate No. 2A of Amity University,Noida
Mobile. : 9210080580
JAIN BOOK AGENCY (GREATER NOIDA)11 Jagat farm ComplexGama Sector Market
Near OBC BankGreater Noida
Phone : 0120-4206655
A GOVERNMENT OF INDIA PUBLICATION
Published by
DIRECTOR GENERALCPWD, Nirman Bhawan, New Delhi - 110011
&
Printed & Marketed by
JAIN BOOK AGENCYAuthorised Dealers of Govt. PublicationsC-9, Connaught Place, New Delhi-110001
Phones : 44556677, 23416390 upto 94
E-mail : [email protected] : www.jainbookagency.com
ISBN : 978-81-932679-1-2
DIAL-A-BOOK011-44332211(
JAIN BOOK DEPOTC - 4, Opp. PVR Plaza, Post Box. No. 51,Connaught Place, New Delhi-110001 (India)
Phone : 011- 23416101 / 02 / 03
E-mail : [email protected]
Distributed byJBA DISTRIBUTORS
4574 / 15, 2nd Floor, Padamchand Marg,Opposite Happy School, Darya Ganj, New Delhi- 110002
Tel.: 011-44332211, 44332222E-mail : [email protected] : www.jba.in
-
dsUnzh; yksd fuekZ.k foHkkxdsUnzh; yksd fuekZ.k foHkkxdsUnzh; yksd fuekZ.k foHkkxdsUnzh; yksd fuekZ.k foHkkxdsUnzh; yksd fuekZ.k foHkkx
fuekZ.k Hkou] ubZ fnYyh 110011fuekZ.k Hkou] ubZ fnYyh 110011fuekZ.k Hkou] ubZ fnYyh 110011fuekZ.k Hkou] ubZ fnYyh 110011fuekZ.k Hkou] ubZ fnYyh 110011Central Public Works DepartmentNirman Bhawan, New Delhi- 110011
Tel : 23062556 / 1317, Fax : 23061884E-Mail : [email protected]
Hkkjr ljdkjHkkjr ljdkjHkkjr ljdkjHkkjr ljdkjHkkjr ljdkj
Government of India
FOREWORD
DIVAKAR GARGDirector General
Central Public Works Department Analysis of Rates for Delhi is a very
comprehensive and useful document forming basis for the rates of various items.It is based on scientific assessment of Inputs of materials, labour and machinery in
various items of work normally involved in civil construction projects.
It was first compiled in the year 1950, followed by subsequent publication or
revision in the years 1955, 1962, 1972, 1977, 1985, 1997, 2007, 2012, 2013 &
2014. Since publication of Analysis of Rates for Delhi 2014, prices of labour and
materials have registered some changes. Besides the decrease in the cost of
Cement and Steel, a number of new construction materials have also emerged.
Innovation & introduction of new technology and mechanization of construction
techniques have also taken place. This has necessitated revision of existing
Analysis of Rates for Delhi 2014 to include the above changes. Accordingly, this
Analysis of Rates for Delhi 2016 has been prepared.
The analysis of existing items has been updated in conformity with updated items ofworks in DSR 2016.
I wish to place on record the technical input and the effective coordination on the
part of Shri Abhai Sinha, Special D.G.(HQ), Shri Balraj Chadha, ADG (TD),
Shri M.K. Sharma, Chief Engineer(CSQ) and the efforts put in by
Shri S.P. Chaudhary, Director (Tech & PR) and team of officers in CSQ unit in
finalizing Analysis of Rates for Delhi 2016 in a record time.
I am sure that C.P.W.D. Analysis of Rates for Delhi 2016 shall be very useful
document to various Central Govt. Ministries, Departments & Public Sector
Undertakings also besides various units of CPWD.
(Divakar Garg)DIRECTOR GENERAL
Place : New Delhi
Date : July, 2016
-
V
1. C.P.W.D. Analysis of Rates for Delhi 2016 is the revised edition of C.P.W.D. Analysis of Rates for
Delhi 2014.
2. Analysis of Rates for Delhi 2016 incorporates most of the analysis of items of Analysis of Rates for
Delhi 2014 with updated correction slips, including analysis of existing items and also corresponding
new items introduced in DSR 2016.
3. Analysis of Rates for Delhi, 2016 is published in two volumes i.e. volume I & II as under:
Volume Sub-head No. Content/ Sub-head
Number
One 00 Basic Rates
01 Carriage of Materials
02 Earth Work
03 Mortars
04 Concrete Work
05 Reinforced Cement Concrete
06 Brick Work
07 Stone Work
08 Marble & Granite Work
09 Wood and PVC Work
10 Steel Work
11 Flooring
12 Roofing
Two 13 Finishing
14 Repairs to Buildings
15 Dismantling and Demolishing
16 Road Work
17 Sanitary Installations
18 Water Supply
19 Drainage
20 Pile work
21 Aluminium Work
22 Water Proofing
23 Rain Water Harvesting & Tubewells
24 Conservation of Heritage Buildings.
25 Structural Glazing Aluminium Composite Panel
26 New Technologies and Materials
PREFACE
-
VI
4. Analysis of few existing items in sub head - 4 (RCC Work) and 18 (Water Supply) have been
deleted. Similarly, analysis of many items have been modified to correspond to items of DSR
2016. Several new analysis and sub items have been introduced in Analysis of Rates for Delhi
2016. Labour coefficients for items of dry stone cladding, stone jali work in sub head 07 have also
been modified. Similarly, the labour coefficient for marble work 08 have also been modified.
5. Analysis of Rates for Delhi, 2016 is based on the study of current market rates of materials at
Delhi, prevailing as on 01-04-2016. The basic rates of materials, incorporated in the analysis,
pertain to materials conforming to BIS Standards/ CPWD Specifications/Materials of good quality
generally available in the market. Labour rates are taken from the minimum wages issued by the
Government of Delhi and Central Govt. (whichever is higher) w.e.f. 01.04.2016.
6. The nomenclatures of main items have been printed along with the analysis of first Sub item only to
conserve the space and number of pages.
7. Sundries have been considered as 1.73 times based on Cost Index of Delhi as on 01.04.2016
(102) with base as per PAR-2012 as 100.
8. Lot of efforts have gone into the preparation of this Analysis of Rates for Delhi 2016. I convey my
deep appreciation and sincere thanks to Shri M K Sharma CE(CSQ), Shri S P Chaudhary, Director
(T& PR), Shri P.P Singh, SE (QA-cum-TLC), Shri S.K. Srivastava,E EE (QA) Shri D.K.
Choudhary, EE (QA) and team, Shri Sanjeev Rastogi , SE (C& M), Shri Virender Kumar, EE
(C), Shri Keshav Ram, EE (M) and his team, Shri R B Garg, EE(TAS-II), Shri K R Meena,
EE(TAD) and his team, Shri D.S. Adhikari, AE (QA) and other officers and staff of CSQ unit
whose names are not mentioned here, for sincere efforts made in the preparation of this document
in such a short time. Various Committees and field units, who contributed field inputs, also deserve
appreciation for their timely help.
9. Due care has been taken to print the C.P.W.D. Analysis of Rates for Delhi as correctly as possible.
It is, however possible that some errors might have crept in. In case any error or omission is
noticed, it may be brought to the notice of the Superintending Engineer (TAS), CPWD, Room no.
418, A-wing, Nirman Bhawan, New Delhi.
(Balraj Chadha)
ADG (TD), CPWD,
Nirman Bhawan, New Delhi.
New Delhi
Dated: July, 2016
-
VII
SH. No. NAME OF SUB-HEAD PAGE No.
A. BASIC RATES
0.1 HIRE CHARGES OF PLANTS & MACHINERY 3-5
0.2 LABOUR 6-7
0.3 MATERIALS 8-63
0.4 CARRIAGE CODES 64-66
B. SUB -HEADS
1. Carriage of Materials 67-78
2. Earth Work 79-124
3. Mortars 125-134
4. Concrete Work 135-166
5. Reinforced Cement Concrete 167-246
6. Brick Work 247-282
7. Stone Work 283-342
8. Marble & Granite Work 343-358
9. Wood and PVC Work 359-576
10. Steel Work 577-616
11. Flooring 617-690
12. Roofing 691-766
C O N T E N T S
Vol. 1
-
VIII
SH. No. NAME OF SUB-HEAD PAGE No.
13 Finishing 767-828
14 Repairs to Building 829-900
15 Dismantling and Demolishing 901-938
16 Road Work 939-1066
17 Sanitary Installations 1067-1162
18 Water Supply 1163-1388
19 Drainage 1389-1482
20 Pile work 1483-1510
21 Aluminium Work 1511-1538
22 Water Proofing 1539-1566
23 Rain Water Harvesting & Tubewells 1567-1586
24 Conservation of Heritage Buildings. 1587-1594
25 Structural Glazing Aluminium Composite Panel 1595-1606
26 New Technologies and Materials 1607-1664
Note: For Sub Heads 1 to 12 refer to Vol. 1
C O N T E N T S
Vol. 2
-
SUB HEAD : 13.0
FINISHING
767
-
769SUB HEAD : 13- FINISHING
13.1 12 mm cement plaster of mix :
13.1.1 1:4 (1 cement: 4 fine sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.144 3499.70 503.96
LABOUR
0155 Mason (average) day 0.67 467.00 312.89
0115 Coolie day 0.75 368.00 276.00
0101 Bhisti day 0.92 407.00 374.44
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 1489.11
Add 1 % Water charges 14.89
TOTAL 1504.00
Add 15 % Contractor's profit and overheads 225.60
Cost of 10.00 sqm 1729.60
Cost of 1.00 sqm 172.96
Say 172.95
13.1.2 1:6 (1 cement: 6 fine sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 6 (1 cement : 6 fine sand)
3.6 Rate as per Item Number 3.6 of SH: Mortars cum 0.144 2746.70 395.52
LABOUR
0155 Mason (average) day 0.67 467.00 312.89
0115 Coolie day 0.75 368.00 276.00
0101 Bhisti day 0.92 407.00 374.44
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 1380.67
Add 1 % Water charges 13.81
TOTAL 1394.48
Add 15 % Contractor's profit and overheads 209.17
Cost of 10.00 sqm 1603.65
Cost of 1.00 sqm 160.36
Say 160.35
13.2 15 mm cement plaster on the rough side of single or half brick wall of mix :
13.2.1 1:4 (1 cement: 4 fine sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.172 3499.70 601.95
LABOUR
0155 Mason (average) day 0.80 467.00 373.60
0115 Coolie day 0.88 368.00 323.84
-
770SUB HEAD : 13- FINISHING
Code Description Unit Quantity Rate Amount
0101 Bhisti day 0.99 407.00 402.93
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 1724.14
Add 1 % Water charges 17.24
TOTAL 1741.38
Add 15 % Contractor's profit and overheads 261.21
Cost of 10.00 sqm 2002.59
Cost of 1.00 sqm 200.25
Say 200.25
13.2.2 1:6 (1 cement: 6 fine sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 6 (1 cement : 6 fine sand)
3.6 Rate as per Item Number 3.6 of SH: Mortars cum 0.172 2746.70 472.43
LABOUR
0155 Mason (average) day 0.80 467.00 373.60
0115 Coolie day 0.88 368.00 323.84
0101 Bhisti day 0.99 407.00 402.93
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 1594.62
Add 1 % Water charges 15.95
TOTAL 1610.57
Add 15 % Contractor's profit and overheads 241.59Cost of 10.00 sqm 1852.16
Cost of 1.00 sqm 185.21
Say 185.20
13.3 20 mm cement plaster of mix :
13.3.1 1:4 (1 cement: 4 fine sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.224 3499.70 783.93
LABOUR
0155 Mason (average) day 0.94 467.00 438.98
0115 Coolie day 1.02 368.00 375.36
0101 Bhisti day 1.10 407.00 447.70
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 2067.79
Add 1 % Water charges 20.68
TOTAL 2088.47
Add 15 % Contractor's profit and overheads 313.27
Cost of 10.00 sqm 2401.74
Cost of 1.00 sqm 240.17
Say 240.15
-
771SUB HEAD : 13- FINISHING
13.3.2 1:6 (1 cement: 6 fine sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 6 (1 cement : 6 fine sand)
3.6 Rate as per Item Number 3.6 of SH: Mortars cum 0.224 2746.70 615.26
LABOUR
0155 Mason (average) day 0.94 467.00 438.98
0115 Coolie day 1.02 368.00 375.36
0101 Bhisti day 1.10 407.00 447.70
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 1899.12
Add 1 % Water charges 18.99
TOTAL 1918.11
Add 15 % Contractor's profit and overheads 287.72
Cost of 10.00 sqm 2205.83
Cost of 1.00 sqm 220.58
Say 220.60
13.4 12 mm cement plaster of mix :
13.4.1 1:4 (1 cement: 4 coarse sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 4 (1 cement :
4 coarse sand)
3.9 Rate as per Item Number 3.9 of SH: Mortars cum 0.144 3970.50 571.75
LABOUR
0155 Mason (average) day 0.67 467.00 312.89
0115 Coolie day 0.75 368.00 276.00
0101 Bhisti day 0.92 407.00 374.44
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 1556.90
Add 1 % Water charges 15.57
TOTAL 1572.47
Add 15 % Contractor's profit and overheads 235.87
Cost of 10.00 sqm 1808.34
Cost of 1.00 sqm 180.83
Say 180.85
13.4.2 1:6 (1 cement: 6 coarse sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 6 (1 cement :
6 coarse sand)
3.11 Rate as per Item Number 3.11 of SH: Mortars cum 0.144 3217.50 463.32
LABOUR
0155 Mason (average) day 0.67 467.00 312.89
0115 Coolie day 0.75 368.00 276.00
-
772SUB HEAD : 13- FINISHING
0101 Bhisti day 0.92 407.00 374.44
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 1448.47
Add 1 % Water charges 14.48
TOTAL 1462.95
Add 15 % Contractor's profit and overheads 219.44
Cost of 10.00 sqm 1682.39
Cost of 1.00 sqm 168.23
Say 168.25
Code Description Unit Quantity Rate Amount
13.5 15 mm cement plaster on rough side of single or half brick wall of mix:
13.5.1 1:4 (1 cement: 4 coarse sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 4 (1 cement :
4 coarse sand)
3.9 Rate as per Item Number 3.9 of
SH: Mortars cum 0.172 3970.50 682.93
LABOUR
0155 Mason (average) day 0.80 467.00 373.60
0115 Coolie day 0.88 368.00 323.84
0101 Bhisti day 0.99 407.00 402.93
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82TOTAL 1805.12
Add 1 % Water charges 18.05
TOTAL 1823.17
Add 15 % Contractor's profit and overheads 273.48
Cost of 10.00 sqm 2096.65
Cost of 1.00 sqm 209.66
Say 209.65
13.5.2 1:6 (1 cement: 6 coarse sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqmMATERIALCement mortar 1 : 6 (1 cement :6 coarse sand)
3.11 Rate as per Item Number 3.11 of SH: Mortars cum 0.172 3217.50 553.41LABOUR
0155 Mason (average) day 0.80 467.00 373.600115 Coolie day 0.88 368.00 323.840101 Bhisti day 0.99 407.00 402.939999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 1675.60Add 1 % Water charges 16.76TOTAL 1692.36Add 15 % Contractor's profit and overheads 253.85Cost of 10.00 sqm 1946.21Cost of 1.00 sqm 194.62Say 194.60
-
773SUB HEAD : 13- FINISHING
13.6 20 mm cement plaster of mix :
13.6.1 1:4 (1 cement: 4 coarse sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 4 (1 cement :
4 coarse sand)
3.9 Rate as per Item Number 3.9 of SH: Mortars cum 0.224 3970.50 889.39
LABOUR
0155 Mason (average) day 0.94 467.00 438.98
0115 Coolie day 1.02 368.00 375.36
0101 Bhisti day 1.10 407.00 447.70
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 2173.25
Add 1 % Water charges 21.73
TOTAL 2194.98
Add 15 % Contractor's profit and overheads 329.25
Cost of 10.00 sqm 2524.23
Cost of 1.00 sqm 252.42
Say 252.40
13.6.2 1:6 (1 cement: 6 coarse sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 6 (1 cement :
6 coarse sand)
3.11 Rate as per Item Number 3.11 of SH: Mortars cum 0.224 3217.50 720.72
LABOUR
0155 Mason (average) day 0.94 467.00 438.98
0115 Coolie day 1.02 368.00 375.36
0101 Bhisti day 1.10 407.00 447.70
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 2004.58
Add 1 % Water charges 20.05
TOTAL 2024.63
Add 15 % Contractor's profit and overheads 303.69
Cost of 10.00 sqm 2328.32
Cost of 1.00 sqm 232.83
Say 232.85
13.7 12 mm cement plaster finished with a floating coat of neat cement of mix :
13.7.1 1:3 (1 cement: 3 fine sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 3 (1 cement : 3 fine sand)
3.3 Rate as per Item Number 3.3 of SH: Mortars cum 0.144 4252.70 612.39
-
774SUB HEAD : 13- FINISHING
LABOUR
0155 Mason (average) day 0.67 467.00 312.89
0115 Coolie day 0.75 368.00 276.00
0101 Bhisti day 0.92 407.00 374.44
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
0367 Portland Cement (OPC-43 grade) tonne 0.02 5700.00 114.00
2209 Carriage of Cement tonne 0.02 92.24 1.84
0155 Mason (average) day 0.27 467.00 126.09
0115 Coolie day 0.27 368.00 99.36
9999 Scaffolding and sundries L.S. 8.06 1.73 13.94
TOTAL 1952.77
Add 1 % Water charges 19.53
TOTAL 1972.30
Add 15 % Contractor's profit and overheads 295.85
Cost of 10.00 sqm 2268.15
Cost of 1.00 sqm 226.81
Say 226.80
Code Description Unit Quantity Rate Amount
13.7.2 1:4 (1 cement: 4 fine sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.144 3499.70 503.96
LABOUR
0155 Mason (average) day 0.67 467.00 312.89
0115 Coolie day 0.75 368.00 276.00
0101 Bhisti day 0.92 407.00 374.44
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
0367 Portland Cement (OPC-43 grade) tonne 0.02 5700.00 114.00
2209 Carriage of Cement tonne 0.02 92.24 1.84
0155 Mason (average) day 0.27 467.00 126.09
0115 Coolie day 0.27 368.00 99.36
9999 Scaffolding and sundries L.S. 8.06 1.73 13.94
TOTAL 1844.34
Add 1 % Water charges 18.44
TOTAL 1862.78
Add 15 % Contractor's profit and overheads 279.42
Cost of 10.00 sqm 2142.20
Cost of 1.00 sqm 214.22
Say 214.20
13.8 15 mm cement plaster on rough side of single or half brick wall finished with afloating coat of neat cement of mix :
13.8.1 1:3 (1 cement: 3 fine sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 3 (1 cement : 3 fine sand)
3.3 Rate as per Item Number 3.3 of SH: Mortars cum 0.172 4252.70 731.46
-
775SUB HEAD : 13- FINISHING
LABOUR
0155 Mason (average) day 0.80 467.00 373.60
0115 Coolie day 0.88 368.00 323.84
0101 Bhisti day 0.99 407.00 402.93
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
0367 Portland Cement (OPC-43 grade) tonne 0.02 5700.00 114.00
2209 Carriage of Cement tonne 0.02 92.24 1.84
0155 Mason (average) day 0.27 467.00 126.09
0115 Coolie day 0.27 368.00 99.36
9999 Scaffolding and sundries L.S. 8.06 1.73 13.94
TOTAL 2208.88
Add 1 % Water charges 22.09
TOTAL 2230.97
Add 15 % Contractor's profit and overheads 334.65
Cost of 10.00 sqm 2565.62
Cost of 1.00 sqm 256.56
Say 256.55
Code Description Unit Quantity Rate Amount
13.8.2 1:4 (1 cement: 4 fine sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.172 3499.70 601.95
LABOUR
0155 Mason (average) day 0.80 467.00 373.60
0115 Coolie day 0.88 368.00 323.84
0101 Bhisti day 0.99 407.00 402.93
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
0367 Portland Cement (OPC-43 grade) tonne 0.02 5700.00 114.00
2209 Carriage of Cement tonne 0.02 92.24 1.84
0155 Mason (average) day 0.27 467.00 126.09
0115 Coolie day 0.27 368.00 99.36
9999 Scaffolding and sundries L.S. 8.06 1.73 13.94
TOTAL 2079.37
Add 1 % Water charges 20.79
TOTAL 2100.16
Add 15 % Contractor's profit and overheads 315.02
Cost of 10.00 sqm 2415.18
Cost of 1.00 sqm 241.51
Say 241.50
13.9 Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat ofneat cement.
13.9.1 12 mm cement plaster
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1:3 (1 cement : 3 coarse sand)
-
776SUB HEAD : 13- FINISHING
3.8 Rate as per Item Number 3.8 of SH: Mortars cum 0.144 4723.50 680.18
LABOUR
0155 Mason (average) day 0.67 467.00 312.89
0115 Coolie day 0.75 368.00 276.00
0101 Bhisti day 0.92 407.00 374.44
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
0367 Portland Cement (OPC-43 grade) tonne 0.02 5700.00 114.00
2209 Carriage of Cement tonne 0.02 92.24 1.84
0155 Mason (average) day 0.27 467.00 126.09
0115 Coolie day 0.27 368.00 99.36
9999 Scaffolding and sundries L.S. 8.06 1.73 13.94
TOTAL 2020.56
Add 1 % Water charges 20.21
TOTAL 2040.77
Add 15 % Contractor's profit and overheads 306.12
Cost of 10.00 sqm 2346.89
Cost of 1.00 sqm 234.68
Say 234.70
Code Description Unit Quantity Rate Amount
13.9.2 20 mm cement plaster
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1:3 (1 cement : 3 coarse sand)
3.8 Rate as per Item Number 3.8 of SH: Mortars cum 0.224 4723.50 1058.06
LABOUR
0155 Mason (average) day 0.94 467.00 438.98
0115 Coolie day 1.02 368.00 375.36
0101 Bhisti day 1.10 407.00 447.70
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
0367 Portland Cement (OPC-43 grade) tonne 0.02 5700.00 114.00
2209 Carriage of Cement tonne 0.02 92.24 1.84
0155 Mason (average) day 0.27 467.00 126.09
0115 Coolie day 0.27 368.00 99.36
9999 Scaffolding and sundries L.S. 8.06 1.73 13.94
TOTAL 2697.15
Add 1 % Water charges 26.97
TOTAL 2724.12
Add 15 % Contractor's profit and overheads 408.62
Cost of 10.00 sqm 3132.74
Cost of 1.00 sqm 313.27
Say 313.25
13.10 15 mm cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floatingcoat of neat cement on the rough side of single or half brick wall.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1:3 (1 cement :
3 coarse sand)
-
777SUB HEAD : 13- FINISHING
3.8 Rate as per Item Number 3.8 of SH: Mortars cum 0.172 4723.50 812.44
LABOUR
0155 Mason (average) day 0.80 467.00 373.60
0115 Coolie day 0.88 368.00 323.84
0101 Bhisti day 0.99 407.00 402.93
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
0367 Portland Cement (OPC-43 grade) tonne 0.02 5700.00 114.00
2209 Carriage of Cement tonne 0.02 92.24 1.84
0155 Mason (average) day 0.27 467.00 126.09
0115 Coolie day 0.27 368.00 99.36
9999 Scaffolding and sundries L.S. 8.06 1.73 13.94
TOTAL 2289.86
Add 1 % Water charges 22.90
TOTAL 2312.76
Add 15 % Contractor's profit and overheads 346.91
Cost of 10.00 sqm 2659.67
Cost of 1.00 sqm 265.96
Say 265.95
Code Description Unit Quantity Rate Amount
13.11 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5(1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster1:6 (1 cement : 6 fine sand).
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Under layer Cement mortar
1 : 5 (1 cement : 5 coarse sand)
3.10 Rate as per Item Number 3.10 of SH: Mortars cum 0.144 3565.05 513.37
Top layer Cement mortar 1 : 6
(1 cement : 6 fine sand)
3.6 Rate as per Item Number 3.6 of SH: Mortars cum 0.072 2746.70 197.76
LABOUR
0155 Mason (average) day 1.21 467.00 565.07
0115 Coolie day 1.29 368.00 474.72
0101 Bhisti day 1.05 407.00 427.35
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 2200.09
Add 1 % Water charges 22.00
TOTAL 2222.09
Add 15 % Contractor's profit and overheads 333.31
Cost of 10.00 sqm 2555.40
Cost of 1.00 sqm 255.54
Say 255.55
-
778SUB HEAD : 13- FINISHING
13.12 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5(1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1cement : 3 coarse sand) finished rough with sponge.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Under layer Cement mortar 1 : 5
(1 cement : 5 coarse sand)
3.10 Rate as per Item Number 3.10 of SH: Mortars cum 0.144 3565.05 513.37
Top layer Cement mortar 1:3
(1 cement : 3 coarse sand)
3.8 Rate as per Item Number 3.8 of SH: Mortars cum 0.072 4723.50 340.09
LABOUR
0155 Mason (average) day 1.21 467.00 565.07
0115 Coolie day 1.29 368.00 474.72
0101 Bhisti day 1.05 407.00 427.35
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 2342.42
Add 1 % Water charges 23.42
TOTAL 2365.84
Add 15 % Contractor's profit and overheads 354.88
Cost of 10.00 sqm 2720.72
Cost of 1.00 sqm 272.07
Say 272.05
13.13 12 mm cement plaster 1:2 (1 cement : 2 stone dust).
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1:2 (1 Cement : 2 stone dust)
3.12 Rate as per Item Number 3.12 of SH: Mortars cum 0.144 5233.50 753.62
LABOUR
0155 Mason (average) day 0.67 467.00 312.89
0115 Coolie day 0.75 368.00 276.00
0101 Bhisti day 0.92 407.00 374.44
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 1738.77
Add 1 % Water charges 17.39
TOTAL 1756.16
Add 15 % Contractor's profit and overheads 263.42
Cost of 10.00 sqm 2019.58
Cost of 1.00 sqm 201.95
Say 201.95
13.14 15 mm cement plaster 1:2 (1 cement : 2 stone dust) on the rough side of singleor half brick wall.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1:2 (1 Cement : 2 stone dust)
-
779SUB HEAD : 13- FINISHING
3.12 Rate as per Item Number 3.12 of SH: Mortars cum 0.172 5233.50 900.16
LABOUR
0155 Mason (average) day 0.80 467.00 373.60
0115 Coolie day 0.88 368.00 323.84
0101 Bhisti day 0.99 407.00 402.93
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 2022.35
Add 1 % Water charges 20.22
TOTAL 2042.57
Add 15 % Contractor's profit and overheads 306.39
Cost of 10.00 sqm 2348.96
Cost of 1.00 sqm 234.89
Say 234.90
Code Description Unit Quantity Rate Amount
13.15 20 mm cement plaster 1:2 (1 cement : 2 stone dust).
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1:2 (1 Cement : 2 stone dust)
3.12 Rate as per Item Number 3.12 of SH: Mortars cum 0.224 5233.50 1172.30
LABOUR
0155 Mason (average) day 0.94 467.00 438.98
0115 Coolie day 1.02 368.00 375.36
0101 Bhisti day 1.10 407.00 447.70
9999 Scaffolding and sundries L.S. 12.61 1.73 21.82
TOTAL 2456.16
Add 1 % Water charges 24.56
TOTAL 2480.72
Add 15 % Contractor's profit and overheads 372.11
Cost of 10.00 sqm 2852.83
Cost of 1.00 sqm 285.28
Say 285.30
13.16 6 mm cement plaster of mix :
13.16.1 1:3 (1 cement : 3 fine sand)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 3 (1 cement : 3 fine sand)
3.3 Rate as per Item Number 3.3 of SH: Mortars cum 0.072 4252.70 306.19
LABOUR
0155 Mason (average) day 0.51 467.00 238.17
0115 Coolie day 0.75 368.00 276.00
0101 Bhisti day 0.92 407.00 374.44
9999 Extra for removing burrs, cleaning with
wire brushes, pock making with pointed
tool etc. complete. L.S. 13.39 1.73 23.16
-
780SUB HEAD : 13- FINISHING
9999 Scaffolding and sundries L.S. 11.70 1.73 20.24
TOTAL 1238.20
Add 1 % Water charges 12.38
TOTAL 1250.58
Add 15 % Contractor's profit and overheads 187.59
Cost of 10.00 sqm 1438.17
Cost of 1.00 sqm 143.81
Say 143.80
Code Description Unit Quantity Rate Amount
13.17 6 mm cement plaster 1:3 (1 cement : 3 fine sand) finished with a floating coat ofneat cement and thick coat of Lime wash on top of walls when dry for bearingof R.C.C. slabs and beams.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 3 (1 cement : 3 fine sand)
3.3 Rate as per Item Number 3.3 of SH: Mortars cum 0.072 4252.70 306.19
LABOUR
0155 Mason (average) day 0.51 467.00 238.17
0115 Coolie day 0.75 368.00 276.00
0101 Bhisti day 0.92 407.00 374.44
9999 Extra for removing burrs, cleaning with wire
brushes, pock making with pointed tool etc.
complete. L.S. 13.39 1.73 23.16
9999 Scaffolding and sundries L.S. 11.7 1.73 20.24
0367 Portland Cement (OPC-43 grade) tonne 0.02 5700.00 114.00
2209 Carriage of Cement tonne 0.02 92.24 1.84
0155 Mason (average) day 0.27 467.00 126.09
0115 Coolie day 0.27 368.00 99.36
9999 Scaffolding and sundries L.S. 8.06 1.73 13.94
0776 Satna lime quintal 0.01 370.00 3.70
9999 Indigo gum etc L.S. 2.08 1.73 3.60
9999 Sundries ladder etc. L.S. 0.52 1.73 0.90
0141 White Washer day 0.07 407.00 28.49
0115 Coolie day 0.07 368.00 25.76
9999 Sundries L.S. 2.73 1.73 4.72
TOTAL 1660.60
Add 1 % Water charges 16.61
TOTAL 1677.21
Add 15 % Contractor's profit and overheads 251.58
Cost of 10.00 sqm 1928.79
Cost of 1.00 sqm 192.87
Say 192.85
13.18 Neat cement punning.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
LABOUR
0367 Portland Cement (OPC-43 grade) tonne 0.022 5700.00 125.40
2209 Carriage of Cement tonne 0.022 92.24 2.03
-
781SUB HEAD : 13- FINISHING
0155 Mason (average) day 0.27 467.00 126.09
0115 Coolie day 0.27 368.00 99.36
9999 Scaffolding and sundries L.S. 8.06 1.73 13.94
TOTAL 366.82
Add 1 % Water charges 3.67
TOTAL 370.49
Add 15 % Contractor's profit and overheads 55.57
Cost of 10.00 sqm 426.06
Cost of 1.00 sqm 42.60
Say 42.60
Code Description Unit Quantity Rate Amount
13.19 Rough cast plaster upto 10 m height above ground level with a mixture of sandand gravel or crushed stone from 6 mm to 10 mm nominal size, dashed overand including the fresh plaster in two layers, under layer 12 mm cement plaster1:4 (1 cement : 4 coarse sand) and top layer 10 mm cement plaster 1:3 (1 cement: 3 fine sand) mixed with 10% finely grounded hydrated lime by volume of cement.
13.19.1 Ordinary cement finish using ordinary cement
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Under layer 12 mm thick cement plaster
Cement mortar 1 : 4 (1 cement :
4 coarse sand)
3.9 Rate as per Item Number 3.9 of
SH: Mortars cum 0.144 3970.50 571.75
LABOUR
0155 Mason (average) day 0.67 467.00 312.89
0114 Beldar day 0.75 368.00 276.00
0101 Bhisti day 0.92 407.00 374.44
9999 Scaffolding and sundries L.S. 9.88 1.73 17.09
Top layer 10 mm thick cement plaster
Cement mortar 1 : 3 (1 cement :
3 fine sand)
3.3 Rate as per Item Number 3.3 of
SH: Mortars cum 0.12 4252.70 510.32
0155 Mason (average) day 0.61 467.00 284.87
0114 Beldar day 0.69 368.00 253.92
0101 Bhisti day 0.85 407.00 345.95
9999 Scaffolding and sundries L.S. 9.88 1.73 17.09
1179 Crushed stone 2.36 mm to 12.5 mm size cum 0.10 900.00 90.00
0101 Bhisti day 0.01 407.00 4.07
0777 Dry hydrated lime (factory made) quintal 0.09 280.00 25.20
9977 Carriage of lime L.S. 3.64 1.73 6.30
0155 Mason (average) day 0.50 467.00 233.50
0114 Beldar day 0.50 368.00 184.00
0101 Bhisti day 0.10 407.00 40.70
9999 Scaffolding and sundries L.S. 9.88 1.73 17.09
Labour for scooping
0123 Mason (brick layer) 1st class day 0.25 487.00 121.75
-
782SUB HEAD : 13- FINISHING
0114 Beldar day 0.25 368.00 92.00
TOTAL 3778.93
Add 1 % Water charges 37.79
TOTAL 3816.72
Add 15 % Contractor's profit and overheads 572.51
Cost of 10.00 sqm 4389.23
Cost of 1.00 sqm 438.92
Say 438.90
Code Description Unit Quantity Rate Amount
13.20 Pebble dash plaster upto 10 m height above ground level with a mixture ofwashed pebble or crushed stone 6 mm to 12.5 mm nominal size, dashed overand including fresh plaster in two layers under layer 12 mm cement plaster 1:4(1 cement : 4 coarse sand) and top layer 10 mm cement plaster with cementmortar 1:3 (1 cement : 3 fine sand) mixed with 10% finely grounded hydratedlime by volume of cement.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Under layer 12 mm thick cement plaster
Cement mortar 1 : 4 (1 cement :
4 coarse sand)
3.9 Rate as per Item Number 3.9 of SH: Mortars cum 0.144 3970.50 571.75
LABOUR
0155 Mason (average) day 0.67 467.00 312.89
0114 Beldar day 0.75 368.00 276.00
0101 Bhisti day 0.92 407.00 374.44
9999 Scaffolding and sundries L.S. 9.88 1.73 17.09
Top layer 10 mm thick cement plaster
Cement mortar 1 : 3 (1 cement : 3 fine sand)
3.3 Rate as per Item Number 3.3 of SH: Mortars cum 0.12 4252.70 510.32
0155 Mason (average) day 0.61 467.00 284.87
0114 Beldar day 0.69 368.00 253.92
0101 Bhisti day 0.85 407.00 345.95
9999 Scaffolding and sundries L.S. 9.88 1.73 17.09
1179 Crushed stone 2.36 mm to 12.5 mm size cum 0.10 900.00 90.00
0101 Bhisti day 0.01 407.00 4.07
0777 Dry hydrated lime (factory made) quintal 0.09 280.00 25.20
9977 Carriage of lime L.S. 3.64 1.73 6.30
0155 Mason (average) day 0.50 467.00 233.50
0114 Beldar day 0.50 368.00 184.00
0101 Bhisti day 0.10 407.00 40.70
9999 Scaffolding and sundries L.S. 9.88 1.73 17.09
9999 Scaffolding and sundries L.S. 4.42 1.73 7.65
TOTAL 3572.83
Add 1 % Water charges 35.73
TOTAL 3608.56
Add 15 % Contractor's profit and overheads 541.28
Cost of 10.00 sqm 4149.84
Cost of 1.00 sqm 414.98
Say 415.00
-
783SUB HEAD : 13- FINISHING
13.21 Extra for providing and mixing water proofing material in cement plaster workin proportion recommended by the manufacturers.
Code Description Unit Quantity Rate Amount
Detail of cost for 12mm cement plaster 1:3(1 cement :3 sand) = 10 sqm or 1.48 bagsof cement used in the mix.Cement required for 10 sqm = 73.89kg.Water proofing material required @ 1 kg per50 kg of cement = 1.48 kg.
1213 Water proofing materials kilogram 1.48 35.00 51.809999 Sundries L.S. 7.15 1.73 12.37
TOTAL 64.17Add 1 % Water charges 0.64TOTAL 64.81Add 15 % Contractor's profit and overheads 9.72Cost of 1.48 bags of cement used in the mix. 74.53Cost of 1.00 bag of 50 kg cement usedin the mix. 50.35Say 50.35
13.22 Extra for plastering exterior walls of height more than 10 m from ground levelfor every additional height of 3 m or part thereof.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm9999 Scaffolding and sundries L.S. 53.82 1.73 93.11
LABOUR0155 Mason (average) day 0.20 467.00 93.400115 Coolie day 0.30 368.00 110.400101 Bhisti day 0.10 407.00 40.709999 Sundries L.S. 7.15 1.73 12.37
TOTAL 349.98Add 1 % Water charges 3.50TOTAL 353.48Add 15 % Contractor's profit and overheads 53.02Cost of 10.00 sqm 406.50Cost of 1.00 sqm 40.65Say 40.65
13.23 Extra for plastering on circular work not exceeding 6 m in radius:
13.23.1 In one coat
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqmLABOUR
0155 Mason (average) day 0.20 467.00 93.400114 Beldar day 0.20 368.00 73.609999 Sundries L.S. 7.15 1.73 12.37
TOTAL 179.37Add 1 % Water charges 1.79TOTAL 181.16Add 15 % Contractor's profit and overheads 27.17Cost of 10.00 sqm 208.33Cost of 1.00 sqm 20.83Say 20.85
-
784SUB HEAD : 13- FINISHING
13.23.2 In two coats
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqmLABOUR
0155 Mason (average) day 0.30 467.00 140.100114 Beldar day 0.30 368.00 110.409999 Sundries L.S. 13.39 1.73 23.16
TOTAL 273.66Add 1 % Water charges 2.74TOTAL 276.40Add 15 % Contractor's profit and overheads 41.46Cost of 10.00 sqm 317.86Cost of 1.00 sqm 31.78Say 31.80
13.24 Extra for plastering done on moulding, cornices or architraves including neatfinish to line and level:
13.24.1 In one coat
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqmLABOUR
0155 Mason (average) day 3.00 467.00 1401.000114 Beldar day 2.00 368.00 736.000115 Coolie day 1.00 368.00 368.000101 Bhisti day 0.25 407.00 101.759999 Sundries L.S. 13.39 1.73 23.16
TOTAL 2629.91Add 1 % Water charges 26.30TOTAL 2656.21Add 15 % Contractor's profit and overheads 398.43Cost of 10.00 sqm 3054.64Cost of 1.00 sqm 305.46Say 305.45
13.24.2 In two coats
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqmLABOUR
0155 Mason (average) day 5.00 467.00 2335.000114 Beldar day 3.00 368.00 1104.000115 Coolie day 2.00 368.00 736.000101 Bhisti day 0.33 407.00 134.319999 Sundries L.S. 13.39 1.73 23.16
TOTAL 4332.47Add 1 % Water charges 43.32TOTAL 4375.79Add 15 % Contractor's profit and overheads 656.37Cost of 10.00 sqm 5032.16Cost of 1.00 sqm 503.21Say 503.20
-
785SUB HEAD : 13- FINISHING
13.25 Extra for plastering:
13.25.1 Spherical ceiling
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqmLABOUR
0155 Mason (average) day 0.75 467.00 350.250114 Beldar day 0.74 368.00 272.329999 Sundries L.S. 26.91 1.73 46.55
TOTAL 669.12Add 1 % Water charges 6.69TOTAL 675.81Add 15 % Contractor's profit and overheads 101.37Cost of 10.00 sqm 777.18Cost of 1.00 sqm 77.71Say 77.70
13.25.2 Groined ceiling
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqmLABOUR
0155 Mason (average) day 0.80 467.00 373.600114 Beldar day 0.80 368.00 294.409999 Sundries L.S. 34.06 1.73 58.92
TOTAL 726.92Add 1 % Water charges 7.27TOTAL 734.19Add 15 % Contractor's profit and overheads 110.13Cost of 10.00 sqm 844.32Cost of 1.00 sqm 84.43Say 84.45
13.25.3 Flewing soffits
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqmLABOUR
0155 Mason (average) day 0.50 467.00 233.500114 Beldar day 0.50 368.00 184.009999 Sundries L.S. 13.39 1.73 23.16
TOTAL 440.66Add 1 % Water charges 4.41TOTAL 445.07Add 15 % Contractor's profit and overheads 66.76Cost of 10.00 sqm 511.83Cost of 1.00 sqm 51.18Say 51.20
-
786SUB HEAD : 13- FINISHING
13.26 Providing and applying plaster of paris putty of 2 mm thickness over plasteredsurface to prepare the surface even and smooth complete.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqmMATERIALPlaster of paris 10x0.002x1121 = 22.42kgAdd 2% wastage= 0.45kgTotal = 22.87kgSay23kg
0869 Plaster of Paris kilogram 23.00 4.00 92.009977 Carriage of plaster of paris L.S. 3.90 1.73 6.75
LABOUR0122 Mason (for plaster of paris work) 1st class day 0.91 487.00 443.170114 Beldar day 0.91 368.00 334.889999 Scaffolding and sundries L.S. 83.98 1.73 145.29
TOTAL 1022.09Add 1 % Water charges 10.22TOTAL 1032.31Add 15 % Contractor's profit and overheads 154.85Cost of 10.00 sqm 1187.16Cost of 1.00 sqm 118.71Say 118.70
13.27 Extra for lining out plaster to imitate stone or concrete blocks walling.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqmLABOUR
0155 Mason (average) day 0.50 467.00 233.500114 Beldar day 0.50 368.00 184.009999 Solution of lime putty L.S. 1.82 1.73 3.15
TOTAL 420.65Add 1 % Water charges 4.21TOTAL 424.86Add 15 % Contractor's profit and overheads 63.73Cost of 10.00 sqm 488.59Cost of 1.00 sqm 48.85Say 48.85
13.28 12 mm thick plain cement mortar bands in cement mortar 1:4 (1 cement : 4fine sand):
13.28.1 Flush Band
Code Description Unit Quantity Rate Amount
Detail of cost for 10 metre long and 10 cm
wide bandMATERIALCement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.014 3499.70 49.00LABOUR
0155 Mason (average) day 0.27 467.00 126.090115 Coolie day 0.27 368.00 99.360101 Bhisti day 0.05 407.00 20.35
-
787SUB HEAD : 13- FINISHING
Code Description Unit Quantity Rate Amount
9999 Sundries L.S. 1.43 1.73 2.47TOTAL 297.27Add 1 % Water charges 2.97TOTAL 300.24Add 15 % Contractor's profit and overheads 45.04Cost of 10.00 metre long and 10 cmwide band 345.28Cost of 1.00 metre long and 1 cm wide band 3.45Say 3.45
13.28.2 Sunk Band
Code Description Unit Quantity Rate Amount
Detail of cost for 10 metre long and 10 cm
wide bandMATERIALCement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.014 3499.70 49.00LABOUR
0155 Mason (average) day 0.30 467.00 140.100115 Coolie day 0.30 368.00 110.400101 Bhisti day 0.05 407.00 20.359999 Sundries L.S. 2.08 1.73 3.60
TOTAL 323.45Add 1 % Water charges 3.23TOTAL 326.68Add 15 % Contractor's profit and overheads 49.00Cost of 10.00 metre long and 10 cmwide band 375.68Cost of 1.00 metre long and 1 cm wide band 3.75Say 3.75
13.28.3 Raised Band
Code Description Unit Quantity Rate Amount
Detail of cost for 10 metre long and 10 cm
wide bandMATERIALCement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.014 3499.70 49.00LABOUR
0155 Mason (average) day 0.35 467.00 163.450115 Coolie day 0.35 368.00 128.800101 Bhisti day 0.05 407.00 20.359999 Sundries L.S. 2.73 1.73 4.72
TOTAL 366.32Add 1 % Water charges 3.66TOTAL 369.98Add 15 % Contractor's profit and overheads 55.50Cost of 10.00 metre long and 10 cmwide band 425.48Cost of 1.00 metre long and 1 cm wide band 4.25Say 4.25
-
788SUB HEAD : 13- FINISHING
13.28.4 Moulded Band
Code Description Unit Quantity Rate Amount
Detail of cost for 10 metre long and 10 cm
wide bandMATERIALCement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.014 3499.70 49.00LABOUR
0155 Mason (average) day 0.65 467.00 303.550115 Coolie day 0.65 368.00 239.200101 Bhisti day 0.05 407.00 20.359999 Sundries L.S. 1.56 1.73 2.70
TOTAL 614.80Add 1 % Water charges 6.15TOTAL 620.95Add 15 % Contractor's profit and overheads 93.14Cost of 10.00 metre long and 10 cmwide band 714.09Cost of 1.00 metre long and 1 cm wide band 7.14Say 7.15
13.29 18 mm thick plain cement mortar band in cement mortar 1:4 (1 cement : 4fine sand):
13.29.1 Flush Band
Code Description Unit Quantity Rate Amount
Detail of cost for 10 metre long and 10 cm
wide bandMATERIALCement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.02 3499.70 69.99LABOUR
0155 Mason (average) day 0.32 467.00 149.440115 Coolie day 0.32 368.00 117.760101 Bhisti day 0.06 407.00 24.429999 Sundries L.S. 2.08 1.73 3.60
TOTAL 365.21Add 1 % Water charges 3.65TOTAL 368.86Add 15 % Contractor's profit and overheads 55.33Cost of 10.00 metre long and 10 cmwide band 424.19Cost of 1.00 metre long and 1 cm wide band 4.24Say 4.25
13.29.2 Sunk Band
Code Description Unit Quantity Rate Amount
Detail of cost for 10 metre long and 10 cm
wide bandMATERIALCement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.02 3499.70 69.99
-
789SUB HEAD : 13- FINISHING
LABOUR0155 Mason (average) day 0.36 467.00 168.120115 Coolie day 0.36 368.00 132.480101 Bhisti day 0.06 407.00 24.429999 Sundries L.S. 2.73 1.73 4.72
TOTAL 399.73Add 1 % Water charges 4.00TOTAL 403.73Add 15 % Contractor's profit and overheads 60.56Cost of 10.00 metre long and 10 cmwide band 464.29Cost of 1.00 metre long and 1 cm wide band 4.64Say 4.65
Code Description Unit Quantity Rate Amount
13.29.3 Raised Band
Code Description Unit Quantity Rate Amount
Detail of cost for 10 metre long and 10 cm
wide bandMATERIALCement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.02 3499.70 69.99LABOUR
0155 Mason (average) day 0.42 467.00 196.140115 Coolie day 0.42 368.00 154.560101 Bhisti day 0.06 407.00 24.429999 Sundries L.S. 4.42 1.73 7.65
TOTAL 452.76Add 1 % Water charges 4.53TOTAL 457.29Add 15 % Contractor's profit and overheads 68.59Cost of 10.00 metre long and 10 cmwide band 525.88Cost of 1.00 metre long and 1 cm wide band 5.25Say 5.25
13.29.4 Moulded Band
Code Description Unit Quantity Rate Amount
Detail of cost for 10 metre long and 10 cm
wide bandMATERIALCement mortar 1 : 5 (1 cement :5 coarse sand)
3.10 Rate as per Item Number 3.4 of SH: Mortars cum 0.024 3565.05 85.56LABOUR
0155 Mason (average) day 0.86 467.00 401.620115 Coolie day 0.86 368.00 316.480101 Bhisti day 0.05 407.00 20.35
-
790SUB HEAD : 13- FINISHING
9999 Sundries L.S. 2.73 1.73 4.72
TOTAL 828.73
Add 1 % Water charges 8.29
TOTAL 837.02
Add 15 % Contractor's profit and overheads 125.55
Cost of 10.00 metre long and 10 cm
wide band 962.57
Cost of 1.00 metre long and 1 cm
wide band 9.62
Say 9.60
Code Description Unit Quantity Rate Amount
13.30 18 mm thick moulded cement mortar band in two coats under layer 12 mmthick with cement mortar 1:5 (1 cement : 5 coarse sand) top layer 6 mm thickwith cement mortar 1:4 (1 cement : 4 fine sand).
Code Description Unit Quantity Rate Amount
Detail of cost for 10 metre long and 10 cm
wide band
MATERIAL
Cement mortar 1 : 5 (1 cement :
5 coarse sand)
3.10 Rate as per Item Number 3.10 of
SH: Mortars cum 0.014 3565.05 49.91
Cement mortar 1 : 4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars cum 0.01 3499.70 35.00
LABOUR
0155 Mason (average) day 0.86 467.00 401.62
0115 Coolie day 0.86 368.00 316.48
0101 Bhisti day 0.05 407.00 20.35
9999 Sundries L.S. 2.73 1.73 4.72
TOTAL 828.08
Add 1 % Water charges 8.28
TOTAL 836.36
Add 15 % Contractor's profit and overheads 125.45
Cost of 1.00 metre long and 1 cm wide band 961.81
Cost of 1.00 metre long and 1 cm wide band 9.61
Say 9.60
13.31 Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement :3 fine sand):
13.31.1 Flush / Ruled/ Struck or weathered pointing
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 3 (1 cement : 3 fine sand)
3.3 Rate as per Item Number 3.3 of SH: Mortars cum 0.03 4252.70 127.58
LABOUR
0155 Mason (average) day 0.50 467.00 233.50
0115 Coolie day 0.60 368.00 220.80
-
791SUB HEAD : 13- FINISHING
0101 Bhisti day 0.93 407.00 378.51
9999 Sundries L.S. 7.15 1.73 12.37
9999 Scaffolding and racking out joints
including sundries L.S. 14.30 1.73 24.74
TOTAL 997.50
Add 1 % Water charges 9.98
TOTAL 1007.48
Add 15 % Contractor's profit and overheads 151.12
Cost of 10.00 sqm 1158.60
Cost of 1.00 sqm 115.86
Say 115.85
Code Description Unit Quantity Rate Amount
13.31.2 Raised and cut pointing
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 3 (1 cement : 3 fine sand)
3.3 Rate as per Item Number 3.3 of SH: Mortars cum 0.046 4252.70 195.62
LABOUR
0155 Mason (average) day 1.07 467.00 499.69
0115 Coolie day 1.31 368.00 482.08
0101 Bhisti day 1.00 407.00 407.00
9999 Sundries L.S. 7.15 1.73 12.37
9999 Scaffolding and racking out joints including
sundries L.S. 16.12 1.73 27.89
TOTAL 1624.65
Add 1 % Water charges 16.25
TOTAL 1640.90
Add 15 % Contractor's profit and overheads 246.14
Cost of 10.00 sqm 1887.04
Cost of 1.00 sqm 188.70
Say 188.70
13.32 Pointing on tile brick work with cement mortar 1:3 (1 cement : 3 fine sand):
13.32.1 Flush/ Ruled/ Struck or weathered pointing
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1 : 3 (1 cement : 3 fine sand)
3.3 Rate as per Item Number 3.3 of SH: Mortars cum 0.046 4252.70 195.62
9999 Sundries L.S. 7.15 1.73 12.37
LABOUR
0155 Mason (average) day 0.67 467.00 312.89
0115 Coolie day 0.80 368.00 294.40
0101 Bhisti day 1.28 407.00 520.96
-
792SUB HEAD : 13- FINISHING
9999 Scaffolding and racking out joints including
sundries sundries L.S. 16.12 1.73 27.89
TOTAL 1364.13
Add 1 % Water charges 13.64
TOTAL 1377.77
Add 15 % Contractor's profit and overheads 206.67
Cost of 10.00 sqm 1584.44
Cost of 1.00 sqm 158.44
Say 158.45
Code Description Unit Quantity Rate Amount
13.33 Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) :
13.33.1 Flush/ Ruled pointing
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqmMATERIALCement mortar 1 : 3 (1 cement : 3 fine sand)
3.3 Rate as per Item Number 3.3 of SH: Mortars cum 0.023 4252.70 97.819999 Sundries L.S. 7.15 1.73 12.37
LABOUR0155 Mason (average) day 0.92 467.00 429.640115 Coolie day 1.37 368.00 504.160101 Bhisti day 0.93 407.00 378.519999 Scaffolding and racking out joints including
sundries L.S. 16.12 1.73 27.89TOTAL 1450.38Add 1 % Water charges 14.50TOTAL 1464.88Add 15 % Contractor's profit and overheads 219.73Cost of 10.00 sqm 1684.61Cost of 1.00 sqm 168.46Say 168.45
13.33.2 Raised and cut pointing
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqmMATERIALCement mortar 1 : 3 (1 cement : 3 fine sand)
3.3 Rate as per Item Number 3.3 of SH: Mortars cum 0.038 4252.70 161.609999 Sundries L.S. 7.15 1.73 12.37
LABOUR0155 Mason (average) day 2.00 467.00 934.000115 Coolie day 2.96 368.00 1089.280101 Bhisti day 1.00 407.00 407.009999 Scaffolding and racking out joints including
sundries L.S. 16.12 1.73 27.89TOTAL 2632.14Add 1 % Water charges 26.32TOTAL 2658.46Add 15 % Contractor's profit and overheads 398.77Cost of 10.00 sqm 3057.23Cost of 1.00 sqm 305.72Say 305.70
-
793SUB HEAD : 13- FINISHING
13.34 Raised and cut pointing on stone work in white cement mortar 1:3 (1 whitecement : 3 marble dust).
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
White Cement mortar 1:3 (1 white cement :
3 marble dust)
3.16 Rate as per Item Number 3.16 of
SH: Mortars cum 0.038 7314.50 277.95
9999 Sundries L.S. 7.15 1.73 12.37
LABOUR
0155 Mason (average) day 2.00 467.00 934.00
0115 Coolie day 2.96 368.00 1089.28
0101 Bhisti day 1.00 407.00 407.00
9999 Scaffolding and racking out joints including
sundries L.S. 16.12 1.73 27.89
TOTAL 2748.49
Add 1 % Water charges 27.48
TOTAL 2775.97
Add 15 % Contractor's profit and overheads 416.40
Cost of 10.00 sqm 3192.37
Cost of 1.00 sqm 319.23
Say 319.25
13.35 Pointing on stone slab ceiling with cement mortar 1:2 (1 cement : 2 fine sand):
13.35.1 Flush/ Ruled pointing
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
Cement mortar 1:2 (1 cement : 2 fine sand)
3.2 Rate as per Item Number 3.2 of SH: Mortars cum 0.015 5133.75 77.01
LABOUR
0155 Mason (average) day 0.47 467.00 219.49
0115 Coolie day 0.69 368.00 253.92
0101 Bhisti day 0.59 407.00 240.13
9999 Scaffolding and racking out joints including
sundries L.S. 16.12 1.73 27.89
TOTAL 818.44
Add 1 % Water charges 8.18
TOTAL 826.62
Add 15 % Contractor's profit and overheads 123.99
Cost of 10.00 sqm 950.61
Cost of 1.00 sqm 95.06
Say 95.05
13.36 Extra for pointing on walls on the outside at height more than 10 m fromground level for every additional height of 3 m or part there of.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
LABOUR
9999 Scaffolding L.S. 13.39 1.73 23.16
-
794SUB HEAD : 13- FINISHING
9999 Sundries L.S. 13.39 1.73 23.16
TOTAL 46.32
Add 1 % Water charges 0.46
TOTAL 46.78
Add 15 % Contractor's profit and overheads 7.02
Cost of 10.00 sqm 53.80
Cost of 1.00 sqm 5.38
Say 5.40
Code Description Unit Quantity Rate Amount
13.37 White washing with lime to give an even shade :
13.37.1 New work (three or more coats)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0775 Dehradun white lime quintal 0.03 550.00 16.50
9977 Carriage of lime L.S. 0.91 1.73 1.57
LABOUR
0141 White Washer day 0.20 407.00 81.40
0115 Coolie day 0.10 368.00 36.80
9999 Indigo gum etc L.S. 4.42 1.73 7.65
9999 Sundries ladders etc L.S. 2.73 1.73 4.72
TOTAL 148.64
Add 1 % Water charges 1.49
TOTAL 150.13
Add 15 % Contractor's profit and overheads 22.52
Cost of 10.00 sqm 172.65
Cost of 1.00 sqm 17.26
Say 17.25
13.38 Satna lime wash on walls with one coat.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0776 Satna lime quintal 0.01 370.00 3.70
9977 Carriage of lime L.S. 2.08 1.73 3.60
9999 Indigo gum etc L.S. 0.52 1.73 0.90
LABOUR
0141 White Washer day 0.08 407.00 32.56
0115 Coolie day 0.04 368.00 14.72
9999 Sundries ladders etc L.S. 2.73 1.73 4.72
TOTAL 60.20
Add 1 % Water charges 0.60
TOTAL 60.80
Add 15 % Contractor's profit and overheads 9.12
Cost of 10.00 sqm 69.92
Cost of 1.00 sqm 6.99
Say 7.00
-
795SUB HEAD : 13- FINISHING
13.39 Colour washing such as green, blue or buff to give an even shade :
13.39.1 New work (two or more coats) with a base coat of white washing with lime
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0775 Dehradun white lime quintal 0.03 550.00 16.50
9977 Carriage of lime L.S. 8.06 1.73 13.94
9999 Add for colouring stuff L.S. 0.91 1.73 1.57
LABOUR
0141 White Washer day 0.30 407.00 122.10
0115 Coolie day 0.10 368.00 36.80
9999 Indigo gum etc L.S. 4.42 1.73 7.65
9999 Sundries ladders etc L.S. 2.73 1.73 4.72
TOTAL 203.28
Add 1 % Water charges 2.03
TOTAL 205.31
Add 15 % Contractor's profit and overheads 30.80
Cost of 10.00 sqm 236.11
Cost of 1.00 sqm 23.61
Say 23.60
13.39.2 New work (two or more coats) with a base coat of whiting
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0775 Dehradun white lime quintal 0.03 550.00 16.50
9977 Carriage of lime L.S. 8.06 1.73 13.94
9999 Add for colouring stuff L.S. 0.91 1.73 1.57
LABOUR
0141 White Washer day 0.30 407.00 122.10
0115 Coolie day 0.10 368.00 36.80
9999 Indigo gum etc L.S. 2.73 1.73 4.72
9999 Sundries ladders etc L.S. 2.73 1.73 4.72
TOTAL 200.35
Add 1 % Water charges 2.00
TOTAL 202.35
Add 15 % Contractor's profit and overheads 30.35
Cost of 10.00 sqm 232.70
Cost of 1.00 sqm 23.27
Say 23.25
13.40 Distempering with dry distemper of approved brand and manufacture (twoor more coats) of required shade on new work, over and including waterthinnable priming coat to give an even shade.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0808 Water thinnable cement primer for interior
wall surface, having VOC content less than
50 gms/lit. litre 0.70 56.00 39.20
-
796SUB HEAD : 13- FINISHING
9999 Putty, glue etc L.S. 2.73 1.73 4.72
For distempering
0815 Dry distemper kilogram 1.50 30.00 45.00
9977 Carriage of material L.S. 1.56 1.73 2.70
9999 Brushes, sand paper etc L.S. 7.15 1.73 12.37
LABOUR
0131 Painter day 0.80 448.00 358.40
0115 Coolie day 0.40 368.00 147.20
9999 Sundries L.S. 5.33 1.73 9.22
TOTAL 618.81
Add 1 % Water charges 6.19
TOTAL 625.00
Add 15 % Contractor's profit and overheads 93.75
Cost of 10.00 sqm 718.75
Cost of 1.00 sqm 71.87
Say 71.85
Code Description Unit Quantity Rate Amount
13.41 Distempering with oil bound washable distemper of approved brand andmanufacture to give an even shade :
13.41.1 New work (two or more coats) over and including water thinnable primingcoat with cement primer
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0808 Water thinnable cement primer for interior
wall surface, having VOC content less than
50 gms/lit. litre 0.70 56.00 39.20
9999 Brushes, putty etc L.S. 7.15 1.73 12.37
9988 Sundries including Carriage L.S. 8.06 1.73 13.94
0816 Oil bound washable distemper/ Acrylic
distemper kilogram 1.50 45.00 67.50
9977 Carriage of material L.S. 4.42 1.73 7.65
9999 Brushes, sand paper and putty for filling
holes L.S. 11.70 1.73 20.24
LABOUR
0131 Painter day 1.00 448.00 448.00
0115 Coolie day 0.50 368.00 184.00
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 806.84
Add 1 % Water charges 8.07
TOTAL 814.91
Add 15 % Contractor's profit and overheads 122.24
Cost of 10.00 sqm 937.15
Cost of 1.00 sqm 93.71
Say 93.70
-
797SUB HEAD : 13- FINISHING
13.42 Distempering with 1st quality acrylic distemper (ready mixed) of approvedmanufacturer, of required shade and colour complete, as per manufacturer'sspecification.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0816 Oil bound washable distemper/ Acrylic
distemper kilogram 1.50 45.00 67.50
9977 Carriage of material L.S. 4.42 1.73 7.65
9999 Brushes, sand paper and putty for filling
holes L.S. 11.57 1.73 20.02
LABOUR
0131 Painter day 0.40 448.00 179.20
0114 Beldar day 0.46 368.00 169.28
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 457.59
Add 1 % Water charges 4.58
TOTAL 462.17
Add 15 % Contractor's profit and overheads 69.33
Cost of 10.00 sqm 531.50
Cost of 1.00 sqm 53.15
Say 53.15
13.43 Applying one coat of water thinnable cement primer of approved brand andmanufacture on wall surface :
13.43.1 Water thinnable cement primer
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0808 Water thinnable cement primer for interior
wall surface, having VOC content less than
50 gms/lit. litre 0.70 56.00 39.20
9999 Brushes, putty etc L.S. 7.15 1.73 12.37
LABOUR
0131 Painter day 0.40 448.00 179.20
0115 Coolie day 0.20 368.00 73.60
9988 Sundries including carriage L.S. 8.06 1.73 13.94
TOTAL 318.31
Add 1 % Water charges 3.18
TOTAL 321.49
Add 15 % Contractor's profit and overheads 48.22
Cost of 10.00 sqm 369.71
Cost of 1.00 sqm 36.97
Say 36.95
-
798SUB HEAD : 13- FINISHING
13.44 Finishing walls with water proofing cement paint of required shade :
13.44.1 New work (Two or more coats applied @ 3.84 kg/10 sqm)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0851 Water proofing cement paint kilogram 3.84 38.00 145.92
9977 Carriage of material L.S. 1.56 1.73 2.70
LABOUR
0131 Painter day 0.46 448.00 206.08
0115 Coolie day 0.23 368.00 84.64
0101 Bhisti day 0.10 407.00 40.70
9999 Brushes, sand paper etc L.S. 7.15 1.73 12.37
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 506.35
Add 1 % Water charges 5.06
TOTAL 511.41
Add 15 % Contractor's profit and overheads 76.71
Cost of 10.00 sqm 588.12
Cost of 1.00 sqm 58.81
Say 58.80
13.45 Finishing walls with textured exterior paint of required shade :
13.45.1 New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and includingpriming coat of exterior primer applied @ 2.20kg/10 sqm
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
8507 Textured exterior paint litre 3.28 230.00 754.40
0809 Exterior primer kilogram 2.20 52.00 114.40
9977 Carriage of material L.S. 1.56 1.73 2.70
LABOUR
0131 Painter day 0.60 448.00 268.80
0115 Coolie day 0.30 368.00 110.40
0101 Bhisti day 0.05 407.00 20.35
9999 Brushes, sand paper etc L.S. 7.02 1.73 12.14
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 1297.13
Add 1 % Water charges 12.97
TOTAL 1310.10
Add 15 % Contractor's profit and overheads 196.52
Cost of 10.00 sqm 1506.62
Cost of 1.00 sqm 150.66
Say 150.65
-
799SUB HEAD : 13- FINISHING
13.46 Finishing walls with Acrylic Smooth exterior paint of required shade :
13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and includingpriming coat of exterior primer applied @ 2.20 kg/10 sqm)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
8505 Acrylic exterior paint litre 1.67 170.00 283.90
0809 Exterior Primer Kg 2.20 52.00 114.40
9977 Carriage of material L.S. 1.56 1.73 2.70
LABOUR
0131 Painter day 0.60 448.00 268.80
0115 Coolie day 0.30 368.00 110.40
0101 Bhisti day 0.05 407.00 20.35
9999 Brushes, sand paper etc L.S. 7.15 1.73 12.37
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 826.86
Add 1 % Water charges 8.27
TOTAL 835.13
Add 15 % Contractor's profit and overheads 125.27
Cost of 10.00 sqm 960.40
Cost of 1.00 sqm 96.04
Say 96.05
13.47 Finishing walls with Premium Acrylic Smooth exterior paint with Siliconeadditives of required shade:
13.47.1 New work (Two or more coats applied @ 1.43 ltr/10 sqm over and includingpriming coat of exterior primer applied @ 2.20 kg/10 sqm)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
8506 Premium Acrylic exterior paint litre 1.43 203.00 290.29
0809 Exterior primer kilogram 2.20 52.00 114.40
9977 Carriage of material L.S. 1.56 1.73 2.70
LABOUR
0131 Painter day 0.60 448.00 268.80
0115 Coolie day 0.30 368.00 110.40
0101 Bhisti day 0.05 407.00 20.35
9999 Brushes, sand paper etc L.S. 7.15 1.73 12.37
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 833.25
Add 1 % Water charges 8.33
TOTAL 841.58
Add 15 % Contractor's profit and overheads 126.24
Cost of 10.00 sqm 967.82
Cost of 1.00 sqm 96.78
Say 96.80
-
800SUB HEAD : 13- FINISHING
13.48 Finishing with Deluxe Multi surface paint system for interiors and exteriorsusing Primer as per manufacturers specifications :
13.48.1 Two or more coats applied on walls @ 1.25 ltr/10 sqm over and includingone coat of Special primer applied @ 0.75 ltr /10 sqm
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
8504 Multi surface paint litre 1.25 255.00 318.75
8509 Special Primer (C.W.) litre 0.75 140.00 105.00
9977 Carriage of material L.S. 1.56 1.73 2.70
LABOUR
0131 Painter day 0.60 448.00 268.80
0115 Coolie day 0.30 368.00 110.40
0101 Bhisti day 0.05 407.00 20.35
9999 Brushes, sand paper etc L.S. 7.02 1.73 12.14
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 852.08
Add 1 % Water charges 8.52
TOTAL 860.60
Add 15 % Contractor's profit and overheads 129.09
Cost of 10.00 sqm 989.69
Cost of 1.00 sqm 98.96
Say 98.95
13.48.2 Painting wood work with Deluxe Multi Surface Paint of required shade. Twoor more coat applied @ 0.90 ltr/10 sqm over an under coat of primer [email protected] ltr/10 sqm of approved brand and manufacture
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
8504 Multi surface paint litre 0.90 255.00 229.50
8509 Special Primer (C.W.) litre 0.75 140.00 105.00
9977 Carriage of material L.S. 1.56 1.73 2.70
LABOUR
0131 Painter day 0.60 448.00 268.80
0115 Coolie day 0.30 368.00 110.40
0101 Bhisti day 0.05 407.00 20.35
9999 Brushes, sand paper etc L.S. 7.02 1.73 12.14
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 762.83
Add 1 % Water charges 7.63
TOTAL 770.46
Add 15 % Contractor's profit and overheads 115.57
Cost of 10.00 sqm 886.03
Cost of 1.00 sqm 88.60
Say 88.60
-
801SUB HEAD : 13- FINISHING
13.48.3 Painting Steel work with Deluxe Multi Surface Paint to give an even shade.Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primerapplied @ 0.80 ltr/10 sqm of approved brand and manufacture
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
8504 Multi surface paint litre 0.90 255.00 229.50
8510 Metal Primer (U.G.) litre 0.80 90.00 72.00
9977 Carriage of material L.S. 1.56 1.73 2.70
LABOUR
0131 Painter day 0.60 448.00 268.80
0115 Coolie day 0.30 368.00 110.40
0101 Bhisti day 0.05 407.00 20.35
9999 Brushes, sand paper etc L.S. 7.02 1.73 12.14
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 729.83
Add 1 % Water charges 7.30
TOTAL 737.13
Add 15 % Contractor's profit and overheads 110.57
Cost of 10.00 sqm 847.70
Cost of 1.00 sqm 84.77
Say 84.75
13.50 Applying priming coat:
13.50.1 With ready mixed pink or Grey primer of approved brand and manufactureon wood work (hard and soft wood)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0823 Pink primer (for wood) litre 0.75 85.00 63.75
9999 Putty L.S. 2.73 1.73 4.72
9977 Carriage L.S. 0.39 1.73 0.67
LABOUR
0131 Painter day 0.25 448.00 112.00
0115 Coolie day 0.25 368.00 92.00
9999 Brushes, sand paper etc L.S. 5.33 1.73 9.22
9999 Sundries L.S. 10.79 1.73 18.67
TOTAL 301.03
Add 1 % Water charges 3.01
TOTAL 304.04
Add 15 % Contractor's profit and overheads 45.61
Cost of 10.00 sqm 349.65
Cost of 1.00 sqm 34.96
Say 34.95
-
802SUB HEAD : 13- FINISHING
13.50.2 With ready mixed aluminium primer of approved brand and manufacture onresinous wood and plywood
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
4201 Aluminium primer litre 0.75 88.00 66.00
9999 Putty L.S. 2.73 1.73 4.72
9977 Carriage L.S. 0.39 1.73 0.67
LABOUR
0131 Painter day 0.25 448.00 112.00
0115 Coolie day 0.25 368.00 92.00
9999 Brushes, sand paper etc L.S. 5.33 1.73 9.22
9999 Sundries L.S. 10.79 1.73 18.67
TOTAL 303.28
Add 1 % Water charges 3.03
TOTAL 306.31
Add 15 % Contractor's profit and overheads 45.95
Cost of 10.00 sqm 352.26
Cost of 1.00 sqm 35.22
Say 35.20
13.50.3 With ready mixed red oxide zinc chromate primer of approved brand andmanufacture on steel galvanised iron/ steel works
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
4202 Red oxide Zinc chromate primer litre 0.54 65.00 35.10
9977 Carriage L.S. 0.52 1.73 0.90
LABOUR
0131 Painter day 0.24 448.00 107.52
0115 Coolie day 0.24 368.00 88.32
9999 Brushes,sand paper including sundries L.S. 10.79 1.73 18.67
TOTAL 250.51
Add 1 % Water charges 2.51
TOTAL 253.02
Add 15 % Contractor's profit and overheads 37.95
Cost of 10.00 sqm 290.97
Cost of 1.00 sqm 29.09
Say 29.10
13.50.4 With ready mixed red oxide zinc chromate primer of approved brand andmanufacture on steel work (second coat)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
4202 Red oxide Zinc chromate primer litre 0.36 65.00 23.40
9977 Carriage L.S. 0.39 1.73 0.67
LABOUR
0131 Painter day 0.12 448.00 53.76
0115 Coolie day 0.12 368.00 44.16
-
803SUB HEAD : 13- FINISHING
9999 Brushes,sand paper including L.S. 7.15 1.73 12.37
TOTAL 134.36
Add 1 % Water charges 1.34
TOTAL 135.70
Add 15 % Contractor's profit and overheads 20.36
Cost of 10.00 sqm 156.06
Cost of 1.00 sqm 15.60
Say 15.60
Code Description Unit Quantity Rate Amount
13.51 Painting with silicon & acrylic emulsion based water thinnable sealer of approvedbrand and manufacture on wet or patchy portion of plastered surfaces :
13.51.1 One coat
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0801 Silicon and acrylic emulsion litre 1.80 130.00 234.00
9977 Carriage of material L.S. 0.52 1.73 0.90
9999 Putty etc L.S. 2.73 1.73 4.72
LABOUR
0131 Painter day 0.27 448.00 120.96
0115 Coolie day 0.27 368.00 99.36
9999 Brushes, sand paper etc L.S. 5.33 1.73 9.22
9999 Sundries L.S. 10.79 1.73 18.67
TOTAL 487.83
Add 1 % Water charges 4.88
TOTAL 492.71
Add 15 % Contractor's profit and overheads 73.91
Cost of 10.00 sqm 566.62
Cost of 1.00 sqm 56.66
Say 56.65
13.51.2 Two coats
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0801 Silicon and acrylic emulsion litre 2.88 130.00 374.40
9977 Carriage of material L.S. 0.52 1.73 0.90
9999 Putty etc L.S. 2.73 1.73 4.72
LABOUR
0131 Painter day 0.43 448.00 192.64
0115 Coolie day 0.43 368.00 158.24
9999 Brushes, sand paper etc L.S. 8.53 1.73 14.76
9999 Sundries L.S. 17.26 1.73 29.86
TOTAL 775.52
Add 1 % Water charges 7.76
TOTAL 783.28
Add 15 % Contractor's profit and overheads 117.49
Cost of 10.00 sqm 900.77
Cost of 1.00 sqm 90.07
Say 90.05
-
804SUB HEAD : 13- FINISHING
13.52 Finishing with Epoxy paint (two or more coats) at all locations prepared andapplied as per manufacturer's specifications including appropriate primingcoat, preparation of surface, etc. complete.
13.52.1 On steel work
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
PRIMING COAT
MATERIAL
4202 Red oxide Zinc chromate primer litre 0.75 65.00 48.75
9999 Putty L.S. 2.73 1.73 4.72
9977 Carriage L.S. 0.39 1.73 0.67
LABOUR
0131 Painter day 0.25 448.00 112.00
0115 Coolie day 0.25 368.00 92.00
9999 Brushes, sand paper etc L.S. 5.46 1.73 9.45
9999 Sundries L.S. 10.66 1.73 18.44
EPOXY PAINTING
MATERIAL
7239 Epoxy paint litre 1.25 240.00 300.00
9977 Carriage of material L.S. 1.43 1.73 2.47
LABOUR
0131 Painter day 0.54 448.00 241.92
0115 Coolie day 0.54 368.00 198.72
9999 Putty, brushes, sand paper etc L.S. 6.76 1.73 11.69
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 1054.77
Add 1 % Water charges 10.55
TOTAL 1065.32
Add 15 % Contractor's profit and overheads 159.80
Cost of 10.00 sqm 1225.12
Cost of 1.00 sqm 122.51
Say 122.50
13.52.2 On concrete work
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
PRIMING COAT
MATERIAL
0821 Distemper primer litre 0.84 59.00 49.56
9999 Putty L.S. 13.52 1.73 23.39
9977 Carriage L.S. 0.52 1.73 0.90
LABOUR
0131 Painter day 0.25 448.00 112.00
0115 Coolie day 0.25 368.00 92.00
9999 Brushes, sand paper etc L.S. 2.73 1.73 4.72
9999 Sundries L.S. 8.06 1.73 13.94
EPOXY PAINTING
MATERIAL
7239 Epoxy paint litre 1.21 240.00 290.40
9999 Materials for filling in holes and cracks L.S. 6.76 1.73 11.69
9977 Carriage of material L.S. 1.43 1.73 2.47
-
805SUB HEAD : 13- FINISHING
LABOUR
0131 Painter day 0.54 448.00 241.92
0115 Coolie day 0.54 368.00 198.72
9999 Putty, brushes, sand paper etc L.S. 10.79 1.73 18.67
9999 Sundries L.S. 6.76 1.73 11.69
TOTAL 1072.07
Add 1 % Water charges 10.72
TOTAL 1082.79
Add 15 % Contractor's profit and overheads 162.42
Cost of 10.00 sqm 1245.21
Cost of 1.00 sqm 124.52
Say 124.50
Code Description Unit Quantity Rate Amount
13.53 Painting on G.S. sheet with synthetic enamel paint of approved brand andmanufacture of required colour to give an even shade :
13.53.1 New work (two or more coats) including a coat of approved steel primer butexcluding a coat of mordant solution
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
PRIMING COAT
MATERIAL
4202 Red oxide Zinc chromate primer litre 0.36 65.00 23.40
9977 Carriage L.S. 0.39 1.73 0.67
LABOUR
0131 Painter day 0.12 448.00 53.76
0114 Beldar day 0.12 368.00 44.16
9999 Brushes, sand paper etc L.S. 7.15 1.73 12.37
EPOXY PAINTING
MATERIAL
0834 Synthetic enamel paint in all shades except
black or chocolate shade litre 0.80 150.00 120.00
9977 Carriage L.S. 1.43 1.73 2.47
LABOUR
0131 Painter day 0.54 448.00 241.92
0115 Coolie day 0.54 368.00 198.72
9999 Putty, brushes, sand paper etc L.S. 6.76 1.73 11.69
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 723.10
Add 1 % Water charges 7.23
TOTAL 730.33
Add 15 % Contractor's profit and overheads 109.55
Cost of 10.00 sqm 839.88
Cost of 1.00 sqm 83.98
Say 84.00
-
806SUB HEAD : 13- FINISHING
13.54 Applying a coat of mordant solution on G.S. sheet:
13.54.1 With a solution of 38 gms of copper acetate in a litre of soft water
Code Description Unit Quantity Rate Amount
Detail of cost for 25 sqm
MATERIAL
4203 Copper acetate kilogram 0.038 300.00 11.40
9999 Soft Water L.S. 1.82 1.73 3.15
9977 Carriage L.S. 0.91 1.73 1.57
LABOUR
0131 Painter day 0.60 448.00 268.80
0115 Coolie day 0.60 368.00 220.80
9999 Brushes, sand paper etc L.S. 35.88 1.73 62.07
9999 Sundries L.S. 35.88 1.73 62.07
TOTAL 629.86
Add 1 % Water charges 6.30
TOTAL 636.16
Add 15 % Contractor's profit and overheads 95.42
Cost of 25 sqm 731.58
Cost of 1.00 sqm 29.26
Say 29.25
13.54.2 With a solution made of 13 gms of hydrochloric acid in a solution of 13 gmseach of copper chloride, copper nitrate and ammonium chloride dissolvedin a litre of soft water
Code Description Unit Quantity Rate Amount
Detail of cost for 25 sqm
MATERIAL
4204 Hydrochloric acid kilogram 0.013 35.00 0.46
4205 Copper chloride kilogram 0.013 280.00 3.64
4206 Copper nitrate kilogram 0.013 220.00 2.86
4207 Ammonium chloride kilogram 0.013 20.00 0.26
9999 Soft Water L.S. 1.82 1.73 3.15
9977 Carriage L.S. 0.91 1.73 1.57
LABOUR
0131 Painter day 0.60 448.00 268.80
0115 Coolie day 0.60 368.00 220.80
9999 Brushes, sand paper etc L.S. 35.88 1.73 62.07
9999 Sundries L.S. 35.88 1.73 62.07
TOTAL 625.68
Add 1 % Water charges 6.26
TOTAL 631.94
Add 15 % Contractor's profit and overheads 94.79
Cost of 25 sqm 726.73
Cost of 1.00 sqm 29.06
Say 29.05
-
807SUB HEAD : 13- FINISHING
13.55 Painting (two or more coats) on rain water, soil, waste and vent pipes andfittings with black anticorrosive bitumastic paint of approved brand andmanufacture, over and including a priming of ready mixed zinc chromateyellow primer on new work:
13.55.1 100 mm diameter pipes
Code Description Unit Quantity Rate Amount
Detail of cost for 30 mtrs
Area=22/7 x106.4mm x30m =10.032sqm
MATERIAL
4202 Red oxide Zinc chromate primer litre 0.54 65.00 35.10
9977 Carriage L.S. 0.52 1.73 0.90
LABOUR
0131 Painter day 0.24 448.00 107.52
0115 Coolie day 0.24 368.00 88.32
9999 Brushes, sand paper etc L.S. 10.79 1.73 18.67
MATERIAL
0828 Anticorrosive bituminous paint (black) litre 0.95 100.00 95.00
9977 Carriage L.S. 1.43 1.73 2.47
LABOUR
0131 Painter day 0.54 448.00 241.92
0115 Coolie day 0.54 368.00 198.72
9999 Putty, sand paper etc L.S. 5.33 1.73 9.22
9999 Sundries L.S. 8.06 1.73 13.94
9999 Wire brushes for cleaning L.S. 5.33 1.73 9.22
9999 Extra for delays L.S. 61.10 1.73 105.70
TOTAL 926.70
Add 1 % Water charges 9.27
TOTAL 935.97
Add 15 % Contractor's profit and overheads 140.40
Cost of 30.00 mtrs 1076.37
Cost of 1.00 metre 35.87
Say 35.85
13.55.2 150 mm diameter pipes
Code Description Unit Quantity Rate Amount
Detail of cost for 30 mtrs
Area=22/7 x0.1572 m x30m =14.82sqm
MATERIAL
4202 Red oxide Zinc chromate primer litre 0.80 65.00 52.00
LABOUR
0131 Painter day 0.36 448.00 161.28
0115 Coolie day 0.36 368.00 132.48
9999 Brushes, sand paper etc L.S. 15.99 1.73 27.66
9977 Carriage L.S. 0.91 1.73 1.57
MATERIAL
0828 Anticorrosive bituminous paint (black) litre 1.41 100.00 141.00
9977 Carriage L.S. 2.08 1.73 3.60
LABOUR
0131 Painter day 0.80 448.00 358.40
0115 Coolie day 0.80 368.00 294.40
9999 Putty, sand paper etc L.S. 8.06 1.73 13.94
9999 Sundries L.S. 11.96 1.73 20.69
-
808SUB HEAD : 13- FINISHING
9999 Wire brushes for cleaning L.S. 7.15 1.73 12.37
9999 Extra for delays L.S. 94.12 1.73 162.83
TOTAL 1382.22
Add 1 % Water charges 13.82
TOTAL 1396.04
Add 15 % Contractor's profit and overheads 209.41
Cost of 30.00 mtrs 1605.45
Cost of 1.00 metre 53.51
Say 53.50
Code Description Unit Quantity Rate Amount
13.56 Painting (two or more coats) on rain water, soil, waste and vent pipes andfittings with synthetic enamel paint of approved brand and manufacture andrequired colour over a priming coat of approved steel primer on new work.
13.56.1 100 mm diameter pipes
Code Description Unit Quantity Rate Amount
Detail of cost for 30 mtrs
Area=22/7x0.1064m x30m =10.032sqm
MATERIAL
4202 Red oxide Zinc chromate primer litre 0.54 65.00 35.10
9977 Carriage L.S. 0.52 1.73 0.90
LABOUR
0131 Painter day 0.24 448.00 107.52
0115 Coolie day 0.24 368.00 88.32
9999 Sundries L.S. 10.79 1.73 18.67
MATERIAL
0833 Synthetic enamel paint in black or
chocolate shade litre 1.16 170.00 197.20
9977 Carriage L.S. 1.43 1.73 2.47
9999 Putty, sand paper etc L.S. 5.33 1.73 9.22
LABOUR
0131 Painter day 0.54 448.00 241.92
0115 Coolie day 0.54 368.00 198.72
9999 Sundries L.S. 6.76 1.73 11.69
9999 Wire brushes for cleaning L.S. 11.96 1.73 20.69
9999 Extra for delays L.S. 66.43 1.73 114.92
TOTAL 1047.34
Add 1 % Water charges 10.47
TOTAL 1057.81
Add 15 % Contractor's profit and overheads 158.67
Cost of 30.00 mtrs 1216.48
Cost of 1.00 metre 40.54
Say 40.55
13.56.2 150 mm diameter pipes
Code Description Unit Quantity Rate Amount
Detail of cost for 30 mtrs
Area=22/7 x157.2mm x30m =14.82sqm
MATERIAL
4202 Red oxide Zinc chromate primer litre 0.80 65.00 52.00
-
809SUB HEAD : 13- FINISHING
9977 Carriage L.S. 0.65 1.73 1.12
LABOUR
0131 Painter day 0.36 448.00 161.28
0115 Coolie day 0.36 368.00 132.48
9999 Sundries L.S. 15.99 1.73 27.66
MATERIAL
0833 Synthetic enamel paint in black or
chocolate shade litre 1.72 170.00 292.40
9977 Carriage L.S. 2.08 1.73 3.60
9999 Putty, sand paper etc L.S. 7.93 1.73 13.72
LABOUR
0131 Painter day 0.80 448.00 358.40
0115 Coolie day 0.80 368.00 294.40
9999 Sundries L.S. 10.01 1.73 17.32
9999 Wire brushes for cleaning L.S. 17.81 1.73 30.81
9999 Extra for delays L.S. 101.40 1.73 175.42
TOTAL 1560.61
Add 1 % Water charges 15.61
TOTAL 1576.22
Add 15 % Contractor's profit and overheads 236.43
Cost of 30.00 mtrs 1812.65
Cost of 1.00 metre 60.42
Say 60.40
Code Description Unit Quantity Rate Amount
13.57 Painting with oil type wood preservative of approved brand andmanufacture :
13.57.1 New work (two or more coats)
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0859 Oil type wood preservative litre 1.00 140.00 140.00
9977 Carriage of material L.S. 0.52 1.73 0.90
LABOUR
0131 Painter day 0.15 448.00 67.20
0115 Coolie day 0.15 368.00 55.20
9999 Brushes etc L.S. 4.16 1.73 7.20
9999 Sundries L.S. 3.90 1.73 6.75
TOTAL 277.25
Add 1 % Water charges 2.77
TOTAL 280.02
Add 15 % Contractor's profit and overheads 42.00
Cost of 10.00 sqm 322.02
Cost of 1.00 sqm 32.20
Say 32.20
-
810SUB HEAD : 13- FINISHING
13.58 Providing and applying two coats of fire retardant paint on cleaned wood / plysurface @ 3.5 sqm per litre per coat including preparation of base surface asper recommendations of manufacturer to make the surface fire retardant.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
7240 Fire retardant paint litre 5.70 269.00 1533.30
9977 Carriage of material L.S. 1.43 1.73 2.47
LABOUR
0131 Painter day 0.54 448.00 241.92
0114 Beldar day 0.54 368.00 198.72
9999 Putty, brushes, sand paper etc L.S. 6.76 1.73 11.69
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 2002.04
Add 1 % Water charges 20.02
TOTAL 2022.06
Add 15 % Contractor's profit and overheads 303.31
Cost of 10.00 sqm 2325.37
Cost of 1.00 sqm 232.53
Say 232.55
13.59 Coal tarring two coats on new work using 0.16 Litre and 0.12 litre coal tar persqm in the first coat and second coat respectively.
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
9999 Lime L.S. 1.43 1.73 2.47
0324 Coal Tar litre 2.80 30.00 84.00
9977 Carriage of material L.S. 1.43 1.73 2.47
0771 Kerosene oil litre 0.50 45.00 22.50
LABOUR
0114 Beldar day 0.43 368.00 158.24
9999 Brushes etc L.S. 5.33 1.73 9.22
9999 Sundries L.S. 5.33 1.73 9.22
TOTAL 288.12
Add 1 % Water charges 2.88
TOTAL 291.00
Add 15 % Contractor's profit and overheads 43.65
Cost of 10.00 sqm 334.65
Cost of 1.00 sqm 33.46
Say 33.45
13.60 Wall painting with acrylic emulsion paint of approved brand and manufactureto give an even shade :
13.60.1 Two or more coats on new work
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0835 Plastic emulsion paint litre 1.21 200.00 242.00
-
811SUB HEAD : 13- FINISHING
9999 MATERIAL L.S. 6.76 1.73 11.69
9977 Carriage of material L.S. 1.43 1.73 2.47
LABOUR
0131 Painter day 0.54 448.00 241.92
0115 Coolie day 0.54 368.00 198.72
9999 Brushes, sand paper etc L.S. 10.79 1.73 18.67
9999 Sundries L.S. 6.76 1.73 11.69
TOTAL 727.16
Add 1 % Water charges 7.27
TOTAL 734.43
Add 15 % Contractor's profit and overheads 110.16
Cost of 10.00 sqm 844.59
Cost of 1.00 sqm 84.45
Say 84.45
Code Description Unit Quantity Rate Amount
13.61 Painting with synthetic enamel paint of approved brand and manufacture togive an even shade :
13.61.1 Two or more coats on new work
Code Description Unit Quantity Rate Amount
Detail of cost for 10 sqm
MATERIAL
0833 Synthetic enamel paint in black or
chocolate shade litre 1.16 170.00 197.20
9999 MATERIAL L.S. 5.33 1.73 9.22
9977 Carriage L.S. 1.43 1.73 2.47
LABOUR
0131 Painter day 0.54 448.00 241.92
0115 Coolie day 0.54 368.00 198.72
9999 Brushes, sand paper etc L.S. 6.76 1.73 11.69
9999 Sundries L.S. 8.06 1.73 13.94
TOTAL 675.16
Add 1 % Water charges 6.75
TOTAL 681.91
Add 15 % Contractor's profit and overheads 102.29
Cost of 10.00 sqm 784.20
Cost of 1.00 sqm 78.42
Say 78.40
13.62 Painting with synthetic enamel paint of approved brand and manufacture ofrequired colour to give an even shade :
13.62.1 Tw