SUPPLY CHAIN MANAGEMENT SCOPE OF WORK PROJECT DESCRIPTION: The Appointment of a Team of Consultants and a 6GB Contractor on a Turnkey Project for the Upgrade of Pienaarspoort and Mamelodi Garden Stations 1. Introduction Pienaarspoort and Mamelodi Garden Stations are critical and support the overall improvement and acceptance of the Testing Corridor. The Capital Budget was previously not allocated on the two Stations, mainly because the two station were to be upgraded and improved under the Modernisation Programme by PRASA Tech. The Modernisation Programme experienced challenges or delays in implementing Pienaarspoort and Mamelodi Stations. The New Train Service is to run between Saulsville Station and Pienaarspoort Station (via Pretoria) and will start in February 2017 as this is the expected date for the new rolling stock to set off. With the arrival of new trains, most of the smaller stations in the Saulsville and Pienaarspoort (via Pretoria) Corridor has recently been upgraded to ensure that the customer Page 1 of 16

Upload: vutruc

Post on 26-Mar-2018

221 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

SUPPLY CHAIN MANAGEMENT

SCOPE OF WORK

PROJECT DESCRIPTION: The Appointment of a Team of Consultants and a 6GB

Contractor on a Turnkey Project for the Upgrade of

Pienaarspoort and Mamelodi Garden Stations

1. Introduction

Pienaarspoort and Mamelodi Garden Stations are critical and support the overall

improvement and acceptance of the Testing Corridor. The Capital Budget was previously

not allocated on the two Stations, mainly because the two station were to be upgraded

and improved under the Modernisation Programme by PRASA Tech. The Modernisation

Programme experienced challenges or delays in implementing Pienaarspoort and

Mamelodi Stations.

The New Train Service is to run between Saulsville Station and Pienaarspoort Station

(via Pretoria) and will start in February 2017 as this is the expected date for the new

rolling stock to set off. With the arrival of new trains, most of the smaller stations in the

Saulsville and Pienaarspoort (via Pretoria) Corridor has recently been upgraded to

ensure that the customer experience is enhanced and that the stations can cope with

future demands. Although the Pienaarspoort and Mamelodi Stations are functional, they

still posed various health, fire and safety hazards due to their poor infrastructural

conditions and as such need to be upgraded as a matter of urgency under NSIP.

PRASA CRES project team scoped the current conditions and subsequently estimated

cost of upgrading the stations in question to fully operational stations which meet the

standards of the proposed new train service. The project team assessed the current

state of the stations to determine the cost of rehabilitating the stations to the respective

Page 1 of 13

Page 2: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

operational standard. The estimates were based on the work to be done on the stations

against what was previously paid for similar stations along the same corridor i.e.

improvement and upgrade recently done at Loftus Station in Pretoria

Prasa Cres Executive Management has taken the decision to upgrade Pienaarspoort

and Mamelodi Gardens Stations. The decision was based on aligning the stations along

the Mamelodi corridor to be in upgraded to the same condition as the projects on the

current Testing Corridor in order to be ready to accommodate the rollout of the new

trains.

The assessments and synopsis of the stations facilities at Pienaarspoort and Mamelodi

Gardens Stations have deteriorated to a point where rehabilitation is required. Current

maintenance intervention has failed to bring them to acceptable standards.

2. Background Information

A number of the Metrorail stations within the Northern Gauteng Region have not been

upgraded over a long time and Pienaarspoort and Mamelodi Gardens Stations are

amongst those stations on the Mamelodi/Pretoria Station Corridor that are in a bad state

of repairs and need attention to ensure that it is in a satisfactory condition and are health

and safety compliant and contribute to the commuter experience.

The scope was identified by PRASA internal team and the professional team

commissioned to assess the extent of the upgrade. The works identified for the upgrade

are security wall, storm water, paving and screed on the sub walkway.

The works identified is estimated at R 10 000 000.00

The services required for a turnkey contractor are as follows:

Page 2 of 13

Page 3: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

The additional services of a Quantity Surveyor must be engaged because:

A conflict of interest exist as the client cannot be a principal agent as well on a

capital project in terms of the construction contract;

An unbiased and professional review is needed for construction documents

prepared by the DB Contractor’s design team for payment recommendation;

All the skills needed to execute the subject capital projects are not available from

the PRASA personnel;

The volume and extend of the subject capital projects is such that the existing

personnel compliment will not be able to cope with the work load; and

The time available to execute the subject capital projects does not allow for

training and recruitment of personnel resources to execute it in-house.

3. Objective of the Proposed Project

The objective of the submission is to obtain consortium with a CIDB 6GB contractor to

design on a Turnkey Contract.

The turnkey procurement is motivated by the PRASA wants to speed-up project

delivery, which is asking for contractual collaboration among PRASA, PRASA’s

consultants, Design-Built Contractor and tenants to collectively manage and

appropriately share the risk, responsibility and liability of project delivery.

The Turnkey solution is also sought mainly for one point of accountability and the time

constraints.

Page 3 of 13

Page 4: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

Parts of the additional benefit of the project are as follows:

Reduction of maintenance and operational costs

Income generation through leasing the building

Portfolio maximisation

Customer satisfaction

Improved employee morale

4. Scope of Works and Areas of Focus

The required Consulting firm will be expected to do an analysis and thorough

assessment on the building regarding the proposed space and occupation thereof.

The preferred bidder, based on the project brief, will amongst others provide the

following services:

Assessment reports

Technical design reports

Preliminary drawings

Detailed designs

Detailed specifications with

Quantify the works and produce working Bills of Quantities

Facilitate procurement process of a building contractor

Monitor construction phase

Issue progress reports

Facilitate and chair project meetings

Ensure health and safety

Update and develop drawings to produce as built

Preparation of final account

Closeout project

In essence the project will have a Design Team and the expectation is to provide the

following services

1. Quantity Surveying Services - Principal Consultant, to quantify the work to be

carried out

2. Architectural Consultant – to do building drawings and align to building regulations

and standards and acquire occupancy certificates

Page 4 of 13

Page 5: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

3. Electrical and Mechanical service – Design of electrical and mechanical

requirements as set out by client

4. Structural Engineer - Provide structural integrity reports and advisory on any

losses/gains of structural strength

5. Health and Safety Services – to ensure safety standards are in order throughout

the project

6. Construction Team - The below is a scope of works defining the activities to be

performed in each area.

Scope of Works and Areas of Focus

Existing Structures and Ticket Office Re-paint the building. Install floor tiles. Fix and replace ceiling and skirting. Replace doors and handles Lighting to be improved Work top in the kitchen New kitchen units Hydro boil Install blinds Install chromadek rain water goods Fix and replace door and window frames Replace sanitary fittings Install signage Provide hawkers stalls Install tarmac at the entrance Fix and install aircons Install roller shutter doors

Platform New benches and chair backs on the existing fixed benches New water pump for the water tank Re-marking white lines Install tactile Provide Prasa signage Install new bins Design new ramp for disabled access Paint footbridge Fix and replace paving Fix and install shelters with chromadek roof sheeting and rain water goods Install new LED lights Fix and repaint palisade fence

Public Ablutions Relocate and construct public ablutions

Page 5 of 13

Page 6: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

Wall and floor tiles. Plumbing work. Water closets, wash hand basins, and urinals. Lighting to be checked.

Waiting Area

Construct a new waiting area

Electrical Works: Lighting LED

Upgrade of DBs

Cabling and power skirtings’

Relocate KIOSK to plattform

Plumbing Works: Water pressure upgrade

Drainage

Sanitary ware

Air-conditioning Equipment: Installation of Hideaways

Installation of Split units

Central Units

Windows: Blinds

Replace cracked glass

Repair broken frames

Carpentry and Joinery: Doors

High security locking system

Counters (Reception, Kitchen, Serving, etc.)

Signage: Internal Signage

External Signage

5. Specifications of the Work or Products or Services Required

Page 6 of 13

Page 7: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

The Specification that will be applied for this project is as per the Prasa Office

specification Blue Print. See attached.

The project will require a Contractor that is graded on the CIBD as 6GB and above. The

contractor required should be able to deliver works as per the drawings below and the

attached office specifications.

The following sample pictures depict the current status of the stations, earmarked for

improvement under NSIP.

Page 7 of 13

Page 8: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

Re-wiring of Distribution board Replace lights at the entrance

Replace tiles Replace existing toilet

6. Time Frames / Programs

Contract period

The construction period of this project is anticipated to be 3 months from date of site handover.

7. Evaluation Criteria

Page 8 of 13

Page 9: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

The evaluation should be done in three stages as follows:

Stage 1: Compliance Requirements

Bidders shall comply with the following requirements failure to comply may lead to disqualification: [list project specific compliance requirements. i.e. CIDB, PSIRA].

a) Valid BBBEE Certificate from a SANAS accredited rating agency

c) Completed and signed Bid Forms of PRASA with all the annexures thereto;

d) Certificate for Attendance of Compulsory Briefing Session;

e) Retention or Guarantees

f) Company Registration Documents;

g) Letter of Good Standing (i.e. COID);

h) Contents of Register of Directors as issued by CITC;

i) Joint Venture or Consortium Agreement (whichever is applicable);

j) Proof of UIF registration;

k) Proof of Bank Account (i.e. cancelled cheque or letter issued by the bank);

l) Copies of Directors’ ID documents; and

m) Company Letter Head.

n) CSD Registration

m) Professional Team

Quantity Surveyor Architectural Consultant Electrical and Mechanical Engineer Civil and Structural Engineer Occupational Health and Safety Consultants Building Contractor

Stage 2: Technical / Functionality Requirements

Evaluation of Multi-Disciplinary Built Environment Professional Team

Page 9 of 13

Page 10: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

CRITERIA SUB-CRITERIA SCORING MAXIMUM POINTS

Completion for building and construction projects of

similar scope and budget (CIDB 6 GB Grading), or

higher. References should be

accompanied by completion

certificates from the Client)

Score will be based on successfully executed and completed similar projects in the Civil Engineering and Construction environment over the last five years of which details are provided:

1. Submit proof of : Appointment letter from client. 2. Final Account 3. Practical Completion certificates

Similar Type – Office Blocks, Tenant Installation, Building Refurbishments, Building Renovation, each project equal or exceeding the CIDB Grading of 6 GB of project on tender

5 = proof of 5 projects and above4 = Proof of 4 Projects3 = Proof of 3 Projects2 = Proof of 2 Projects1 = Proof of 1 Project

20%

Qualifications and

Competencies of Key Staff

Points allocated for qualifications and professional registration for each professional, Design, Engineering, and Technical Category.

1. Certified qualifications 2. Certified professional registration 3. CV

B Degree (B Tech or B Eng) plus 10 years of Experience and above ( extra year for Diploma )

B Degree (B Tech or B Eng) plus 8 years of Experience and above ( extra year for Diploma )

B Degree (B Tech or B Eng) plus 6 years of Experience and above ( extra year for Diploma )

B Degree (B Tech or B Eng) plus 4 years of Experience and above ( extra year for Diploma )

B Degree (B Tech or B Eng) plus 2 years of Experience and above ( extra year for Diploma )

5-Professionally Registered personnel for all categories ( Evidence is CV + certified Proof of Qualifications + certified Proof of Professional registration) with SACPCMP and/or SACQSP and/or ECSA and/or SACAP or similar endorsed in RSA4-Professionally for all categories un-Registered personnel with minimum of Bachelor's Degree in the built environment ( CV + Certified Proof of Qualifications )3-Professionally for all categories un-Registered personnel with National Diploma in the built environment (CV + Certified Proof of Qualifications)2-Professionally for all categories un-Registered personnel with Certificate in the built environment (CV + Certified Proof of Qualifications)1-No relevant qualifications in the built environment

10%

Approach and Methodology

Points allocated for submission of Methodology that is detailed , project specific and have milestones

5-Submission of approach and methodology plus 1. Detailed 2. Project Specific 3. Milestones4-Submission of approach and methodology plus 1. Detailed and any 1 of 2. Project Specific or 3. Milestones3-Submission of approach and methodology plus any 2 of the three requirements met 1. Detailed 2. Project Specific or 3. Milestones2-Submission of approach and methodology plus any of 1. Detailed 2. Project Specific or 3. Milestones1-Submission of 1 requirement

5%

Client Satisfaction

Letter

Points allocated for a submitted Client Satisfaction Letters

5-Submission of letter from at least 5 + clients4-Submission of letter from at least 4-5 clients

5%

Page 10 of 13

Page 11: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

3-Submission of letter from at least 2-3 clients2-Submission of letter from at least 2 clients1-Submission of letter from at least 1 client

Professional Team Sub-Total 40%

Main Building Construction Evaluation (6GB or higher )CRITERIA SUB-CRITERIA SCORING MAXIMUM POINTS

Organisational Experience Projects)

At least a minimum of 5 completed projects of grade 6 GB with contactable reference

Attach Completion Certificates or any proof of completion certified by the Client

Similar Type – Office Blocks, Tenant Installation, Houses, Building Refurbishments, Building Renovation, each project equal or exceeding the CIDB Grading of 6 GB of project on tender

Attach letters of Appointment and Completion Certificates5 = proof of 5 projects and above4 = Proof of 4 Projects3 = Proof of 3 Projects2 = Proof of 2 Projects1 = Proof of 1 Project

25%

Plant and Equipment

Proof of ownership of plant and equipment or proof of account to hire [100% = 1 Tipper Truck, 1 Tonne Bakkie, Power Tools, Laser levelling tools, Ladder, Hand Tools(shovels, chisels, scrapers, hammers, Hands Saws, measuring tools, trowels, floats and knives)

Ownership = Certified Asset Register

5 = 100% Proof of all owned equipment4 = 80% Proof of owned or 100% Proof of account to Hire3 = 70% Proof of owned or 80% Proof of account to hire2 = 50% Proof of ownership or 70% account to hire1 = Less than 50% and no proof of account to hire

20%

Health and Safety Report

1. Provide a competent Safety Officer with a minimum of 3 years industry experience and registered with the SACPCMP(Attach CV and qualifications)

2. Provide a project specific and comprehensive baseline risk assessment.

3. Complete (S&H evaluation Sheet)

4. Provide a valid Workman’s compensation registration certificate

5 = All required information4 = 1,2,3 and 4 without the registration with the SACPCMP3 =Provision of item 1 and 2, without 3 and/or 4.2 = Provision of 2 and 3 without 1 and / or 41 = Provision of only 1 requirement

“Kindly note that you are required to submit a comprehensive safety file for approval on appointment as the preferred bidder.”

15%

Construction Team Sub-Total 60%

TOTAL 100%

Stage 3: Pricing and BBBEE

The formula for calculating price scores is as follows:

Page 11 of 13

Page 12: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

Only Bidders who have achieved the 70% minimum threshold for Technical / Functional

evaluation will be evaluated for the Price and B-BBE components.

Pricing Evaluation: A maximum of 80 points is allocated for price. The evaluation for price will be done based on

the following formula:

Ps=80[1−Pt−PminPmin]

Where:Ps = Points scored for price of tender under considerationPt = Rand value of tender under considerationPmin = Rand value of lowest acceptable tender

B-BBEE Evaluation:

A maximum of 20 points is allocated for B-BBEE. The allocation of points for B-BBEE is as

follows:

B-BBEE Status Level of

Contributor

Number of points( 90/10

system) above R50 Million

Number of points (80/20

system) below R50 Million

1 10 20

2 9 18

3 6 14

4 5 12

5 4 8

6 3 6

7 2 4

8 1 2

Non-Compliant Contributor 0 0

Evaluation criteria Weighting

Page 12 of 13

Page 13: · Web viewCurrent maintenance intervention has failed to bring them to acceptable standards. Background Information A number of the Metrorail stations within the Northern Gauteng

Stage 1: Compliance Requirements

Security Screening Compliance

CIDB Grading 6 GB

Bank Rating Compliance

Stage 2: Technical / Functionality Requirements

Technical Threshold of 70 %

Stage 3: Pricing and B-BBEE

BBBEE 20

Price 80

TOTAL 100

Page 13 of 13