Attachment 2

Public Disclosure Document

PUBLIC DISCLOSURE DOCUMENT

Mildred Lake Extension Project

October 2012

Syncrude Canada Ltd. October, 2012 Page 2

1.0 Introduction Syncrude Canada Ltd. (Syncrude) proposes to develop two additional mining areas within and adjacent to the Mildred Lake Project site, known collectively as the Mildred Lake Extension (“MLX”) Project. Accordingly, amendments to Syncrude’s regulatory approvals are required for development, operation, and closure of these mine sites. The Mildred Lake North Mine reserves will be depleted on or about 2023. Syncrude proposes to develop the resource present in the MLX mines prior to salvage of the Mildred Lake Mining and Extraction facilities. Pending regulatory approval, it is Syncrude’s intention to initiate development of the MLX Project on or about 2018. The Syncrude Mildred Lake Project is located approximately 40 kilometres north of Fort McMurray on Oil Sands Leases 17 and 22, within Townships 91 through 94, Ranges 10 through 12 (W4M), and within the Regional Municipality of Wood Buffalo. Figure 1 shows the location of the MLX Project relative to significant regional features. Under the Memorandum of Understanding (IL96-7) between the Alberta Energy Resources Conservation Board (ERCB) and Alberta Environment and Sustainable Resource Development (AESRD) with respect to oil sands developments, Syncrude will be filing a joint application related to the Mildred Lake Project to amend the following approvals: • Amendment of ERCB Approval No. 8573 pursuant to Section 13 of the Alberta Oil Sands

Conservation Act; • Amendment of AESRD Approval No. 26-02 pursuant to Sections 66 and 70 of the

Environmental Protection and Enhancement Act; and • Fenceline Licenses pursuant to section 36 of the Water Act. 2.0 Project Description For purposes of this disclosure, the “Project” in question is the development of two separate open pit mine facilities on or adjacent to the Mildred Lake Project, as follows: • The “East Mine” located between the Mildred Lake Settling Basin and the Athabasca River;

and • The “West Mine” located west of the MacKay River. Figure 1 shows the locations of the East Mine and West Mine. Pending regulatory approval, it is Syncrude’s intention to develop the MLX Project on or about 2018. Conventional shovel/truck mining technology will be used to develop these mines. Construction of a bridge over the MacKay River is contemplated. The existing Mildred Lake ore preparation, hydrotransport, and extraction facilities will be used to process the mined ore and supply bitumen to the Mildred Lake upgrader. No additional types of solid waste, liquid effluent, or gaseous emissions are expected from the proposed Project. No increase in annual import of fresh water is required for the proposed Project.

Syncrude Canada Ltd. October, 2012 Page 3

3.0 Environmental Matters Baseline studies in the Project areas were initiated in the first quarter of 2012 and will continue through the first quarter of 2014. These studies currently include an assessment of air quality, noise, hydrogeology, surface water quality and quantity, fisheries and aquatic resources, soils and terrain, vegetation and wetlands, wildlife, biodiversity, and historical resources. An Environmental Impact Assessment (EIA) will be completed and submitted to AESRD and the ERCB. Stakeholders are invited to contribute to the EIA Terms of Reference (TOR). Once the TOR have been finalized, results of the baseline studies will be used as appropriate for impact assessment. Syncrude will continue to take a leadership role to ensure that any environmental concerns are minimized and/or mitigated in order to lessen impacts to the environment resulting from this project. 4.0 Community Information Figure 2 provides Syncrude’s proposed time line for this Project. Syncrude will ensure that stakeholders are given the opportunity to comment on this project. Key opportunities for stakeholder involvement and comment are as follows:

• Project Disclosure/Announcement – October 2012 • Notice for the Proposed TOR for the EIA – October 2012 • Notice for Joint ERCB/AENV Application – proposed June 2014

If you have any questions or require additional information please contact the following individuals: Syncrude Canada Ltd. P.O. bag 4023 Fort McMurray, Alberta T9H 3H5 Fred Payne Manager, Regulatory Affairs MD 3800 (780) 790-6249 [email protected] Cheryl Robb Media Relations Advisor MD 1000 780 970-6923 [email protected]

Pat

h: S

:\Gis

\Pro

ject

s\C

E\S

yncr

ude_

MLX

\CE

0418

3_M

LX_E

IA\A

rcG

IS\W

orki

ngM

aps\

PrjM

gmt\R

egio

nal P

roje

ct L

ocat

ion.

mxd

PoplarCreek

Reservoir

RuthLake

BeaverRiver

Reservoir

Athabasca River

TWP 94TWP 93

MacKa

y Rive

r

RGE 13 RGE 12

FortMcKay

Beav

er

River

MacKa

y

Dover

River

River

RGE 11 RGE 10 W4

River

Muskeg

West Mine

East Mine

North Mine

TWP 92TWP 91

MLSB

SWSS

SalineLake

RIver

Steepbank

LegendEast Pit and Overburden Dump

West Pit and Overburden Dump

Syncrude Oil Sands Lease

Oil Sands Lease

Operating and Approved Oil Sands Development

Open Water

Watercourse

±

3.5 0 3.5 7

Kilometres1:250,000

Projection: UTM Zone 12 NAD83Note: SPOT5 Orthophoto flown 2010, Bing Maps © 2012 Microsoft Corporation Sources: GeoBase®, Spatial Data Warehouse Ltd., Syncrude.

MLXProject Location

Figure 1

Regional Project Location12-09-24

AMECPROVIDED BY:

AMECFINAL MAPPING BY:

QA/QC:

KW EH EHKWANALYST:

MLX

September 2012DATE:

fp04937
Rectangle

Syncrude Canada Ltd. October, 2012 Page 5

Figure 2: Project Schedule MLX Project

2012 2013 2014 2015 2016 2017 2018Activity Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Consultation with StakeholdersIssue PDDPublish Proposed TOREIA StudiesIssue Final TORApplication SubmissionReview ProcessApprovalProject Implementation