visit of ranchi high court
TRANSCRIPT
![Page 1: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/1.jpg)
NAME –AMIT KUMARBRANCH –CIVIL ( LATERAL )Reg. NO – 13112035012Roll no – 64 ( L 1 )SEMESTER – 6thSESSION – 2013 – 2016report–HIGH court ranchiDATE – 21/05/2016
Signature teacher’s signature
![Page 2: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/2.jpg)
VISIT OF RANCHI HIGH COURT
UNDER THE GUIDANCE OF = Mr. B.N THAKURDATE OF VISIT = 21-05-2015
![Page 3: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/3.jpg)
INDEX
S.NO DETAILS PAGE NO.
NAME = AMIT KUMAR REG NO.13112035012BRANCH = CIVIL (LATERAL) SUB = VISIT OF HIGH COURT RANCHI
1 HIGH COURT RANCHI 1
2 PREFACE 2
3 ABOUT THE COMPANY 3
4 SOIL TEST 4
5 TYPES OF FOUNDATION 5
6 ISOLATED FOOTING 6-7
7 COMBINED FOOTING 8-9
8 EARTHQUAKE RESISTING 10 9 GRADE OF CONCRETE 11
10 CURING 12
11 CONCLUSION 13
![Page 4: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/4.jpg)
HIGH COURT RANCHI
• Site incharge Mr. Braj kishor
![Page 5: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/5.jpg)
PREFACE
• In this project it consist of the date collected during the visit of high court ranchi . this project was undertaken by the ram kripal construction pvt ltd .
Site in-charge of high court ranchi is Mr. Braj Kishor.
![Page 6: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/6.jpg)
ABOUT THE COMPANY• M/S RAM KRIPAL SINGH
CONSTRUCTION PVT LTD.
• Established in 1978• Owner Sh. Ram Kripal Singh • It has been rendering services only in
the field of construction after induction as a private limited company in the year 2003
• It stands high and possesses very rich experience in the field of constructions.
![Page 7: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/7.jpg)
SOIL TEST• Geotechnical engineers have a clear
understanding with soil-structure interaction.Soil test for construction is an important step taken by the geo technologist or the soil engineers.
• They investegated and found the bearing capacity of the site is about 25 N/MM2
• It was found that the site is on the decomposed Rock .
![Page 8: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/8.jpg)
TYPES OF FOUNDATION USED IN
CONSTRUCTION• Shallow foundation- Pad footing or column footing a ) Isolated footing b ) Combined footing- Cantilever or strap footings- Mat/Raft footings- Wall Footings• Deep foundation- Pile foundation
![Page 9: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/9.jpg)
FOUNDATION
• ISOLATED FOUNDATION These are most economical.
They are usually in square or rectangle size with the column sitting in the middle of the square. It's a kind of pad footing.
![Page 10: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/10.jpg)
Isolated footing used in High court Ranchi
![Page 11: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/11.jpg)
FOUNDATION
• COMBINED FOOTING A footing, either
rectangular or trapezoidal, that supports two columns. It's also a pad footing.
![Page 12: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/12.jpg)
Combined footing used in high court ranchi
![Page 13: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/13.jpg)
Earthquake resistant design was considered • Jack arched roofs or floors, where used
shall be provided with mild steel ties in all spans along with diagonal braces in plan to ensure diaphragms actions.
![Page 14: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/14.jpg)
GRADE OF CONCRETE USED
• Grade of concrete used in the foundation of High court ranchi was M 36 .
M36 is used in the foundation to provide high strength to the foundation and to resist the earthquake .
• Lower part of foundation consist of polythene of 75 micron.
![Page 15: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/15.jpg)
CURING
• Curing is giving the concrete what it needs to gain strength properly. Concrete strength depends on the growth of crystals within the matrix of the concrete. These crystals grow from a reaction between Portland cement and water—a reaction known as hydration. If there isn't enough water, the crystals can't grow and the concrete doesn't develop the strength it should. If there is enough water, the crystals grow out like tiny rock-hard fingers wrapping around the sand and gravel in the mix and intertwining with one another. Almost sounds like a horror movie—our concrete baby has turned into a monster!
![Page 16: Visit of ranchi high court](https://reader035.vdocuments.us/reader035/viewer/2022062400/58a8ddf51a28ab5a368b683f/html5/thumbnails/16.jpg)
CONCLUSION
With the help of the visit of high court ranchi we came to know about
• Importance of soil testing.• The types of footing used in
the heavy construction . • Grade of concrete used in
heavy construction .• Importance of vibrator• Importance of curing done for
heavy work.