victoria street jubileebuildings...section 2, phase a landside 1. for information section 2, phase a...

5
Victoria Street Regent Street Royal Bank of Scotland Jubilee Buildings Joe Jennings Demolished Sugarland Hotel Post Office Admiral House Claremount Hotel Car Park Client: AMENDMENTS Drawing Title Job Title Date Drawn By Checked By Job Ref Scale Drawing No Rev. Status Highway Services - Design Ellerslie Depot Crosby Isle of Man IM4 2HA Telephone: (01624) 686681 Date Revision Ref. By QUO QUE CUN CER IS JE STA BIT Reiltys Ellan Vannin Government Isle of Man infrastructure bun troggalys~shirveishyn raaidey highway services NOTES HIGHWAY SERVICES REFURBISHMENT PHASING SEQUENCE SHEET 1 OF 5 DOUGLAS PROMENADE 02 Oct 2019 HW3523 PH01 1:500@A1 F FOR INFORMATION Section 2, Phase A Landside 1. Section 2, Phase A Landside 2. Section 2, Phase B Seaside 1. Section 2, Phase B Seaside 2. Programme Revision 2, 16 Jan 2019 A 25/01/19 KQ DISCLAIMER The plan has been developed from the Contractors Programme and highlights the main construction phases only. Other planned works to upgrade and install new utilities throughout the works are not shown on this plan. These works will be taking place in advance of the main construction tasks and will also require similar levels of traffic management. 0m 20m 40m 60m 80m 100m 150m 200m Programme Revision 3, 27 Feb 2019 B 08/03/19 KQ Programme Revision 4, 1 July 2019 C 01/07/19 KQ Programme Revision 5, 08 Aug 2019 D 22/08/19 KQ Programme Revision 6, 16 Sept 2019 E 23/09/19 KQ Programme Revision 7, 02 Oct 2019 F 02/10/19 KQ

Upload: others

Post on 28-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Victoria Street JubileeBuildings...Section 2, Phase A Landside 1. FOR INFORMATION Section 2, Phase A Landside 2. Section 2, Phase B Seaside 1. Section 2, Phase B Seaside 2. A Programme

V

i

c

t

o

r

i

a

S

t

r

e

e

t

R

e

g

e

n

t

S

t

r

e

e

t

Royal Bank

of Scotland

J

u

b

i

l

e

eB

u

i

l

d

i

n

g

s

Joe Jennings

Demolished

Sugarland

Hotel

Post Office

Admiral

House

Claremount

Hotel

C

a

r

P

a

r

k

Client:

AMENDMENTS

Drawing Title

Job Title

DateDrawn By

Checked By

Job Ref

Scale

Drawing No Rev.

Status

Highway Services - Design

Ellerslie Depot

Crosby

Isle of Man

IM4 2HA

Telephone: (01624) 686681

DateRevisionRef.By

Q

U

O

QU

E

C

U

N

CERIS

J

E

S

T

A

B

I

T

Reiltys Ellan VanninGovernment

Isle of Man

infrastructure

bun troggalys~shirveishyn raaidey

highway services

NOTES

HIGHWAY SERVICES

REFURBISHMENT

PHASING SEQUENCE

SHEET 1 OF 5

DOUGLAS PROMENADE

02 Oct 2019

HW3523PH01

1:500@A1

F

FOR INFORMATION

Section 2, Phase A Landside 1.

Section 2, Phase A Landside 2.

Section 2, Phase B Seaside 1.

Section 2, Phase B Seaside 2.

Programme Revision 2, 16 Jan 2019A

25/01/19

KQ

DISCLAIMER

The plan has been developed from the Contractors Programme and highlights the main

construction phases only.

Other planned works to upgrade and install new utilities throughout the works are not shown

on this plan. These works will be taking place in advance of the main

construction tasks and will also require similar levels of traffic management.

0m 20m 40m 60m 80m 100m 150m 200m

Programme Revision 3, 27 Feb 2019B

08/03/19

KQ

Programme Revision 4, 1 July 2019C

01/07/19

KQ

Programme Revision 5, 08 Aug 2019D

22/08/19

KQ

Programme Revision 6, 16 Sept 2019E

23/09/19

KQ

Programme Revision 7, 02 Oct 2019F

02/10/19

KQ

Page 2: Victoria Street JubileeBuildings...Section 2, Phase A Landside 1. FOR INFORMATION Section 2, Phase A Landside 2. Section 2, Phase B Seaside 1. Section 2, Phase B Seaside 2. A Programme

Chesterhouse

Hotel

Ellan Vannin

Hotel

Gresham

Seaforth

House

Paparazzi

Monaville

Cubbon

House

Falcon

Hotel

Promenade

Methodist

Church

Cunard

Apartments

The Tow

n

House

Loch Hotel

Apartments

Jaks

Bar & Steak

House

Quids

Inn

Mayfair

Bon Fabrics

Kensington

House

Waverley

Apartm

ents

Gloucester

House

Midland

Apartm

ents

Balm

oral

Hotel

Amber

Marina

Hotel

G

ranville Street

Keighley

Apartm

ents

Market Street

Berkely

House

Church Road

Castle Street

Argyle

House

Rochester

Court

Wyndham

Sam Webb's

St Thom

as' W

alk

Marina Road

Client:

AMENDMENTS

Drawing Title

Job Title

DateDrawn By

Checked By

Job Ref

Scale

Drawing No Rev.

Status

Highway Services - Design

Ellerslie Depot

Crosby

Isle of Man

IM4 2HA

Telephone: (01624) 686681

DateRevisionRef.By

Q

U

O

QU

E

C

U

N

CERIS

J

E

S

T

A

B

I

T

Reiltys Ellan VanninGovernment

Isle of Man

infrastructure

bun troggalys~shirveishyn raaidey

highway services

NOTES

HIGHWAY SERVICES

REFURBISHMENT

PHASING SEQUENCE

SHEET 2 OF 5

DOUGLAS PROMENADE

02 Oct 2019

HW3523PH02

1:500@A1

F

FOR INFORMATION

Section 2, Phase A Landside 2.

Section 2, Phase A Landside 3.

Section 2, Phase B Seaside 2.

Section 2, Phase B Seaside 3.

Section 3, Phase A Tram Track Ch 1140 - 700.

Section 3, Phase B Seaside 1.

Section 3, Phase B Seaside 2.

Section 3, Phase C Landside 1.

DISCLAIMER

The plan has been developed from the Contractors Programme and highlights the main

construction phases only.

Other planned works to upgrade and install new utilities throughout the works are not shown

on this plan. These works will be taking place in advance of the main

construction tasks and will also require similar levels of traffic management.

0m 20m 40m 60m 80m 100m 150m 200m

0m 20m 40m 60m 80m 100m 150m 200m

Section 3, Phase C Landside 2.

Section 3, Phase C Landside 3.

Programme Revision 2, 16 Jan 2019A

25/01/19

KQ

Programme Revision 3, 27 Feb 2019B08/03/19

KQ

Programme Revision 4, 1 July 2019C

01/07/19

KQ

Programme Revision 5, 08 Aug 2019D

22/08/19

KQ

Programme Revision 6, 16 Sept 2019E

23/09/19

KQ

Programme Revision 7, 02 Oct 2019F

02/10/19

KQ

Page 3: Victoria Street JubileeBuildings...Section 2, Phase A Landside 1. FOR INFORMATION Section 2, Phase A Landside 2. Section 2, Phase B Seaside 1. Section 2, Phase B Seaside 2. A Programme

The Cavern

Hotel

Angel

Court

The Esplanade

Compton

Court

Clarence H

ouse

No. 8

Esplanade Lane

Empress Hotel

Esplanade Mews

Pandora Apts

Corrib H

ouse

Grosvenor Apts

Beach Lodge /

US Fried Chicken

C

a

s

t

l

e

M

o

n

a

A

v

e

n

u

e

No. 1 / N

o. 2

Flats

The

Richm

ond

Clarence H

ouse

No. 9

How

arth

Crofton H

ouse

Blossm

s

Seafield

Adelaide

No. 8

No. 9 / N

o. 10

Flats

Spectrum

Apartments

Client:

AMENDMENTS

Drawing Title

Job Title

DateDrawn By

Checked By

Job Ref

Scale

Drawing No Rev.

Status

Highway Services - Design

Ellerslie Depot

Crosby

Isle of Man

IM4 2HA

Telephone: (01624) 686681

DateRevisionRef.By

Q

U

O

QU

E

C

U

N

CERIS

J

E

S

T

A

B

I

T

Reiltys Ellan VanninGovernment

Isle of Man

infrastructure

bun troggalys~shirveishyn raaidey

highway services

NOTES

HIGHWAY SERVICES

REFURBISHMENT

PHASING SEQUENCE

SHEET 3 OF 5

DOUGLAS PROMENADE

02 Oct 2019

HW3523PH03

N.T.S

F

FOR INFORMATION

Section 1, Phase A Tram Track Ch 1500-1140.

Section 1, Phase B Seaside 4.

Section 1, Phase C Landside 6.

Section 3, Phase A Tram Track Ch 1140 -700.

Section 3, Phase B Seaside 1.

Section 3, Phase C Landside 1.

DISCLAIMER

The plan has been developed from the Contractors Programme and highlights the main

construction phases only.

Other planned works to upgrade and install new utilities throughout the works are not shown

on this plan. These works will be taking place in advance of the main

construction tasks and will also require similar levels of traffic management.

0m 20m 40m 60m 80m 100m 150m 200m

Programme Revision 2, 16 Jan 2019A

25/01/19

KQ

Programme Revision 3, 27 Feb 2019B08/03/19

KQ

Programme Revision 4, 1 July 2019C

01/07/19

KQ

Programme Revision 5, 08 Aug 2019D

22/08/19

KQ

Programme Revision 6, 16 Sept 2019E

23/09/19

KQ

Programme Revision 7, 02 Oct 2019F

02/10/19

KQ

Page 4: Victoria Street JubileeBuildings...Section 2, Phase A Landside 1. FOR INFORMATION Section 2, Phase A Landside 2. Section 2, Phase B Seaside 1. Section 2, Phase B Seaside 2. A Programme

Queen's

Mansion

Regal

Hotel

Penta

Hotel

P

alace V

iew

T

errace

Palace Hotel

Queen's

ApartmentsAvondale

House

Beresford

House

Sandcastles Nursery

Douglas Bay

Chippy

Client:

AMENDMENTS

Drawing Title

Job Title

DateDrawn By

Checked By

Job Ref

Scale

Drawing No Rev.

Status

Highway Services - Design

Ellerslie Depot

Crosby

Isle of Man

IM4 2HA

Telephone: (01624) 686681

DateRevisionRef.By

Q

U

O

QU

E

C

U

N

CERIS

J

E

S

T

A

B

I

T

Reiltys Ellan VanninGovernment

Isle of Man

infrastructure

bun troggalys~shirveishyn raaidey

highway services

NOTES

HIGHWAY SERVICES

REFURBISHMENT

PHASING SEQUENCE

SHEET 4 OF 5

DOUGLAS PROMENADE

02 Octt 2019

HW3523PH04

1:500@A1

F

FOR INFORMATION

Section 1, Phase A Tram Track Ch 2480-1990.

Section 1, Phase A Tram Track Ch 1990-1500.

Section 1, Phase B Seaside 1.

Section 1, Phase B Seaside 2.

Section 1, Phase B Seaside 3.

Section 1, Phase C Landside 1.

Section 1, Phase C Landside 2.

Section 1, Phase C Landside 3.

Section 1, Phase C Landside 4.

Section 1, Phase C Landside 5.

DISCLAIMER

The plan has been developed from the Contractors Programme and highlights the main

construction phases only.

Other planned works to upgrade and install new utilities throughout the works are not shown

on this plan. These works will be taking place in advance of the main

construction tasks and will also require similar levels of traffic management.

0m 20m 40m 60m 80m 100m 150m 200m

0m 20m 40m 60m 80m 100m 150m 200m

Programme Revision 2, 16 Jan 2019A

25/01/19

KQ

Programme Revision 3, 27 Feb 2019B08/03/19

KQ

Programme Revision 4, 1 July 2019C

01/07/19

KQ

Programme Revision 5, 08 Aug 2019D

22/08/19

KQ

Programme Revision 6, 16 Sept 2019E

23/09/19

KQ

Programme Revision 7, 02 Oct 2019F

02/10/19

KQ

Page 5: Victoria Street JubileeBuildings...Section 2, Phase A Landside 1. FOR INFORMATION Section 2, Phase A Landside 2. Section 2, Phase B Seaside 1. Section 2, Phase B Seaside 2. A Programme

Client:

AMENDMENTS

Drawing Title

Job Title

DateDrawn By

Checked By

Job Ref

Scale

Drawing No Rev.

Status

Highway Services - Design

Ellerslie Depot

Crosby

Isle of Man

IM4 2HA

Telephone: (01624) 686681

DateRevisionRef.By

Q

U

O

QU

E

C

U

N

CERIS

J

E

S

T

A

B

I

T

Reiltys Ellan VanninGovernment

Isle of Man

infrastructure

bun troggalys~shirveishyn raaidey

highway services

NOTES

HIGHWAY SERVICES

REFURBISHMENT

PHASING SEQUENCE

SHEET 5 OF 5

DOUGLAS PROMENADE

02 Octt 2019

HW3523PH05

1:500@A1

F

FOR INFORMATION

Section 1, Phase A Tram Track Ch 2480-1990.

Section 1, Phase C Landside 1.

Section 1, Phase B Seaside 1.

Section 1, Phase B Seaside 2.

Section 1, Phase C Landside 2.

DISCLAIMER

The plan has been developed from the Contractors Programme and highlights the main

construction phases only.

Other planned works to upgrade and install new utilities throughout the works are not shown

on this plan. These works will be taking place in advance of the main

construction tasks and will also require similar levels of traffic management.

0m 20m 40m 60m 80m 100m 150m 200m

Programme Revision 2, 16 Jan 2019A

25/01/19

KQ

Programme Revision 3, 27 Feb 2019B08/03/19

KQ

Programme Revision 4, 1 July 2019C

01/07/19

KQ

Programme Revision 5, 08 Aug 2019D

22/08/19

KQ

Programme Revision 6, 16 Sept 2019E

23/09/19

KQ

Programme Revision 7, 02 Oct 2019F

02/10/19

KQ