vijay prasad’s views on earned value management in project
DESCRIPTION
This slide show explains the ingredients necessary for successful deployment of earned value management in projectsTRANSCRIPT
![Page 1: Vijay Prasad’S Views On Earned Value Management In Project](https://reader035.vdocuments.us/reader035/viewer/2022070302/548cd2feb4795976728b48e5/html5/thumbnails/1.jpg)
Ingredients for success deployment of Earned-Value Management in projects
![Page 2: Vijay Prasad’S Views On Earned Value Management In Project](https://reader035.vdocuments.us/reader035/viewer/2022070302/548cd2feb4795976728b48e5/html5/thumbnails/2.jpg)
Culture shift is essential – every Project Team must understand the working of EVM
model
Also, culture shift needs to be managed and supported well
![Page 3: Vijay Prasad’S Views On Earned Value Management In Project](https://reader035.vdocuments.us/reader035/viewer/2022070302/548cd2feb4795976728b48e5/html5/thumbnails/3.jpg)
Besides accurate WBS, accurate planning, scheduling and proper costing of work
packages(PV) at frequency points of measurement is the first step towards
successful EVM implementation. Costing to include all the costs that will be incurred
(Direct, Indirect, Fixed and Variable costs covering all resources including human
resources)
![Page 4: Vijay Prasad’S Views On Earned Value Management In Project](https://reader035.vdocuments.us/reader035/viewer/2022070302/548cd2feb4795976728b48e5/html5/thumbnails/4.jpg)
It is absolutely essential to measure the work completed(earned
back ie EV) at each task level and at the project level either in
terms of % of work scheduled, or absolute $ value
![Page 5: Vijay Prasad’S Views On Earned Value Management In Project](https://reader035.vdocuments.us/reader035/viewer/2022070302/548cd2feb4795976728b48e5/html5/thumbnails/5.jpg)
To get a true picture of all Costs incurred (AC) between two
frequency of measurement points, all costs – Direct, Indirect,
Fixed and Variable incurred at every task level must be recorded.
![Page 6: Vijay Prasad’S Views On Earned Value Management In Project](https://reader035.vdocuments.us/reader035/viewer/2022070302/548cd2feb4795976728b48e5/html5/thumbnails/6.jpg)
Replanning the work at every change is critical. Use of automated
tools will ease out this process
![Page 7: Vijay Prasad’S Views On Earned Value Management In Project](https://reader035.vdocuments.us/reader035/viewer/2022070302/548cd2feb4795976728b48e5/html5/thumbnails/7.jpg)
Frequency of measurement of PV, EV and AC is critical. It must be
optimum suiting the duration of the project, neither low nor high
![Page 8: Vijay Prasad’S Views On Earned Value Management In Project](https://reader035.vdocuments.us/reader035/viewer/2022070302/548cd2feb4795976728b48e5/html5/thumbnails/8.jpg)
It is absolutely essential to record all project costs on a daily basis
or at an appropriate frequency in line with the Frequency of
measurement of EVM values
![Page 9: Vijay Prasad’S Views On Earned Value Management In Project](https://reader035.vdocuments.us/reader035/viewer/2022070302/548cd2feb4795976728b48e5/html5/thumbnails/9.jpg)