  • North American LRV/Streetcar Procurements … since we last met

    Steven C. Apanian, P.E.Vice President, North Central Region

    LTK Engineering ServicesMinneapolis, MN

    Thomas B. Furmaniak, P.E.Senior Director

    LTK Engineering ServicesAmbler, PA

  • • Agency• Carbuilder• Car length (over anticlimbers)• % Low Floor (by vehicle length)• Total fixed seats (+ folding seats)• Purchase quantity• Unit price (less spares, special tools

    and test equipment)• Delivery/in-service year(s)

    Information Presented

  • Light Rail Vehicles

    North American LRV/StreetcarProcurements … since we last met

  • • C-Train• Siemens• 84.8’ (24.8m)• High Floor• 60 seats• 6 cars• $4.0M• 2019

    Calgary

  • • RTD• Siemens• 77.4’ (23.6m)• High Floor• 56 seats• 29 cars• $3.9M*• 2018

    Denver

    * Includes spare parts, tools and special equipment

  • • Edmonton Transit• Bombardier• 133.2’ (40.6m)• 100% Low Floor• 78 seats (+4)• 26 cars• $ n/a (P3)• 2018-20

    Edmonton (Valley Line)

  • • Metro• Siemens• 94.5’ (28.8m)• 70% Low Floor• 64 (+ 8)• 14 cars• $4.7M• 2022

    Houston

  • • MDMTA• CAF• 137.4’ (41.8m)• 80% Low Floor• 40 seats (+ 40)• 14 cars• $ n/a (P3) • 2021

    Maryland (Purple Line)

  • • City of Ottawa• Alstom• 158.7’ (48.4m)• 100% Low Floor• 104 seats (+ 16)• 38 cars•

  • • Valley Metro• Siemens• 88.4’ (27.0m)• 70% Low Floor• 54 seats (+ 12)• 11 cars• $4.8M• 2019-22

    Phoenix

  • • Sound Transit• Siemens• 93.0’ (28.3m)• 70% Low Floor• 66 seats (+ 8)• 152 cars• $4.1M • 2019-23

    Seattle

  • • Metrolinx• Alstom• 158.7’ (48.4m)• 100% Low Floor• 104 seats (+ 16)• 61 cars•

  • Streetcars

    North American LRV/StreetcarProcurements … since we last met

  • • CATS• Siemens• 83.4’ (25.4m)• 70% Low Floor• 52 seats (+ 4)• 6 cars• $6.3M• 2019

    Charlotte

    Onboard Energy Storage

  • • Kansas City• CAF• 77.5’ (23.6m)• 100% Low Floor• 32 seats (+ 6)• 2 cars• $5.2M • 2019

    Kansas City

  • • City of Portland• Brookville• 66’ (20m)• 50% Low Floor• 22 seats (+ 4)• 3 cars (Option in Sound

    Transit contract for Tacoma)

    • $4.5M• 2020-21

    Portland

  • • OCTA• Siemens• 90’ (27.4m)• 70% Low Floor• 54 Seats (+ 16)• 8 cars• $5.5M• 2020-21

    Orange County, CA

  • • City of Seattle• CAF• 75.3’ (22.9m)• 100% Low Floor• 31 seats• 10 cars• $5.8M• TBD

    Seattle

    Onboard Energy Storage

  • • Sound Transit• Brookville• 66’• 50% Low Floor• 22 seats (+ 4)• 5 cars• $4.8M• 2020

    Tacoma

  • • Valley Metro• Brookville• 72’ (22m)• 50% Low Floor• 36 seats (+ 4)• 6 cars• $5.2M• 2020

    Tempe

    Onboard Energy Storage

  • Light Rail VehiclesBoston Green Line (~165 + options)Calgary (70 - Low floor)Hamilton (~22) (P3)Portland (26)Sacramento (20 - Low Floor)… more?

    What’s Next?

  • StreetcarsAtlantaLos Angeles (8-12)Philadelphia (120)Sacramento (6)TampaToronto (60)Washington, DC… more?

    What’s Next?

  • Thank you!

    North American LRV/StreetcarProcurements … since we last met

    Steven C. Apanian, [email protected]

    Thomas B. Furmaniak, [email protected]

    Slide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23