DESCRIPTION
Virtual Server Implementation. Presented by HYUN. The Project objects. Power saving server environment Server resource utilization. Virtual Server. d. Virtual Networking implementation. Electricity power calculation. A fluorescent light power consumption. 30 – 40 W. - PowerPoint PPT PresentationTRANSCRIPT
Virtual Server Implementation
Presented by HYUN
The Project objects
• Power saving server environment
• Server resource utilization
Virtual Server
• d
Virtual Networking implementation
Electricity power calculation
• A fluorescent light power consumption
30 – 40 W
Electricity power calculation
• General desktop/server’s power consumption
• CPU : 100W• RAM : 8W• Graphic card : 30W• Mother board : 20W• CD-ROM : 20W• HDD : 13W• Monitor : 40W
-------------------------------------------------------------------Total = 230W
Electricity power calculation
• General server power consumption(per day)
230W x 24(hours) = 5,520 Wh = 5.5 KWh
5.5kWh $ ?
Electricity power calculation
• A fluorescent light power consumption30 – 40 W
230W / 35W ≒ 6.5
=
Power consumption comparison
VS
5 Physical Virtual Server servers
Power consumption comparison
230Wx5x
24h=
27.6kwh + a
230Wx
24h
=5.5kwh + a
Virtual Server Advantages
• Power saving over multiple physical servers
• Simplify system administration by integrating all servers into one physical machine
• Server hardware resource optimization
Virtual Server disadvantages
• When host server machine crash, all virtual servers embedded in the server crash too.
Extra considerations for power saving
• General SATA HDD
13W
• NAND flash memory – SSD
1W
Extra considerations for power saving
• External USB HDD
3W – 5W
Extra considerations for power saving
• Power saving application
– Turning off the monitor– Turning off the HDD– CPU power control etc.
Full load Saving Mode
230W 150W
Design Overview
e
Hardware ListTiming Equipment needed
Quantity
Description Unit cost Total cost
1 Standalone Server(HP Prolian ML 370 G5)CPU: Quad Core
Processor 2 GHzRAM: 2G
$6,000 $6,000
2 External HDD 320G(USB) $100 $2001 SSD Flash
memory(64GB)$1,875 $1,875
1 Halogen light(USB) $15 $151 17” LCD Monitor $200 $2001 HP T1500 XR UPS G2 $700 $700
Total equipment cost for the project $8,990
Software ListTiming Software needed
Quantity
Description Unit cost Total cost
1 VMware GSX $3,400 $3,400
1 Windows2000 Advanced Server(5CAL)
$570 $570
1 Ubuntu Server $0 $0
1 Windows Server 2003(5CAL)
$1,583 $1,583
1 Recording power consumption software
$0 $0
1 Power saving application $38 $38
Total software cost for the project $5,591
MS ProjectID Task_Name Duration
Initiate 0.5 days
1 Project Charter 0.3 days
2 Feasibility study 0.2 days
Planning 1.7 days
3 WBS 0.5 days
4 MS Project 0.1 days
5 Sketch 0.2 days
6 Hardware 0.3 days
7 Software 0.3 days
8 Service 0.3 days
Executing 2.5 days?
9 Installation 1 day?
10 Test 0.5 days
11 Training 1 day?
Control 0.8 days
12 Change Control 0.5 days
13 Sketch of Change 0.3 days
Closing 1.5 days?
14 Closeout Report 0.5 days
15 Audit 1day?
Total 7DAY
Budget
Expenditures
Internal Staff Labor $3,000
Software Tools $5,600
Hardware $8,990
Total $17,590
THANK YOU