villa vieja hoa office material and labor cost

Upload: christian-llorca

Post on 02-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 Villa Vieja HOA Office Material and Labor Cost

    1/7

    Name: Ray Christian Boston Date Needed:

    Department: CDD

    Date

    13-Jun-13 Additional for my Brother's Enrollment/Tuition Fee

    Total

    Prepared by: Recommended by: Approve

    Ray Christian Boston Ferdinand De Castro

    Name Division Head Ferdina

    Architect CDD Head Presiden

    CASH ADVANCE / INDEX / VALE REQUEST FORM

    Purpose

  • 8/10/2019 Villa Vieja HOA Office Material and Labor Cost

    2/7

    NAME: Charismo

    DEPARTMENT: C.D.D.

    JUSTIFICATION/REASON: Villa Vieja

    SUPPLIER:

    ITEMS:

    QUANTITY: UNIT

    60 bags Cement

    15 cu.m White sand

    5 PCS D/F BARS 8

    50 PCS D/F BARS 1

    60 PCS D/F BARS 1

    8 cu.m Gravel 3/4

    30 pcs Coco lumb

    30 pcs Coco lumb

    4 pcs Plywood m

    4 kl CWN #2

    4 kl CWN #34 kl CWN #4

    4 kl Concrete n

    4 kl Concrete n

    8 kl Tie wire #1

    890 pcs CHB 5"

    100 meters Flexible ho

    1 box THHN 3.5m

    4 pcs Plastic rece

    2 pcs 1 Gang swi

    1 pc 2 Gang swi

    3 pcs 2 Gand out

    4 pcs Junction b

    3 pcs Utility box

    4 pcs Daylight bu

    5 pcs PVC pipe 4

    3 pcs PVC pipe 2

    3 pcs PVC elbow

    2 pcs PVC elbow

    1 pc PVC wye re

    1 pc PVC wye 4"

    1 pc P-trap 2"

    1 pc Clean out 4

    1 pc Floor drain

    3 cans Neltex solv

    2 pcs PVC elbow

  • 8/10/2019 Villa Vieja HOA Office Material and Labor Cost

    3/7

    Payee:

    Date PO Number

    REQUEST FOR

  • 8/10/2019 Villa Vieja HOA Office Material and Labor Cost

    4/7

    Name: Ray Christian Boston

    Dept: CDD

    Date OR No.

    6-Sep-13 OOO22366 ALCFIGS Tr

    LESS UNLIQUIDATED PETTY CASH ADVANCES:

    Date Control No.

    LIQUIDATION / REPLENISHM

  • 8/10/2019 Villa Vieja HOA Office Material and Labor Cost

    5/7

    Name:

    Dept:

    Date OR No. Name Particulars

    LESS UNLIQUIDATED PETTY CASH ADVANCES:

    Date Control No. Name Particulars

    REIMBURSEMENT FORM

  • 8/10/2019 Villa Vieja HOA Office Material and Labor Cost

    6/7

    FORM NO. A-

    INDEX RULES AND REGULATIONS:

    1. MAXIMUM AMOUNT OF INDEX MUST NOT BE GREATER THAN THE EMPLOYEES 1 WEEK'S PAY.

    2. DEDUCTIONS WOULD BE DONE EVERY WEEK AND MUST BE EQUAL TO 1 DAY SALARY.

    3. EMPLOYEES WITH OUTSTANDING INDEX WILL NOT BE ALLOWED TO AVAIL UNTIL THE LATTER HAVE BEEN

    SETTLED, UNLESS APPROVED BY FRD OR RDC.

    4. INDEX WOULD BE GRANTED UPON FUND AVAILABILITY.

    5. INDEX SHOULD BE ON A FIRST COME FIRST SERVE BASIS UNLESS OTHERWISE IMPORTANCE IS OF THE

    ESSENCE.

    6. I, THE BORROWER WOULD BE EVALUATED BY ADMIN AND FINANCE DEPARTMENT ON THE PAYMENTS

    I AM MAKING WHICH MIGHT AFFECT MY NEXT INDEX APPLICATION.

    I HAVE READ AND UNDERSTOOD THE RULES AND REGULATIONS ISSUED BY THE COMPANY AND IS

    OBLIGED TO FOLLOW THEM ACCORDINGLY.

    AMOUNT

    NAME & SIGNATURE OF EMPLOYEE

    TO BE FILLED UP BY ADMIN AND FINANCE DEPARTMENT:

    REMARKS:

    APPROVED BY: FERDINAND DE CASTRO

    CHECKED BY : Human Resource Dept. RECOMMENDED FOR APPROVAL : PIC / SITE ENGINEE

    DATE NO.OF PAYMENTS

    INDEX FORM

    NAME AMOUNT DATE NEEDED REASON

    President / CEO

    SCHEDULE OF PAYMENT

    BALANCE REMARKS

  • 8/10/2019 Villa Vieja HOA Office Material and Labor Cost

    7/7

    FORM NO. A-013

    From :

    Department : DATE:To : REF. NO. :

    Department :

    Subject :

    DATE REF. NO. P A R T I C U L A R AMOUNT REMARKS

    Received by: Noted by:

    Signed Over Printed Name Division Head

    FRDC Form A012-00 Revised 00

    TRANSMITTAL FORM