![Page 1: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/1.jpg)
Vietnam’s Crisis of Success in ElectricityOptions for a Successful Clean Energy Mix
David DapiceSenior Economist, Vietnam and Myanmar ProgramAsh Center for Democratic Governance and Innovation John F. Kennedy School of Government, Harvard University
December 2018
![Page 2: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/2.jpg)
Vietnam’s Crisis of Success in ElectricityOptions for a Successful Clean Energy Mix
This policy note was written by David Dapice ([email protected]) and benefited from input and feedback from Professors Le Viet Phu, Nguyen Quy Tam, and Thach Phuoc Hung at the Fulbright School of Public Policy and Management.
The views expressed herein are the author’s alone and do not necessarily reflect those of Harvard University or the Fulbright School of Public Policy and Management.
This piece, along with other Ash reports on Vietnam, is posted at ash.harvard.edu/policy-briefs and ash.harvard.edu/vietnam-program. John F. Kennedy School of Government, Harvard University
December 2018
![Page 3: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/3.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
2
CONTENTS
ABOUTTHEAUTHOR.........................................................................................................3
ABOUTTHEASHCENTER...................................................................................................3
EXECUTIVESUMMARY.......................................................................................................4
VIETNAM’SCRISISOFSUCCESSINELECTRICITY................................................................8
Background....................................................................................................................8
Vietnam’sElectricitySituation.......................................................................................9
CurrentPlansforCapacityExpansion..........................................................................13
ReasonsforHighRenewableCostsinVietnam-PPA..................................................14
MeasurestoReducetheCostofRenewableEnergyinVietnam.................................16
GasComparedtoCoalforBaseloadGeneration..........................................................18
SUMMARY-OPTIONSFORTHEFUTURE.........................................................................19
Demand........................................................................................................................19
Supply...........................................................................................................................20
BIBLIOGRAPHY.................................................................................................................23
![Page 4: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/4.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
3
ABOUTTHEAUTHOR
DavidDapiceisaleadingexpertontheeconomicdevelopmentofSoutheastAsiaandhasworkedextensivelyinIndonesia,Thailand,Cambodia,Myanmar,andVietnam.HewasanadvisortotheIndonesianMinistryofFinancewhenthecountryenjoyeditsperiodofrapidgrowthandhasstudiedtheVietnameseeconomysince1990.Dapice’sexpertiseonmattersofeconomicpolicyisregularlysoughtbytheVietnamesegovernment.HeisProfessorEmeritusofEconomicsatTuftsUniversity,whereheservedasChairoftheEconomicsDepartment.HehastakenleaveattheWorldBank(asaBrookingsPolicyFellow),theRockefellerFoundation,andtheHarvardInstituteforInternationalDevelopment.Hehasauthoredorco-authoredanumberofpolicystudiesincludingChoosingSuccess:TheLessonsofEastandSoutheastAsiaandVietnam’sFuture.Hehascontributedtoanalysisofmacroeconomics,urbanization,regionaldevelopment,agricultureandenergyinVietnamandMyanmar,oftencollaboratingwithlocalprofessorsandexperts.
ABOUTTHEASHCENTER
TheRoyandLilaAshCenterforDemocraticGovernanceandInnovationadvancesexcellenceandinnovationingovernanceandpublicpolicythroughresearch,education,andpublicdiscussion.TheFordFoundationisafoundingdonoroftheCenter.ThreemajorprogramssupporttheCenter’smission:TheProgramonDemocraticGovernance,theInnovationsinGovernmentProgram,andtheRajawaliFoundationInstituteforAsia.Thispaperiscopyrightedbytheauthor(s).Itcannotbereproducedorreusedwithoutpermission.
![Page 5: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/5.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
4
EXECUTIVESUMMARY
AsVietnamlookstothefutureplanningforenergyproductionanduse,keyisacarefulanalysisofthecostofthevarietyofpowergenerationsystemsthatcancontributetoasuccessfulenergymix.ThispaperisdesignedtoassistinthateffortandinprovidinginformationfortheresearchforPowerDevelopmentPlan8.
EfficiencyandUse
1.Vietnamhashugelyincreaseditsoutputofelectricitysince2000andhasreachedvirtuallyeveryvillageandimprovedthequalityofservice.Consumptionnowexceeds2000kWhpercapita,higherthanIndiaandIndonesiaandapproachingthatofThailand–allarericher.
2.Theannualgrowthrateofelectricitydemandhasbeen12%,fasterthananyothercomparableAsianeconomyandisprojectedtobe8-9%annuallyoutto2030–againmuchfasterthanlikelyGDPgrowth.OthereconomieshaveelectricitydemandgrowthatorbelowGDPgrowth.VietnamrequirestwiceasmuchelectricitytoproducethesameamountofrealGDPasThailand.ItusesmoreelectricityperunitofoutputthanChinadoes,yetChinaisbothmoreindustrialandmoreurbanandbothtendtoincreaseenergydemand.Inshort,Vietnamuseselectricitytooinefficiently.
3.Thereasonforsuchpoorenergyefficiencyisalowpriceofelectricitywhichhasfalleninrealtermsfrom2010to2016inspiteofbeingpricedbelowthecostofnewproductionanditsdelivery.Thereisalsoineffectiveenforcementofconservationpolicies,includinginnewbuildings.China’seffortsofferagoodmodelformoreaggressiveandeffectivepolicies.
CoalvsGas
4.CurrentPowerDevelopmentplans(PDP-7-revised)areforcoaltoprovidemostincrementalelectricity.Vietnam’scoaluseinthelastfiveyearsgrew75%,fasterthananyothercountryintheworld.Itisprojectedoutto2030tocontinuegrowingveryrapidly,withanincreasingshareoftotaloutput.Thisisinspiteofcoalbeingimportedandintensepoliticalresistancetocoalduetolocalpollutionconcerns.Thereisscantuseofnaturalgas(keptatasixthoftotalpower)inspiteofampleoffshoredomesticreservesandopportunitiestoimportLNG.PDP-8,duein2019,shouldreassesstheseplans.
![Page 6: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/6.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
5
5.Domesticgasproductionistaxedheavilyeventhoughitisacleanerfuel.Importedcoalisscarcelytaxedatall.Ifcoalweretaxedonthesamethermalbasisasgas,thetariffwouldbe$100aton.Iflocalpollutioncostsareconsidered,gaselectricity’stotalcostswouldbecheaperthancoal.Forcoalandgas,equaltaxationonathermalbasisandconsiderationoflocalpollutioncostswoulddecisivelyfavorgasovercoal,andwouldassistthegovernmenttoaccuratelyassesstotalcosts.
6.EVNclaimsthatitisdangerouslyunreliableortooexpensivetomoveawayfromitscoal-centricstrategy.ItcouldcertainlyimportLNGandnegotiatethesupplyoflocaloffshoregasinstead.1Gas-firedelectricityisactuallymoreflexibleforrampingupandrampingdownthancoalandmuchcleaner.Ifexcessdiseaseanddeathsarecounted,gasisalsocheaperthancoal,andwelearnmoreaboutthesocietalcostsofairpollutioneveryyear.Ifchangesweremadetosolarandwindpolicy,itcouldgreatlyincreasetheamountandreliabilityofthesesourcesatalowercostthancoalbythetimenewcoalplantscomeonline.EVNcouldfindlocalresistancetocoalmakesitnecessarytorespond,probablyatfirstwithincreasedimportsofpowerandlargeruseofhigh-priceddiesel.
7.InbothIndiaandChina,thecapacityutilizationofcoalgeneratingplantshasfallensharplyduetoacombinationoflowerdemandgrowth(ashifttoservices),improvedefficiency,lowerrenewablepricesandrapidlyincreasingrenewableproduction.InChina,thecapacityutilizationforcoalwasbelow50%in2016andasaresult40%ofcoalplantswerelosingmoney.Thisrepresentsafinancialrisk,especiallysinceittakes3-5yearstocompleteacoalplant,theyarea30-40yearinvestment,anditishardtostopconstructiononcestarted.Gasandespeciallyrenewableenergytakelesstimeandcapacitycanbetailoredtodemand.
Renewables
8.Renewableenergy(meaningsolarandwind–excludinglargehydro)wasinsignificantin2017butisexpectedtogrowtoaprojected10%ofcapacityin2030.Indiaisaimingformorethan20%in2022andChinafor20%in2030.Inothercountries,wind/solarbidsinauctionsarecominginbelowthecostofcoalnow.Vietnam’srenewablecostsareaboutdoublethoseofIndiaorChina.
1Thecostsofgas-firedelectricityaresaidtobe10-12centsperkWhinVietnambutare4-7centsinothercountries,includingthosewhichimportLNG.ShipswhichhaveonboardgeneratorsandLNGstorageandgasificationfacilitiesareavailableandshouldproduceelectricityforlessthan10centsperkWh.
![Page 7: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/7.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
6
8.ThereareseveralreasonsforhighrenewablecostsinVietnam,mostlytiedtothePowerPurchaseAgreement(PPA)constraints.First,landhasbeenallocatedorlicensedbyprovincestotoomanywithoutthetrackrecordorfinancestodevelopit.Insomecasestheyintendtosellorcooperatewiththerealdeveloperswhoputupthemoneyandhavetheexpertise–butseekingtocharge20%astheir“equity”forhavingthebestland.Inmore-crowdedIndia,landisauctionedandcostsonly5%ofsolarprojects.(Foracceptedprojects,thelandcostis10%ormore.)Second,duetothehighfeed-intariffsandlimitedgridcapacity,underthePPA,EVNisreluctanttoguarantee“takeorpay”contractsthatwouldattractmuchinternationalfunding.Instead,thereisamuchweakerpromisetobuy,whichisacceptablesofarmostlyonlytolocalbanks.(Someforeignenvironmentalfundswillinvestfor“green”reasonsinlimitedamounts.)AtypicalVietnameseloanwillbeabout10%interestfortenyearsinlocalcurrencywhileforeignloanscanbelowercostandmorefavorableterms.Thisraisesthecostofrenewableenergyduetothefasterpaybackperiodandhigherinterestratebyasmuchas3-5centsperkWh.Third,thedeveloperinVietnamhastobuildatransmissionlinetothegridfromtheprojectwhileinIndia,thegridcomestotheproject.Takentogether,thesePPApoliciesatleastdoublethecostofsolarandwindelectricity.
10.Thehighfeed-intariffisslatedtoexpireinmid-2019fornewprojectsstartingafterthatdateanditshouldnotbecontinued.Theonlywayforrenewableenergytoplayaslargearoleasinothercountriesisbyloweringitscostsandimprovingthegridandthusthecertaintyofpowersupplycontractssothatsolarandwindelectricitycanprofitablybesoldforlessthancoal.Workingonwaystointegraterenewableenergywithexistingsources,andsupplementingstoragewithbatteries,wouldhelpVietnamreachhighereconomiclevelsofrenewableenergy.
11.Bystrictlyapplyingexistinglaws,ifadeveloperfailstogetasignedpowerprojectwithinoneortwoyears,theprovinceshouldrecallthelandforauction.Byloweringfeed-intariffsbutstrengtheningthePPAcommitmenttobuyelectricity,lower-costinternationalfundingcouldbeattracted.ByhavingEVNorthegovernmentarrangeforlandrightsforconnectinglinesfromtheprojecttothegrid,thecostsanddelaysassociatedwithgridconnectionswouldbereduced.ThesestepswouldhelpEVNgetlower-pricedenergyandincreasetheirincentivetoimprovethegridmorerapidly.Iffinancewereshort,minorityFDIortop-tierVietnameseprivatecompanyinvestmentintransmissioncouldbenegotiated,includingstorage.DirectPowerPurchaseAgreements(DPPA)ofgreenenergytoFDIfirmsthatwanttobuyitwouldaddanothermechanismtohelpspeedatransitiontoamorerobustenergymix.
12.Byloweringthecostofandboostingtheinvestmentinsolarandwind;rapidlyimprovingthegridandstorage;andloweringthegrowthofdemandthroughsteadybutmodestannualpriceincreasesandtieredpricingtoencourageefficiencyprograms,it
![Page 8: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/8.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
7
shouldbepossibletosubstantiallyreducetheamountofthermalcapacityneededinthenextdecadewhilekeepingfinancialcostsreasonable.Coordinationofgridcapacityandrenewableproductionshouldbepartofthelicensingprocess.
![Page 9: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/9.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
8
VIETNAM’SCRISISOFSUCCESSINELECTRICITY
BackgroundVietnamhasincreasedthesupplyofelectricitytoitseconomysince2000byeighttimesandextendedsupplytovirtuallyeveryvillage.EVN,thestatemonopolyutility,hasreducedblackoutsandincreasedthequalityofelectricitysince2010.In2018itwillhaveproducedmorethan2200kWhpercapita,whichwhilejustlessthanhalfofthatofChina,surpassesthatofIndiaandIndonesiaandisapproachingthatofThailand–allofwhicharericherthanVietnam.Vietnam’sgrowthrateofelectricityin2018is10%,whichwoulddoubleuseinsevenyears.LongerrangeprojectionsinthePowerDevelopmentPlanrevised(PDP7),from2020to2030,projectan8%annualgrowth.ThisgrowthrateisfasterthanthatofotherAsianeconomies,manyofwhichhaveelectricitygrowthratesbelowthatofGDPgrowthduetorealisticpricing,conservationandefficiencyprograms.
Vietnamcomparedtoitsneighborsisdifferentwithrespecttoelectricityinseveralotherways.Ithasmuchlessrenewableenergypercapita(excludinglargescalehydro)thananyotherneighbor.Ithashadarapidgrowthofcoalforgeneratingelectricitywith75%growthincoalusefrom2012to2017,whileChinadeclinedandotherswereslower.(SeeAppendix4.)Thecurrent(PDP-7,revised)energyplanprojectsfurtherrapidgrowthincoalatatimewhenneighborsandindeedmostoftheworldarereducingorslowingcoaluse,dueasmuchtoeconomics,governmentassessmentofproperpricingstructuresandlocalpollutionconcernsasclimateissues.2(SeeAppendix4.)
AnotherkeyissueisthatVietnamhaschosentopriceenergylowerthanitsneighborsandclosetoaveragecost,usinglowcostlegacyhydropowertosoftenthehighercostsofnewthermalplants.Butthismeansthatexpansioniscostlyandrequirescontinuingandunpopularpriceincreases.Italsohelpstoexplaintheextremelyinefficientenergyconsumption–VietnamusestwiceasmuchelectricityasThailandtoproducethesameamountofrealoutput.3
WhileVietnam’ssolarandwindpowerproductionarehistoricallylow,theyaresettoincreaseduetohighfeed-intariffsannouncedinrecentyears.Whilenewcoalplantsarepricedat7-8centsperkWhandLNGperhapsahalf-centmorethancoal,onshorewindpowerisnowpricedat8.5centsperkWhandsolarat9.4cents.ThesehighpricesforsolarandwindaredoubleormorethanthoseofauctionpricesinIndiaorChileandhaveinducedahugenumberofproposals–morethan25,000MW–atatimewhen
2Anexcellent2016studyoncoalpollutionis“SynthesisReportonSocio-environmentalImpactsofCoalandCoal-firedPowerPlantsinVietnam”(https://hal-enpc.archives-ouvertes.fr/hal-01441680)MinhHa-Duongistheleadauthor.Itdescribesthenegativeresultsofburninglargeamountsofcoaloneconomicactivityandhealth.3SomearguethattheunmeasuredeconomicactivityofVietnamissolargethatcomparisonsarenotfair.However,studiesoftheinformalsectorsuggestIndonesiaandIndiahaveevenlargerunrecordedoutputandtheyalsohavemuchloweruseofelectricityperunitofoutputinspiteofhighermeasuredGDPpercapita.
![Page 10: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/10.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
9
totalcapacityisonly48,000MW(48GW).EVNobjects,truthfully,thatitcannottransmitsomuchonitsexistinggridandisreluctanttosign“takeorpay”contractsthatwouldcommitittobuyelectricityitcannotmovetowhereitcouldbesold.However,itisunclearhowmuchofaprioritytheyplaceonimprovingthegridsothatmoresolarorwindenergy–primarilyproducedinthesouthernthirdofthecountry–couldbebought,movedandsoldtocustomers.Thereisnodoubtthatitisnoteasytomovefromamodelwherecentralpowerplantsproducepowerasneededtoonewheretheyadjusttoaccommodatefluctuatingrenewableenergyoutput.Inanycase,suchachangedoesnotcomenaturallytoacash-strappedutility.
Change,however,maybeforceduponEVN.AirpollutionlevelsinmanyVietnamesecitiesexceedWHOguidelinesandarealreadyunhealthy.Burningtensofmillionsoftonsmorecoalwillmakeairqualityworse,evenwithsomewhatimprovedboilersandpollutioncontrolequipment.Localgovernmentsinthesouth–includingtheMekongDelta,HCMCandnearbyprovinces,andevenNinhThuanallhaveaskedforeitherLNGgenerationand/orrenewableenergyratherthannewcoalplants.Simplysayingnotosuchrequestsandfailingtoupgradetransmissionlineswillresultinenergyshortages,possiblyassoonas2019.Whilesomereliefcancomefromusinghigh-costdieselgenerationandimportingenergyfromCambodiaandLaos,itisnotlikelytobeanadequateresponse.
TheGovernmentshouldfindadifferentpaththanthecoal-centriconewhichisnowplannedandhasbeenusedinrecentyears.AcleanerpathwouldhavelowertotalcostsforVietnam.
ThispaperwillfirstdocumentthefactswithrespecttoVietnam’slavishelectricityconsumptionpattern,itslimitedrenewabledeploymentandPMP7’srelianceoncoalfornewpower.Itwillexaminethelogicoffeed-intariffscomparedtoauctionsasawaytobuyelectricitynotproducedbyEVN.ItwillsuggestreasonswhyrenewableenergyinVietnamissoexpensiveandwaystoreduceitscost.Ifthecostsofwindandsolarfalltoalevelwellbelowthatofcoal,thecostsofintegratingthem,eveninconsiderableamounts,intoareliable,year-roundelectricitysystemwouldbemoreattractive.However,thisdoesnotmeanthatallfutureelectricitycancomefromrenewablesources.Somecombinationofgasandcurrentcoalwillbeneededunlessconservationandefficiencyprogramsmorerealisticallyreduceprojectedenergydemand.Suchconservationisentirelypossiblebutnotwithinthescopeofthispaper.
Vietnam’sElectricitySituationVietnamhasincreaseditsproductionofelectricityfrom26.7millionin2000to208millionkWhin2018,agrowthrateofmorethan12%ayear.Percapitaproductionrosefrom347to2213kWhpercapita,asix-foldgain.VirtuallyeveryvillageisconnectedandthequalityofelectricityisimprovingaccordingtotheEVN2017AnnualReport.4Retail
4AccordingtotheEVN2017AnnualReport,p.22,thedurationofoutagesdeclined80%from2012to2016andthenumberoftimespowerwascutfell73%inthesameperiod.Totaltransmissionanddistributionlossesalsofellfrom9.2%to7.6%overthoseyears.
![Page 11: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/11.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
10
pricesofabout7.5centsperkWharesetbythegovernmentandhavebeenslowlygrowinginlocalcurrencyterms-45%from2010to2016–adeclineinrealtermsafteradjustingforinflation-butcurrencydepreciationhascuttherateofdollarpriceincreasetojust22%inthosesixyears.Mostcostsofnewelectricityinvolveforeigncurrencycostsforthegeneratingequipmentandfuel.EGAT,theprofitableThaiutility,charges12centsperkWhforgenerationandtransmissionanddistribution.IfEVNwereaprivatecompanyitislikelyaregulatoryboardwouldallow11-12centsakWhforitsaverageretailprice.EVNreportsanominalprofitbyaveraginginlowcosthistoricalhydropowerwithnewerandmorecostlythermalpower.However,thismeansthatfastgrowthcausesasmallerportionoftotalpowercomesfromlowcosthydrosourcesandagrowingportionfromhighercostthermalsources,largelycoal.Thisrequiresconstantlyraisingprices.Pricingpowerclosetoitsmarginalcost–thecostofnewcapacityanddelivery–isabetterstrategy.Subsidizedpricingforthosewithlittleconsumptionwouldsoftentheimpactontheneedy.
Thefinancialcostofnewcoalisnegotiatedat7-8centsperkWh–abouthalffromChinesesuppliedandfinancedgenerationstations,withthebalancemainlyfromJapanandSouthKorea.WhileChinaisslowlyreducingitsowncoaluse,itisaggressivelyfinancingtheexportofcoalgeneratingunitsabroad.Themarginalcostofpowerfromnewcoalisabout4centsperkWh–thecostoffuelandmaintenancecostsassociatedwithoperations.Coalburningisassociatedwiththeproductionofashandair,waterandsoilpollution.Thesearealllocalornationalcosts,separatefromanyconsiderationofcarbondioxideandseparatefromthepricepaidbyEVN.EstimatesintheUSputthepollutioncostofcoalburningforpowergenerationatmorethan3centsperkWh–thisisinadditiontofinancialcostsoffuelandcapital.IfasimilarcostappliestoVietnam,thenthetotalfinancialandpollutioncostofcoal-firedelectricityis10-12centsperkWh.SinceUScoalplantshavesignificantcoalpollutioncontrolequipmentnotalwaysfoundorusedinVietnam,itwouldnotbesurprisingifpollutioncostsinVietnamwerehigher.5
Thispaperdoesnotconsideracarbonpollutiontaxincomparingcoalwithothersourcesofelectricity,eventhoughVietnamhascommittedtoreducingcarbonemissionsby8%to25%(withinternationalaid)by2030comparedtoa“BusinessasUsual”scenario.TheOctober8,2018reportoftheUNIGPCC(http://ipcc.ch/news_and_events/pr_181008_P48_spm.shtml)predictedearlierandmuchmoreseveredamagefromclimatechange,includingtolow-lyingareassuchasmuchoftheMekongDelta.Itsuggestedthatdrasticeffortstoreducethepotentialdamagefromrisingglobaltemperaturesassociatedwithincreasingcarbondioxidelevelswereneededandstilljustbarelypossible.Ifconcertedinternationalactionwerecalledforinthenextdecade,carbon-heavyinvestmentscouldbeexposedtopossiblecarbontaxesorothermeasures.Thisisapotentialfinancialriskwhichisonereason
5Beyondelectrostaticprecipitatorsandscrubbersforsulfuroxides,mercurycontroldevicesarerequiredintheUSwhichcancost$400millionpergeneratingplant.Ashdisposalalsoremainsaconcernforlocalcommunities.InTraVinh,the30hectaressetasideforashstoragefromarecentlyopenedcoalplantarealready2/3fullandheavymetalsareaconcernforlocalagricultureandfishandshrimpgrowing.
![Page 12: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/12.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
11
whymanywesternbanksandinvestmentfundshavestoppedfinancingcoalplants.Thereisarealriskthatacoal-centricstrategycouldendupwithVietnamhavingstrandedassetsthatarenolongereconomic.6
TheincreaseinelectricitydemandinVietnamismuchhigherthanincomparableAsianeconomies,evenwhencorrectingfortheGDPgrowth.Thegraphbelowshowsthegrowthofelectricityfrom2006to2016dividedbytheGDPgrowthrateoverthesameperiod.(DatafromBPandWorldBank.)
ThegraphshowsthatVietnamusesabouttwiceasmuchelectricityperunitofgrowthasitsneighbors.Sincemanyofthemaremoreurbanandhavemoreindustry,bothofwhichusemoreelectricity,thisdifferenceisevenmoresurprising.NorisitbecauseVietnam’selectricityuseissolowpercapita–IndiaandIndonesiahavehigherGDPpercapitabuthavemuchlowerelectricityusepercapita.Indeed,atprojectedratesVietnamwillovertakeThailand’spercapitaelectricityuseinafewyearseventhoughThailandhas2.5timesVietnam’sincomelevelpercapita.WhentheuseofelectricityisdividedbyGDPatcomparableinternationalprices,Vietnamismoreenergy-intensivethananyofitsneighborsaswell:
Sources:BPStatisticalReviewofWorldEnergy2018andWorldBankPPPGDPdata.
6ItistruethatChina,IndiaandtheUSarenotagreeingtocurtailcoaluse,buttheUScutcoaluseby20%infiveyearsinfavorofgasandrenewables,whileChina’susedeclinedfrom2012-17andIndia’sslowed.TheyarepreparingforaclimatetaxwhileVietnamisnot.
0
0.5
1
1.5
2
2.5
Vietnam Indonesia Malaysia India Thailand China
ElectricityGrowthOverGDPGrowth,2006-16
0
0.1
0.2
0.3
0.4
Vietnam China Malaysia India Thailand Indonesia
ElectrictyinGWhOverGDP(PPP)in2017
![Page 13: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/13.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
12
Vietnamismoreenergyintensiveperunitofoutputnowandisusingabouttwiceasmuchelectricitytogetequalamountsofextraoutput.ItsprojectedenergyuseiswellabovelikelyGDPgrowth,makingitoneoftheleastenergyefficienteconomiesintheregion–andbecomingmoresoovertime.ThiscreatestremendouspressureonEVNtoinvestheavilyinproductionwhenmoreefficientuseofelectricitywouldalmostcertainlybelessexpensiveandcertainlybelesspolluting.LoweringthegrowthofelectricitytotheGDPgrowthrateshouldbeentirelypossible–itisinfactnormalforvirtuallyalllargeAsianeconomies.7AneffectiveefficiencyeffortwouldcreatemuchmoretimeforEVNtoupdateitsgridanddevelopatechnicalabilitytouseothersourcesofgeneratingcapacity.Raisingelectricitypricesinapredictablewayinatieredstructurepairedwithapubliceducationcampaigncouldhelp.
TheotherwayinwhichVietnamstandsoutistheirhistoricallyextremelylimiteduseofrenewableenergy,excludinglargehydro.Thefollowinggraph,usingenergydatatakenfromthe2018BPStatisticalReviewofWorldEnergyReport,showsthepercapitaproductionofrenewableenergybycountryin2017.8Clearly,Vietnamhasnotdevelopedrenewablesourcestoanysignificantextent,atleastthrough2017.In2018,EVNsignedrenewablecontractsfor2271MWofcapacity,or4%ofexpected2020capacity.
7OnlyBangladeshisatallclosetoVietnam,witha9%electricitydemandgrowthoverthelastdecade,butwithlessthan500kWhpercapita(Vietnamhasmorethan2000kWhpc),itisnormaltohaveelectricitydemandgrowfromsuchlowlevels.8Thisincludessolar,wind,biomass,geothermalandsmallscalehydro.In2017,globalwindcapacitywas514thousandMWandsolarcapacitywas391thousandMW.Annualadditionsare50-100thousandMWeach.Theindustrynolongerneedshighfeed-intariffsasscaleeconomieshavebeenachieved.
![Page 14: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/14.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
13
CurrentPlansforCapacityExpansionThecurrentPowerDevelopmentPlan7-revisedwasreleasedin2016.ItisexpectedtobereplacedbyPDP-8inlate2019.Thecurrentplanforecastscoaltorisefrom34%ofallelectricitygeneratedin2015to53%by2030,Gasandhydrofallfrom30%eachin2015to17%and12%respectivelyby2030.Renewableenergyrisesfrom3.7%to10.7%ofallelectricitygenerated.Importsremainat1-2%oftotalpowerandnuclearwassupposedtorisefromzeroto5.7%,butthoseplanshavebeensuspended.Normally,nuclearandcoalaresubstitutesasbothareusedforbaseloadgeneration,socoal’ssharecouldapproach60%by2030ifitreplacednuclear.Totalcapacityin2030isplannedtobe130GW,upfrom38.6GWin2015,acompoundgrowthrateofabout8.5%ayear.9
Therelativedecreaseinlarge-scalehydroiseasilyexplained.Therearenotmanylargesitesleftfordevelopment.Forgas,itismorecomplicated.Vietnamhassignificantoffshoredepositsofgaswhichithasnotdevelopedandexplorationhassuffered.Thoughitwouldtake5-7yearstodevelopthemoncealltherequiredcontractsaresigned,theycouldprovideagreatershareofelectricitythanscheduled.Onereasonprogresshasbeenslowinsigningdevelopmentdealsisfirst,itisoftensaiditistooexpensivetodevelopoffshorefields–$10billionormore–withgaspricesof$5-6perthousandcubicfeetofgas.(PVNissayingthesameforBlockB)However,theslowdowninexplorationisbecausetheGovernmenthasdecidedthatoffshoregasmustbeheavilytaxed,apparentlyby$3-4perthousandcubicfeetinadditiontothe$5-6price.Atthatpriceof$9-10,gashasbeenviewedastooexpensiveandisnotdeveloped.Incontrast,importedcoalisbarelytaxedatallandasimilartaxoncoal’sthermalcontentasgaswouldamountto$100aton!Thatwouldalsomakecoaluneconomic.Soadecisiontotaxoffshoregasbutnottotaximportedcoaliswhatmakescoalcompetitive.Gas–adomesticasset-hasfarfewerenvironmentaldrawbacksandislesscarbon-intensivethancoal,andwithexploration,greaterpotential.Thegovernmentcouldreexaminethesepolicydecisions.
AnotherpossibilityistoimportLNG–liquefiednaturalgas.10Thisisaninternationallytradedcommodity,likecoal,andimportsaretypicallyarrangedunderlong-termcontractssincethespecializedshipscarryingLNGanddegasificationterminalsareexpensive.LNGfromtheUSwouldprobablycosttheexporterabout$6-$7perthousandcubicfeet(thepriceintheUSisonly$3-$4butliquefyingandtransportadd$3tothecost),butLNG’spriceinAsiaisbidupordowndependingondemandfromChina,SouthKoreaandJapan.ItappearsthatLNGelectricityismoreexpensivethanwhatEVNispayingforcoal-firedelectricity.11However,itcanbeusedmoreeasilywithrenewable
9The2016GIZReport,“VietnamPowerDevelopmentPlanforthePeriod2011-2020:HighlightsofthePDPrevised”providethedatainthisparagraph.ThereportisbasedonthePDP-7-revised.10IfVietnamneedstobargainwiththeUStoreduceitstradesurplusandmaintainaccesstotheUSmarket,importingLNGfromtheUSwouldbeonewaytoshow“goodfaith”inhighlytransactionalnegotiations.11WeweretoldbyMOITthatreplacing6000MWofcoalwith6000MWofLNGwouldraisesystem-wideelectricitycostsby0.6%.Since6000MWisaboutatenthoftotal2020capacity,this
![Page 15: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/15.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
14
sourcessincegasgeneratorscycleupanddownmorequicklythancoalboilers,adjustingtovaryingsupplyfromsolarandwindsources.Thisisalsotrueforhydroelectricity.
Theplantohaveabout10%solarandwindby2030isnotaggressive–Indiaplanstohavemorethan20%solarandwindgeneratedelectricityby2022–andadetailedstudysuggeststhatevenIndia’scoal-centricgridwillbeabletotakewindandsolarof175GWoftotalcapacitywithoutmajorchangestothegrid,thoughpredictivemodelingandbettercontrolsofcoalplantswillbeincorporated.12Ofcourse,asamoredevelopedmarket,Indiahasanauctionsystemandisgettingsolarbidsatlessthan4centsperkWh,whichischeaperthancoal.Itwillactuallylowertotalsystemcostsbyusingcheapsolarandwind.Chinaplanstohave20%renewablesby2030andisnowgettingsolarbidsforlessthan5centsperkWh.13DevelopersinVietnamclaimthatthecostsofrenewableinVietnamareatleasttwiceashighasIndia,andhavesuccessfullyarguedforhighfeed-intariffsof8.5centsperkWhforonshorewindand9.4centsforsolar.WhyshouldVietnamesecostsbesomuchhigherthancostsinIndia?
ReasonsforHighRenewableCostsinVietnam-PPAWhenhighfeed-intariffswereannounced,therewasasurprisingresponsefromfirmswishingtosupplyrenewableelectricity–morethan20,000MWofsolarprojectproposalsweresubmitted.Thisisathirdof2020generatingcapacityandfarmorethanthegridcancurrentlyabsorb–mostsolarandwindsitesaresomedistancefrommajorcitiesthatneedthatmuchpower.But,inaddition,therewasarushattheprovincialleveltohandoutlandlicensestolocaldevelopers.Mostofthe“developers”weresaidtolackcapitalorexpertiseinbuildinglargesolarorwindprojects.Theyhopedtoselltheirrightsorco-investintheprojectsbytakingasharebasedontheirlicenserights.Theactualdeveloperwouldhavetoprovideallcapitalandexpertisebutgiveup10-20%oftheownershipshare,orsoweweretoldininterviews.InIndia,landcostsareonlyabout5%ofprojectcosts,eventhoughIndiaismoredenselypopulated.
SinceEVNwasnotinapositiontotransportsomuchrenewableenergy,itisreluctanttosignfirm“takeorpay”contractsforit.Instead,thecontractsallowedthemtotakeonlysomuchastheyneededorwereabletoabsorb.Thesecontractsarenotacceptabletomostinternationalbanksorinvestors.Therefore,itwaslocalbanksandfirmsthathadtoprovidethecapitalformostprojectsthatwerelicensed.Localbankshavehigherinterestratesandshortertermsthaninternationalbanks.Atypicallocalloanisabout10%ayearfortenyearsratherthan6-8%for15-20yearsfromcommercialinternationalsources–withExport/ImportBankfinancingisevencheaper.(USExport/ImportBank
impliesa6%highercostthancoal.Thatisroughly0.5centsperkWhmorethancoal.Othernews-basedestimatesare10centsperkWhforLNG.12“GreeningtheGrid:PathwaystoIntegrate175GWofRenewableEnergyintoIndia’sElectricityGrid”–VolumeI,NationalStudy,June2017,IndiaMinistryofPowerandUSAID.AsimilarstudyforVietnamisneeded,13ChinaIsSlashingItsSubsidiesonSolarPower,Forbes,6/18/2018,JillBaker
![Page 16: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/16.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
15
financinghadinterestratesof4.2%for18yearsinOctober,2018.14)Ifa100MWprojectcosts$1000akilowatt,thetotalcostofthematerialandconstructionis$100million.(Thesearetypicalcosts.)Toshowtheimpactofdifferentcostsofcapital,considera100%debtfinancedproject.(Inpractice,debtisabout70-85%andtherestisequity,whichhasahighercapitalcharge.)Thetablebelowshowsannualinterestcostsandthetermoftheloanavailable.
AnnualPaymentsona100MW/$100MillionProject CostperKilowatt-hour
10%/10years(Local) $16.3million 9.6cents7%/15years(Foreign/commercial) $11.0million 6.5cents4.2%/18years(Foreign/Ex-ImportBank)$8.0million 4.7centsIftheprojectproduced1700kWhayearperkilowattofcapacity,itwouldproduce170millionkWhayear.Thedifferentrepaymentcostsperkilowatt-hourareshowninthetable.Clearly,ifcontractswerewrittensothatinternationalloanscouldbeused,therepaymentcostswouldbemuchlower.Notethatthistableisonlyillustrative–actualworld-wideinterestratesarerisingandequityfinancetypicallyhasacapitalchargeof12-15%,sotheactualcostwouldhavetobecalculatedforanactualproject.15Thereisalsotheimportantcomplicationofforeignexchangerisk.Sincethedonghasbeenslowlydepreciatingagainstthedollar16,dollar-basedloanshavetobeadjustediftherevenueisinlocalcurrency.Therecouldbehedging(akindofinsurance)orsimplyadding3%ayeartothedollarinterestratetooffsettheexpecteddepreciation.Withadepreciationadjustment,themainadvantageofinternationalcommerciallendingisitslongertermandthespreadingofriskawayfromVietnamesebankswhomightotherwiseput“toomanyeggsinonebasket”andfacehighlossesifproblemsdevelopedwithrenewableenergyloans.
ThereisathirdfactorwhichexplainswhyVietnamhashighrenewableenergycosts.Thetransmissionlinefromtheprojecttothenationalgridhastobebuiltbytheprojectdeveloper.He(orshe)hastonegotiatewitheachlandholderalongtheroutethattheproject-to-gridlinewilltakeandpaythemforthelandorrentitfor10-20years.Inaddition,thedevelopermustpaythecostofbuildingthehighvoltagelinefromtheprojecttothegrid.A110kilovolttransmissionlineis$400,000perkilometersoa25kmlinewouldadd$10millioninconstructioncostspluslandacquisitioncosts.Thiswouldaddatleast10%tothecostofthe100MWproject.
PuttingthethreefactorstogetherunderthePPA–landspeculationtakingupthebestsites;higherinterestratesduetocontractswhichdonotsatisfyinternationalstandards,
14TherecentlyimposedtariffsonsolarpanelsmaketheUSabadchoiceforexportingsolarequipment,butothercountrieshaveExport-Importfinancingatroughlysimilarrates.15Whiletheblendedcostofloanandequitycapitalwouldbehigher,theactualcostofpanelsandreasonablypricedlandcouldwellbelower.Solarpanelcostsarefalling20-30%in2018.16Thedongexchangerateattheendof2008was17,000=$1anditwas$23,300=$1inOctober2018,anannualdepreciationrateof3.2%.
![Page 17: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/17.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
16
insufficienttakeorpayguarantees,andtransmissionlinerequirements–itisclearthatrenewableenergycostsarehigherthanneedbe.Roughlyspeaking,thesecostsatleastdoublethecostperkilowatthourthatwouldotherwisebepossible.
MeasurestoReducetheCostofRenewableEnergyinVietnamTherearestepsthatcouldbetakensothatthecostofrenewableenergyfallstolevelsclosertothoseofothercountries.
1. Forland,thecurrentnational“useitorloseit”regulationshouldbestrictlyappliedoncetheinvestorsfailtoimplementtheirproposedprojectwithinayear,orsometimestwoyears,sincethegrantingofinvestmentlicense.Theprovincecouldthenauctionthelandtodeveloperswhowantedtobuildtheprojects.Evidencemightberequiredthatthebidderhassomecapacitytodeveloptheprojectandisnotaspeculator.EVNandtheGeneratingCompanies[orGencos-SOEownersofgeneratingcapacityspunofffromEVN]shouldbeallowedtobidforprovinciallandonanequalbasisiftheyplantoinvestinrenewableenergythemselves.
2. Forcontracts,thereisnofinancialincentiveforEVNtobuylargeamountsofpoweratpriceshigherthancoal,orindeedhigherthanitsretailpriceofelectricity.Thehighfeed-intariffsarelossmakingforthem,andwhiletheyareaSOEtheyneedtobecreditworthyandthusarenotbeeagertobuyhigh-costpowerwhichrequiresbillionsofdollarsofgridinvestments.Byemphasizingrealbutmanageablegridconnectionproblems,theycanandlikelywillresistsigningcontractsthatworsentheirsituationandputpressureonretailelectricityprices.Thesolutionistolowerthecostofrenewableenergybyreducingthefixedpriceandeventuallyallowingauctions,butthisrequiressolvingtheproblemsinthePPA.TheprivatesectorthinksauctionshavebeenshowntonotworkuntilthereisamarketdevelopedandthinksitistooearlyforEVNtogotoauction.EventheWorldBankiscomingtotheconclusionthatEVNcan’tbereadysoonforauctions.Alternativesaretohaveauctionsbutwithaminimumsharesetasideforwindandsolar;lowerrenewablefeed-intariffswithstrongercontractualcertaintythatoutputwillbebought;ortohaveatrulyneutralpartymanagetheauctions.Ofthethree,perhapsalowerfeed-intariffwithafirmcontractwouldbepreferredbydevelopersinthenextfewyears.
IfVietnamdecidesitwantstomovetowardsahighproportionofrenewableenergy,asothercountriesaredoing,itshouldfindawaytosigncontractsthatattractinternationalfundingandreapthebenefitsoflongertermloansandlowerinterestrates,atleastfromExport-ImportBanks.Ifitiscontentwithasmallfractionofrenewableenergy,itwillmaintainthecurrentpracticeofsigningcontractsthatputmoreuncertaintyonthedeveloperandlenderatthecostofexcludingmostinternationalfinancialparticipation.Butthenrenewableenergywillbemoreexpensivethanitmightbeandalsomoreexpensivethancoal,atleastatcurrentsolarpanelcosts.
3. Fortransmissionlinesconnectingthesolarorwindprojecttothenationalgrid,variousremediesexist.Thegovernmentmighttakeoverlandacquisition
![Page 18: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/18.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
17
responsibilityand/orpayforthefirstseveralkilometersoftransmissionlinesorcost-sharewiththedeveloper.Havingsmallerprojectsclosetoeachothersharingasingletransmissionlineisalreadybeingexploredandisanotherstepthatwouldlowertheeffectivecostofrenewableenergy.Ifthecostcomeinat4-6centsperkWh,thatwouldbecheaperthanthecurrentfixedcoalprice–thoughthevariablenatureofrenewablepowerimposesextracostsonEVNrelativetothermalorhydro,whichcanbecalleduponasneeded.ItislikelythatifEVNfollowedIndiainpredictingtheamountsofrenewableenergyandsettingtheircoal,gasandhydrotocombinewithrenewableenergyasitbecameavailable,itwouldbepossibletoutilizemuchmorerenewableenergyatareasonablecostthaniscurrentlyplannedfor,especiallyinthesouth.
AnimportantaspectofrenewableenergyinVietnamisthatmanyofthebestsolarandwindlocationsareinthesouthernthirdofthecountry.Thislieswithinaregionthathasarelativelyhighshareofoffshoregasandhydrosourcedenergyrelativetocoal.Sincegasandhydrocanbecycledupordownmorequicklythancoalcan,theyworkbetterwithrenewableenergy.Whilethisbynomeanseliminatesthechallengesassociatedwithintegratingrenewableenergy–therewouldstillhavetobeanupgradedgridtocarrymorepower–itshouldmakeiteasiertomanagetheintegrationatareasonablecost.
IfEVNfoundithardtoinvestenoughorrapidlyenoughinthegrid,itcould(ifallowed)welcomeforeigninvestmentasaminorityinterestinupgradedtransmissionlines.Thecontractwouldallowatransmissionfeeforaspecifieddistanceandamount,payabletotheforeigninvestor.ControlcouldremainwithEVN.TheFDIordomesticprivateinvestmentcouldincludebatteriesorotherenergystoragewhichwouldhelpstabilizesupplyandextendtheavailabilityofsolarandwindbeyondtheperiodswhentheyaregenerating.Suchstoredrenewablepeakperiodsupplywillsoon,ifnotalready,becheaperthankeepingseldom-usedexcessthermalcapacity.Dieselpower,forexample,costsmorethan25centsperkWh.
AnotherissuerelevanttotheSouth,butalsotootherregions,istoallowDPPAordirectsalesofgreenenergytofirmsthatprefertobuyit.Manyforeigncompanieswanttoreducetheircarbonfootprintandarewillingtopayextraforthat.Ifasolarorwinddeveloperorgroupcouldsendtheirenergytoawillingbuyeratanegotiatedpriceandwheelingfee,thatwouldhelpspeedthedevelopmentofcleanenergyandinvestmentinthegrid,sinceEVN(andanyforeignpartnersinthegrid)couldbepaidforsuchtransport.Suchdirectsalesrequirenogovernmentmoneyandcouldbeasimpleregulatorychange.
Similarcommentsapplytoallowingsalesfromrooftopcollectorsinapartments,industrialorofficebuildingstonearbyconsumersinacompactarea,suchasanindustrialzone.Currentregulationsdiscourageorevenprohibitrooftopcollectorsalesexcepttothegrid.Allowingdirectsalescouldgenerateseveralthousandmegawattsofelectricitywithnopublicspending–estimatesarefor6GWinHCMCalone.Sincemany
![Page 19: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/19.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
18
othercountrieshavebeenabletoissuesupportiveregulations,itwouldbesurprisingifVietnamcouldnotdothesame.
GasComparedtoCoalforBaseloadGenerationInglobalgenericanalysis,thecostsofcoalandgas-firedelectricityaresimilar.17CoalisattractingfavorableinvestmentstermsfromChina,JapanandSouthKoreaastheyscaledowninvestmentathomebutlookforinternationalmarketssuchasVietnamandthePhilippines.InVietnam,itappearsthatgas-firedelectricityusingLNGissomewhatmoreexpensivethancoalifonlyEVN’sfinancialcostsareconsidered,thoughitisnotclearwhycostsarehigherthaninotherLNGimportingcountries.
TheWHOin2018releasedastudy18finding60,000excessearlydeathsinVietnamin2016duetoairpollution.Whilecoalburningsignificantlycontributestothattotal,sodovehicles,industrialproductionandevenagriculturefromburningwastes.However,increasingcoalburningwouldcertainlyaddtothetotalairpollutionandthusdeathanddisease.AnotherstudyexaminedplanstoincreasecoalburninginSoutheastAsiaandpredictedalmost20,000deathsayearinVietnamfromcoalby2030.19
Thereisnodoubtthatcoalburninghasahigherhealthandenvironmentalcostthangas.Therearelittleornoparticulateemissionsfromnaturalgasandnitrogenandsulfuroxideemissionsarealsolower.20(Ofcourse,carbonpollutionisalsoless,butthatismoreofaglobalproblem.)Pendingfutureresearch,itwouldbereasonabletoconcludethatthelocalpollutioncostsofcoalarehigherthangasandwouldmakethetotalcost(financial+pollution)higherforcoalrelativetogas.SincegascanbeimportedascoalisnoworproducedinVietnamifoffshoredepositsaredeveloped,itisoroughttobeconsideredasapreferablecompetitortocoal,especiallygiventheconcernofthepublictowardsnewcoalplants.Sincegasisbothusedforbaseloadandquicklyresponsivetochangesindemandorrenewablesupply,itisastrongcontendertobealargerpartoftheenergymix.ThisisthedirectionChinaistakingalready.However,ultimatelyitisthe
17https://www.lazard.com/media/450337/lazard-levelized-cost-of-energy-version-110.pdfEvenif$3perthousandcubicfeetisaddedtotheUSgascost,thatbringstotalgas-firedelectricitycostsupto6centsperkWh,stilllessthancoal.Thecostofgasrelativetocoaliscriticalindeterminingwhichischeaperinfinancialterms.18http://www.wpro.who.int/vietnam/mediacentre/releases/2018/air_pollution_vietnam/en/19https://pubs.acs.org/doi/pdf/10.1021/acs.est.6b0373120TheUnionofConcernedScientistswrote:“Cleanerburningthanotherfossilfuels,thecombustionofnaturalgasproducesnegligibleamountsofsulfur,mercury,andparticulates.Burningnaturalgasdoesproducenitrogenoxides(NOx),whichareprecursorstosmog,butatlowerlevelsthangasolineanddieselusedformotorvehicles.DOEanalysesindicatethatevery10,000U.S.homespoweredwithnaturalgasinsteadofcoalavoidstheannualemissionsof1,900tonsofNOx,3,900tonsofSO2,and5,200tonsofparticulates[7].Reductionsintheseemissionstranslateintopublichealthbenefits,asthesepollutantshavebeenlinkedwithproblemssuchasasthma,bronchitis,lungcancer,andheartdiseaseforhundredsofthousandsofAmericans.”Foundat:https://www.ucsusa.org/clean-energy/coal-and-other-fossil-fuels/environmental-impacts-of-natural-gas#.W8TwG_lReUk
![Page 20: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/20.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
19
governmentthatsetstherelativepriceofuntaxedcoalandheavilytaxedgas,whilethepublicabsorbspollutioncosts.21
Theotheraspectofgasisthatasingle-cycleunitcanbeinstalledinlessthanayearandacombinedcycle(moreefficient)unitintwoorthreeyears.Thisallowssupplytobematchedmorecloselytoactualdemandandreducestheriskofoverbuildingduetoaglobalslowdown,shifttoservicesthatuselesselectricity,greaterefficiencyorgreaterroleofcheaprenewableenergy.SeeAppendix1forexamplesofwhygasand/orrenewablesourceshavelessriskthancoalinafinancialsense.
SUMMARY-OPTIONSFORTHEFUTUREDemandVietnam’sPDP8shouldreexaminerevisedPDP-7thatprojectselectricitydemandtogrowat8.8%from2018to2030.Electricitydemandwouldjumpinthatplanfrom208GWHin2018to569GWHin2030.Vietnam’spercapitauseofelectricitywouldrisefromabout2200in2018to5400kWhpercapitain2030.HongKonghadelectricityconsumptionoflessthan6000kWhpercapitain2017–whenitspercapitaincomewas$60,000.Vietnam’sPPPGDPpercapitaislessthan$7000andmaydoubleinthenexttwelveyears.Isitreasonabletoapproachpercapitaelectricityconsumptionlevelsofaneconomyseveraltimesricher?
Again,itwouldbereasonableforVietnamtoaimforelectricitydemandgrowthaboutequaltoGDPgrowth.At7%ayeargrowth,totalelectricityproductionwouldgrowtoonly468GWH,saving101GWHcomparedtobusiness-as-usual.Percapitademandwouldstillrisesharplyto4400kWh,whileVietnam’sPPPGDPpercapitawouldbeinthe$14-$16thousandpercapitarangeby2030.Amajordecisionpointisifelectricitydemandshouldgrow“asusual”orslowdowntoreflectthenearlyuniversalexperienceofotherAsianeconomies.
Inordertoencourageenergyefficiency,EVNshouldideallyraisethepriceofretailelectricitytoreflectthecostofnewproductionanditsdelivery.Thisislikelytobe10-12centsperkWh,thesameasThailand’sutility.Gettingthereeventuallyismoreimportantthantryingtogettherefast.Veryrapidelectricitypriceincreasesgeneratedissatisfactionandaredifficulttoimplement.Singledigitannualpriceincreasesinpercentageterms,somewhathigherthanintherecentpast,arelikelytobeacceptableifcombinedwithanexplanationthatEVNischoosingcleanersourcesofenergyandthepriceforinitialkWhuseremainslowerforthedisadvantaged.Simplyannouncingthatelectricitypriceswillriseslowlybutsteadilywillsignaltobothhouseholdandindustrialconsumersthatitwillpaytoinvestinmoreefficientequipment.Helpingwithinformation,labeling,andevenloansforsuchequipmentwillhastenitsadoption.ThereareampleexamplesofsuccessfulconservationprogramsinChinaandothercountries.
21Coalhashistoricallybeenuntaxedorlightlytaxedwhilegashashistoricallybeenmoreheavilytaxedduetoitsprofitability.Thishabitcouldbere-evaluatedsoequaltaxationofthermalvaluesallowedefficientdecisions.
![Page 21: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/21.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
20
CombininggentlebutpredictablepriceincreaseswithnudgesandinformationwouldhelpVietnam’selectricitydemandslowdownanditsefficiencyrise.
SupplyEvenwithslowergrowth,alotofnewcapacitywillbeneeded.EachnewPowerDevelopmentPlanwillconsidercoal,gasandrenewableenergy.Ifrenewablecosts,particularlyforsolar,continuetodeclinerapidly,therenewablepriceadvantage(withsupportivepolicies)willgrowovertime.22Ifapoliticaldecisionweremadetooptforhighersharesofrenewableandgas-firedelectricityrelativetocoal,itisunlikelythatsystem-widecostsafter2020wouldbeverydifferentinfinancialterms.Withpollutioncostsandfinancialuncertaintyconsidered,achoicethatreducescoal’srolewouldcertainlybelesscostlyandlessrisky.
Attheveryleast,Vietnammayaskitselfwhyitisalmostaloneamongitsneighborsinchoosingapaththatheavilyusesafuelmoreassociatedwithpreviouscenturiesandwidespreadpublichealthproblemsthanwithfutureenergyuseinmiddle-incomeeconomies.
Apointnotalwaysincorporatedincomparingrenewableenergywithcoalisthetimetocompletion.Oncelandaccessissuesaresettled,itisquitepossibletoimplementasolarorwindprojectwithinoneyearorevenless.Agreen-field(newsite)coalplantwilltakeatleastfouryearsandoftenfiveormore.Thus,anuncontesteddecisiontobuildanewcoalplantnowwillresultinavailableenergyin2022or2023.Itcouldtakeevenlongeriftheprovinceobjectstothecoalplant.Adecisiontobuildevencheaperrenewableenergyearlyin2021willresultinpoweravailableinlate2021.Thefuture(andlower)priceofrenewableenergyshouldbecomparedtothecurrentpriceofcoalplants.
ItislikelythattheworldwillfaceaneconomicslowdownthatwoulddepressVietnam’sexportsandoverallgrowthrate.Beingabletoadjustelectricitysupplytodemandbydelayingshort-cyclecapacityadditionslikerenewables(andtoalesserextentgas)ratherthanbeingcaughtinalong-termcoalinvestmentcyclewouldsaveEVNandthenationasignificantamountinavoidedcosts.ThisfactorisalreadyevidentinbothChina–wherecoalgeneratorsrunlessthanhalfofthetime–andalsoinIndia.23Notethatwhencoal,withitshighfixedcosts,runsatalowcapacityutilization,thecostper
22Batteryandotherkindsofenergystoragecostswillalsofall–thesehelpmakerenewableenergymorereliable,evenafterdarkorwhenthewindisstill.Inthenextdecade,renewableenergywillbemuchmoresmoothlyandreliablysuppliedthanitisnowoveralongertimeperiodwithbatteriesorotherstorage.See,forexamplehttps://about.bnef.com/blog/tumbling-costs-wind-solar-batteries-squeezing-fossil-fuels/23https://www.reuters.com/article/us-china-power-capacity/china-suspends-new-coal-fired-power-plants-in-29-provinces-report-idUSKBN1880P4statesthatin2016,averagethermalgeneratingplantsinChina,mostlycoal,operated4165hoursayearorat47.5%ofpotential..Accordingtohttps://eneken/ieej.or.jp/data/7498.pdfInIndia,thecoalcapacityutilizationin2016was56.7%,downfrom77.5%in2010accordingto“ATaleofThreeCoalMarkets”byJ.NakanoandS.Ladislaw,CSIS,March2018,p.21
![Page 22: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/22.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
21
kilowatt-hourgeneratedrises.Thiscouldmakecoalevenmoreexpensive.(See“Box”oncoalinappendix1.)
Ifrenewableenergydoesgrowrapidly,therewillhavetobesignificantupgradestothephysicalcapacityofthegridandalsotoitsabilitytocarryandincorporateinformationaboutvaryingsupplyanddemandlevels.Budgetingforseriousgridinvestments,predictivemodelingandenergystorageispartofatransitiontoacleanerenergymix.ItwouldalsohelppoorprovinceslikeLaiChau.Thereare18hydroprojectswaitingfortransmissionlinessotheycanstartconstruction.Thepoorprovincewouldgetconstructionjobsandincomefromtheimprovedgrid–andprivateinvestorswouldfundthedams.
Ifinvestmentsaremadeinthegridandstorage,EVNwouldhaveincentivestobuyrenewableenergyandhydroelectricityfirst.Themarginalcostsofsolar,windandhydroareclosetozeroandevenapricebelowfourcents,themarginalcostofcoal(fuelandvariablemaintenance)isstillagainfortherenewabledeveloper,whileapricebelowfourcentsisalossforthecoalplant.Thereisalsonopollutionfromrenewableenergyandhydro,whiletherearesignificantcoststodisposingproperlyofash,controllinglocalairpollution,andtheimpactonlocalwatersupplies.Takingbothfinancialandexternalpollutioncostsintoaccount,EVNandVietnamwouldbebetteroffcallingonrenewableandhydropowerfirstandlimitingtheamountofpowerthatisnotdispatched(used)whenitisavailablefromcleansources.ThechoicebetweencoalandgasismorecomplicatedandshouldbeapproachedasaLevelizedPriceofElectricitymodelingtobedeterminedbyavarietyoffactors,includinglocalpollutionlevels,costs,taxrevenues,availablesupplyandlocaldemand,andbaseloadadjustabilityofthevariousplants.AnimportantcomplicationisthatEVNmayhaveenteredintolong-termcoalpurchasecontractsandthesewillincreasethecostofnotusingcoal.However,curtailingnewcoalinvestmentswillhelpallowexistingplantstoproducewiththeircontractswhilelimitingfutureliability.
Theexpansionofgridcapacityandimprovingtheagilityofthegridtorespondtodemandandsupplyfluctuationswillnotbecheap.Foreignandtoptierdomesticcompanies,couldpartnerwithEVNtoinvestingridupgradingandstorageiffirmcontractswerewrittentorewardhigherelectricitytransmissionvolumesandstorageforpeakperiods.ThiscouldspeedtheabilityofEVNtosignfirmsupplycontractswithsolarandwinddevelopers.24Iffirmcontractsweresigned,thefeed-intariffshouldbelowertoreflectreducedrisks.Therewillbeachancetoreassessfeed-intariffsafterJune2019.
24Anotheroptionwouldbeforaprivatefirmtobuildtransmissionlinesfromprojectstousersandnegotiatewiththesolar/windproducer(whichcouldbeitself)andtheconsumer.Thisoptionwouldrequireachangeinlaw.
![Page 23: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/23.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
22
Ifsensiblestepsaretakentoreducerenewablecoststothoseofothercountries,alargeamountofincrementalpowercouldcomefromsolarandwindbythe2020’s.Ifthisiscombinedwithseriousefficiencypolicies,itislikelythatamuchmoremodestroleforcoalandgaswouldbeneededevenwhilecontrollingcostsandimprovingpollutionemissions.Theargumentthatrenewableenergyistoouncertainandexperimentalisnolongervalid,thoughchangesingridinfrastructureandmanagementwouldbeneededtomakethetransitiontoreliable,cleanerandultimatelycheaperenergy.ThequestionisifVietnamwishestomakethetransitionasfastasotherAsianeconomiesormoreslowly.
TheCostsofaHighFeed-InTariff
Highfeed-intariffsarejustifiedifatechnologyisjustgettingstartedorifinstitutionalcostsarehighandscareoffpotentialinvestors.InVietnam,thedecisiontooffersolarelectricitypricesmorethandoubleIndianauctionpriceshasfalselypersuadedmanyinEVNthatsolaristoocostlyandexperimentalforlargescaleuse.Italsogivestheopportunityandincentiveforgovernmentofficialstorequiredeveloperstopaytogetonapprovedprojectlists.Ingeneral,honestgovernmentcomesnotonlyfromenforcinglegalproceduresbutalsocreatingconditionsthatdonotcreate“rents”orexcesspotentialprofitsthatareselectedbyadministrativedecisions.Ifalowerfeed-intariffiscombinedwithseriousstepstoreducecostsforlandandcapital,therewouldbelessexcessprofitandlessopportunitytodemandsidepayments.Ultimately,fairauctionsareasolution,afterastablemarketmechanismisdeveloped.Endingthehighfeed-intariffafterJune2019iswiseandshouldbefollowedbyjointeffortstolowercostsandimprovecertaintyofcontracts.
![Page 24: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/24.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
23
BIBLIOGRAPHY
SynthesisReportonSocio-environmentalImpactsofCoalandCoal-firedPowerPlantsinVietnam,MinhHa-Duong,AnHaTruong,HongNamNguyen,HoangAnhNguyenTrinh,2016foundat:https://hal-enpc.archives-ouvertes.fr/hal-01441680
BurdenofDiseasefromRisingCoal-FiredPowerPlantEmissionsinSoutheastAsia,1/12/2017,EnvironmentalScienceandTechnology,S.Koplitz,D.Jacob,M.Ulprizio,L.Myllyvirta,C.Reidat:https://pubs.acs.org/doi/pdf/10.1021/acs.est.6b03731
VietnamPowerDevelopmentPlanfortheperiod2011-2020:HighlightsofthePDP7revised,GIZ,2016,http://www.gizenergy.org.vn/media/app/media/legal%20documents/GIZ_PDP%207%20rev_Mar%202016_Highlights_IS.pdf
BPStatisticalReviewofWorldEnergy,June2018,67theditionfoundat:https://www.bp.com/content/dam/bp/en/corporate/pdf/energy-economics/statistical-review/bp-stats-review-2018-full-report.pdf
Lazard’sLevelizedCostofEnergyAnalysis,v.11.0,November2017foundat:https://www.lazard.com/media/450337/lazard-levelized-cost-of-energy-version-110.pdf
Lazard’sLevelizedCostofStorageAnalysis,v.3.0,November2017foundat:https://www.lazard.com/media/450338/lazard-levelized-cost-of-storage-version-30.pdf
FossilPowerPlantCapacityUtilizationRateFallinginChina,LuZheng,EnergyDataandModelingCenter,July2017athttps://eneken.ieej.or.jp/data/7498.pdf
TumblingCostsforWind,Solar,BatteriesAreSqueezingFossilFuels,BloombergNewEnergyFinance,3/28/2018at:https://about.bnef.com/blog/tumbling-costs-wind-solar-batteries-squeezing-fossil-fuels/
“SolarLeaderChinaisSlashingItsSubsidiesonSolarPower–WhatYouNeedtoKnow,Forbes,6/18/2018,JillBakerat:https://www.forbes.com/sites/jillbaker/2018/06/18/solar-leader-china-is-slashing-its-subsidies-on-solar-power-what-you-need-to-know/#5d1b2b7d2f9a
ATakeifThreeCoalMarkets:CommonChallengesandUniqueAttributesofU.S.,ChineseandIndianMarkets,CSIS,March2018,J.NakanoandS.Ladislawat:https://www.csis.org/analysis/tale-three-coal-markets
“GreeningtheGrid:PathwaystoIntegrate175GWofRenewableEnergyintoIndia’sElectricityGrid”–VolumeI,NationalStudy,June2017,IndiaMinistryofPowerandUSAID;ExecutiveSummaryat:https://www.nrel.gov/docs/fy17osti/68720.pdf
“EnvironmentalImpactsofNaturalGas”,UnionofConcernedScientists,foundat:https://www.ucsusa.org/clean-energy/coal-and-other-fossil-fuels/environmental-impacts-of-natural-gas#.W8TwG_lReUk
![Page 25: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/25.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
24
“TheMadeinVietnamEnergyPlan:ExecutiveSummaryandRecommendations”November,2016,astudycommissionedbytheVietnamBusinessForumfoundat:https://www.auschamvn.org/wp-content/uploads/2016/10/Made-in-Vietnam-Energy-Plan-MVEP-v12.pdf
![Page 26: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/26.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
25
Appendix1:RisksAssociatedWithCoal
OneofthemajorrisksassociatedwithcoalinIndiaandChinanowisthatthecoalgeneratingplantsarebuiltinanticipationofdemandthatdoesnotdevelop.Ittakes4-6yearstobuilda“greenfield”plantandthatrequiresprojectingelectricitydemand.Asefficiencyimproves;aseconomiesshiftmoretoservices(whichuselessenergy);asChina’sgrowthslowsdown;andasrenewablesourcesprovidelow-costcompetition,theutilizationratioofcoalgeneratingplantsfalls.InIndia,theutilizationofcoalplantsfellfrom77.5%in2010to56.7%in2016/17.OnaverageChina’scoalstationsoperatedatlessthanhalfofcapacityin2016.Thisraisestheaveragecostofcoal-firedelectricitysincefixedcapitalandmaintenancecostsmustbespreadoverfewerkilowatt-hoursofproduction.Ifaplausiblecapitalandfixedmaintenancechargeof$200perkWofcapacityperyearistaken,fallingfrom80%to50%utilizationraisesfixedcostsby1.8centsperkWh.Themarginalcostofhydro,windandsolariseffectivelyzero,sooncetheircapacityisbuiltitisonlyrationaltousethosesourcesfirstifthegridisabletotakethepowertowhereitisneeded.(ForeignBOToperatorsofcoalplantsmaylobbyforpriorityinsupplyingEVNiftheyhaveinvestedincoalplants.Thisintroducesapoliticalcomplicationbeyondthescopeofthispaper.)
Asacountrybecomesmiddle-income,thepublicbecomesmoreconcernedwithpollution.IntenseresistancetonewcoalplantsisalreadyevidentinthesouthernpartofVietnamand,attheveryleast,thisincreasesdelaysandcostsofanewcoalplant.Asfurtherevidenceofpublichealth,ashdisposal,andairandwaterpollutionissuescometolight,thisresistancewillincrease.EvenEVNmaybegintoworrythatitwillhavetofixtheashstoragesitesthatwillcoverthousandsofhectares.TherecordofJapan,SouthKorea,TaiwanandChinaareclearevidencethatthisisarisk.Allofthemarereducingorstabilizingcoaluse.ThelocalpollutioncostsofcoalinVietnamarelikelytobeseveralcentsperkWh,thoughmoreresearchisneededtoconfirmifVietnamissimilartoothercountriesinthisregard.India,withasimilarpercapitaincome,putcoal’sexternalcostsat2-3centsperkWh.
TheOctober2018releaseofaUNclimatestudyfoundthatthecostandthreatsofrisingglobaltemperatureswillgrowtoalarminglevelsby2030unlessstrongactionistakenraisesthelikelihoodofsomecollectiveinternationalactiontoreducecarbonemissions.ItistruethatVietnamhasverylowpercapitacarbonemissionsandshouldnotpayforthemistakesofothercountries.Ontheotherhand,aninternationalagreementthatrequiresallcountriestoimposeacarbontaxoritsregulatoryequivalentisbecomingmorelikely.Evenifthetaxiscollectedandspentlocally,thecostofcoal-firedelectricitywouldrisebyseveralcentsperkWhinmostplausiblescenarios.Thisiswhymanywesternbanksandinvestorsarenotwillingtofinancenewcoalplants–thereistoomuchfinancialrisk.(Each$10pertonofCO2taxaddsonecentperkWhoftaxtocoal-firedelectricity.Carbontaxesof$20to$50atonarelikelyiftheyareimposed,thoughtheUNReportarguesforevenhighercarbontaxes.)
Finally,thereisariskfromimportingcoal.Willaninternationalcarbontaxbeappliedatthepointofexport?Willnationaldecisionstoreducecoalproductiondriveupprices?Whatifthecurrencydepreciatesandcoalpricesjumpintermsofdong?Theserisksarenotonesthathavetobetakenifefficiencygrowsorlocalgasdepositsaredevelopedorifsolarpanelsareused–oncepaidfor,thereisnofurtherdrainofforeigncurrency.
![Page 27: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/27.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
26
Appendix2:EvenGeneralElectric(GE)GetsItWrong
GEisamajorUScompanythathelpedcreatetheelectricageandisamajorproducerofgeneratingequipmentforcoalandgas.Itsstockpricehassufferedinspiteof7500gasturbinesworld-wide,whichshouldbeabaseforprofitableservicecontracts.Butitsstockpricehasplummetedfrom$30to$7ashare.Why?
AccordingtoastoryintheOctober31,2018NewYorkTimes:
“Energyefficiencyprogramsandrenewablesourceslikesolarandwindhavebothexpandedanddroppedinpricefasterthananticipated.Andfurtheradvancesinbatterytechnologycouldmakerenewablesconsistentlyreliableratherthandependentontheweather.Theseforceshavepromptedutilityexecutivestoholdoffnewordersforgasturbines,afteryearsofgrowth.Thedemandforgas-turbinepowergenerationthisyear[2018]willbemorethan40%lessthanin2016,analystsestimate.”(Emphasisadded]
GE’sexperiencesuggeststhatenergyefficiencyandrenewableenergycancauselargedeclinesintheneedforthermalenergy–evengas-firedelectricitywhichisdisplacingcoalintheUSduetofracking(awayofdrilling)andtheresultingcheapnaturalgasthatmakesevennewercoalplantslesscompetitive.ButthisisnotjustaUSphenomenon–itishappeningacrosstheglobe.Whencompaniesfacemarketforces,theyhavetoadjusttonewtechnologicalandeconomicrealities.IfEVNrespondedtothesamepressures,itwouldnotplanforexpansionofelectricpowerinthewayitdoes.ApoliticaldecisionisneededtopersuadeEVNtorespondmoretomarketforces,thoughbetterpolicytowardsrenewableenergyandelectricitypricingwouldbeneededaswell.Lessgrowthinelectricity,usedmoreefficientlyandproducedinacleanerway,wouldendupbeingcheaperforVietnamthanthealternative.
![Page 28: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/28.jpg)
Vietnam’sCrisisofSuccessinElectricity December2018
27
Appendix4:AnnualGrowthRateinCoalUseofMajorAsianConsumers,2012-17
(“Major”consumersusemorethan10milliontonsin2017;Globalconsumptionofcoaldeclined.)
Declining: Australia,China
SlowIncreases: Indonesia–1.6%ayear Japan–0.8% SouthKorea–1.4% Taiwan–0.8% Thailand–2.0%Moderateincreases: India–5.1% Malaysia–4.7%FastIncreases: Philippines–10.2% Vietnam–11.9%
Appendix3:TheRealPriceofElectricityinVietnamFellfrom2010to2016
Vietnamhasdecidedtochargelessthanthemarginalcostofgeneratinganddistributingtheelectricityitsells.Instead,itchargessomethingclosetotheaveragecost,usingcheaphydroelectricprojectstooffsetthehighercostofnewthermalunits.Mostcompetitivecompanieschargethecostofincreasedproductionplusdistribution,becauseotherwisetheywouldlosemoneyastheyaddedmorehigh-pricedcapacity.
However,VietnamdoesnotjustunderchargecomparedtootherASEANutilitieslikeEGAT,theprofitableThaiutilitythatcharges12cents(plustaxes)perkWhtoEVN’s7.5cents.Itoftenactuallylowerstherealpriceofelectricity!In2010,EVNreported96.4trilliondonginnon-financialrevenueandsold91.7billionkWhforapriceof1051dongperkWh.In2016,revenueroseto268.4trillionwhilesalesjumpedto178.6billionkWh.ThepriceperkWhin2016was1503dongperkWh.However,inthattimeperiod,theGDPdeflatorrose47%.Inrealterms,theelectricitypricein2016(aftercorrectingforinflation)was1020dongperkWh.Oversixyears,realpricefell.(TheGDPpriceindexrosefrom100in2010to147.4in2016.)
Wedonothaveauditedreportsfor2017and2018,buttheestimated2017pricewas7.5centsperkWh,orabout1670dongperkWh.Inrealterms,thatis1090dongperkWh.So,insevenyearstherealpriceofelectricityroseby½of1%ayear,whilethecostofelectricitylikelyincreasedmoreasVietnamhadtoswitchtoimportedcoalonnewplantsandtheshareoflowcosthydrofell.IfVietnamhadmanagedtoincreasethepriceofelectricityby3%ayearinrealterms,EVNwouldbeinastrongerpositionandfinancinggridandcapacityexpansionwouldbemucheasier.Conservationwouldhavegrownandpollutionwouldbeless.
![Page 29: Vietnam’s Crisis of Success in Electricity · Vietnam’s Crisis of Success in Electricity Options for a Successful Clean Energy Mix This policy note was written by David Dapice](https://reader030.vdocuments.us/reader030/viewer/2022040811/5e53fe57af0f414488076287/html5/thumbnails/29.jpg)
A publication of the Ash Center for Democratic Governance and InnovationHarvard Kennedy School79 John F. Kennedy StreetCambridge, MA 02138617-495-0557www.ash.harvard.edu