itsmeharishblog.files.wordpress.com · web viewto update the table of contents, put the cursor...
TRANSCRIPT
RD.050 BUSINESS REQUIREMENTS SCENARIOS FOR CORE BUSINESS PROCESS
ORAERP INC.Fixed Assets
Author: Creation Date: 02-June-13Last Updated: 02-June-13Document Ref: RD050_FAVersion: 1.0 Final
Approvals:
NAMES
GE Internal
RD.050 Business Requirements Scenarios Doc Ref: RD.050
Ver.1.1 Final
Document Control
Change Record1
Date Author Version
Change Reference
29-May-13
1.0 No Previous Document
References
Document Name Ref.
MOM & AS-IS flow charts recorded
Accounting policies and procedure manual by D&T
Business plans for unbundled companies by D&T
Proposed Organizational Chart for 10 companies
Sector Law
Tender specification requirements (excel sheets)
Reviewers
Name Position
GE Internal
RD.050 Business Requirements Scenarios Doc Ref: RD.050
Ver.1.1 Final
Name Position
Distribution
Copy No.
Name Location
1
2
Note to Holders:If you receive an electronic copy of this document and print it out, please write your name on the equivalent of the cover page, for document control purposes.If you receive a hard copy of this document, please write your name on the front cover, for document control purposes.
GE Internal
RD.050 Business Requirements Scenarios Doc Ref: RD.050
Ver.1.1 Final
DOCUMENT CONTROL...................................................................................................2
1 BUSINESS PROCESS IDENTIFICATION...................................................................41.1 Fixed Assets structure (FA001).................................................................5
1.2 Asset Addition (FA002).............................................................................6
1.3 Asset Depreciation (FA003)......................................................................8
1.4 Asset Transfer (FA004)...........................................................................10
1.5 Asset Retirement (FA005)......................................................................11
1.6 CIP Capitalization (FA006)......................................................................13
1.7 Revaluation (FA007)...............................................................................14
1.8 Asset Inquiry (FA008).............................................................................15
2 FIXED ASSETS PROCESS FLOW DIAGRAMS.........................................................172.1 Fixed Assets Configuration.....................................................................18
2.2 Mass Additions Process Flow..................................................................19
2.3 Prepare Mass Additions Process.............................................................20
2.4 Post Mass Additions Process...................................................................21
2.5 Asset Retirement....................................................................................22
2.6 Depreciation and Month end Process.....................................................23
1. 3. OPEN AND CLOSED ISSUES FOR THIS DELIVERABLE.....................................24...............................................................................................................................
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
Objectives
The objective of this document is to outline the Business Requirements, in as much detail as possible, related to General Ledger business processes in ORAERP COM INC, Abu Dhabi, to facilitate implementation of Oracle General Ledger.BASIC GUIDELINES TOWARDS FINALISATION OF BUSINESS REQUIREMENTS/CURRENT BUSINESS BASELINE DOCUMENT SHALL BE TO ENSURE AN EFFICIENT, SMOOTH AND EFFECTIVE IMPLEMENTATION, BY OBSERVING THE FOLLOWING:1. The objective is to utilize to the best possible extent, the flexibility and facilities of Oracle General Ledger.2. Flexibility, therefore, will be the norm and will be ‘Built – In’ at every stage to the best possible extent, based on available current information on the Business Processes given by the users.3. Reduction of the gaps will be ensured as far as possible.
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
ScopeThe scope of this study is limited to the functions pertaining to Fixed Assets based on the Business Requirements information provided by ORAERP COM INC.The focus of the study and this document is to identify and outline the processes involving the management of the Fixed Assets functions in the Oracle Application.Business requirements InformationA combination of the following methods were used for collecting data on current business scenario and future requirement for the 10 new companies-
Standard questionnaire based discussions with assets and stores departments on requirement of standard functions, special issues
Visit to all all major stores(Ghubrah, Rusail, Wadi Jizzi and Azaibah) and study of all processes, procedure, documents
Overview of current IT systems being used
Current forms and reports used for purchasing, contracts and inventory functions
Document review of proposed Business plans, Statement of Accounting policies and procedures by Deloitte & Touche with reference to inventory & purchasing function
(SAPP 3 & 12)
Study of proposed draft organization structure for the 10 companies and sector law
Information collected from Function Heads and their team on various dates during the Requirements Analysis in Jan 2003, through meetings and discussions at various locations. Discussions with user departments like Services, Generation, T&C, Projects etc
Discussions with General Managers of new companies.
Validation of requirements specified in the tender documents
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
AS-IS Processes
Based on above and various Minutes of Meetings all the ‘AS-IS’ processes as understood were drawn.
TO-BE Processes
The current business scenario has limited application and usefulness and requirement analysis has to be primarily evolved using available documents, requirements communicated through various discussions on the future vision, policies and procedures for the new companies.
The following inputs were considered for the design of TO-BE processes-
Proposed organization structure
D&T policies to the extent applicable to business processes
Best practices as per Oracle ERP standard processes
Elements of Current processes only to the extent applicable in future scenario
1.1 Fixed Assets structure (FA001)
Process: ADCB Fixed Asset structure Business Function: Fixed Assets structure Date: June-02-2013
Mapping Team: ORAERP COM INC Process Owner: Finance Team
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
Librarian: Priority (H, M, L): High
Core (Y/N)Yes
Process Number: FA001 Description: This process explains the Fixed Assets structure.
Assumptions ADCB maintains the assets at operating unit level/Legal Entity Level
Event Description:This process is triggered if we want to capture the fixed assets details
Number:FA.001 Type: Master Source Agent: Finance Team
Mechanisms: System Assisted
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
FA001.01
ADCB will have multiple Corporate Asset Books basing on the business unit
Internal – System Assisted
Asset Book One Corporate assets book is created
Finance Team
Active
FA001.02
Asset will be categorized into Company, Major Category and Minor Category. This division will be based on the subsidiary company and asset type
Internal – System Assisted
Asset Addition
Categorization of Asset
Finance Team
Active
FA001.03
Asset will be located based on Company, Branch, Location, Sub-Location, Department and cost centre.
Internal – System Assisted
Asset Addition
Location of asset details
Finance Team
Active
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
(Fro instance)
1.2 Asset Addition (FA002)
Process: Asset Addition Business Function: Fixed Assets Date: June-02-2013
Mapping Team: ADBC Company Process Owner: Finance Team
Librarian: Priority (H, M, L): High
Core (Y/N)Yes
Process Number: FA002 Description: This process explains the Procurement of Fixed Assets and addition of assets in FA module
Assumptions ADBC adds does miscellaneous transactions like transfer of assets from one location to another location, transfers from Head Office to sites etc.. and manual additions if found in the reconditions
Event Description: This process is triggered if we want to transfer from one location to another location/ manual additions, initial data migrations
Number:FA.002 Type: Transaction Source Agent: Finance Team
Mechanisms: System Assisted
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
FA002.01 Raise a Purchase Order for purchase of Fixed Assets
Internal – System Assisted
Asset Addition
Purchase Order issued for required asset.
Purchase Team
Active
FA002.02 Receive the Asset from the Vendor. Assign Asset Number and Tag number.
Internal – System Assisted
Asset Addition
Material Received Note
Purchase Team
Active
FA002.03 Receive the Invoice from the Vendor Manual Asset Addition
Supplier Invoice ready for entry
Finance Team
Active
FA002.04 Record the Supplier invoice into the System by matching to Purchase Order / Receipt
Internal – System Assisted
Asset Addition
Invoice accounting
Finance Team
Active
FA002.05 Validate the Invoice into the system. Create Accounting and approve the invoice for payment
Internal – System Assisted
Asset Addition
Accrual of Liability
Finance Team
Active
FA002.06 Issue the payment for the Invoice amount as per payment terms
Internal – System Assisted
Asset Addition
Invoice Payment Finance Team
Active
FA002.07 Transfer the AP data to GL Internal – System Assisted
Asset Addition
Creating Accounting Entries into GL
Finance Team
Active
FA002.08 Transfer the Asset Details into the Fixed Assets System
Internal – System Assisted
Asset Addition
Creation of Asset Record into the FA System
Finance Team
Active
FA002.09 Create Asset in the Fixed Asset through Prepare Mass Additions.
Internal – System Assisted
Asset Addition
Asset creation Finance Team
Active
FA002.10 Identify whether the asset is Internal – System Asset Type of Asset Finance ActiveGE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
Capitalization asset or CIP asset. Assisted Addition Team
FA002.11 Identify the Employee to which the asset would be attached.
Internal – System Assisted
Asset Addition
Asset is created and asset id is generated
Finance Team
Active
FA002.12 System should generate asset number automatically.
Internal – System Assisted
Asset Addition
Asset is created and asset number is generated
Finance Team
Active
FA002.13 Create Accounting and Transfer to GL. Internal – System Assisted
Asset Addition
Accounting is created
Finance Team
Active
FA002.14 System should allow to group assets as parent and child.
Internal – System Assisted
Asset Addition
Grouping of Assets
Finance Team
Active
FA002.15 System should allow adding additional asset cost to an existing asset.
Internal – System Assisted
Asset Addition
Adding asset cost to an existing asset.
Finance Team
Active
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
1.3 Asset Depreciation (FA003)
Process: Asset Depreciation Business Function: Fixed Assets Date: June-2-2013
Mapping Team: ADBC Company Process Owner: Finance Team
Librarian: Priority (H, M, L): High Core (Y/N)Yes
Process Number: FA003 Description: Charge Depreciation to the Assets
Assumptions Depreciation is charged to the assets
Event Description: This process is triggered when the asset is capitalized
Number:FA.003 Type: Transaction Source Agent: Finance Team
Mechanisms: System Assisted
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
FA003.01 ADBC follows monthly depreciation calendar
Internal – Manual Asset Depreciation
Calendar Finance Team
Active
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
FA003.02 Run Depreciation for the period. Internal – System Assisted
Asset Depreciation
Depreciation amount calculated by the system
Finance Team
Active
FA003.03 ADBC follows Straight/Dimension Line depreciation method for Corporate Book.
Internal – System Assisted
Asset Depreciation
Depreciation amount calculated by the system based on Depreciation method.
Finance Team
Active
FA003.05 Verify the depreciation calculated by the system.
Internal – Manual Asset Depreciation
Verify the depreciation amount calculated by system and do the correction if any
Finance Team
Active
FA003.06 If there are any changes to be done to Asset book like addition/retirement, after running the depreciation and verification, the changes can be made and run the depreciation once again. The previous run of depreciation automatically rolled back by the system.
Internal – System Assisted
Asset Depreciation
Verify the depreciation amount calculated by system and do the correction if any
Finance Team
Active
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
FA003.07 Transfer and Post the Journal entries into General Ledger
Internal –System Assisted
Asset Depreciation
Depreciation entries generated and posted to General Ledger
Finance Team
Active
FA003.08 System should allow exclude/suspend certain assets from depreciation cycle for the month.
Internal –System Assisted
Asset Depreciation
Depreciation entries generated and posted to General Ledger excluding certain assets.
Finance Team
Active
1.4 Asset Transfer (FA004)
Process: Asset Transfer Business Function: Fixed Assets Date: June.02.2013
Mapping Team: ADBC Company Process Owner: Finance Team
Librarian: Priority (H, M, L): High Core (Y/N)
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
Yes
Process Number: FA004
Description: Track the movement of assets within the organization from a place to place or person to person or a category to category
Assumptions All the movements of assets within ADBC is tracked and recorded.
Event Description: This process is triggered when the asset is transferred from location to another or between companies etc..
Number:FA.004 Type: Transaction Source Agent: Finance Team
Mechanisms: System Assisted
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
FA004.01 System should allow Reclassification of Asset from one category to another category
Internal – System Assisted
Asset Reclassification
Reclassification of Asset
Finance Team
Active
FA004.02 System should allow Transfer / Move / Relocate the Asset from a Person / Location / Cost Center to another Person / Location / Cost
Internal – System Assisted
Asset Transfer Transfer of Asset
Finance Team
Active
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
Center
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
1.5 Asset Retirement (FA005)
Process: Asset Retirement Business Function: Fixed Assets Date: June-02-2013
Mapping Team: ORAERP COM INC Process Owner: Finance Team
Librarian: Priority (H, M, L): High Core (Y/N)Yes
Process Number: FA005 Description: Retire/remove the assets from the system which are retired by selling or scraping or whose useful life is completed
Assumptions Asset life is over
Event Description:When the assets life is completed and can’t be used anymore/ damaged/ theft...
Number:FA.005 Type: Transaction Source Agent: Finance Team
Mechanisms: System Assisted
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
FA005.01
Identify the Assets retired in the current month due to end of useful life / theft / sale.
Internal – Manual Asset Retirement
Assets are identified for retire from the
Finance Team
Active
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
system
FA005.02
Retire the Asset from the system after entering the date of removal, reason , cost retired, proceeds of sale, cost of removal etc.
Internal – System Assisted
Asset Retirement
Assets are retired from the system
Finance Team
Active
FA005.03
ADCB does not calculate depreciation for the month in which the asset is retired.
Internal – System Assisted
Asset Retirement
Depreciation calculated the disposal of the asset.
Finance Team
Active
FA005.04
System should calculate Gain / Loss on disposal of Asset.
Internal – System Assisted
Asset Retirement
Gain or Loss calculated on the disposal of the asset.
Finance Team
Active
FA005.05
Create Journal Entries for the retirement of the Asset and post it to General Ledger.
Internal – System Assisted
Asset Retirement
Records the Journal Entries into System
Finance Team
Active
1.6 CIP Capitalization (FA006)
Process: CIP Capitalization Business Function: Fixed Assets Date: August 26, 2010
Mapping Team: Wipro Team Process Owner: Finance Team
Librarian:NASS Project Manager
Priority (H, M, L): High
Core (Y/N)Yes
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
Process Number: FA006 Description: Capitalization of CIP assets when the assets are ready for use.
Assumptions NASS has the CIP assets.
Event Description:This process is triggered when the asset is constructed fully and want to start taking the depreciation
Number:FA.006 Type: Transaction Source Agent: Finance Team
Mechanisms: System Assisted
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
FA006.01
Identify the CIP Assets that are to be capitalized
Internal – Manual CIP Capitalization
Assets are identified for capitalization
Finance Team
Active
FA006.02
Query the identified asset and enter the date of capitalization
Internal – System Assisted
CIP Capitalization
Assets are capitalized
Finance Team
Active
FA006.03
System should be able to generate an CIP Assets ageing report.
Internal – System Assisted
CIP Ageing report
CIP Ageing report generated
Finance Team
Active
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
1.7 Asset Inquiry (FA008)
Process: Asset Enquiry Business Function: Fixed Assets Date: June-2-2013
Mapping Team: ORAERP COM INC Process Owner: Finance Team
Librarian: Priority (H, M, L): High
Core (Y/N)Yes
Process Number: FA007 Description: This process explains the enquiry of existing Assets
Assumptions Check the details
Event Description:When the user wants to know the details of the assets like cost, acc. Depreciation, depreciation reserve…
Number:FA.007 Type: Transaction Source Agent: Finance Team
Mechanisms: System Assisted
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
Process ID # Description Type
ElementaryBusiness Function
Result Agent Status
FA008.01
Enter enquiry criteria in terms of Asset detail /Books/assignment etc
Internal – System Assisted
Asset Enquiry Criteria entered to query the assets
Finance Team
Active
FA008.02
Listing Assets basic information Internal – System Assisted
Assets Enquiry Assets details are listed based on entered criteria
Finance Team
Active
FA008.03
Asset assignments enquiry, employee and location
Internal – System Assisted
Asset assignment details enquiry
Asset assignment details are listed
Finance Team
Active
FA008.04
Asset source line enquiry, PO, Invoice and supplier
Internal – System Assisted
Asset source line details enquiry
Asset source line details are listed
Finance Team
Active
FA008.05
Asset book enquiry, Cost and depreciation
Internal – System Assisted
Asset assigned book details enquiry
Asset book details are listed
Finance Team
Active
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
2 Fixed Assets Process Flow Diagrams
Overview:
This section explains you the pictorial representation of different processes involved in Assets module. There are different processes involved in Assets module.
2.1 Fixed Assets Configuration
2.2 Mass Additions Process Flow
2.3 Prepare Mass Additions Process
2.4 Post Mass Additions Process
2.5 Asset Retirement
2.6 Depreciation and Month end Process
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
2.1 Fixed Assets Configuration
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
2.2 Mass Additions Process Flow
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
2.3 Prepare Mass Additions Process
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
2.4 Post Mass Additions Process
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
2.5 Asset Retirement
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
2.6 Depreciation and Month end Process
GE Internal
RD.050 Business Requirements Scenarios Doc. Ref: RD.050
Ver 1.1 Final
3. Open and Closed Issues for this Deliverable
Open Issues
ID Issue Resolution Responsibility Target Date Impact Date
Closed Issues
ID Issue Resolution Responsibility Target Date Impact Date
GE Internal