villa vieja elevated tank material and labor cost

Upload: christian-llorca

Post on 02-Jun-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 Villa Vieja Elevated Tank Material and Labor Cost

    1/7

    Name: Ray Christian Boston Date Needed:

    Department: CDD

    Date

    13-Jun-13 Additional for my Brother's Enrollment/Tuition Fee

    Total

    Prepared by: Recommended by: Approve

    Ray Christian Boston Ferdinand De Castro

    Name Division Head Ferdina

    Architect CDD Head Presiden

    CASH ADVANCE / INDEX / VALE REQUEST FORM

    Purpose

  • 8/10/2019 Villa Vieja Elevated Tank Material and Labor Cost

    2/7

    FORM N

    PURCHASE REQUISITION FORM

    NAME: Charismo Payo DATE: July 22, 2014

    DEPARTMENT: C.D.D.

    JUSTIFICATION/REASON: Villa Vieja elevated tank material and labor cost

    SUPPLIER:

    ITEMS:

    QUANTITY: UNIT PATICULARS/DESCRIPTION PRICE AMOUNT

    30 bags Cement 223

    3 cu.m White sand 620.00

    1.5 cu.m Gravel 3/4 950.00

    4 pcs Deformed bars 16mm 395.00

    4 pcs Deformed bars 12mm 288.00

    10 pcs Deformed bars 10mm 112.00

    5 kls Tie wires #16 50.00

    16 pcs Anchor bolt 16mmx 12" wit nut and washers 420.00

    15 pcs Coco lumber 2x2x10' 135.00

    15 pcs Coco lumber 2x3x10' 157.00

    4 kls CWN #2 80.00

    4 kls CWN # 3 80.00

    3 kls Concrete nails #3 80.00

    2 pcs Plywood 3/4 850.00

    3 pcs G.I Pipe 1" 1,250.00

    5 pcs G.I Elbow 1" 55.00

    5 pcs Teflon tape 3/4 10.00

    3 pcs G.I pipe 3/4 950.00

    5 pcs G.I elbow 3/4 45.00

    TOTAL:

    REQUESTED BY: DEPARTMENT

    RECOMMENDED BY: DEPARTMENT

    APPROVED BY: DEPARTMENT DATE

    Office of the President

    President

    Ferdinand De Castro

    DATE

    Charismo Payo CDD July 22, 2014

    Villa Bienes P.I.C

    DATE

    Arch. Christian Llorca CDD

    C.D.D. O.I.C.

  • 8/10/2019 Villa Vieja Elevated Tank Material and Labor Cost

    3/7

    Payee:

    Date PO Number

    REQUEST FOR

  • 8/10/2019 Villa Vieja Elevated Tank Material and Labor Cost

    4/7

    Name: Ray Christian Boston

    Dept: CDD

    Date OR No.

    6-Sep-13 OOO22366 ALCFIGS Tr

    LESS UNLIQUIDATED PETTY CASH ADVANCES:

    Date Control No.

    LIQUIDATION / REPLENISHM

  • 8/10/2019 Villa Vieja Elevated Tank Material and Labor Cost

    5/7

  • 8/10/2019 Villa Vieja Elevated Tank Material and Labor Cost

    6/7

    FORM NO. A-

    INDEX RULES AND REGULATIONS:

    1. MAXIMUM AMOUNT OF INDEX MUST NOT BE GREATER THAN THE EMPLOYEES 1 WEEK'S PAY.

    2. DEDUCTIONS WOULD BE DONE EVERY WEEK AND MUST BE EQUAL TO 1 DAY SALARY.

    3. EMPLOYEES WITH OUTSTANDING INDEX WILL NOT BE ALLOWED TO AVAIL UNTIL THE LATTER HAVE BEEN

    SETTLED, UNLESS APPROVED BY FRD OR RDC.

    4. INDEX WOULD BE GRANTED UPON FUND AVAILABILITY.

    5. INDEX SHOULD BE ON A FIRST COME FIRST SERVE BASIS UNLESS OTHERWISE IMPORTANCE IS OF THE

    ESSENCE.

    6. I, THE BORROWER WOULD BE EVALUATED BY ADMIN AND FINANCE DEPARTMENT ON THE PAYMENTS

    I AM MAKING WHICH MIGHT AFFECT MY NEXT INDEX APPLICATION.

    I HAVE READ AND UNDERSTOOD THE RULES AND REGULATIONS ISSUED BY THE COMPANY AND IS

    OBLIGED TO FOLLOW THEM ACCORDINGLY.

    AMOUNT

    NAME & SIGNATURE OF EMPLOYEE

    TO BE FILLED UP BY ADMIN AND FINANCE DEPARTMENT:

    REMARKS:

    President / CEO

    SCHEDULE OF PAYMENT

    BALANCE REMARKS

    INDEX FORM

    NAME AMOUNT DATE NEEDED REASON

    DATE NO.OF PAYMENTS

    APPROVED BY: FERDINAND DE CASTRO

    CHECKED BY : Human Resource Dept. RECOMMENDED FOR APPROVAL : PIC / SITE ENGINEE

  • 8/10/2019 Villa Vieja Elevated Tank Material and Labor Cost

    7/7

    FORM NO. A-013

    From :

    Department : DATE:To : REF. NO. :

    Department :

    Subject :

    DATE REF. NO. P A R T I C U L A R AMOUNT REMARKS

    Received by: Noted by:

    Signed Over Printed Name Division Head

    FRDC Form A012-00 Revised 00

    TRANSMITTAL FORM