VOCALS Operations Coordination
José MeitínVOCALS Project Office
and EOL Field Project Services
ARICA Operations Coordination (2 ops coord)
- Conduct of Daily Planning Meetings• Facility Status Updates• Forecast Support • Mission Planning • Flight Planning
– Notification / Information Dissemination– Briefings – pre-flight and mission debriefs– Flight Coordination / ATC Interactions– Communications – Special Displays (Xchat, field catalog, flight tracks)– Outreach / Media
Administrative SupportSystem Administration
VOCALS Operations Center
ARICA Administrative Support (1 admin)
- Shipping Coordination- General administrative support- Liaison with hotel staff
System Administration (2 sys admin)
Operations Center set-up (10 Oct)Hotel conference space (2nd floor lobby)Electricity 220V, 50Hz Type “C”
VOCALS Operations Center
Arica Computing Infrastructure- network data server (Linux)- 1TB mirrored storage - data storage access via NFS, Samba/CIFS, ftp- network printers:
- 1 B/W, 1 color laserjet- 3 general access desktops or laptops (cybercafé)- 2 Mbps firewalled network, wired & wireless ethernet with DHCP
service- IDS (Intrusion Detection System)- Skype® support through firewall- Hotel Arica WiFi guest rooms
VOCALS Operations Center
Internet, Xchat,Phone, ‘Skype’
Arica Operations Center
Operations CoordinationFacility StatusField Catalog
Forecast supportATC coordinationMission PlanningIn-field analysis
internet
Internet, Xchat,Phone, ‘Skype’
satcom,internet,
xchat
NCEP
Model products
internet,“Rest of the World”
internet
? ? xcha
t
C-130 CIRPAS G-1 BAe-146
Iquique Data Center
GAUS dataGTS report
?D
ata
feed
Da
ta fe
ed
internet
?
coastalsite
?
FAAM
Web server
R/V Olaya
R/V Brown
model products
Univ of Chile
NCAR
Field CatalogGAUS dataFlight data