Annual Environmental Report 2011 - 777-01 1 VIRIDIAN POWER STATION ANNUAL ENVIRONMENTAL REPORT 2011 REPORT PERIOD 1 ST JANUARY 2011 TO 31 ST DECEMBER 2011 Licence Register Number: 777-01 IPC Class 2.10 Licensee: Viridian Power Ltd Location of Activity: Huntstown Quarry, Huntstown, Finglas, Dublin 11. Description of Activities: The production of energy in combustion plant the rated thermal input of which is equal to or greater than 50 MW. Coordinates of Location: -632518 53.4126 RBME risk Category B2 NACE Code 3511

Upload: ledien

Post on 18-Mar-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

Annual Environmental Report 2011 - 777-01

1

VIRIDIAN POWER STATION ANNUAL ENVIRONMENTAL REPORT 2011

REPORT PERIOD – 1ST JANUARY 2011 TO 31ST DECEMBER 2011

Licence Register Number: 777-01 IPC Class 2.10 Licensee: Viridian Power Ltd Location of Activity: Huntstown Quarry,

Huntstown, Finglas, Dublin 11. Description of Activities: The production of energy in combustion plant the rated

thermal input of which is equal to or greater than 50 MW. Coordinates of Location: -632518 53.4126 RBME risk Category B2 NACE Code 3511

Annual Environmental Report 2011 - 777-01

2

TABLE OF CONTENTS

1. INTRODUCTION. . . . . . . . 3 1.1 Q, E, H&S POLICY STATEMENT. . . . 3 2. SUMMARY INFORMATION. . . . . . 4 2.1 EMISSIONS TO WATER. . . . . . 4 2.2 EMISSIONS TO ATMOSPHERE. . . . . . 4 2.3 WASTE MANAGEMENT . . . . . 5 2.4 ENERGY AND WATER CONSUMPTION. . . . . 6 2.4.1 ENERGY INPUT. . . . . . . 6 2.4.2 WATER CONSUMPTION. . . . . . 6 2.5 ENVIRONMENTAL INCIDENTS AND COMPLAINTS. . . 7 2.5.1 ENVIRONMENTAL INCIDENTS. . . . . 7 2.5.2 COMPLAINTS. . . . . . . . 8 2.5.3 MISCELLANEOUS RECORDS. . . . . . 8 APPENDICES. . . . . . . . . 9 APPENDIX 1 EMP 2011 APPENDIX 2 EMP PROPOSED 2011 APPENDIX 3 PRTR TABLES TABLE 1: PROCESS EMISSIONS TO WATER. . . . . 4

TABLE 2: EMISSIONS TO ATMOSPHERE . . . . 4

TABLE 3: ENERGY INPUT . . . . . . 6

TABLE 4: WATER CONSUMPTION. . . . . . 6

TABLE 5: SUMMARY OF COMPLAINTS. . . . . 8

Annual Environmental Report 2011 - 777-01

3

1.1

Quality, Environmental, Health & Safety Policy

Huntstown Power Station is a combined cycle power station and is situated at Huntstown

Quarry, near Finglas, Co. Dublin. Huntstown Power Station produces electricity for export to

the National Grid. The Power Station is owned by the Viridian Group and is operated and

maintained by Gensys Power Ltd., a wholly owned subsidiary of the Viridian Group.

Gensys Power Ltd. is committed to operating the Huntstown Power Station to the highest

standards of Health & Safety as detailed in the Safety, Health & Welfare at Work Act, 2005.

Huntstown Power Station is a lower tier Seveso site under the COMAH regulations and fully

committed to the safe, efficient, profitable and reliable production of electrical energy in order

to meet the long term expectations of both the customers and shareholders.

GenSys will fulfil its responsibilities towards employees, clients, partners, visitors, neighbours

and the environment by demonstrating leadership and commitment to Quality, Environmental,

Health & Safety Management Systems and complying with all relevant legislation and other

requirements. GenSys is committed to achieving continual improvement, to prevention of

pollution and meeting relevant corporate objectives by establishing local objectives that support

them. We are also committed to providing adequate resources to achieve the objectives and

aims of this policy.

At GenSys we are fully aware of the impact that our activities may have on the environment

and as a result we are committed to high standards of environmental care and to continually

improving our environmental performance in line with our IPPC licenses. The Company will

have a philosophy of integrating quality, health & safety and environmental issues into all its

activities and ensure that all business decisions are aligned with the aims of this policy.

Annual Environmental Report 2011 - 777-01

4

2.Summary Emissions 2.1 Self-Monitoring Data – Process Emissions to Water

Parameter Unit Max. Licensed

Emission per year 2009 2010

2011

Volume M3/yr 219,000 36,484 13,441 14,543.69

Suspended Solids Kg/yr 6,570 412.96 50.4 72.72

Nitrate Kg/yr n/a 95.43 20.62 19.82

BOD Kg/yr 4380 36.71 13.44 14.54

COD Kg/yr 10,950 376.26 191.12 290.87

Total Dissolved Solids Kg/yr

438,000 28,623.4 10,343.09 6215.0

Total Nitrogen Kg/yr n/a 54.26 22.48 34.97

Total Phosphorus Kg/yr 21.9 1.028 0.56 0.73

Ammonia Kg/yr 328.5 5.87 4.28 15.25

Table 1: Process Emissions to Water 2.2 Self-Monitoring Data – Emissions to Atmosphere

Table 2 – Emissions to Atmosphere *From CEMS ** Calculated under ETS

Emissions to air

Parameter Unit 2009 2010 2011

Sox Kg/yr 9,846 10,026 9,792*

Nox Kg/yr 576,622 667,532 510,568*

Co2 Kg/yr 1,043,359,000 1,039,070,000 931,269,000**

CO Kg/yr 47,245 269,248  193,656* 

Annual Environmental Report 2011 - 777-01

5

2.3 Waste Management

SECTION A‐PRTR WASTE TRANSFERS TAB‐ TO BE COMPLETED BY ALL IPPC AND WASTE FACILITIES 

See PRTR

SECTION B‐ WASTE ACCEPTED ONTO SITE‐TO BE COMPLETED BY ALL IPPC AND WASTE FACILITIES 

  

1  Were any wastes accepted onto your site for recovery or disposal or treatment prior to recovery or disposal within the boundaries of your facility ?; (waste generated within your boundaries is to be captured through PRTR reporting)  No 

If yes please enter details  in table 1 below

Did your site have any rejected consignments of waste in the current reporting year? If yes please give a brief explanation in the additional information   No 

Was waste accepted onto your site that was generated outside the Republic of Ireland? If yes please state the quantity in tonnes in additional information  No 

Annual Environmental Report 2011 - 777-01

6

2.4 ENERGY AND WATER CONSUMPTION 2.4.1 ENERGY Consumption (01/01/11 – 31/12/11)

Energy Usage

Energy Consumption

Sulphur Content Unit

2010

2011

Heavy Fuel Oil M3/yr

Light Fuel Oil 15.00% M3/yr 359.68 290.59 

Natural Gas NM3/yr 477,651,084.8  429,211,655.57 

Electricity MWhr 45,007 40,371 

Coal Kg/yr 0 0

Table 3: Energy Input (total used on site)

2.4.2 WATER CONSUMPTION (01/01/11 – 31/12/11)

Well Water

Quantity

2008 (m3)

Quantity

2009 (m3)

Quantity

2010 (m3)

Quantity

2011 (m3)

Rate (m3/day)

Well Water

53,153

42,282.74

27,053

33,863

92.77 m3/day

Potable water

34,274 44,929 11,780 903 2.47 m3/day

Table 4: Water Consumption Summary

Annual Environmental Report 2011 - 777-01

7

2.5 Environmental Incidents

Annual Environmental Report 2011 - 777-01

8

2.5.2 ENVIRONMENTAL COMPLAINTS

Category

Number of Complaints

(01/1/10 – 31/12/10)

Odour 0 Noise 0 Water 0 Procedural 0 Miscellaneous 0 Total 0

Table 5: Summary of Complaints

2.5.3 MISCELLANEOUS RECORDS

Bund Testing was carried out during 2011. The results and reports are available on-site.

Annual Environmental Report 2011 - 777-01

9

APPENDIX 1

Environmental Management Programme

( 2011 – resulting from EHS Management Meetings)

Environmental Aspect: Energy and Resource Usage/Product Stewardship Objective No. 1: Minimise and reduce energy and resource usage. Relevant Legislation: Protection of the Environment Act 2003 (Commencement) Order 2004 Objective No.1 Target Action Due Date Resp. Status Minimise and reduce energy and resource usage.

1.1 Investigate options for

further

energy/resource

reduction Viridian.

a) Investigate areas for energy/resource reduction.

b) Implement energy/resource reduction measures.

c) Report on progress of energy reduction measures.

31/08/11 Kieran Adams/ Karina Ruddy

Complete

1.2 Investigate alternative

operation plan for

Auxiliary Boiler

a) Look at current operating methodology for Auxiliary Boiler (complete)

b) Identify means of reducing energy consumed by Aux. Boiler

c) Implement new operating strategy for Aux. Boiler

31/12/11 P Mervyn Complete

1.3 External lighting

energy reduction

a) Survey the external lighting in use around site and current operating policy. (Note: Due to security & safety reasons external road lighting will not be surveyed as per EHS meeting Nov 2010)

b) Investigate the feasibility of installing light sensors or other energy reduction methods

c) Install equipment d) Report on reduction

31/12/11 D Geraghty

15% Complete (1 area, Control room lighting

complete)

1.4 Auxiliary Boiler Project a) DG to test Aux Boiler to investigate how long it takes to recover from cold

b) From this test investigate whether it is advisable to leave the Aux Boiler off for long periods

31/04/11 D Geraghty

Complete

Environmental Aspect: Supply Side Activities Objective No.2: Establish the environmental and health and safety probity of suppliers and contractors

Relevant Legislation: Safety, Health and Welfare at Work Act 2005 Objective No.2 Target Action Due Date Resp. Status Establish the environmental probity of suppliers.

2.1 Develop method for control of suppliers.

(a) Continue promoting environmental awareness amongst suppliers/vendors by issuing them with environmental documentation (i.e. environmental policy). (Ongoing)

Ongoing K Ruddy Complete apart from

Ongoing Issues

2.2 Incorporate EHS

Probity into Vendor

Approval System.

(a) Develop a checksheet to be completed following site induction.

(b) Ensure all method statements, risk assessments lifting plans are all submitted and approved prior to Phase 1 & 2 Outages.

(c) Environmental and safety audit to be carried out during both outages.

Ongoing K Ruddy / K Adams

Complete for 2011

Environmental Aspect: Emissions Objective No. 3: Identification & Reduction of Fugitive Emissions Objective No.3 Target Action Due Date Resp. Status Carry out risk assessments of all chemicals onsite and ensure M.S.D.S sheets are in compliance with current legislation.

3.1 - Complete Chemical Risk Assessments for all chemicals on site

(a) Complete risk assessments for all chemicals on site. (b) Check that they are specific to the tasks used on site

i.e. pouring/mixing (c) Setup a database for these Chemical Risk assessments

allowing them to be easily accessible to staff via Viridian Website or another website.

(d) Any chemicals which are found to be a high risk look at getting a replacement which is less hazardous.

(e) Audit required to ensure all chemicals are captured (f) System required for new chemicals to ensure they are

on the database.

31/09/2011

A Moloney, Complete

3.2 – Ensure all M.S.D.S. comply with Annex II of the Reach regulations.

(a) Complete a review all MSDS on site to determine how many comply with Annex II of the REACH Regulations regarding layout of the MSDS (closed)

(b) Contact to be made with contractors / suppliers of non-compliant MSDS sheets and request made for re-issue of MSDS which comply with REACH regulations.

(c) Update chemical risk assessment data base with MSDS sheets.

01/09/11 A Moloney, Project team

Complete

Prevent glycol from entering water discharges/ release from site

3.3 Conduct Engineering study and complete corrective actions which have been identified.

(a) Conduct Engineering Study and Containment Gap Review of CCCW system

(b) Review recommendations arising from the study and action accordingly. (CCCW cooler has been replaced to reduce the risk of a leak from the system)

10/01/10 Engineering Department

, Project Team

Complete

3.4 Install monitoring system for TOC to increase the detection of fugitive emissions/glycol

(a) Investigate the feasibility of installing a TOC meter (b) Compile quotations and select most suitable product. (c) Identify mechanical/electrical installation requirements (d) Install and test TOC meter

1/04/11 Maintenance Depart, A

Moloney, K Adams

Complete

Environmental Risk Assessments Objective No. 5: PRAD – Risk Assessment Register

Relevant Legislation: Safety, Health and Welfare at Work Act 2005 Objective No.5 Target Action Due Date Resp. Status PRAD Risk Assessment Register

5.1 – Review and update PRAD (a) PRAD needs to be developed so that specific hazards and controls are included

Ongoing

K Ruddy

Ops / Maint

Complete

5.2 Review Risk Assessment and Method Statement approval process to ensure staff and contractors apply sufficient considerations in reviewing environmental risks.

(a) Define changes required to improve risk assessments Environmental consideration.

(b) External contractor to complete template to enable Environmental specialist risk assessment

(c) Template to be incorporated into PRAD, Risk assessment database

31/12/11 K Ruddy Complete

Environmental Aspect/Heath and Safety Risk: Hazardous Chemicals Objective No.4: Reduce Hazardous Chemicals Onsite Relevant Legislation: Safety, Health and Welfare at Work (Chemical Agents) Regulations 2001 and Waste Regulations Objective No.4 Target Action Due Date Resp. Status Reduce the potential impact of hazardous chemicals and waste on site.

4.1 Reduction in laboratory hazardous chemicals

(a) Any hazardous chemicals used for laboratory analysis should be assessed and if possible replaced by a less hazardous chemical.

31/03/2010

A Moloney Survey complete

4.3 Reduction in

hydrazine

(a) Hydrazine to be removed from dosing skids for safe storage in the chemical storage area (closed)

(b) Investigate the feasibility of replacing the hydrazine by a less hazardous option, possibly Carbohydrazide (ongoing)

(c) Modify dosing skids as required.

29/02/2012 A Moloney / K Ruddy

Complete -all

hydrazine remove,

dosing skid installed

Environmental Legislation: GHG Permit Objective No. 6: Gas Constituents & Air Intake filters differential pressure. Objective No.6 Target Action Due Date Resp. Status Assess the constituents of the Gas for major variations

6.1 Bord Gais Gas data results should be monitored by using graph functions.

(a) Monthly monitoring of gas data for major discretions (b) Graphing and reporting on the constituents of the gas should ensure that plant is running at maximum efficiency by highlighting irregularities in the gas burn / humming effects

Ongoing D Geraghty Open – Monthly

Graph the efficiency of the Air Filters at the Air Intake Area

6.2 In order to improve the efficiency of the unit and therefore increase the power output compared to emissions.

(a) Monthly graphing of the efficiency of the Air Filters in the Air Intake Area. If the differential pressure between the filters increases then the efficiency of the compressor could be compromised due to dirt entering in the air. This study should ensure that any issues are picked up before they have a detrimental effect.

Ongoing Production Managers

Ongoing- Monthly

APPENDIX 2

Environmental Management Programme

Proposed 2012

  

Environmental Aspect:  Release to water   Objective No. 1: Ensure all discharges are within IPPC licence conditions.   Relevant Legislation:  IPPC licence  

Objective No.1 Target  

Action   Due Date Resp. Status

1.1  Increase Monitoring On discharges   a)  Prepare a schedule of testing from the Quarterly list of parameters in the IPPC 

licence. This is additional testing to the licence requirements.   

b) Carry out testing regime, as per above, review and adjust based on results  

15/06/12  Chem   In Progress 

1.2  Ensure all IPPC licence related water 

discharge alarms are correct and 

distinguished clearly 

 a) Review all site alarms for IPPC licence compliance  

 b) Identify any  improvement  items,   make recommendations to ensure a robust 

monitoring and alarm system to the D.C.S is in place.   

c) Implement recommendations  

 

31/12/12  Ops/Sys  In Progress 

      

Environmental Aspect:  Hazardous Materials  Objective No.2:  Reduce quantity  of hazardous materials  and ensure they are correctly stored 

Relevant Legislation:  IPPC licence Target   Action   Due Date Resp. Status   2.1  Removal of hydrazine 

(d) Hydrazine  to be  removed  from dosing  skids  for  safe  storage  in  the  chemical 

storage area  

(e) Investigate  the  feasibility  of  replacing  the  hydrazine  by  a  less  hazardous 

option, possibly Carbohydrazide  

(f) Remove hydrazine and modify dosing skids  

29/02/12 Chemist Complete

2.2 Remove hazardous materials 

from main stores  a) Carry out an audit of the chemicals/hazardous materials in the stores  

b) Segregate all chemicals/hazardous materials  from  the main  stores. Provide a 

designated  area  with  suitable  storage  requirements  for  all  store’s 

chemicals/materials. 

c) Update location on CMMS.  

31/03/12 Project team 

In Progress

2.2 Improve management and control 

of Materials brought to site  a) Procedure to be compiled to include further control measures for the selection and introduction of hazardous materials onsite. ENV‐016 

29/02/12 Station Chemist 

Complete

  

 Environmental Aspect:  Hazardous Waste   Objective No. 3:  Ensure all Hazardous waste is stored and disposed of in accordance with IPPC licence conditions.   

Target   Action   Due Date Resp. Status  3.1  Ensure compliance with IPPC 

licence regarding waste storage and disposal.    

a) Waste contractor to be audited   

b) Weekly audit of the Chemical and Waste storage area   

c) 6 monthly audit to be carried out of Waste certification documents and Waste Contractors Permits.  

31/07/2012 Tech Services/Operations  

OPEN

 

Environmental Aspect:  Non‐Hazardous Waste Objective No.4:  Reduce Non‐Hazardous waste generated Onsite Relevant Legislation:  IPPC licence  Target  

Action   Due Date Resp. Status

4.1 Reduce quantity of non‐

hazardous waste produced  

 (a) Compile a detailed breakdown of hazardous waste streams onsite.  

 (b) Review  breakdown  and  propose  objectives  for  reduction  of Non‐Hazardous 

waste onsite. 

31/03/2013 Tech Services  

OPEN

4.2  Ensure compliance with IPPC 

licence regarding waste storage 

and disposal 

(a) 6 monthly audit to be carried out of Waste certification documents and Waste Contractors Permits. 

31/07/2012 Tech Services  

OPEN

Environmental Aspect:  Emissions to Atmosphere Objective No. 5:  Ensure compliance with Air Emissions Quality Standard EN14181  Relevant Legislation: EN14181  Target   Action   Due Date Resp. Status     5.1 Review site compliance with EN14181  

a) Review of continuous emissions monitoring system performance including data availability,  calibration  history,  documented  maintenance,  reliability  and reporting of emission limit value breaches; 

b) Performance and reliability of air emissions abatement equipment; e.g. CEMS. Carry out an audit to ensure compliance 

c) Ensure QAL 1, 2 & 3, and AST are carried out in compliance with legislation. 

d) Review Previous Air Audit carried out by the EPA 

31/06/12   

31/06/12  

Ongoing  

31/04/12 

    

ECI/Tech Services 

   

OPEN   

Environmental Aspect: Potential Land Contamination Objective No. 6:  Reduce the risk of potential land contamination  

Relevant Legislation:  Target   Action   Due Date Resp. Status6.1 Ensure integrity test of 

underground pipework 

a) Underground pipework survey to be carried out of Foul and Surface water 

lines 

 

b) Complete any works identified in the survey. 

31/06/12Tech 

Services 

In progress 

6.2. Ensure appropriate 

Environmental  consideration 

i.e. Risk assessments are carried 

out for every task 

a) Ensure staff awareness on importance of Environmental Risk assessments

 

b) Audit Risk assessments to ensure appropriate controls are in place to 

prevent any Environmental issues. 

31/07/12 Ops / Maint 

In progress

 

Environmental Aspect: Natural Resource Consumption/Product Stewardship Objective No. 7:  Minimise and reduce energy and resource usage.  

Relevant Legislation: Protection of the Environment Act 2003 (Commencement) Order 2004 

Target   Action   Due Date Resp. Status7.1 Reduce energy usage  in the UCA 

building 

a) Investigate the feasibility of installing light sensors in the UCA buildingb) Install equipment  c) Report on reduction 

30/04/12 Ops / Maint 

In progress 

7.2. Reduce house load  a)   Investigate the potential of using one set of Air Compressors to supply both plants, i.e. Phase 1 Air Compressors feeding Phase 2 plant. b) Carry  out  the  required  changes,  Plant  Mods,  to  allow  sharing  of  Air 

Compressors between plants 

31/06/12 Ops / Maint 

In progress

7.3 Reduce water consumption  a)  Introduce monitoring to the potable water system b)  Install continuous monitoring on the potable water system. This will ensure early detection of leaks.   

31/10/12 ECI Not started

Health and Safety & Environmetnal Targets Objective No. 8: Report on all near miss and accident/incidents  Relevant Legislation:  Target   Action   Due Date Resp. Status 8.1 Near Miss and Accident/Incident Reporting 

a) Ensure reports are completed for all near miss and accident/incidents    b) Identify  corrective actions  to be  carried out  as  a  result of near miss and 

accident/incidents c) Ensure corrective actions are carried out as per agreed timeline. 

N/A  

Ops / Maint 

Ongoing 

8.2 Workplace Inspections/audits  a) Carry  out  four  workplace  inspections  per  year  and  one  inspection  per scheduled 

b) Identify  corrective  actions  to  be  carried  out  as  a  result  of  workplace inspection/audit 

c) Ensure corrective actions are carried out as per agreed timeline. 

N/A Safety Officer / Safety 

Representative 

Ongoing

  

Health and Safety Targets  Objective No. 9: Identify any safety issues site wide  Relevant Legislation:  

Target  Action   Due Date Resp. Status 8.1 Identify hazards on site and minimise where possible 

 

 a) T.M.S to carry out an site wide risk assessment to identify hazards onsite. 

 b) Review TMS Risk assessments 

 c) Complete any corrective actions identified as a result of the Risk Assessment 

Complete  

Complete  

30/06/12 

OPS/Project team/Maint 

In Progress       

 

Environmental Legislation:  Co2 Carbon Levy Legislation  Objective No. 10:  Ensure Gensys is compliant with the Legislation   Relevant Legislation:  Electricity Regulation (Amendment) (Carbon Revenue Levy) Act 2010 Target   Action   Due Date Resp. Status6.1  Calculate Co2 emissions and report 

to the CER on a quarterly basis. 

a) Calculate Co2 emissions on a quarterly basis

b) Audit calculations and emission figures 

c) Submit reports to CER 

d) Resolve any corrective actions as a result of audits/ reports 

Ongoing K Ruddy Open –Quarterly 

APPENDIX 3

AER Returns Workbook

Sheet : Facility ID Activities AER Returns Workbook 30/3/2012 15:57

| PRTR# : P0777 | Facility Name : Viridian Power Limited | Filename : P0777_2011.xls | Return Year : 2011 | 4869 30/03/2012 15:57

Guidance to completing the PRTR workbook

Version 1.1.13

REFERENCE YEAR 2011

1. FACILITY IDENTIFICATIONParent Company Name Viridian Power Limited

Facility Name Viridian Power LimitedPRTR Identification Number P0777

Licence Number P0777-01

Waste or IPPC Classes of ActivityNo. class_name

2.1The operation of combustion installations with a rated thermal input equal to or greater than 50MW

Address 1 Parsons Brinckerhoff LimitedAddress 2 Manchester Technology CentreAddress 3 Oxford RoadAddress 4 Manchester M1 7ED

DublinCountry Ireland

Coordinates of Location -6.32607 53.4116River Basin District IEEA

NACE Code 3511Main Economic Activity Production of electricity

AER Returns Contact Name Brian KinsellaAER Returns Contact Email Address [email protected]

AER Returns Contact Position Plant ManagerAER Returns Contact Telephone Number 01-8645900

AER Returns Contact Mobile Phone NumberAER Returns Contact Fax Number 01-8645927

Production Volume 0.0Production Volume Units

Number of Installations 0Number of Operating Hours in Year 0

Number of Employees 0User Feedback/Comments

AER Returns Workbook

| PRTR# : P0777 | Facility Name : Viridian Power Limited | Filename : P0483_2011.xls | Return Year : 2011 | Page 1 of 1

User Feedback/CommentsWeb Address

2. PRTR CLASS ACTIVITIESActivity Number Activity Name1(c) Thermal power stations and other combustion installations

3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002)Is it applicable? No

Have you been granted an exemption ? NoIf applicable which activity class applies (as per

Schedule 2 of the regulations) ?Is the reduction scheme compliance route being

used ?

| PRTR# : P0777 | Facility Name : Viridian Power Limited | Filename : P0483_2011.xls | Return Year : 2011 | Page 1 of 1

Sheet : Releases to Air AER Returns Workbook 30/3/2012 15:57

4.1 RELEASES TO AIR Link to previous years emissions data | PRTR# : P0777 | Facility Name : Viridian Power Limited | Filename : P0777_2011.xls | Return Year : 2011 | 30/03/2012 15:58

8 11 19 19 27 28 6 6 6SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS

Please enter all quantities in this section in KGsQUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year08 Nitrogen oxides (NOx/NO2) M ALT EN14181 510568.0 510568.0 0.0 0.003 Carbon dioxide (CO2) C ETS 931269000.0 931269000.0 0.0 0.002 Carbon monoxide (CO) M ALT EN14181 193656.0 193656.0 0.0 0.011 Sulphur oxides (SOx/SO2) M ALT EN14181 9792.8 9792.8 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING PRTR POLLUTANTSPlease enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence)Please enter all quantities in this section in KGs

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year210 Dust M ALT EN13284-1:2002 7543.0 7543.0 0.0 0.0

0.0 0.0 0.0 0.0* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

Additional Data Requested from Landfill operators

Landfill: Viridian Power LimitedPlease enter summary data on the quantities of methane flared and / or utilised

additional_pollutant_no T (Total) kg/Year M/C/E Method CodeDesignation or

DescriptionFacility Total Capacity

m3 per hourTotal estimated methane generation (as per

site model) 0.0 N/AMethane flared 0 0 0 0 (Total Flaring Capacity)

Method Used

Method Used

RELEASES TO AIRPOLLUTANT METHOD

Method Used

POLLUTANT

RELEASES TO AIR

RELEASES TO AIRMETHOD

POLLUTANT METHODMethod Used

For the purposes of the National Inventory on Greenhouse Gases, landfill operators are requested to provide summary data on landfill gas (Methane) flared or utilised on their facilities to accompany the figures for total methane generated. Operators should only report their Net methane (CH4) emission to the environment under T(total) KG/yr for Section A: Sector specific PRTR pollutants above. Please complete the table below:

| PRTR# : P0777 | Facility Name : Viridian Power Limited | Filename : P0777_2011.xls | Return Year : 2011 | Page 1 of 1

Methane flared 0.0 0.0 (Total Flaring Capacity)Methane utilised in engine/s 0.0 0.0 (Total Utilising Capacity)

Net methane emission (as reported in Section A above) 0.0 N/A

| PRTR# : P0777 | Facility Name : Viridian Power Limited | Filename : P0777_2011.xls | Return Year : 2011 | Page 1 of 1

Sheet : Releases to Waters AER Returns Workbook 30/3/2012 15:58

4.2 RELEASES TO WATERS Link to previous years emissions data | PRTR# : P0777 | Facility Name : Viridian Power Limited | Filename : P0777_2011.xls | Return Year : 2011 | 30/03/2012 15:58

8 9 17 17 25 31 6 6 6SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS Data on ambient monitoring of storm/surface water or groundwater, conducted as part of your licence requirements, should NOT be submitted under AER / PRTR Reporting as th

Please enter all quantities in this section in KGsQUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

12 Total nitrogen M OTHAWWA Standard 4500-NO3, Konelab analyser 34.97 34.97 0.0 0.0

13 Total phosphorus MEN ISO 6878:2004 0.73 0.73 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING PRTR POLLUTANTSPlease enter all quantities in this section in KGs

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION C : REMAINING POLLUTANT EMISSIONS (as required in your Licence)Please enter all quantities in this section in KGs

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year

238 Ammonia (as N) M OTHStandard Method -Konelab Analyser 15.25 15.25 0.0 0.0

240 Suspended Solids M OTH Gravimetric 72.72 72.72 0.0 0.0

306 COD M OTHStandard Method - Hach Method 8000 290.87 290.87 0.0 0.0

303 BOD M OTH

Based on Standard methods for the examination of water & waste water 21st ed. 2005 14.54 14.54 0.0 0.0

327 Nitrate (as N) M OTHAWWA Standard 4500-NO3 Konelab Analyser 19.82 19.82 0.0 0.0

363 Total Dissolved Solids M OTH

Standard methods for the examination of water & waste water 21st ed. 2005 6215.0 6215.0 0.0 0.0

324 Mineral oils M OTH

Standard Method - Adapted from USEPA 8015B 1.45 1.45 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

RELEASES TO WATERS

RELEASES TO WATERS

Method Used

POLLUTANTMethod Used

POLLUTANT

POLLUTANTRELEASES TO WATERS

Method Used

| PRTR# : P0777 | Facility Name : Viridian Power Limited | Filename : P0777_2011.xls | Return Year : 2011 | Page 1 of 1

Sheet : Releases to Wastewater or Sewer AER Returns Workbook 30/3/2012 15:58

4.3 RELEASES TO WASTEWATER OR SEWER Link to previous years emissions data | PRTR# : P0777 | Facility Name : Viridian Power Limited | Filename : P0777_2011.xls | Return Year : 2 30/03/2012 15:58

8 8 16 16 6 6 6 6SECTION A : PRTR POLLUTANTS

Please enter all quantities in this section in KGsQUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)Please enter all quantities in this section in KGs

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER

OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER

Method Used

Method Used

POLLUTANT METHOD

POLLUTANT METHOD

Link to previous years emissions data Page 1 of 1Link to previous years emissions data Page 1 of 1

Sheet : Releases to Land AER Returns Workbook 30/3/2012 15:58

4.4 RELEASES TO LAND Link to previous years emissions data | PRTR# : P0777 | Facility Name : Viridian Power Limited | Filename : P0777_2011.xls | Return Year : 2011 | 30/03/2012 15:59

8 8 16 16 6 6 6 6SECTION A : PRTR POLLUTANTS

Please enter all quantities in this section in KGsQUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)Please enter all quantities in this section in KGs

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

POLLUTANT METHODMethod Used

RELEASES TO LAND

RELEASES TO LAND

POLLUTANT METHODMethod Used

| PRTR# : P0777 | Facility Name : Viridian Power Limited | Filename : P0777_2011.xls | Return Year : 2011 | Page 1 of 1| PRTR# : P0777 | Facility Name : Viridian Power Limited | Filename : P0777_2011.xls | Return Year : 2011 | Page 1 of 1

Sheet : Treatment Transfers of Waste AER Returns Workbook 31/3/2012 10:2

5. ONSITE TREATMENT & OFFSITE TRANSFERS OF WASTE | PRTR# : P0483 | Facility Name : Huntstown Power Company Limited | Filename : P0483_2011.xls | Return Year : 2011 | 31/03/2012 10:02

5 29 Please enter all quantities on this sheet in Tonnes 22

Quantity (Tonnes per

Year)

Haz Waste : Name and Licence/Permit No of Next

Destination Facility Non Haz Waste: Name and Licence/Permit No of

Recover/Disposer

Haz Waste : Address of Next Destination Facility

Non Haz Waste: Address of Recover/Disposer

Name and License / Permit No. and Address of Final Recoverer /

Disposer (HAZARDOUS WASTE ONLY)

Actual Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY)

Transfer DestinationEuropean Waste

Code Hazardous Quantity T/Year Description of Waste

Waste Treatment Operation M/C/E Method Used

Location of Treatment Name and Licence / Permit No. of Recoverer / Disposer / Broker Address of Recoverer / Disposer / Broker Name and Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Licence / Permit No. of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY)

Within the Country 20 01 01 No 3.506 paper and cardboard R3 M Weighed Offsite in Ireland Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

Within the Country 20 03 01 No 15.675 mixed municipal waste D5 M Weighed Offsite in IrelandGreenstar Limited,CP D 735/5

Ballyogan Road Sandyford,Unit 6 Ballyogan Business Park,Dublin ,18,Ireland

Within the Country 20 01 40 No 3.46 metals R4 M Weighed Offsite in IrelandGreenstar Limited,CP D 735/5

Ballyogan Road Sandyford,Unit 6 Ballyogan Business Park,Dublin ,18,Ireland

Within the Country 20 01 38 No 6.22 wood other than that mentioned in 20 01 37 R12 M Weighed Offsite in IrelandGreenstar Limited,CP D 735/5

Ballyogan Road Sandyford,Unit 6 Ballyogan Business Park,Dublin ,18,Ireland

Within the Country 15 01 01 No 2.34 paper and cardboard packaging R3 M Weighed Offsite in IrelandGreenstar Limited,CP D 735/5

Ballyogan Road Sandyford,Unit 6 Ballyogan Business Park,Dublin ,18,Ireland

Within the Country 20 01 33 Yes 0.115

batteries and accumulators included in 16 06 01, 16 06 02 or 16 06 03 and unsorted batteries and accumulators containing these batteries R4 M Weighed Offsite in Ireland

Irish Lamp Recycling ,WFP-KE-08-0348-01 .,Athy,Kildare,.,Ireland

KMK Metals,113-2,.,Tullamore,Co. Offaly,.,Ireland

.,Tullamore,Co. Offaly,.,Ireland

Within the Country 20 01 35 Yes 0.28

discarded electrical and electronic equipment other than those mentioned in 20 01 21 and and 20 01 23 containing hazardous components R4 M Weighed Offsite in Ireland

Irish Lamp Recycling ,WFP-KE-08-0348-01 .,Athy,Kildare,.,Ireland

KMK Metals,113-2,.,Tullamore,Co. Offaly,.,Ireland

.,Tullamore,Co. Offaly,.,Ireland

Within the Country 20 01 21 Yes 0.0335fluorescent tubes and other mercury-containing waste R4 M Weighed Offsite in Ireland

Irish Lamp Recycling ,WFP-KE-08-0348-01 .,Athy,Kildare,.,Ireland

KMK Metals,113-2,.,Tullamore,Co. Offaly,.,Ireland

.,Tullamore,Co. Offaly,.,Ireland

Within the Country 16 10 02 No 767.0aqueous liquid wastes other than those mentioned in 16 10 01 D8 M Weighed Offsite in Ireland

Dublin City Council ,WWTP Ringsend , ,Ringsend Dublin,4,Ireland

paint inks adhesives and resins containingGreenogue Business Park Rathcoole Dublin 24 Ire

ATM Morerdijk ,821780,Vlasweg 12,.,NL-4782 PW Vlasweg 12 NL-4782 PW

Method Used

To Other Countries 20 01 27 Yes 0.02paint, inks, adhesives and resins containing dangerous substances R1 M Weighed Abroad Rilta Environmental,192-2

Park,Rathcoole,Dublin,24,Ireland

4782 PW Moerdijk,.,Netherlands

Vlasweg 12,.,NL-4782 PW Moerdijk,.,Netherlands

To Other Countries 06 01 06 Yes 0.495 other acids R6 M Weighed Abroad Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

Ravatech S.A. ,0421 021 761,Zoning Industrial Estate, , ,BE B 4480 Engis,Belgium

Zoning Industrial Estate, , ,BE B 4480 Engis,Belgium

To Other Countries 18 02 08 No 0.0105medicines other than those mentioned in 18 02 07 R1 M Weighed Abroad ATM Morerdijk ,821780

Vlasweg 12,.,NL-4782 PW Moerdijk,.,Netherlands

To Other Countries 11 01 09 Yes 0.2755sludges and filter cakes containing dangerous substances R1 M Weighed Abroad Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

Zimmermann Sonderabfallentsorgung und Verwertung & Co.,E75475049,Gottieb-Daimier Strasse 31 ,DE 33334 ,Gutersioh,DE 33334 ,Germany

Gottieb-Daimier Strasse 31 ,DE 33334 ,Gutersioh,DE 33334 ,Germany

To Other Countries 15 02 02 Yes 12.177

absorbents, filter materials (including oil filters not otherwise specified), wiping cloths, protective clothing contaminated by dangerous substances R1 M Weighed Abroad Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

ATM Morerdijk ,821780,Vlasweg 12,.,NL-4782 PW Moerdijk,.,Netherlands

Vlasweg 12,.,NL-4782 PW Moerdijk,.,Netherlands

To Other Countries 16 05 07 Yes 2.91discarded inorganic chemicals consisting of or containing dangerous substances R6 M Weighed Abroad Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

Ravatech S.A. ,0421 021 761,Zoning Industrial Estate, , ,BE B 4480 Engis,Belgium

Zoning Industrial Estate, , ,BE B 4480 Engis,Belgium

To Other Countries 08 01 11 Yes 0.775waste paint and varnish containing organic solvents or other dangerous substances R1 M Weighed Abroad Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

ATM Morerdijk ,821780,Vlasweg 12,.,NL-4782 PW Moerdijk,.,Netherlands

Vlasweg 12,.,NL-4782 PW Moerdijk,.,Netherlands

| PRTR# : P0483 | Facility Name : Huntstown Power Company Limited | Filename : P0483_2011.xls | Return Year : 2011 | Page 1 of 2

Sheet : Treatment Transfers of Waste AER Returns Workbook 31/3/2012 10:2

Quantity (Tonnes per

Year)

Haz Waste : Name and Licence/Permit No of Next

Destination Facility Non Haz Waste: Name and Licence/Permit No of

Recover/Disposer

Haz Waste : Address of Next Destination Facility

Non Haz Waste: Address of Recover/Disposer

Name and License / Permit No. and Address of Final Recoverer /

Disposer (HAZARDOUS WASTE ONLY)

Actual Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY)

Transfer DestinationEuropean Waste

Code Hazardous Quantity T/Year Description of Waste

Waste Treatment Operation M/C/E Method Used

Location of Treatment Name and Licence / Permit No. of Recoverer / Disposer / Broker Address of Recoverer / Disposer / Broker Name and Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Licence / Permit No. of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY)

Method Used

Within the Country 13 07 01 Yes 0.037 fuel oil and diesel D9 M Weighed Offsite in Ireland Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

Rilta Environmental ,192-2,Greenogue Business Park ,.,Rathcoole Dublin,24,Ireland

Greenogue Business Park ,.,Rathcoole Dublin,24,Ireland

Within the Country 16 10 01 Yes 45.578aqueous liquid wastes containing dangerous substances D9 M Weighed Offsite in Ireland Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

Rilta Environmental ,192-2,Greenogue Business Park ,.,Rathcoole Dublin,24,Ireland

Greenogue Business Park ,.,Rathcoole Dublin,24,Ireland

Within the Country 15 01 10 Yes 0.98packaging containing residues of or contaminated by dangerous substances R4 M Weighed Offsite in Ireland Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

Rilta Environmental ,192-2,Greenogue Business Park ,.,Rathcoole Dublin,24,Ireland

Greenogue Business Park ,.,Rathcoole Dublin,24,Ireland

To Other Countries 16 05 06 Yes 0.39

laboratory chemicals, consisting of or containing dangerous substances, including mixtures of laboratory chemicals R1 M Weighed Abroad Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

ATM Morerdijk ,821780,Vlasweg 12,.,NL-4782 PW Moerdijk,.,Netherlands

Vlasweg 12,.,NL-4782 PW Moerdijk,.,Netherlands

Within the Country 13 02 08 Yes 2.38 other engine, gear and lubricating oils D9 M Weighed Offsite in Ireland Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

Rilta Environmental ,192-2,Greenogue Business Park ,.,Rathcoole Dublin,24,Ireland

Greenogue Business Park ,.,Rathcoole Dublin,24,Ireland

Within the Country 13 05 07 Yes 15.62 oily water from oil/water separators D9 M Weighed Offsite in Ireland Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

Rilta Environmental ,192-2,Greenogue Business Park ,.,Rathcoole Dublin,24,Ireland

Greenogue Business Park ,.,Rathcoole Dublin,24,Ireland

Within the Country 20 03 04 No 195.0 septic tank sludge D8 M Weighed Offsite in IrelandDublin City Council ,WWTP Ringsend , ,Ringsend Dublin,4,Ireland

To Other Countries 08 04 09 Yes 0.06

waste adhesives and sealants containing organic solvents or other dangerous substances R3 M Weighed Abroad Rilta Environmental,192-2

Greenogue Business Park,Rathcoole,Dublin,24,Ireland

ATM Morerdijk ,821780,Vlasweg 12,.,NL-4782 PW Moerdijk,.,Netherlands

Vlasweg 12,.,NL-4782 PW Moerdijk,.,Netherlands

* Select a row by double-clicking the Description of Waste then click the delete button

| PRTR# : P0483 | Facility Name : Huntstown Power Company Limited | Filename : P0483_2011.xls | Return Year : 2011 | Page 2 of 2