vision technologies - bicsi · pdf filevision technologies ... • link budget ... •...
TRANSCRIPT
![Page 1: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/1.jpg)
Partnering for Success!DAS Systems
Vision Technologies
![Page 2: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/2.jpg)
Agenda
• Intro• Technology Overview• Solutions Deployment
![Page 3: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/3.jpg)
Vision Technologies• Revenue exceeding $90 Million in 2014• Design & Engineering Services:
• Certified: CIBET, RCDD, PMP, RCWD, CM-BIM• In-house CAD Team• “Company Behind the Company” Business Model
– We only succeed when you succeed!• National Delivery• 350+ Employees, 22 states• Service-Disabled Veteran-Owned• GSA Connections II Prime Contractor,
Schedules 70 and 58i, Sch. 84 pending
DAS IP Surveillance PON Audio Visual Wireless Structured Cabling
![Page 4: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/4.jpg)
Partner Opportunities• Don’t pass up new or additional opportunities• Expand your portfolio• Maintain account control• Continue to provide your core services• Vision becomes your RF Engineering bench!• Vision Technologies provides:
– RF Engineering and Design Services– Site Surveys– DAS Commissioning (System Activation)– WSP/Carrier Coordination– Documentation
![Page 5: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/5.jpg)
Distributed Antenna Systems• DAS Function
– RF Transportation System• DAS Applications
– Public Safety– Land Mobile Radios– Cellular / Commercial
• Cellular /Commercial DAS is “Special” / Different– Regulated– Monitored by FCC and WSPs– Requires WSP Approvals
![Page 6: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/6.jpg)
A distributed antenna system, or DAS, is a network of spatially separated antenna nodes connected to a common source via a transport medium that provides wireless service within a geographic area or structure.
~ Wikipedia
DAS 101DAS Terminology• IBW: In-building Wireless• Neutral Host: Multi Carrier DAS• HetNet: Heterogeneous Network• Technology; 2G, 3G, 4G, LTE, 5G• RF Signal Source Cellular Repeater aka BDA
(Bi-Directional Amplifier) BTS = Base Transceiver Station Small Cell
• DAS Cellular Enhancement Cell Booster Radio Frequency Repeater System
Funding Models• Enterprise• Carrier• 3rd Party / NHP
DAS Solutions• Cellular Voice and Data
2G/3G/4G• Land Mobile Radios/2-way
First Responder Security/Facilities
• Paging • WMTS – Medical Telemetry• WiFi / WLAN; RTLS –
Location Systems• Next Generation
Device to Device Internet of Things
![Page 7: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/7.jpg)
Regulated• FCC Auctioned Spectrum• Conditions
– Licensee Responsible for Performance Metrics • FCC Definitions
– Consumer Booster• Register with your local WSP
– Industrial Booster• Requires Express Consent of FCC Licensee (WSP)
– wireless.fcc.gov/signal-boosters/index.html
![Page 8: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/8.jpg)
DAS Architecture - Passive
8
![Page 9: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/9.jpg)
DAS Architecture – Active (Hybrid)Fiber & 50 Ohm Coax
9
![Page 10: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/10.jpg)
DAS Architecture – Active Fiber & 75 Ohm Coax
10
![Page 11: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/11.jpg)
DAS Architecture – ActiveFiber Only
11
![Page 12: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/12.jpg)
DAS Architecture – ActiveFiber & Cat6A/Cat7
12
![Page 13: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/13.jpg)
Solution Deployment
![Page 14: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/14.jpg)
Project DeploymentRequirements
Gathering
Survey & Design
Proposal & Pricing
System Installation
Carrier Coordination
DAS Activation& Integration
System Test& Verification
Project Documentation
& Close Out
Warranty & Maintenance
![Page 15: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/15.jpg)
• Current Needs– Mission Critical, Desired, ROI/Budgeting– Public Safety? Which Commercial Providers? – Mobility Services (Which frequencies, Voice, Data, WiFi offloading) – Venue Occupants/Wireless Users?– Coverage Requirements? (Partial Building; Entire Building; Campus
(Elevators; Stairwells; Mechanical Spaces)• Future Expectations
– Additional Coverage Areas– Additional Carriers, New Services (MIMO, New Licensed Spectrum)
• Facility-Based Considerations– New Construction, Renovation, or Expansion– Aesthetic and Architectural Requirements– Working Hours; Daytime, After Hours– Preferred Low Voltage Contractor?– Union/Non Union, Prevailing Wages
Understanding Customer Requirements
![Page 16: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/16.jpg)
Site SurveySite Features to Evaluate• Cable Pathways• Equipment Locations• RF Propagation Characteristics• Ambient RF Environment• Macro Serving Cell Sites• Aesthetics
![Page 17: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/17.jpg)
Site Survey• Preparation• Physical Characteristics • RF Characteristics• Tools
![Page 18: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/18.jpg)
Site Survey Preparation• Obtain Electronic copies of Floor Plans• Create a Preliminary Design• Pre-configure Survey Tools
– Insert Floor Plans– Charge Batteries
• Site Access– Site POC Information – Working Hours– Arrange Escorts if needed– Access into Existing Equipment Locations– Access onto the Roof
![Page 19: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/19.jpg)
Site Survey - Physical Characteristics
• Cable Pathways – Plenum, Non-Plenum – Conduit fill ratios
• Existing Fiber • Wall Types, Ceiling Types• Equipment Locations
– Space, Grounding, Electrical, HVAC• Document Aesthetically Sensitive Areas
![Page 20: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/20.jpg)
Site Survey – RF Characteristics• Building Propagation Characteristics
– Transmitter / Receiver
• RF Benchmarking• Macro Serving Cell Sites• Critical Areas
– VIP Areas– Meeting Rooms
![Page 21: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/21.jpg)
Survey Tools• Collection Tools
– PC/Tablets connected to Multiple UEs– Scanners
• Continuous Wave Transmitters• Spectrum Analyzers / BTS Analyzers• Check List / Task List• Camera
![Page 22: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/22.jpg)
Survey Results Analysis • Physical
– Cable pathways: Existing/Create– Equipment Locations– Interior Build-out
• Walls, Ceilings• Aesthetic and Structural
• RF – Ambient– DAS Dominance– Soft Handoff – Elevators/Stairwell Locations
![Page 23: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/23.jpg)
Survey Summary• Preparation
– Client Expectations & Site Access– Preliminary DAS Design– Pre-configuration of Tools– Survey Checklist
• Ensure Data Collection During Survey• Take Plenty of Pictures and Notes• Analyze Data soon after Survey Completion
23
![Page 24: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/24.jpg)
Link Budget
Frequency750 750 880 880 880 1960 1960 1960 MHz
TechnologyLTE LTE CDMA UMTS GSM CDMA UMTS GSM
Composite Power Output
# of Channels1 1 4 4 4 4 4 4
Power per Channel 27.0 27.0 21.0 23.2 13.2 21.0 21.7 11.7 dBm
Splitter/combiner Losses -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 dB
1/2-inch Cable Length 150 150 150 150 150 150 150 150 feet
1/2-inch Cable Loss -3.0 -3.0 -3.3 -3.3 -3.3 -5.3 -5.3 -5.3 dB
Antenna Gain1.5 1.5 1.5 1.5 1.5 2.9 2.9 2.9 dBi
Antenna Output15.5 15.5 9.2 11.4 1.4 8.6 9.3 -0.7 dBm
Distance (Radius)65 65 65 65 65 65 65 65 feet
Free Space Path Loss -55.9 -55.9 -57.3 -57.3 -57.3 -64.3 -64.3 -64.3 dB
Body Loss-3.0 -3.0 -3.0 -3.0 -3.0 -3.0 -3.0 -3.0 dB
Wall/Clutter Loss-10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 0.0 dB
Fade Margin-5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 dB
Pilot-27.8 -27.8 -8.2 -10.0 0.0 -8.2 -10.0 0.0 dB
DL Pilot RSSI Level -86.2 -86.2 -74.3 -73.9 -73.9 -81.8 -82.9 -72.9 dBm
Link Budget Calculations - 1 Watt OEM Remote Hub Unit
3030
30
DesignRF Considerations• Active or Passive DAS• OEM Selection• RF Signal Source for the DAS• In-Building Antenna
Placement• RF Link Budgets• Carrier Approvals - Required Construction Considerations
• Defined Scope of Work • Pricing/Proper Budgeting• Project Schedule• Staffing Plan• Material Storage
![Page 25: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/25.jpg)
Design
• Design Tools• Design Process• Design Creation• Incorporate
Survey Data
![Page 26: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/26.jpg)
Design Tools
• iBwave - Industry Standard Design S/W– Certification Level 1: Enterprise Design
• Import and size floor plans• Add RF signal sources• Add DAS equipment and materials
– Certification Level 2: Propagation, Data Collection, Optimization
• Create “Walls” onto floor plans• Modify and adjust propagation characteristics• Create Predictive Analysis (2D and 3D)
![Page 27: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/27.jpg)
Design Tools• iBwave (Continued)
– Certification Level 3: MIMO, Complex Venues, Capacity Planning
• Stadium environments• MIMO and WiFi offloading• Capacity considerations for data throughput
• Link Budget• “Dixie Cup”
– Preliminary approach only
![Page 28: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/28.jpg)
Design Process• Initial Setup is Critical
– Scaling of Floor Plans– Reference Point – RF Signal Sources
• Channel Loading• RSSI vs. RSRP vs. RSCP
– Wall Type, Composition and Placement
– Coverage Requirements
![Page 29: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/29.jpg)
Creating the Design• Neatness Counts!!
– Design doc installer’s instruction manual• Where antennas are installed• Interconnection diagrams
– Install manual as-built documentation• Used for maintenance, repair and upgrades
• Generate Bill of Materials– S/W auto-calculates % for waste– Per system, per building, per floor
• Database of Parts
![Page 30: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/30.jpg)
Incorporate Survey Data
• Wall Types– Concrete Block, Drywall, Cubical
• Cable Pathways – Vertical, Horizontal– DAS Requirements
• Critical Areas– CEO’s office– Meeting Rooms
![Page 31: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/31.jpg)
Survey vs. Predictive
• Import Survey Results into iBwave– Overlay onto Floor Plans
• Predictive vs. Survey – DAS Dominance– Soft Handoff Areas– “What if” Scenarios
• Make Design Adjustments• Generate Heat Maps
![Page 32: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/32.jpg)
Design Summary• Preparation
– Understanding the Big Picture • Customer Requirements• Venue Characteristics• Equipment Capabilities
• Software does not replace knowledge– Garbage In = Garbage Out– Pay attention to the details
• Fine tune the design using predictive analysis • Build upon previous work
– Design Installation As-built
32
![Page 33: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/33.jpg)
ProposalProposal Elements• Design Information
– Bill of Materials• Construction
– Labor of Effort– Schedule
• Solution Description– Coverage
• Pricing
![Page 34: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/34.jpg)
System InstallationDisciplined Project Management• Responsibilities Matrix;
Prime/Subcontractors/Installation team• Stakeholder Management• Regular/Weekly Status Reports• In-Process Quality ReviewsInstallation• Stage Delivery to Match Installation
Schedule (Lead-time issues)• Cable Rough-in and Termination• Equipment Mounting, Interconnections,
Setup & Testing
![Page 35: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/35.jpg)
Carrier Coordination - WhyThe Carriers must always be involved!• DAS Solutions Rebroadcast Licensed & Regulated Spectrum• Carriers own their Spectrum (Licensed from the FCC)• Carriers must Approve the Design to Ensure their Participation• Carriers Issue Rebroadcast Agreements /Letter of Authorizations
If the Carriers are not Involved• Right & Authority to shutdown the DAS & keep it off• DAS Owner left with a costly and non-functional system• There is usually no recourse; a system redesign resolving deficiencies
and meeting Carrier approval must be performed, or remain off air
![Page 36: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/36.jpg)
Carrier Coordination – Activities• Submit Design, BoM, Link Budgets & Predictive Analysis
for Technical Approval• Follow up with Carrier on Approval Status• Modify Design or Provide Clarification as Required• Provide Client/Venue Information for Legal Agreements• Follow up to Ensure Approval Process Moves Forward• Coordinate Signal Source & DAS Activation Activities• Provide As-Built Documentation upon Project Completion
![Page 37: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/37.jpg)
Testing and Verification• Component & Cable Testing Return loss, DTF, PIM Optical loss, Reflections Antenna Testing
• DAS Equipment Configuration & Testing• Continuous Wave/RF Testing• Signal Source Activation• Optimization and Fine Tuning Power, UL/DL, Antenna Direction
• System Verification Survey & Verify Performance Metrics
Specialized Tools & Expertise Required
• Design• Survey• Testing
![Page 38: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/38.jpg)
Project Documentation• Cabling Pathways• Antenna Placements• Equipment Configuration• Survey Results
Manufacturer Description Part Number Unit QTYTE Conectivity Spectrum-Prism - Host Unit - No DARTS FWP-00000HUII ea 2TE Conectivity Spectrum-Prism - Host Unit - 850 CELL, Classic DART FWU-20000HUDART ea 2TE Conectivity Spectrum-Prism - Host Unit - 1900 PCS, SuperDART FWU-86000HUDART ea 4TE Conectivity Spectrum-Prism - Host Unit - 2100 AWS, SuperDART FWU-A6000HUDART ea 3TE Conectivity Spectrum-Prism - Host Unit - 700 LTE, SuperDART FWU-L6000HUDART ea 2TE Conectivity Spectrum DART Remote Unit SPT-0000DRUII ea 4TE Conectivity Spectrum, 850 CELL, IF DART SPT-000000850IFD ea 4TE Conectivity Spectrum, 1900 PCS, IF DART SPT-000001900IFD ea 4TE Conectivity Spectrum, 2100 AWS, IF DART SPT-002100AWSIFD ea 4TE Conectivity Spectrum, 700LTE DART (SISO) SPT-00700UPC1IFD ea 4TE Conectivity Spectrum, 700LTE DART (MIMO) SPT-00700UPC2IFD ea 4TE Conectivity Spectrum IF Expansion Unit SPT-00000IFEU-1 ea 6TE Conectivity Spectrum Power Supply SPT-2400ACDC-1 6TE Conectivity Spectrum Fiber Transceiver FWU-SMCW1470XVR ea 8TE Conectivity Spectrum, 850-1900 Main Remote Access Unit (RAU) SPT-8519-1 ea 8TE Conectivity Spectrum, 700 MIMO Secondary RAU SPT-S1-7070-1-MIMO ea 8TE Conectivity Spectrum, 1900-2100AWS Main RAU SPT-M1-19AWS-1 ea 8TE Conectivity Spectrum, 700 SISO-2100AWS Secondary RAU SPT-S1-70AWS-1-SISO ea 8TE Conectivity Omni Antenna, (3) 72" pigtails, 700/800-2100/2400-2500 4214-M727 ea 16
TE ConectivityRG-6/U, 75 Ohm, Plenum, Hub to RAU distances up to 450 feet (1000ft) 862733 ea 5
Belden RG-11/U, 75 Ohm, Plenum, Hub to RAU, distances up to 650 feet 7732A ea 5
![Page 39: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/39.jpg)
Warranty & Maintenance• Service Level Agreements
– Severity Levels– Response Times
• Site Access• Remote Access
– Monitoring– Maintenance
• Annual Performance Inspection
![Page 40: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/40.jpg)
Integrator / Partner Selection• Key Attributes
– Solutions Focus– Technology Focused Engineering– Project Management Experience– Program Management Experience– Partnership Mentality– Service and Support Capabilities
![Page 41: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval](https://reader031.vdocuments.us/reader031/viewer/2022022504/5ab50b027f8b9a7c5b8c5e75/html5/thumbnails/41.jpg)
Contact Information
Thank YouWilliam Foy RCDD, NTS, OSP, WD, ESS
– Solutions Architect– 443-370-9258– [email protected]