Florida Polytechnic University RFSOQ 2013-001 for Development of Residential Housing Response Proposer Name: Vestcor Communities, Inc.

Upload: truongtu

Post on 03-Jan-2017

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Florida Polytechnic University

RFSOQ 2013-001 for Development of Residential Housing Response

Proposer Name:

Vestcor Communities, Inc.

Page 2: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Table of Contents

Florida Polytechnic University

RFSOQ Response

Tab 1 - Transmittal Letter

Exhibit A - Proposer Summary Sheet

Tab 2 - Financial Information

Tab 3 - Corporate Qualifications

Tab 4 - Experience and Past Performance

Exhibit B - Proposer Experience References

Tab 5 - Personnel Qualifications

Tab 6 - Project Approach

Tab 7 - Business Terms

Page 3: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

TAB 1 – TRANSMITTAL LETTER

Page 4: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

www.vestcor.com

Mr. John T. Gray Director of Special Projects Florida Polytechnic University 439 S. Florida Avenue, Suite 300 Lakeland, Florida 33801 Dear Mr. Gray, On behalf of our entire team, Vestcor Communities is pleased to submit our response to the Request for Statement of Qualifications for Development of Residential Housing (RFSOQ 2013-001). We are proud to provide a proposed solution to the housing needs at the University in these early stages of its development when support is so critical. We are excited about the impressive team we have assembled and the opportunity to develop and operate the inaugural residential housing facility on the campus of Florida Polytechnic University. Our team of Vestcor Communities, Inc., Skanska USA, Ambling Management Company and PQH Group provides the University with a collective group of experience in student housing development that will result in the on-time delivery of a first-class student housing facility that we will all be proud of. Should we be selected, we will embrace this opportunity to be a partner in what will be a successful institution of higher learning. Sincerely,

William L. Morgan President Vestcor Communities, Inc.

The Vestcor Companies 3030 Hartley Road Suite 310 Jacksonville, Florida, 32257 T 904-260-3030 F 904-260-9031

Page 1 of 74

Page 5: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

EXHIBIT A – PROPOSER SUMMARY SHEET

Page 6: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Exhibit A – Proposer Summary Sheet Proposer Name: Vestcor Communities, Inc. Proposer Address: 3030 Hartley Road, Suite 310 Jacksonville, FL 32257 Proposer FEIN: 56-2312405 Proposer DUNS Number: 80-685-2526 Proposer Contact (for purposes of this RFSOQ): Will Morgan, President Vestcor Communities, Inc. 3030 Hartley Road, Suite 310 Jacksonville, FL 32257 Phone: 904-288-7810 Mobile: 904-333-1652 Fax: 904-260-9031 [email protected] Proposer Team Members (if applicable) (financing, design, construction, operation):

1. Vestcor Communities, Inc. Developer Will Morgan, President 3030 Hartley Road, Suite 310 Jacksonville, FL 32257 Phone: 904-288-7810 Mobile: 904-333-1652 Fax: 904-260-9031 [email protected]

2. PQH Group

Architect – Design and Build Services Ricardo E. Quinones, AIA, LEED, AP BD+C 4141 Southpoint Drive East Jacksonville, FL 32216 Phone: 904-224-0001 Mobile: 904-635-1240 Fax: 904-224-0023 [email protected]

Page 2 of 74

Page 7: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

3. Skanska USA General Contractor Matthew Gilbert, Senior Vice President 511 Grove Park Dr. Orlando, FL 32801 Phone: 407-428-0114 Mobile: 407-873-1121 [email protected]

4. Ambling Management Company/Ambling Student Housing

Property Manager Kimberly A. Barkwell, President 110 Ministry Drive, Suite D Irmo, SC 29063 Phone: 866-777-7228 Fax: 229-219-6701 [email protected]

Page 3 of 74

Page 8: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

TAB 2 – FINANCIAL INFORMATION

Page 9: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Financial Information Over the past 30 years, The Vestcor Companies (Vestcor), or affiliates of Vestcor, have procured and participated in excess of $200,000,000 of equity used to acquire, renovate, develop and operate multifamily communities. Throughout this period, Vestcor has built strong relationships with financial institutions and individuals who have invested in these communities. These relationships have enabled Vestcor to raise private funds necessary to develop the residence hall at Florida Polytechnic University.

Attached are the audited financial statements of Vestcor Communities, Inc. (VCI), the Proposer for this RFSOQ. VCI is the student housing development entity for Vestcor. VCI earns development fees during the development process and earns asset management fees during operation of the community. Vestcor also has several other entities, like VCI, that are involved in development, brokerage, and management in other real estate areas. All apartment communities developed by VCI and other Vestcor affiliates are owned in individual limited partnerships. There are currently twenty-five such partnerships, and an affiliate of Vestcor controls and has a significant financial interest in these partnerships. While VCI and other Vestcor affiliated entities similar to VCI are expected to generate a positive cash flow, all of the value and cash flow of the apartment communities for Vestcor is in the limited partnerships. It is not the regular practice of Vestcor to combine the balance sheets, operations, and cash flows of all the Vestcor related entities with footnotes and due to the time constraints of the RFSOQ, we were not able to provide this combination. However, a summary of the estimated fair market value of the assets and equity, revenue, net operating income, and cash flow of the twenty-five affiliated partnerships that own the apartment communities is as follows:

Fair Market Value of Assets: $325,000,000 Equity: $52,000,000 Revenue: $44,000,000 Net Operating Income: $20,000,000 Cash Flow: $6,000,000

Page 4 of 74

Page 10: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Page 5 of 74

Page 11: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Page 6 of 74

Page 12: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Page 7 of 74

afink
Page 13: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Page 8 of 74

afink
Page 14: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Page 9 of 74

afink
Page 15: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Page 10 of 74

afink
Page 16: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Page 11 of 74

afink
Page 17: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Page 12 of 74

afink
Page 18: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Page 13 of 74

afink
Page 19: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Page 14 of 74

afink
Page 20: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

www.vestcor.com

October 4, 2013 Mr. John T. Gray Director of Special Projects Florida Polytechnic University 439 S. Florida Avenue, Suite 300 Lakeland, Florida 33801 Financial Certification Dear Mr. Grey, I, William L. Morgan, as President of Vestcor Communities, Inc., certify that this Statement of Financial Capability, including all attachments, is true and correct to the best of my (our) knowledge and belief. The Florida Polytechnic University is authorized to verify any information contained herein. Sincerely,

William L. Morgan President and Secretary Vestcor Communities, Inc.

The Vestcor Companies 3030 Hartley Road Suite 310 Jacksonville, Florida, 32257 T 904-260-3030 F 904-260-9031

Page 15 of 74

Page 21: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

TAB 3 – CORPORATE QUALIFICATIONS

Page 22: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Corporate Qualifications

Founded in 1983, The Vestcor Companies (Vestcor) is  one  of  Florida’s  largest  owner/developers  of multifamily communities. Drawing on over 30 years of real-estate development experience, Vestcor continues to be a leader in the areas of multifamily investment, development, and management services. Throughout its history, Vestcor has developed and constructed more than 11,000 multifamily rental units and  100,000   square   feet   of   commercial   space.  The   company’s  real-estate developments have spanned the market demographic, including affordable tax-credit and conventional apartments, historic renovations, luxury high rise and affordable condominiums, and purpose-built student housing communities. Most recently, Vestcor Communities, an affiliate of The Vestcor Companies, has leveraged Vestor’s  multifamily  experience in the design, development, and asset management of purpose-built student housing communities. The design of these communities allows us to deliver a very cost effective floorplan that is spacious yet efficient while still offering the most well-amenitized product in the market. Each product developed has received a tremendous reception in each respective market and continues to be operated as a best-in-class property. For this proposal, we have teamed with several key business partners, each of which brings a long history of proven success in the multifamily student housing industry, including a prior track record of working together to deliver successful projects on time and within budget. Our development team members include PQH Group (Architect) and Skanska USA (General Contractor). Working collectively to provide a cohesive blend of creativity, problem solving and practicality, our development team will deliver this project on time. We have partnered with Ambling Management Company to provide property management services.

Page 16 of 74

Page 23: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

PQH Group Corporate HeadquartersJacksonville, Florida

Firm Principals as pictured left to right: Ricardo E. Quiñones,AIA,LEED RAP ; Jose M. “Pepe” Perez, AIA, CGC, LEED RAP,President & CEO; and Robert D. Hoenshel, AIA., LEED RAP

Fast Facts...• Established in 1982• LEED Accredited• Registered in 10 States• MBE State Certified• FDOT DBE Certified• Registered Contractors

As trained problem-solvers, we provide design and constructionsolutions to meet our clients’ needs, be it a complex program, limitedbudget or even building for future growth. To consolidate thedecision process, we offer the following in-house services:

Programming, Master Planning, Architectural Design, InteriorDesign, Space Planning, Building Rehabilitation includingConstruction Services.

Centrally Located...PQH Group, Inc. is centrally located in Jacksonville’s Southpoint Busi-ness District, just off the I-95 and JT Butler interchange. We are minutesfrom downtown and the beaches, and just a short drive from the Jack-sonville International Airport. For more information, you cancontact us at:

4141 Southpoint Drive East, Jacksonville, FL 32216(904) 224-0001 (fax) 224-0023 www.pqh.com

At PQH, we strive to createexceptional environments, exceedour client’s goals and enhance theuser’s quality of life.Everyday experiences in our evolving society serve asour source of inspiration for design. Our staff draws fromthis collective experience, keeping our ideas fresh andinnovative. After over twenty seven years of practice,we understand the extraordinary level of responsibilityeach one of our projects holds; that long after completed,it continues to serve our client’s ever changing needs.

PQH Expertise...Our multi-disciplined team of qualified designprofessionals has been honored to work with clients, bothpublic and private, from across the country. As a whole,our knowledge spans the areas of Commercial,Student Housing, Senior Living, Multi-Family Housing,Mixed-Use, Medical, Educational and Religiousfacilities.

Page 17 of 74

Page 24: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

39 Skanska USA Office Locations

San Juan, PR

Oakland, CA

Portland, OR Seattle, WA

Kalamazoo, MI

Riverside, CACortez, CO

San Antonio, TX

Phoenix, AZ*

Detroit, MI

Cincinnati, OH

Dallas, TX

Boston, MA

New Haven, CTNew York, NY *

Parsippany, NJPhiladelphia, PA

Cape Charles, VA

Virginia Beach, VADurham, NC

Charlotte, NCNashville, TN

Atlanta, GA

Orlando, FL

Tampa, FL

Ft. Lauderdale, FL

Carteret, NJ

Washington, DC *

Houston, TX

Harlingen, TX

Los Angeles, CA*

Evansville, IN

Chicago, IL

Los Angeles*DowntownWest Los Angeles

New York*New York CityMaspethQueens

Phoenix*TempePeoria

Washington DC*Alexandria, VAArlington, VARockville, MD

Our history Incorporated in New York since 1971 Four U.S. business units: USA Building, USA Civil,

Infrastructure Development North America, and USA Commercial Development

39 offices across the country More than 8,300 U.S. employees More than 440 LEED® APs and more than 125

projects that have achieved or are seeking LEED® certification

6th largest general building contractor by revenue (ENR)

Excellent safety record - in 2012, the average industry contractor had more than five lost time incidents for every one experienced at Skanska USA

Among the first U.S. construction firms to have all operations certified under ISO 14001, a global standard for environmental performance

Our financial strength Revenue of $5.8 billion in 2012, representing 30

percent of Skanska’s global revenue Equity of $770 million Strong bonding capacity of $7.5 billion

Our investment Plan to invest approximately $1 billion in

commercial development properties in U.S. cities over the next five years

$1.4 million donated to local charitable initiatives in 2012

Approximately $180 million in U.S. and state corporate taxes paid over the last five years

More than 46 million man-hours put in place annually

Skanska USA Building Overview

Page 18 of 74

Page 25: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Unique Skanska AdvantagesSkanska o!ers a broad array of relevant University housing experience, a high performing team that is already intimately familiar with the unique characteristics of the project site, and a project management/design management platform that optimizes value throughout the delivery of the facility.

Our team has been involved with the development and building of the Phase 1 Classroom facility since early in design, and our “collaborative experts” approach has been key to delivering the design intent and programming goals within the framework of the original budget. We have a culture of mutual accountability and respect for all team members, with the objective of delivering on all of the goals of the client. We will continue this same approach on the delivery of this most important project that will support the development of the campus and the student experience. Our familiarity with the master plan goals and our experience on the classroom building – especially as it relates to driving value into the process of delivering the design – puts us in a unique position to be able to carry forward all of this knowledge to our development partners and bring to fruition the right solution for this very important "rst phase of the housing program for the University.

Our team’s unique knowledge, which will enable us to seamlessly deliver the project by early August, 2014, includes:

Understanding of the subsoil conditions and the rami"cations on design, cost and schedule.

Understanding of the in place-utilities. Our team installed all of them including site gas, TECO electric, Brighthouse and Verizon phone and internet services.

Understanding of permitting agencies- we know our SWFWMD person, we know the City of Lakeland permitting authorities and inspectors, we know the Fire Marshall, and most importantly, we have a very close working relationship with Tom Browning, FPU’s Authority that has jurisdiction over the site.

Understanding of adjacent property- we have a close relationship with Williams Company, the owner of the majority of the surrounding property.

Established working relationship with the civil engineers of record, Anderson Lane and Chastain Skillman (who also performed all site surveying and layout).

Understanding of site access- we developed and execute all logistics plans.

Control of the Site: It is not e#cient for another contractor to be on site working in an area that we control and that has to be "nished as part of our contract. We can better control the use of the housing site and its associated logistical issues, including laydown, parking, work areas, etc. $is is especially important on this project because of the extreme schedule constraints and probable necessity for shi% work.

Subcontractor E#ciency: It will be possible to achieve best value pricing from the subcontractors that are already on site by taking advantage of supervision, other general conditions costs and equipment (i.e. site subcontractor, for example).

General Conditions costs will be minimized because we are already established on site. A new contractor coming onto the job will have to mobilize from scratch.

Overall risk, cost, quality and schedule will be better optimized by our existing team, which has already demonstrated the ability to manage and deliver a complex project with mostly local subcontractors, suppliers and labor.

Florida Polytechnic University Innovation Science and Technology Building

Florida Polytechnic University - Development of Residential Housing Relevant Experience Page 19 of 74

Page 26: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Established in 1997, Ambling Management Company (AMC) is one of the nation's most successful and experienced managers of student housing communities. AMC offers a proven track record and invaluable experience in the student housing industry having directed more than 100 new construction lease-ups across the country in a wide vari-ety of project sizes, university settings and market conditions. Their current portfolio consists of 31 student housing properties in 17 states comprising nearly 19,000 beds in addition to 154 market rate and affordable properties comprising 13,040 units in seven states, totaling 185 properties. These properties represent 33 universities and more than 70 owners across 19 states - all supported by over 900 employees.

Every decision, every strategy, every working moment is centered around two funda-mental questions. How can we increase NOI? And how can we enhance the value of the asset? We take a hands-on, entrepreneurial approach, utilizing the broad range of tools and talents at our disposal. Our management team is finely calibrated to assess, then act, making improvements in a variety of ways. From employing pinpointed marketing, to utilizing cost-effective resident retention programs, from cutting costs in one area to investing in another, all while ensuring resident satisfaction.

We have the systems in place and the depth of experience to quickly develop a strat-egy and plan of action to execute a successful lease up within the critical time period during the academic year even while a new project is under construction. In addition, AMC offers extensive experience in developing and implementing Residence Life Pro-gramming that complements the mission of our clients and student residents and look forward to working with the New Jersey City University (NJCU) to develop a custom solution for this new project.

AMC has adopted a multi-faceted approach to resident programming, blending current student development models and theories. The overall emphasis of the Residential Life Program is to support the academic enterprise through the creation of a healthy living-learning environment which promotes academic and personal enrichment both in and out of the classroom. Our student-centered communities provide accessible resources and promote collaborative efforts with the University that are critical to student success. Programming is developed to complement and supplement the pro-grams already offered by the University in order to meet the specific needs of the students residing in a particular residence hall or apartment community.

As a third-party management firm, AMC is keenly focused on customer service to our clients in order to promote long-term value, asset preservation, and cost efficiency. AMC offers a full range of management services and solutions including superior prop-erty operations management, lease-up management, financial services and reporting, facilities maintenance and operation, residence life programs, acquisitions and due diligence services, professional development and training as well as strategic business and marketing plan development and implementation.

Every university, owner, and financial institution we have the privilege to serve is unique and our continued success is based upon our flexibility to work in a constantly changing environment. AMC believes the most important aspect of providing global business and human capital solutions is to understand the needs of our client, execute our duties as assigned within the management agreement, take care of our residents and be the best relationship managers in the business.

Page 20 of 74

Page 27: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

TAB 4 – EXPERIENCE & PAST PREFORMANCE

Page 28: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Experience and Past Performance Vestcor Communities has assembled   a   team   that   is  well   qualified   to  meet   all   of   the   Project’s  requirements, including having it available for residents to occupy on August 20, 2014. The members of our team, each industry leaders in their respective fields, combine to provide many years of experience and a proven track record in the design, development and construction of student housing communities as well as intimate knowledge of the FPU campus and housing site. Our team also brings a proven track record with one of the leaders in property management to ultimately operate the community efficiently and effectively to ensure a safe, enjoyable atmosphere for all residents.

Vestcor and PQH Group have a history of working together for over 25 years on the design and development of multifamily communities, including each of the student communities developed by Vestcor Communities. A long history of working together with attention to detail and a clear vision for design results in efficient design decisions and ultimate execution of a project. Included on the following pages are representative projects developed by this design and development team each of which were delivered on time and within budget.

Skanska, one of the largest construction companies in the world, is currently the construction manager  for   the  Florida  Polytechnic  University’s   Innovation  Science  and  Technology Building project. Their Residence Hall construction team will easily coordinate all activities with the Academic Building team. This collaboration and knowledge will translate into quick decision making, resulting in a more efficient team and a shorter schedule. Included on the following pages  is  a  representative  selection  of  Skanska’s  vast  University  housing  experience.

Ambling Management Company (Ambling) is one of the industry's most experienced managers of student housing communities. Ambling offers a proven track record and invaluable experience in the student housing industry having directed more than 100 new construction lease-ups across the country in a wide variety of project sizes, university settings and market conditions. Ambling has the systems in place and the depth of experience to quickly develop a strategy and plan of action to market and ultimately manage this property. In addition, Ambling offers extensive experience in developing and implementing Residence Life Programming that will complement the mission of the University. Included on the following pages are four on-campus properties managed by Ambling, which are representative of their portfolio of over 6,600 on-campus beds managed.

Page 21 of 74

Page 29: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Construction Cost:

$26,000,000

Size:

223,000-SF

Completion Date:

2009

Architect:

Ricardo Quinones PQH Group

Management Company:

Ambling

Reference:

John Delaney, President University of North Florida 1 UNF Drive J.J. Daniel Hall Suite 2800 Jacksonville, FL 32224 (904) 620– 2500 [email protected]

The Flats at Kernan Jacksonville, FL

Located directly across from the campus of The University of North Florida, this $26 million student  housing  community  was  the  first  of  the  Flats’  luxury  student  living  brand  developed  and owned by Vestcor. This purpose-built student housing development is a 192 unit 480 bed facility with a separate 10,000 SF Community Center that caters to students enrolled at the University of North Florida, Florida State College, and Florida Costal School of Law. Buildings at this community were delivered in less than 8 months from foundation prepara-tion to final certificate of occupancy. This property is currently 98% occupied.

Quote from UNF President John Delaney on the development of The Flats at Kernan: “As  the  University  of  North  Florida  continues  to  grow,  both  in  size  of  the  student  body  and  the  size  of  the  campus,  private  businesses  surrounding  UNF  become  key  to  its  success”.    

The Flats at Mallard Creek Charlotte, NC

Construction Cost:

$16,400,000

Size:

163,500-SF

Completion Date:

2010 Architect:

Ricardo Quinones PQH Group

Management Company:

Ambling

Reference:

Phillip Dubois, Chancellor UNC Charlotte 9201 University City Blvd. Charlotte, NC 28223 (704) 687-5727 [email protected]

This  $16.4  million  development  was  the  second  of  Vestcor’s  student  housing  communities  and had aggressive deadlines that were met for August 2010 move in. This 131 unit 386 bed student housing community was built in less than 12 months, including sitework. Working closely as a team with PQH Architects and our general contractor through the entire project, we were able to stay ahead of schedule and even incorporate features into our community at a nominal cost that would otherwise be considered upgrades. The community opened for the Fall 2010 semester with a tremendous reception by the students at University of North Carolina – Charlotte. Located less than 1/3 mile from campus, this property has consistently remained fully occupied since opening in 2010.

Page 22 of 74

Page 30: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Construction�Cost:�$10,300,000��

Size:�115,000ͲSF��

Completion�Date:�2012��

Architect:�Ricardo�Quinones�PQH�Group��

Management�Company:�Ambling���

Reference:�Richard�Laliberte��Real�Estate�Director�UNC�Ͳ�Charlotte�9201�University�City�Blvd.�Charlotte,�NC�28223�704Ͳ687Ͳ0560�[email protected]

The Flats at Campus Pointe Charlotte, NC

The sister property to The Flats at Mallard Creek in Charlotte, NC is a 99 unit, 183- bed stu-dent housing community which is also located less than 1/3 mile from campus. This project also had construction timeline challenges to overcome. Working through a harsh winter that was immediately preceded by 75 rain days during sitework, vertical construction started in December 2011 and we received our Certificate of Occupancy on August 13, 2012. Since opening in 2012, Campus Pointe has also remained fully occupied. The occupancy of our properties is a testament to the ongoing sense of community that has been developed by Vestcor and Ambling.

Construction�Cost:�$20,000,000��

Size:�225,000ͲSF��

Completion�Date:�2013��

Management�Company:�Ambling��

Reference:�Brad�Griffin��Planning�Director�AthensͲClarke�County�Unified�Government�120�W.�Dougherty�St.�Athens,�GA�30601�(706)�613Ͳ3515�planning@athensclarkeͲcounty.com��

The newest of Vestcor’s student housing communities was completed in June, 2013 ahead of schedule. Vertical construction of this 225,000-SF facility, which included a two-story park-ing garage, took less than a year. Construction was completed 45 days ahead of schedule, which allowed residents the opportunity to move in early. This 5 story facility is equipped with elevators, internal corridors and trash rooms on every floor, much like the product we have designed for this proposal.

Quote from UGA student Justin Stewart about living at The Flat at Carrs Hill: “The Flats at Carrs Hill has a unique blend of the luxuries you expect in off campus living and convenience of living on campus. With the many amenities available here, there is no reason to leave the property. With its ideal location, getting to class and the attractions in Downtown Athens is a cinch!”

The Flats at Carrs Hill Athens, GA

Page 23 of 74

Page 31: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

ClientFlorida Polytechnic

ArchitectSantiago Calatrava / Festina Lente LLP

Construction Cost$98 million

Size160,000-GSF

Delivery MethodConstruction Management

Completion DateJuly 2014

Why Relevant?Florida Polytechnic

project

Proposed

construction

team is currently

working on this

project

Familiarity with

client and campus

Higher education

Phase I of Florida Polytechnic, designed by architect Santiago Calatrava, consists of the 160,000-GSF Innovation Science and Technology Building. !is facility includes research labs, teaching labs, classrooms, o"ce space, study space, support space, student spaces and common areas. !e two-story structure will also house a large amphitheater that can be used for hosting exhibitions and lectures. Phase I also includes construction of a 5,000-SF Central Energy Plant (CEP). !e CEP will house four 600 ton chillers and four cooling towers. In addition the Technology Hub and Central command room is located within the Plant including all associated equipment that make up the cooling for the Phase I portion of the project.

Calatrava’s design also incorporates an outdoor terrace, shaded by a continuous pergola that provides outdoor learning, gathering and seating areas.

Florida Polytechnic focuses exclusively on STEM education, o#ering undergraduate and graduate degrees as well as online educational programs. !e polytechnic model emphasizes applied learning, research and intensive collaboration with industry and will enhance the economic development in the region. When complete, the building will house upper and lower division interdisciplinary teaching and research, serving as the State’s 12th University and the $rst and only Polytechnic.

Florida Polytechnic Innovation Science and Technology BuildingLakeland, Florida

Page 24 of 74

Page 32: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Construction CostOriginal GMP: $23.8 millionFinal Cost: $24.6 million ( Approved added scope)

Size153,000-SF

Current Phase of DevelopmentComplete

Completion DateAugust 2003

Type of ServicesDesign-Build

Owner Contact Mr. Darryl Ellison (retired)Florida State University850-545-8881

Architect ContactMs. Kristen BoltKBJ Architects, Inc.904.356.3491

Skanska provided design-build services for this new 153,000-SF student residence hall for Florida State University.

!e residence hall contains four, "ve-story buildings with eight apartments per building, to accommodate 540 students. !e four-bedroom units share two bathrooms, a kitchen and a common area.

!e buildings have steep clay tile roofs with precast and brick veneer and stone caps on the walls. !ey also include light gauge trusses, SBS modi"ed bitumen roo"ng, curtain walls, precast stairs, and ceramic tile. In addition, Skanska constructed an open courtyard in the center of the residence hall for the students.

Florida State University New Residence Hall Tallahassee, Florida

East Carolina University College Hill Suites Residence Hall Greenville, North Carolina

Construction CostOriginal GMP: $26.6 millionFinal Cost: $26.9 million( Approved added scope)

Size155,000-SF

Current Phase of DevelopmentComplete

Completion DateJuly 2006

Type of ServicesConstruction Management

Owner Contact Mr. Bill BagnellEast Carolina University 252.328.6858

Architect ContactMr. Scott SullivanBurt Hill215.751.2900

Skanska provided construction management at-risk services for this 155,000-SF, 504-bed suite style residence hall that provides a comfortable and secure place for students to live in an environment that is conductive to learning outside of the classroom.

!e typical suite has a small kitchen space, living /dining area, two bedrooms, and two bathrooms. !e kitchen area has base and upper cabinets for storage, a sink, microwave, and a full size refrigerator. !e living area "ts a small couch and stu#ed chair, entertainment center and a dining table for four. Each bedroom is sized to "t two twin beds, two hanging wardrobes, two dressers/end tables.

Why Relevant?Florida project

Higher education

Residence Hall

Active campus

Why Relevant?

Similar size

Higher education

Residence Hall

Active campus

Florida Polytechnic University - Development of Residential Housing Relevant Experience

Page 25 of 74

Page 33: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Ryan Hall, Notre Dame’s newest women’s residence hall, is a 75,000-SF multi-story facility with a partial basement, 248 new student beds, and a new student chapel. It is located on the southwest side of campus just north of the Hammes Bookstore and it is designed in the collegiate Gothic style that is consistent with Notre Dame’s high-end campus architecture. !is project achieved LEED® Gold Certi"cation.

Other notable credits that are the responsibility of the designer are alternative transportation (bicycle storage), recycling stations in the building, zero VOC’s in all adhesives, paints, and sealants, low-$ow "xtures and plumbing, enhanced commissioning, controllability of lighting/thermal control by use of proximity switches, and ND’s “green housekeeping” program.

University of Notre Dame Ryan Residence HallNotre Dame, Indiana

Savannah College of Art & Design Student HousingSavannah, Georgia

!e new, 290-unit student residence building was designed with two adjoining wings (one 5-story, one 4-story) that are connected by a 6-story common area in order to promote student interaction.

To accommodate the accelerated schedule, Skanska utilized an innovative, precast, aerated, autoclave concrete system with panels measuring the exact height as the building. A%er installing the panels, the team applied a top coating for sealant. !is process expedited the installation time.

!e fast-track project was delivered successfully on two completion dates and apartments in each wing were turned over on schedule.

Construction CostOriginal GMP: $15.1 millionFinal Cost: $15.1 million

Size75,000-SF

Current Phase of DevelopmentComplete

Completion DateJune 2009

Type of ServicesConstruction Management

Owner ContactMr. Tony Polotto, LEED AP University of Notre Dame 574.631.4200

Architect ContactMr. Javier EstebanMackey Mitchell Architects314.421.1815

Construction CostOriginal GMP: $14.2 millionFinal Cost: $14.2 million

Size162,000-SF

Current Phase of DevelopmentComplete

Completion DateSeptember 2001

Type of ServicesConstruction Management

Owner ContactMr. Martin SmithSavannah College of Art and Design 912.525.5080

Architect ContactMr. Stewart Aiken Aiken, Beauchamp & Sheete404.233.4466

Why Relevant?

LEED Gold certified

Residence Hall

Higher education

Active campus

Why Relevant?

Residence Hall

Higher education

Active campus

Florida Polytechnic University - Development of Residential Housing Relevant Experience

Page 26 of 74

Page 34: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

UNIVERSISTY COURTYARD On-Campus Student Housing | Youngstown, OH

PROJECT OVERVIEW SIZE 408 Beds UNITS 130 UNIT MIX 1BR/1BA, 2BR/2BA, 4BR/2BA DEVELOPER Ambling University Development Group MANAGEMENT Ambling Management Company MANGANGED SINCE 2003 OCCUPANCY 97% ARCHITECT Niles Bolton & Associates, Inc.

PROJECT DESCRIPTION # OF BUILDINGS 2 Buildings BUILDING DESIGN Three and four-story LOCATION On campus

AMC SERVICES PROVIDED Regional manager oversight Facilities management & maintenance Marketing & leasing Residence life program Rent collection Financial management, reporting & cost

analysis

REFERENCE Jack Fahey VP of Student Affairs Youngstown State University Todd Hall, Youngstown, OH Phone (330) 941-3532 [email protected]

UNIVERSISTY PLAZA Off-Campus Student Housing | Vestal, NY

PROJECT OVERVIEW SIZE 710 Beds UNITS 186 UNIT MIX 2BR/2BA, 3BR/2BA, 4BR/2BA Townhouse, 4BR/4BA, 4BR/2BA Loft DEVELOPER Ambling University Development Group MANAGEMENT Ambling Management Company MANAGED SINCE 2006 OCCUPANCY 100% ARCHITECT Niles Bolton & Associates, Inc.

PROJECT DESCRIPTION # OF BUILDINGS 4 Buildings BUILDING DESIGN Three (3) Four-story Buildings One (1) Two-story Building LOCATION 3 miles from campus on Vestal Pkwy

AMC SERVICES PROVIDED Regional manager oversight Facilities management & maintenance Marketing & leasing Residence life program Financial management, reporting & cost

analysis

REFERENCE Sheila Doyle Executive Director Binghamton University Foundation Vestal, NY Phone (607) 777-3844 [email protected]

Page 27 of 74

Page 35: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

UNIVERSISTY COURTYARD Off-Campus Student Housing | Newark, DE

PROJECT OVERVIEW SIZE 880 Beds UNITS 266 UNIT MIX 1BR/1BA, 2BR/2BA, 4BR/2BA DEVELOPER Ambling University Development Group MANAGEMENT Ambling Management Company ARCHITECT Niles Bolton & Associates, Inc.

PROJECT DESCRIPTION # OF BUILDINGS 7 Buildings BUILDING DESIGN Three-story garden-style LOCATION Within blocks from campus

AMC SERVICES PROVIDED Regional manager oversight Facilities management & maintenance Marketing & leasing Residence life program Rent collection Financial management, reporting & cost analysis

TIGER VILLAGE—GRAMLING STATE UNIVERSITY On-Campus Student Housing | Grambling, LA

PROJECT OVERVIEW SIZE Phase 1—1,204 Beds Phase II—815 Beds UNITS Phase I—479 Phase II—338 UNIT MIX 1BR/1BA, 2BR/1BA, 4BR/2BA DEVELOPER Ambling University Development Group MANAGEMENT Ambling Management Company MANAGED SINCE 2007 ARCHITECT Niles Bolton & Associates, Inc.

PROJECT DESCRIPTION # OF BUILDINGS Phase 1—7 Buildings Phase II—4 Buildings BUILDING DESIGN Three-story Buildings LOCATION On Grambling State University Campus

AMC SERVICES PROVIDED Regional manager oversight Facilities management & maintenance Financial management, reporting & cost

analysis

REFERENCE Leon Sanders VP for Finance and Administration Grambling State University 403 Main Street Grambling, LA 71245 Phone (318) 274-6406 [email protected]

Page 28 of 74

Page 36: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

EXHIBIT B – PROPOSER EXPERIENCE REFERENCES

Page 37: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Exhibit B – Proposer Experience Reference [Include behind Tab 4 of the Statement. Submit at least three (3) but not more than five (5) references. Use a separate form for each reference.] Proposer Name: Vestcor Communities, Inc. If reference is for an individual or entity rather than for Proposer, identify the individual or entity:

(1) Project information (name, term of performance, overall project amount, your project amount): The Flats at Carrs Hill – 316 Bed Student Housing Community located in Athens, GA Project Start Date: 4-1-2012 Project End Date: 6-28-2013 Total Cost: $20,000,000 (2) Awarding authority (i.e., party/agency responsible for awarding contract or administering project) (name, address, phone number): Vestcor Communities, Inc. 3030 Hartley Road, Suite 310 Jacksonville, FL 32257 904-288-7810 (3)    Other  party’s  contract  officer,  if  applicable  (list  all  if  multiple,  and  dates  of  service)  (name, phone number, email address, and physical address if different from (2)): Not Applicable (4)    Other  party’s  project  manager  (list  all  if  multiple,  and  dates  of  service)  (name,  phone  number, email address, and physical address if different from (2)): Not Applicable (5) Nature of the work you performed under the project, and how it is relevant to the work you will perform if selected as a Developer by the University: Developed this 225,000 SF community within budget and ahead of schedule. This property is 5 stories and includes elevators, trash rooms, a trash chute, and interior hallways, much like this proposed project.

Page 29 of 74

Page 38: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

(6) Type and extent of any subcontracting, teaming, or other arrangements to deliver service  (describe  your  role,  others’  roles,  and  the  overall  project  structure):   Effectively teamed with PQH and a local architectural firm to identify ideas that resulted in project savings of over $1 million. Managed by Ambling Management Company. (7) Significant challenges or weaknesses experienced under the project, and how you approached/overcame them: Significant design modifications were required on this project to achieve our goal of parking underneath the building. The parking garage was designed around the subsurface rock that was prevalent on the geotechnical borings. The design was successful as rock was not encountered in the garage area during construction. The site had a tremendous amount of rock on it, the risk of which was mitigated by paying a premium for the sitework subcontractor to take the risk for any rock encountered during construction. This additional premium was well calculated and resulted in us avoiding possible delays as there was extensive rock encountered which the subcontractor accepted under his contract without any delays to the schedule. (8) Significant successes or innovations achieved under the project: Project was delivered 45 days ahead of schedule. The property is served with a fiber pipe delivering 100MB of bandwith which provides extremely fast and dependable internet service to our residents. Successfully worked with Athens-Clarke County Department of Planning and Development to comply with all new code restrictions. (9) Other information about this project that is relevant to an assessment of your ability to perform under the Project if selected as a Developer: Vertical construction for this 225,000 SF facility was completed in less than 1 year, which is what will be required for this project. We worked effectively with a new contractor on this project.

Page 30 of 74

Page 39: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Exhibit B – Proposer Experience Reference [Include behind Tab 4 of the Statement. Submit at least three (3) but not more than five (5) references. Use a separate form for each reference.] Proposer Name: Vestcor Communities, Inc. If reference is for an individual or entity rather than for Proposer, identify the individual or entity:

(1) Project information (name, term of performance, overall project amount, your project amount): The Flats at Campus Pointe – 183 Bed Student Housing Community located in Charlotte, NC Project Start Date: 9-1-11 Project End Date: 8-1-2012 Total Cost: $10,300,000 (2) Awarding authority (i.e., party/agency responsible for awarding contract or administering project) (name, address, phone number): Vestcor Communities, Inc. 3030 Hartley Road, Suite 310 Jacksonville, FL 32257 904-288-7810 (3)    Other  party’s  contract  officer,  if  applicable  (list  all  if  multiple,  and  dates  of  service)  (name, phone number, email address, and physical address if different from (2)): Not Applicable (4)    Other  party’s  project  manager  (list  all  if  multiple, and dates of service) (name, phone number, email address, and physical address if different from (2)): Not Applicable (5) Nature of the work you performed under the project, and how it is relevant to the work you will perform if selected as a Developer by the University: Development was privately financed. Similar financing is necessary for this project. 183 Bed student housing community with amenities is similar in size to our proposed project.

Page 31 of 74

Page 40: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

(6) Type and extent of any subcontracting, teaming, or other arrangements to deliver service  (describe  your  role,  others’  roles,  and  the  overall  project  structure):   Designed by PQH Group. MEP engineers who worked with PQH Group will be the same on this project. Managed by Ambling Management Company. Ambling Management Company successfully leased project to 100% and continues to provide property management services. Effectively worked with Mecklenburg Department of Planning and Development throughout entire development process. (7) Significant challenges or weaknesses experienced under the project, and how you approached/overcame them: Tirelessly worked with city council members, University officials and Charlotte-Mecklenburg Planning Department to ensure this project and its sister property, The Flats at Mallard Creek, included the features that were important to each party. Vertical construction was accelerated due to numerous weather delays during sitework. Working 7 days a week as needed, and lighting the site at night, this project was delivered ahead of schedule. (8) Significant successes or innovations achieved under the project: Furniture installation time was reduced significantly by staging and assembling offsite. We have used this process improvement on all subsequent projects to save time and reduce traffic on the job site. Design innovations were introduced into the marketplace for the first time. 1BR and 2BR units represent the majority of the beds at this student property when most properties only offer higher density products. These unit types have a waiting list each year. Our IT solution on both Charlotte properties provided the fastest internet service of any student housing community in the area. We were also able to provide wireless routers in each unit for faster more secure access by residents. We were the first developer in the market to successfully negotiate with the University for use of the school shuttle to transfer residents from an off-campus property. With other developers subsequently following our lead, over 3,000 students are now shuttled daily from off-campus communities providing a tremendous relief for University parking.

Page 32 of 74

Page 41: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

(9) Other information about this project that is relevant to an assessment of your ability to perform under the Project if selected as a Developer: Working closely with UNCC, we provide housing to many of the international students that attend the University. Positive  working  relationship  with  many  departments  (Chancellor’s  Office,  Real  Estate  Office,  Facilities Management, University Police). Both of our student communities in Charlotte are consistently full which represents its acceptance and appeal in the marketplace.

Page 33 of 74

Page 42: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Exhibit B – Proposer Experience Reference [Include behind Tab 4 of the Statement. Submit at least three (3) but not more than five (5) references. Use a separate form for each reference.] Proposer Name: Vestcor Communities, Inc. If reference is for an individual or entity rather than for Proposer, identify the individual or entity:

(1) Project information (name, term of performance, overall project amount, your project amount): The Flats at Kernan – 480 Bed Student Housing Community located in Jacksonville, FL Project Start Date: 4-1-2008 Project End Date: 2-9-2009 Total Cost: $26,000,000 (2) Awarding authority (i.e., party/agency responsible for awarding contract or administering project) (name, address, phone number): Vestcor Communities, Inc. 3030 Hartley Road, Suite 310 Jacksonville, FL 32257 904-288-7810 (3)    Other  party’s  contract  officer,  if  applicable  (list  all  if  multiple,  and  dates  of  service)  (name, phone number, email address, and physical address if different from (2)): Not Applicable (4)    Other  party’s  project  manager  (list  all  if  multiple,  and  dates  of  service)  (name,  phone  number, email address, and physical address if different from (2)): Not Applicable (5) Nature of the work you performed under the project, and how it is relevant to the work you will perform if selected as a Developer by the University: Developed this student housing community located in Jacksonville, FL at UNF, another university in the State of Florida University System.

Page 34 of 74

Page 43: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

(6) Type and extent of any subcontracting, teaming, or other arrangements to deliver service  (describe  your  role,  others’  roles,  and  the  overall  project  structure):   Built by JDR Construction, LLC, general contractor, an affiliate of Vestcor. Designed by PQH Group. Managed by Ambling Management Company. (7) Significant challenges or weaknesses experienced under the project, and how you approached/overcame them: Significant savings were generated on this project by working with general contractor and architect to effectively value engineer the design. (8) Significant successes or innovations achieved under the project: This was the first purpose-built student housing community in the Jacksonville area that rents only student. This is a key factor to many parents looking for housing for their son or daughter. (9) Other information about this project that is relevant to an assessment of your ability to perform under the Project if selected as a Developer: Successfully worked with the various program departments (English Language Program, International MBA Program, Athletic Department) to facilitate off-campus housing. After 5 years, this property is still the most appealing off-campus student housing option for students at the University of North Florida.

Page 35 of 74

Page 44: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Exhibit B – Proposer Experience Reference

[Include behind Tab 4 of the Statement. Submit at least three (3) but not more than five

(5) references. Use a separate form for each reference.]

Proposer Name:

If reference is for an individual or entity rather than for Proposer, identify the

individual or entity:

(1) Project information (name, term of performance, overall project amount, your

project amount):

(2) Awarding authority (i.e., party/agency responsible for awarding contract or

administering project) (name, address, phone number):

(3) Other party’s contract officer, if applicable (list all if multiple, and dates of

service) (name, phone number, email address, and physical address if different from

(2)):

(4) Other party’s project manager (list all if multiple, and dates of service) (name,

phone number, email address, and physical address if different from (2)):

Page 27 of 28

Page 36 of 74

shelise.derks
shelise.derks
shelise.derks
Skanska USA Building, Inc.
shelise.derks
Florida State University Residence Hall 2/26/2002 to 8/19/2003 $24,645,734
shelise.derks
Florida State University 220 South Wildwood Drive Tallahassee, FL 32304 Daryl Ellison / 850-545-8881
shelise.derks
shelise.derks
shelise.derks
shelise.derks
Daryl Ellison / 850-545-8881 [email protected] January 2002 - January 2004
shelise.derks
Not Applicable
afink
Page 45: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

(5) Nature of the work you performed under the project, and how it is relevant to the

work you will perform if selected as a Developer by the University:

(6) Type and extent of any subcontracting, teaming, or other arrangements to deliver

service (describe your role, others’ roles, and the overall project structure):

(7) Significant challenges or weaknesses experienced under the project, and how you

approached/overcame them:

(8) Significant successes or innovations achieved under the project:

(9) Other information about this project that is relevant to an assessment of your

ability to perform under the Project if selected as a Developer:

Page 28 of 28

Page 37 of 74

shelise.derks
Four, 4-story housing units located on Florida State University's campus in Tallahassee, Florida.
shelise.derks
Hard bid contract. Built four, 4-story concrete shell structures with structural stud/ brick cavity wall system and metal roof. Skanska was the construction manager on the project, led by Chuck Jablon, Project Executive.
shelise.derks
shelise.derks
This project had a strict budget and extremely tight schedule. The team worked multiple shifts to deliver the project on-time to accept the students in the Fall.
shelise.derks
shelise.derks
The team worked together to dry all four buildings in before the summer rains in began in early afternoons. This enabled the team to install drywall during the day and brick at night.
shelise.derks
Our construction team worked well and in harmony with the user so that all the FF&E could be installed prior to the students arriving. We finished the units from the top, working down to the bottom floors.
afink
Page 46: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Exhibit B – Proposer Experience Reference

[Include behind Tab 4 of the Statement. Submit at least three (3) but not more than five

(5) references. Use a separate form for each reference.]

Proposer Name:

If reference is for an individual or entity rather than for Proposer, identify the

individual or entity:

(1) Project information (name, term of performance, overall project amount, your

project amount):

(2) Awarding authority (i.e., party/agency responsible for awarding contract or

administering project) (name, address, phone number):

(3) Other party’s contract officer, if applicable (list all if multiple, and dates of

service) (name, phone number, email address, and physical address if different from

(2)):

(4) Other party’s project manager (list all if multiple, and dates of service) (name,

phone number, email address, and physical address if different from (2)):

Page 27 of 28

Page 38 of 74

shelise.derks
shelise.derks
shelise.derks
Skanska USA Building, Inc.
shelise.derks
Florida Polytechnic Innovation Science and Technology Building 11/01/2011 to 8/29/2014 $98,000,000 / $80,581,415
shelise.derks
Florida Polytechnic University 4700 Research Way Lakeland, Florida Pete Karamitsanis / 813.300.6022
shelise.derks
shelise.derks
shelise.derks
shelise.derks
shelise.derks
shelise.derks
shelise.derks
shelise.derks
Not Applicable
shelise.derks
shelise.derks
Florida Polytechnic University 4700 Research Way Lakeland, Florida Pete Karamitsanis / 813.300.6022
shelise.derks
afink
Page 47: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

(5) Nature of the work you performed under the project, and how it is relevant to the

work you will perform if selected as a Developer by the University:

(6) Type and extent of any subcontracting, teaming, or other arrangements to deliver

service (describe your role, others’ roles, and the overall project structure):

(7) Significant challenges or weaknesses experienced under the project, and how you

approached/overcame them:

(8) Significant successes or innovations achieved under the project:

(9) Other information about this project that is relevant to an assessment of your

ability to perform under the Project if selected as a Developer:

Page 28 of 28

Page 39 of 74

shelise.derks
Skanska has performed all preconstruction services and construction services on the Florida Polytechnic University project to date, including sitework, IST Building, Campus Control Building, and Admissions Building.
shelise.derks
Skanska is serving as construction manager on the project. Teamed key subcontractor collaborative experts with the designers to assist in complicated architectural elements of the project to maximize functionality, constructability and cost.
shelise.derks
shelise.derks
A significant challenge on this project has been keeping the design in budget. As mentioned above, by utilizing our large pool of subcontractor experts, we were able to guide the architect’s design towards an affordable end result for Florida Polytechnic.
shelise.derks
A significant success has been our ability to maintain project budget while not sacrificing owner’s program, architect’s design or quality. All quality and schedule targets have been met to date.
shelise.derks
shelise.derks
Since we are currently on the Polytechnic site, we have the unmatched knowledge of site/soil conditions, utility locations, as well as site utilization and logistics. We have a successful, established relationship with the Owner, the various Authorities having jurisdiction, and the subcontractor market, both local and nationwide.
afink
Page 48: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

TAB 5 – PERSONNEL QUALIFICATIONS

Page 49: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Florida Polytechnic University Resident Hall Organizational Chart

RESIDENCE HALL

ARCHITECT

DEVELOPER

Ricardo E. Quinones Director of Design

PROPERTY MANAGEMENT

GENERAL CONTRACTOR

William L. Morgan President

John D. Rood Chairman

Frank Ringhofer Jr. Vice President

Daniel Strickland VP – Director of

Construction Activities

Kimberly A. Barkwell President

James  “Hugh”  Hodge Executive VP

Michael A. Davis Regional VP

Matt Gilbert Senior VP

Chuck Jablon Construction Manager

Charlie Bauerlein Sr. Project Manager

Jake Krehbiel

Assistant Project Manager

Rick Lee Superintendent

Brian Coakley Preconstruction Director

Page 40 of 74

Page 50: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

www.vestcor.com

October 4, 2013 RE: Project Commitment To whom it may concern: If selected as the Developer for on-campus housing at Florida Polytechnic University, the experienced staff members listed below will be committed to the success of the project with a delivery date of August 20th 2014. John D. Rood Chairman Vestcor Communities, Inc. Phone: 904-288-7777 [email protected] William L. Morgan President Vestcor Communities, Inc. Phone: 904-288-7810 Mobile: 904-333-1652 [email protected] Sincerely,

William L. Morgan President Vestcor Communities, Inc.

The Vestcor Companies 3030 Hartley Road Suite 310 Jacksonville, Florida, 32257 T 904-260-3030 F 904-260-9031

Page 41 of 74

Page 51: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Vestcor Communities, Inc.

JOHN D. ROOD Chairman

Mr. Rood began his real estate career in 1983 as founder of The Vestcor Companies.

Under his direction, the company focused on brokerage of multifamily properties

and then expanded into real estate investments, development, and construction. As

the managing partner for over 71 investment partnerships, Mr. Rood is responsible

for acquisition or development, management and disposition of properties in the

portfolio. A total of fifty-seven communities, consisting of over 11,000 units, have been acquired or developed by

partnerships managed by Mr. Rood.

In September of 2004, President George W. Bush appointed Mr. Rood as United States Ambassador to the

Commonwealth of the Bahamas where he served until 2007. An April, 2005 article from The Freeport News,

commented,   “John   D.   Rood   is   the   quintessential   diplomat.     Ever   since   he   presented   his   credentials   to   Governor  

General Dame Ivy Dumont, he has been a model diplomat, as he  has  sought  to  keep  the  promise  he  made  to  “work  

with my Bahamian friends, old and new, to advance our common interests and to help attain lasting prosperity and

security  for  our  two  countries  and  the  region.”  

The   Ambassador’s   commitment   to   public   and professional service is reflected in his many activities outside his

professional life. In 2002, he was appointed by Florida Governor Jeb Bush as a commissioner of the Florida Fish and

Wildlife Conservation Commission where he served as a commissioner and chairman until 2004. Mr. Rood is a

former board member of the James Madison Institute. He is a Rotarian and past president of the Rotary Club of

Mandarin. He was a member of the University of North Florida Business Advisory Council and has served as a

visiting professor at the university. U.S. Department of Housing and Urban Development Secretary Mel Martinez

appointed Mr. Rood to the Advisory Council on Renewal Communities to help local communities take advantage of

tax incentives to stimulate job growth and economic development. Mr. Rood was appointed by Mayor John Peyton to

serve as co-chairman   on   the   Jacksonville   Journey.     This   program   addressed   the   rise   in   Jacksonville’s   crime   and  

resulted in a multifaceted approach which was implemented by Mayor Peyton. Mr. Rood is a board member of the

Tiger  Academy  which  provides  the  children  of  Jacksonville’s  northwest  quadrant  a  structured  and  nurturing  learning  

environment. In 2009, Ambassador Rood was appointed by Florida Governor Crist as the Republican Party of

Florida Finance Chairman. Since May of 2009, Mr. Rood has served on the board of Alico Inc. (ALCO). Mr. Rood is a

current member of the Florida Council of 100. In January 2010, Mr. Rood was appointed by Governor Crist to serve

on the Board of Governors of the State University System. In April 2010, Mr. Rood received an honorary degree of

Doctor of Laws from Flagler College in recognition of his public service. Mr. Rood was elected to membership on the

Board of Trustees of Flagler College in October 2010. In 2012, he became a member of the Board of Advisors for the

JU Public Policy Institute. Mr. Rood currently serves on the Fidelity National Financial, Inc. Board of Directors.

Mr. Rood is the proud father of three children. He is a licensed pilot and an avid sportsman.

Page 42 of 74

Page 52: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Vestcor Communities, Inc.

William L. Morgan President

With numerous projects under his direction, Will Morgan brings to Vestcor

Communities a well-rounded base of financial and development experience. Vestcor

Communities successfully leverages Vestcor’s   prior   multifamily   experience   in  

design, development, and asset management to produce quality investment

properties in several multifamily niches.

Most recently, Mr. Morgan has established Vestcor as a leading developer and asset manager of best-in-class,

purpose-built student housing communities in the Southeast. He is responsible for generating all new business in

this sector, including market and site selection, project design and development, asset management oversight, capital

structuring and investor relations. Prior to his current role, Mr. Morgan has held the positions of controller and CFO

of The Vestcor Companies. He also serves as president of the Vestcor Family Foundation.

Mr. Morgan has more than 20 years of finance, accounting, and development experience in entrepreneurial

environments, resulting in significant expertise in accounting, finance, risk management, mergers and acquisitions,

and multifamily development. Prior to joining Vestcor in 2001, Mr. Morgan was the controller for a business-to-

business e-commerce company. He also worked as an audit manager at Ernst & Young LLP, where he served clients in

the  company’s  Entrepreneurial  Services  Group.    

Mr.  Morgan  received  his  bachelor’s  degree   from   the  Fischer  School   of  Accounting   at the University of Florida and

earned  his  master’s  degree  in  accounting  from  the  University  of  North  Florida.  He  is  a  certified  public  accountant.  He  

is also the past president of the board of directors for the North Florida School, President of the Vestcor Family

Foundation and participant of Leadership Jacksonville.

Page 43 of 74

Page 53: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Page 44 of 74

Page 54: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

EDUCATION: Masters in Architecture - University of Illinois - 1981Bachelor of Science in Architectural Studies -

University of Illinois - 1979

MEMBERSHIPS: National Council of Architectural Registration BoardsAmerican Institute of ArchitectsAIA Jacksonville, President 1997-98Jacksonville Historic Preservation CommissionMandarin RotaryKnights of ColumbusHispanic American Business AssociationAssisted Living FederationNational Fire Protection AssociationThe Arc Jacksonville, Board of Directors

REGISTRATION: Florida - No. AR0009765 NCARB - No. 48953Tennessee - No. 00103158 Texas - No. 16949LEED Accredited Professional, Green Certified

PREVIOUS TO CURRENT EXPERIENCE:

5/81 University of Illinois5/81 to 2/84 Reynolds, Smith and Hills/Design Architect2/84 to 11/86 The Haskell Co./Sr. Design Architect11/86 to Present PQH Group, Inc. Vice President in Charge of Design

Ricardo E. Quiñones, AIA, LEED RAP, is the Director of Design, responsible for programming, schematics and imple-mentation of design through construction documents. He has worked closely with owners and contractors to developsystems and methods of construction which streamline the design/build process.

Highly respected for his work ethic, Ricardo has been honored for his dedication to the profession and the communityby the American Institute of Architects in Jacksonville. His dedication and devotion are evident in his work, in thecommunity, and with his family. It is these traits, along with his ability to assess situations, that have fostered manysatisfied clients.

A blend of creativity, problem solving, and practicality make programming an enjoyable task for Ricardo. He uses anhonest, up-front approach to address clients by meeting with them, evaluating their needs versus their wants, and thentranslating them into space, form, and building. Proven time and time again, his designs convey creative solutions thatare accomplished realistically, within budget, and on-time.

Ricardo is experienced in a variety of project types, including multi-family housing, senior living, historic renovation,educational and medical facilities. A driving force behind PQH, Ricardo continues to focus on the details and personalattention that make this firm a success.

Ricardo E. Quiñones, AIA, LEEDRAPVice President - Director of Design

When I first came to this country, I had to work very hard tounderstand its people and diverse cultures. This methodic,analytical process provided me with a strong foundation for mywork. It has allowed me to successfully understand people’s needsand desires and interpret them into the built environment.

Page 45 of 74

Page 55: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

EDUCATION: Bachelor of Architecture - Kansas State University - 1985Danish International Architectural Study Program,

University of Copenhagen

MEMBERSHIPS: National Council of Architectural Registration BoardsAmerican Institute of Architects

REGISTRATION: Florida No. AR0016446Missouri AR-5985LEED Accredited Professional, Green Certified

Frank M. Ringhofer Jr., AIA, LEED RAP is Associate Vice President, Principal for PQH and he is a LEED accreditedprofessional with the Green Building Council. He leads the production team in association with Principal Rob Hoenshel.As a “mentor” for the Project Managers of the firm, Frank leads production effort of delivering comprehensive con-struction documents. He also assists Project Managers in the development of Drawing Standards and Project Man-agement Strategies.

Additionally, Frank’s reponsibilities include coordination with the Construction Administration staff during the De-sign process, so that he and the production staff can use their feedback during the preparation of ConstructionDocuments. In order to insure that project resources are allocated appropriately, Frank coordinates staff managementin relation to project staffing and production budgets.

During his 20 plus years of experience, his responsibilities have included project management, design, constructionadministration, specification writing, cost analysis, coordination between the architectural and engineering disci-plines, quality reviews, and delivery of a quality product within the construction budget. His project experienceincludes a variety of types: educational, commercial, military, multi-family, and institutional, with a focus on andmedical/laboratory work.

Frank has had the opportunity to work for a number of prestigious clients including several Fortune 500 companies,Monsanto Company, Southwestern Bell, Nextel and Mallinckrodt Medical. Under the category of public and govern-ment clients, he has provided services to the United States Navy, United States Postal Service, the City of St. Louis andthe City of Jacksonville. He also has experience with noted schools of higher learning including Washington Univer-sity, St. Louis University, University of Florida, University of Missouri and University of North Florida as well as someof Florida’s fastest growing school districts such as Duval, Broward and Collier Counties.

Frank M. Ringhofer Jr., AIA, LEEDRAP BD+CVice President

The Architect is a conduit for the expression of clients’ desires andneeds in the built environment. It is our taskto translate theirideas and convert them to practical and functional spaces. Wemust assemble the multitude of people and parts to create a balanceand harmony that the client will enjoy for years.

Page 46 of 74

Page 56: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

EDUCATION: Auburn University - 1979Bachelor of Science in Building Construction

CERTIFICATIONS: Certified General Contractor, State of FloridaLicense No. CGC045538

Mr. Strickland reviews documents during the design stage for constructability andcoordination of details. During the design phase, he prepares opinions of probablecost in order to establish project budgets. He also monitors and reviews design docu-ments for adherence to established budgets and continuity of bidding documents.Once projects are in the bidding stage, he assists the client in evaluating the bids andmakes award recommendations.

His responsibilities during the construction phase of a project include reviewing and processing submittal data andrequests for information, and coordinating all communication between contractors and design personnel. He reviewsand makes recommendations on contractors’ applications for payment and requests for change orders. Additionally, Mr.Strickland performs field observations and prepares field reports to document construction progress andadherence to design documents. If any discrepancies arise, he coordinates the resolution of field problems and acts asliaison between construction and design personnel. Finally, he is in charge of the preparation and administration ofproject acceptance and close-out procedures.

Past experience includes supervisory positions in Medical, Residential, Multifamily, Commercial, Institutional, Utility,and Industrial Construction Projects as craftsman, superintendent, estimator, construction engineer and project man-ager. Major projects supervised include:

Thomas Chase Apartments - Jacksonville, FLFCCJ Buildings B, C, & D – Jacksonville, FL11 East Forsyth – Jacksonville, FLRitz Theatre, Cultural Museum, and Educational Center – Jacksonville, FLOperations & Maintenance Facility – Neptune Beach, FLJacksonville Electrical Authority “CREW Sites” – Jacksonville, FLEmergency Operations Center – Phases I, II, III – Jacksonville, FLBaymeadows Medical Center - New Office Facility - Jacksonville, FLDunn Avenue Professional Office Center - Jacksonville, FLSummit Headquarters Building - Jacksonville, FLLeigh Meadows Apartments - Jacksonville, FLFleet Landing Retirement Community – Atlantic Beach, FLVicar’s Landing Retirement Community – Ponte Vedra Beach, FLMallard Cove Apartments – Jacksonville, FLCedar Creek Condominiums – Jacksonville, FLMarsh Oaks Apartments – Jacksonville, FLMandarin Lanai Apartments – Jacksonville, FLClay County Gymnasiums – Orange Park, FL

Daniel S. “Danny” Strickland, CGCVice President

Director of Construction Activities

Page 47 of 74

Page 57: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Skanska USA Building Inc. 4030 Boy Scout Blvd., Suite 200

Tampa, FL 33067 Phone 813.282.7100 Fax 813.281.3262

Web www.skanskausa.com

RE: Project Commitment To whom it may concern: Skanska USA is ready to partner with Vestcor Communities, Inc. as the General Contractor for the proposed  housing  project  at  Florida  Polytechnic  University.    We’re  excited  to  bring  our  experience  and  knowledge working with Florida Polytechnic University to the team. The following experienced team members are committed to supporting the project: Matthew J. Gilbert, LEED AP Senior Vice President Skanska USA Building Chuck Jablon Construction Manager Skanska USA Building Charlie Bauerlein Senior Project Manager Skanska USA Building Rick Lee Superintendent Skanska USA Building Jake Krehbiel, LEED AP Assistant Project Manager Skanska USA Building Brian Coakley, LEED AP Preconstruction Director Skanska USA Building Sincerely,

Matthew J. Gilbert, LEED AP Senior Vice President Skanska USA Building [email protected]

October 4, 2013

Page 48 of 74

Page 58: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Florida Polytechnic University - Development of Residential Housing Proposed Construction Team

Construction Personnel

Key Personnel!e Skanska personnel assigned to the Florida Polytechnic Residence Hall project are a proven, successful, fully integrated team capable of achieving all of the goals for the project.

Based on our understanding of the current timeframe, all team members proposed by Skanska are available and committed to this project, and will be available over the long term. Each key team members’ experience and expertise can be found in the detailed resumes following this page as well as our organizational chart for team reporting and structure.

Florida Polytechnic University Innovation Science and Technology Building

Page 49 of 74

Page 59: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Key Personnel Organization ChartWe have selected a team speci"c to the Florida Polytechnic University Residence Hall project based on their experience, knowledge and availability to meet the project requirements. We have combined the best local resources with extensive higher educational experience. !is team is familiar with the long-term project goals and objectives and the impact the Residence Hall project will have on the entire vision of the your residential program.

Residence Hall Innovation Studio ConceptOur proposed “Innovation Studio Concept” will enhance our team’s ability to work with Florida Polytechnic stakeholders, right from the beginning, to collectively look for opportunities to improve project outcomes.

We view innovation as a way to drive and increase e#ciencies in the way buildings are designed, built, operated and used by the occupants. !rough Skanska’s Innovation Studios, we have developed safer projects, cleaner jobsites, schedule enhancements, quality control and cost savings that have allowed us to lower project risks and provide a more predictable outcome for the project. Some of the concepts from our Innovation Studios are:

!e organizational chart on the following page demonstrates how your project team will be structured. Resumes for key personnel containing detailed information on their experience/expertise can be found following this page.

Florida Polytechnic University - Development of Residential Housing Proposed Construction Team

Innovation Studio ConceptFive studio concepts to save Florida Polytechnic time and money

Information Management Flat Procurement Prefabrication

Quantifiable savings in time and money to Florida Polytechnic

TechnologyValue

Management

Page 50 of 74

Page 60: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Florida Polytechnic University

Skanska Florida Polytechnic University*Construction Management Team

Master Contractor

Executive Oversight

Matt GilbertSenior Vice President

Chuck JablonConstruction Manager

Point of Contact

Brian CoakleyPreconstruction Director

Preconstruction Construction

Charlie Bauerlein Sr. Project Manager

Jake KrehbielAssistant Project Manager

Rick LeeSuperintendent

Florida Polytechnic University Residence Hall Construction Organizational Chart

Skanska is currently the construction manager for the Florida Polytechnic University’s Innovation Science and Technology Building project. Our Residence Hall construction team will easily coordinate all activities with the Academic Building team. This collaboration and knowledge will translate into quicker decision making, resulting in a more efficient team and a shorter schedule.

Florida Polytechnic University Residence Hall Team

Florida Polytechnic University - Development of Residential Housing Proposed Construction Team Page 51 of 74

Page 61: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Matthew J. Gilbert, LEED® AP

UF J. Wayne Reitz Union Student Center Expansion and Renovation, Gainesville, FL$43 million, 100,000-SF new, 50,000-SF renovation at the heart of the UF campus.

University of Florida, Clinical Translational Research Building for the Institute on Aging, Gainesville, FL

$36 million, 120,000-SF, new facility for studying aging and disability. Seeking LEED Platinum certi"cation by USGBC.

University of South Florida, Health South Pavilion, Tampa, FL $26 million, 126,000-SF, new seven-story, medical o#ce building for the University of South Florida.

UF Health Medical Office Building at Springhill, Gainesville, FL$25.8 million, 111,000-SF, design-build, "ve-story medical o#ce building at University of Florida.

UCF Baseball Stadium Expansion, Orlando, FL$4 million, 6,250-SF, expansion of existing baseball stadium on the University of Central Florida campus.

20 years in the industry

9 years with Skanska

University of CincinnatiB.S., Building Construction

Licensed General Contractor, State of Florida

Personal Stats

Executive Oversight

Chuck Jablon

Florida Polytechnic Innovation Science and Technology Building, Lakeland, FL$98 million, 160,000-SF, Phase I of Florida Polytechnic consists of the Innovation Science and Technology Building including research labs, teaching labs, classrooms, o#ce space, study space, support space, student spaces and common areas.

Florida State University New Residence Hall, Tallahassee, FL $24.6 million, 153,000-SF new residence hall, including four "ve-story buildings (eight apartments per building) to accommodate 540 students. Tuskegee University Kellogg Conference Center / Dorothy Hall Suites, Tuskegee, AL$25 million, 142,000-SF classroom and teleconference facility including restoration of a 6-story historic hotel. National ABC Historic Restoration Award Winner.

Tuskegee University Henderson Hall Renovations, Tuskegee, AL$9 million renovation of a 60-unit dormitory.

Tuskegee University Logan Hall Renovations, Tuskegee, AL$10.2 million renovation of a 60-unit dormitory.

Tuskegee University White Hall Renovations, Tuskegee, AL$10.7 million renovation of a 93-year old, 32,000-SF facility to rebuild a 110-bed female dormitory.

39 years in the industry

8 years with Skanska

Personal Stats

Construction Manager

Page 52 of 74

Page 62: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Charlie Bauerlein

University of South Florida, East Holly Apartments, Tampa, FL$23 million, 245,000-SF, 198 unit apartment building. !e four-bedroom and two-bedroom student apartments are clustered in three and four-story blocks with four apartments per $oor and are located around an exterior circulation and social area.

Sarasota Memorial Hospital Patient Bed Tower, Sarasota, FL$112 million, new 220,000-SF, ten-story patient tower.

School Board of Pinellas County, Thurgood Marshall Middle School, St. Petersburg, FL$18.2 million, 171,000-SF, new 1,000 student station middle school.

School Board of Pinellas County, Highpoint Elementary School, Clearwater, FL$21.2 million, 99,150-SF, new seven building prototype school on a property adjacent to the existing school.

34 years in the industry

19 years with Skanska

University of FloridaB.S., Building Construction

Licensed General Contractor, State of Florida

Personal Stats

Senior Project Manager

Rick Lee

Florida Polytechnic Innovation Science and Technology Building, Lakeland, FL$98 million, 160,000-SF, Phase I of Florida Polytechnic consists of the Innovation Science and Technology Building including research labs, teaching labs, classrooms, o#ce space, study space, support space, student spaces and common areas.

University of South Florida Interdisciplinary Teaching and Research Facility, Tampa, FL$68 million, 238,000-SF multi-story facility that accommodates upper and lower division interdisciplinary teaching and research needs for the University. !is project is seeking LEED® Gold Certi"cation.

Marriott Grande Ocean Resort, Hilton Head Island, SCTwo 7-story, 250,000-SF condominiums.

District School Board of Pasco County, Charles S. Rushe Middle School, Land O’ Lakes, FL$36.6 million, 200,000-SF, new middle school consisting of two single-story buildings and one three-story building.

34 years in the industry

16 years with Skanska

Personal Stats

Superintendent

Page 53 of 74

Page 63: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Jake Krehbiel, LEED® AP

Florida Polytechnic Innovation Science and Technology Building, Lakeland, FL$98 million, 160,000-SF, Phase I of Florida Polytechnic consists of the Innovation Science and Technology Building including research labs, teaching labs, classrooms, o#ce space, study space, support space, student spaces and common areas.

Hernando County School Board, Winding Waters K-8, Weeki Wachee, FL$21.9 million, 185,213-SF, new K-8 school.

Hernando County School Board, Weeki Wachee High School, Brooksville, FL$49.8 million 220,000-SF, new 2,000-student high school.

Hernando County School Board, Springstead High School, Spring Hill, FL$12.2 million, 49,000-SF, expansion and renovation to existing high school.

7 years in the industry

7 years with Skanska

Kansas State UniversityB.A., Construction Science and Management with Minor in Business Administration

Personal Stats

Assistant Project Manager

Brian Coakley, LEED® AP

Florida Polytechnic Innovation Science and Technology Building, Lakeland, FL$98 million, 160,000-SF, Phase I of Florida Polytechnic consists of the Innovation Science and Technology Building including research labs, teaching labs, classrooms, o#ce space, study space, support space, student spaces and common areas.

Florida International University Stempel Complex, Miami, FL $32 million, 120,000-SF science research facility. !e project will be seeking LEED Gold certi"cation.

University of South Florida Interdisciplinary Teaching and Research Facility, Tampa, FL$68 million, 238,000-SF multi-story facility that accommodates upper and lower division interdisciplinary teaching and research needs for the University. !is project is seeking LEED® Gold Certi"cation.

North Carolina State University Engineering Building III, Raleigh, NC$77.4 million, 247,200-SF engineering classroom facility.

Duke University Hospital Addition for Surgery (HAFS), Durham, NC$56.4 million, 130,000-SF addition and renovation.

Duke University Genetics Institute Project, Durham, NC$30 million, 123,000-SF genetics laboratory.

24 years in the industry

6 years with Skanska

New Jersey Institute of TechnologyB.S., Construction/Contracting Engineering Technology

Union County CollegeA.S., Civil/Construction Engineering Technology

Personal Stats

Preconstruction Director

Page 54 of 74

Page 64: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Page 55 of 74

Page 65: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

kimberly a. barkwellPresident & Chief Operating Officer

Current Responsibilities

Relevant Experience

Education/Affiliations

As president and COO of Ambling Management Company, Kimberly Barkwell is responsible for all facets of the company’s operations, including strategic planning, overall property management and financial operations, new business development, client satisfaction, and company culture preservation. Under her guidance, Ambling has implemented sophisticated systems and procedures to accommodate the company’s growth as it continues to expand operations nationwide. Barkwell has held progressively responsible accounting, management and administrative positions and is recognized by her peers as an inspirational leader with a unique ability to train, motivate and direct her people.

Prior to being appointed president of Ambling Management Company, Barkwell was chief operating officer of AMC, where she was responsible for the development of all company policies and procedures, information technology, direction of the marketing and professional development department, compliance department, assessment and recovery team, due diligence, national purchasing, maintenance and facilities management, as well as budgeting and financial performance of management company operations. Barkwell has over 25 years of experience in all facets of real estate property management. Prior to Ambling, Barkwell held the position of regional vice president with Brisben Companies/National Realty Management, Columbia, S.C., where she directed the overall operations of the Northeast and Mid-Atlantic Regions, comprised of conventional, tax credit and senior living apartments. Specific responsibilities included supervision of regional property managers, project maintenance and new construction oversight, development of marketing campaigns and internal operations procedures, as well as financial performance for the properties and corporate operations. Prior to that, Barkwell served with AIMCO/Insignia Management Group, Greenville, S.C., where she held two roles. As regional vice president, Barkwell supervised a staff of over 350 including corporate members, regional property managers, marketing directors, construction managers, systems personnel, administrative support and site personnel. During her tenure, Barkwell directed overall operations of large conventional and affordable residential portfolios of up to 21,000 units. As vice president of business development/ancillary functions, Barkwell directed presentations, wrote policies and procedures for new business development activities and created proposals and marketing collateral information for the company’s new business development efforts. Barkwell also designed and developed computerized budget programs for over 1,200 residential properties owned and managed by Insignia. Prior to that, Barkwell served in various capacities with the Duddlesten Companies in Houston, including residential property accountant, accounting manager, assistant vice president of financial services, internal auditor, administrative property supervisor and regional property manager.

Barkwell attended Ohio University and later transferred to the University of Houston where she pursued a bachelor’s degree in business administration and management. Barkwell has served on a number of committees for the Houston Apartment Association, the Texas Apartment Association and National Apartment Association. Barkwell is a Certified Apartment Property Supervisor, a member of IREM and is in the process of completing her Certified Property Manager Designation.

Page 56 of 74

Page 66: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

james e. hodgeExecutive Vice President

Current Responsibilities

Relevant Experience

Education/Affiliations

James “Hugh” Hodge is responsible for the operation, marketing, leasing, resident’s life and maintenance components of Ambling Management Company’s entire student housing portfolio. Hodge has overall responsibility for budgeting and purchasing, human resources, maintenance and construction. Specific responsibilities include reviewing budget estimates and assisting property managers in preparing budgets for specific properties while also ensuring budgets are implemented and consistently followed to promote efficiently run and profitable student housing properties. Hodge prepares directives to carry out policies approved by the corporate council and administers company policies relating to such matters as regulation of property management and marketing of student housing, as well as ensuring compliance with operation and maintenance standards. Hodge regularly visits property offices, inspects field operations and reviews periodic reports from property managers to determine

occupancy and maintenance projects.

Hodge attended the University of South Carolina, where he majored in psychology and business administration and holds a Certified Property Manager designation. Additionally, Hodge is a licensed real estate broker in North and South Carolina and has served as president of the South Carolina Apartment Association, the Upper State Apartment Association (Greenville, S.C.) and the Apartment Association of Greater Columbia, South Carolina. Hodge is also a Certified Apartment Property and Certified Property Supervisor Instructor.

Hodge has more than 20 years of experience in the real estate/property management industry, including new development, property repositioning, property redevelopment and property sales and acquisitions. Prior to joining Ambling, Hodge was senior regional property manager with AIMCO/Insignia Management Group, Greenville, S.C. where he directed the overall operation of 20 conventional apartment communities comprising a total of 4,125 units, located in North and South Carolina and Georgia. Hodge’s responsibilities included supervision of marketing, human resources, construction management and technical services. Hodge also served as assistant regional vice president for Insignia Management Group where he supervised the management of properties throughout the Southeast. Hodge was responsible for the physical preservation and improvement, as well as the overall financial performance of 42 conventional apartment properties, supervised the annual property budget preparation and performed final budget reviews. Hodge also served as a property management consultant for Cornerstone Properties and The Berkley Group where he performed property assessments, made recommendations for property improvements and prepared and implemented business plans to reposition multi-family properties. Hodge also held property management positions with the Paragon Group, including director of property

management for properties in North and South Carolina, Tennessee and Virginia.

Page 57 of 74

Page 67: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

michael davisRegional Vice President, Student Housing

Current Responsibilities

Relevant Experience

Education/Affiliations

Michael Davis has more than eleven years of student housing experience and is directly

responsible for the operations and oversight of seven communities encompassing nearly

4,500 beds. Davis establishes policies relating to matters such as regulation of property

management execution, implementation of internal and external marketing plans for the

student housing target market, implementation of residence life programs and facilities

maintenance oversight. Davis assist in the preparation of directives to carry out policies

approved by the corporate council and marketing of student housing, as well, as ensuring

compliance with operation and maintenance standards. He coordinates training to enrich

overall staff development and performance. Davis communicates with the assigned

client representative to ensure that the client’s goals are being met and implements

corrective action plans as needed based on customer feedback and his assessments.

Davis is pursuing his Certified Property Manager Designation through IREM.

Davis has a Master of Science Degree in Communication with a concentration in

Public Relations and a Minor in Business Management and a Bachelor of Arts Degree

in Mass Communications with Minors in Business and English from the University of

Louisiana at Lafayette. Davis is an active member of his church he has attended for

23 years. Davis sits on the church’s Education Board and oversees an After-School

Mentoring and Tutoring Program for low-income/single-parent students.

Davis has been with Ambling since 2000 and has an extensive background in student

housing spanning 12 years. Davis’ student housing career began when he worked

as a resident assistant (RA) at an on-campus residence hall then as community

assistant at an off-campus third-party student housing community. Davis was quickly

promoted to Leasing Manager then Property Manager. After two years as property

manager, Davis was promoted to Regional Property Manager. Davis assist in the

preparation of directives to carry out policies approved by the corporate council and

marketing of student housing, as well, as ensuring compliance with operation and

maintenance standards. He coordinates training to enrich overall staff development

and performance. Davis communicates with the assigned client representative to

ensure that the client’s goals are being met and implements corrective action plans as

needed based on customer feedback and his assessments. Davis was subsequently

promoted to the Regional Vice President position wherein he is responsible for all

aspects of the operation of a portfolio of on and off-campus communities, primarily

in the South and Southeast. Davis is also a member Ambling’s Due Diligence Team

and assumes additional roles as assigned by senior leadership.

Page 58 of 74

Page 68: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

TAB 6 – PROJECT APPROACH

Page 69: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Development Overview Vestcor Communities is proposing to develop 216 beds of residence hall housing on the campus of Florida Polytechnic University. It is our intent this project would be the first phase of a conceptual master plan for the development of at least 1,000 beds of student housing at Florida Polytechnic University as depicted in Exhibit 1 on the following page. However, we understand the University may see advantages to building in an alternate location or with an alternate design and we are open to those ideas. This project requires an unleveraged investment to fund the entire amount of the development. We have assembled a group of investors to support this project that are not only committed to investing in this project but are interested in the long term success of the University. Our investors will now have a vested interest in supporting Florida Polytech University and ensuring it succeeds in the early years when support will be most critical. Our proposed 5 story L-shaped building will be positioned on the back of the housing quadrant identified in the RFSOQ, close to the IST Building and future site of the Wellness Center and easily accessible from the parking lot as shown in Exhibit 2 on the following page. We feel this location will provide a sense of arrival for students and prospective students during the early years of the University. The master plan in Exhibit 1 includes four phases of on-campus student housing comprising at least 1,000 beds, including both efficiency suites and apartment style living. Based on enrollment projections and housing demand, we anticipate one additional phase would be needed for the start of each successive academic school year. While each phase of this community will function independently with its own indoor and outdoor amenity spaces, as the campus grows the phases will eventually mesh together to become the epicenter of residential life at Florida Polytechnic University. Other components that can be incorporated to support resident life include a permanent dining hall that can be leased back to and eventually owned by the school, a resort-style swimming pool and other outdoor amenities for residents to enjoy such as volleyball, courtyards, greenspace and sitting areas.

Page 59 of 74

Page 70: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Exhibit 1 Student Housing Master Plan

Florida Polytechnic University

Exhibit 2 Phase I Residence Hall

Florida Polytechnic University

Page 60 of 74

Page 71: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Project Description

The design of the Florida Polytechnic University Housing includes modern amenities students are accustomed to in their own home as well as the features needed to support their educational experience. Today’s  Millenial  student  has  ever-expanding needs with regards to how they use technology in their daily lives and as part of their learning. Privacy, safety, convenience, and community amenities are combined in this project with the latest technological advances to create an environment that supports academic achievement in an enjoyable college atmosphere. Each suite will be approximately 1,150 square feet and will feature four private bedrooms and two bathrooms. Bathroom vanities are located outside the shower and toilet room. Each bedroom will have its own data/voice/cable port. All floor plans are designed to include spacious and efficient living space, including a living room, dining area, and an efficiency kitchen that encourages community and companionship in addition to providing comfortable accommodations. By providing efficiency kitchens, students will be encouraged to support the dining hall that will be operating on campus. Suites come complete with a microwave and refrigerator. We will offer laundry facilities on each floor or include a separate laundry room, equipped with washer and dryer in each suite. We believe providing a washer and dryer in each unit will allow residents to make the most productive use of their time. Electrical service, water/sewer, cable TV and high speed fiber optic internet are all included at no additional charge to the student. All suites are fully furnished. Included below is a representative unit floorplan that will be finalized in conjunction with University input.

Page 61 of 74

Page 72: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

There will be 8 one bedroom units each with a separate living room that will comprise the resident hall assistant  (“RA”)  bedrooms.    These  rooms  will  all  be  handicap  accessible  units  and  can be rented to others as we anticipate only using 6 units for RAs. These units are strategically placed in high traffic areas to provide maximum oversight to the residents on each floor. Our IT consulting group, which we have used on all previous student housing communities, will coordinate wiring specifications, installation, and ultimate service connection with the Facilities Department at the university and the appropriate vendor. They will also coordinate the ongoing support of services throughout the building. We provide a standard cable service package to each unit and bedroom as well as a managed network of data service to each unit and bedroom with an uninterrupted speed of at least 25/5 MPS. We anticipate these same service levels will be available from the current vendors providing service to the campus. Wireless internet will be provided in each unit and throughout the entire building. Secure wifi connections for each unit will be provided to minimize traffic disruptions to the residents. The amenities at Florida Polytechnic University (FPU) Housing will offer a wide variety of gathering spaces that promote social interaction and support the applied learning philosophy at FPU. The first floor of the Phase I building will include over 8,000 square feet of common space that will include the following amenities:

Entrance/Elevator Lobby Leasing Office Fitness Room Club Room with hospitality and coffee bar Billiards Room Internet café and Computer Lab Study lounge with group study rooms State-of-the-art fitness center Wi-Fi access Reception desk with package area Mailroom Vending Area

Page 62 of 74

Page 73: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

In addition to these amenity areas, there is a resident lounge on each floor that offers a gathering spot or meeting place. Residents will have 24/7 access to the amenity areas on the first floor. Other amenities included throughout the community including the following:

Secure building access Secure unit access 24 hour emergency maintenance Well-lighted building exterior Closed circuit video monitors throughout common areas Weekly resident activities

Access to the residence hall building will be controlled. Our objective is to manage this building with similar levels of security and access as other buildings on campus. During business hours, the leasing office and entrance foyer will be open to the public. All other building access points, interior amenity areas, residential hallways, units and elevator access will require use of the campus-wide card access system at all times. After hours, the leasing office will be closed and the entrance foyer will require the same level of secure access as the rest of the building. A community-wide surveillance system will be installed that provides constant monitoring of all building access points, common areas, and traffic points around the building.

Ambling’s   management   staff   will   be   made up of 1 full-time manager, 1 full-time resident life director, 1 full-time maintenance supervisor, and 6 graduate or undergraduate resident assistants. We are open to exploring personnel sharing arrangements with the University for staffing needs such as maintenance and security.

We envision up to three additional phases of residence hall housing will eventually be constructed to complete this master plan. The size of each future phase is flexible to accommodate the housing demand. The fourth and final phase will be apartment style units that will front the pond and provide the architectural framework that was envisioned in the campus master plan. Our intent is that the design of all phases will not only achieve the aesthetic agenda that was contemplated in the campus master plan, but will complement the architectural style of the IST Building, even pulling certain building materials such as exterior metal panels, low E glass, and glazed concrete floors to provide a consistency across campus. Vestcor Communities has assembled the team that is driven to design, construct and deliver this project ahead of schedule. As such, resident’s official Move-In Day will be August 20, 2014.

Page 63 of 74

Page 74: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Project Timeline Vestcor Communities will direct the project team from initial concept and design, through construction to ultimate project delivery and management of this residence hall. We have assembled a very experienced team with a proven track record of delivering projects on time and effectively operating these communities for years to come. Each of our team members has a significant presence in Florida, offering immediately available resources to execute this project. Vestcor Communities is headquartered in Jacksonville, Florida. Vestcor affiliated entities currently have 19 apartment communities throughout Florida consisting of over 4,000 units. Our long working relationship with our architect, Ricardo Quinones of PQH Group, will be a contributing factor in efficiently implementing conceptual design ideas by offering systems and methods of construction which streamline what will be a design/build process. As Director of Design, Ricardo will personally facilitate the design and preparation of all construction documents with   his   engineers.    Ricardo’s   personal   attention  will   ensure   design  milestones   are  met to make this project a reality. PQH is headquartered in Jacksonville, Florida. Vestcor Communities has already invested in a conceptual architectural design that we feel is not only attractive and complimentary to the IST building on the exterior, but practical and repeatable for construction while still offering a spacious and appealing housing community

upon completion. Our project will comply with the University’s   established   design   and   architectural  standards and be constructed of concrete and steel. Our project will also comply with the State Requirements for Educational Facilities (Nov. 19, 2012) and the Florida Building Code (2010). Our work to date will allow for expedited completion of construction documents and submission for review.

Immediate availability of the site will be a key component to keeping on schedule. We anticipate that the pad will be delivered by the University and available to access in early November. Based on our development timeline, foundation plans will be available by November 4th, which will allow for immediate plan review, foundation preparation and pouring by the General Contractor. As part of the permitting process, we plan to request an Early Start – Foundation Only permit from the University.

Page 64 of 74

Page 75: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

We are excited to partner with Skanska USA on this proposal. Their inclusion as General Contractor not only provides a superb general contractor and vast resources to ensure timely completion of construction, but also invaluable continuity and knowledge on the site given their current role as contractor for the construction of the University’s   Innovation,   Science,   and  Technology Building. Skanska’s full mobilization on site already provides immediate time savings to our overall development timeline while continuing the same working relationship with University staff and other key team members. Included below are a few of the advantages our team will realize by using Skanska as General Contractor: Understanding of the subsoil conditions and the ramifications on design, cost and schedule. Understanding of the in place-utilities installed by Skanska, including site gas, TECO electric,

Brighthouse and Verizon phone and internet services. Established working relationship with permitting agencies, including SWFWMD, City of

Lakeland permitting authorities and inspectors, Fire Marshall, and most importantly, Tom Browning, FPU’s Authority that has jurisdiction over the site.

Established working relationship with the civil engineers of record, Anderson Lane and Chastain Skillman (who also performed all site surveying and layout).

Control of the Site: Skanska can best control the use of the housing site and its associated logistical issues, including laydown, parking, work areas, etc. This is especially important on this project because of the extreme schedule constraints and probable necessity for shift work.

Subcontractor Efficiency: It will be possible to achieve best performance reliability from subcontractors that are already on site.

Overall risk, cost, quality and schedule will be better optimized by using  Skanska’s existing team, which has already demonstrated the ability to manage and deliver a complex project with mostly local subcontractors, suppliers and labor.

Skanska has a significant presence in the State of Florida and anticipates continuing to use many local materialmen and vendors, providing a beneficial economic impact in the surrounding community. Enclosed following this narrative is a complete project schedule and timeline discussion prepared by Skanska.

Page 65 of 74

Page 76: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Upon construction completion, which has been projected for July 15, 2014 by Skanska, Vestcor Communities will coordinate with its interior design firm and furniture provider to execute the delivery and installation of all unit and common area furniture. A building of 60 units typically requires 4 days for the installation of unit furniture. The interior design firm typically requires 2 days for the installation of all of the common area furniture. Our vendor stages their assembly off-site for efficient installation into the building. Our IT consultants will finalize installation and testing of all equipment, cameras and computers at this time as well. We will be ready for residents to move in on August 20, 2014. We are pleased to include Ambling Management Company on our team as the property management firm for this development. With approximately 19,000 beds of student housing under management, including over 6,600 on-campus, Ambling is one of the largest student housing management companies in the country. As part of their portfolio, Ambling currently manages student housing communities in the following university markets in the State of Florida: Florida State University, Florida Gulf Coast University, University of Central Florida, University of North Florida, and University of Florida. Ambling  also  manages  each  of  Vestcor’s  student housing communities. Our proven partnership of operating first class student housing communities will continue with this property. Ambling will provide and administer a resident code of conduct for the housing community. Our marketing department and Ambling can begin working immediately with the Admissions staff to provide marketing collateral to interested parties. We anticipate Ambling will have a presence on campus beginning in January 2014 and will work with the University staff to determine how we can best support their marketing efforts when a student and their family arrive for a site visit. We are open to providing our own temporary leasing facility or working under the same roof in the Admissions Office. In either case, we will invest resources to ensure that a representative model or showroom is available for prospects to tour. We feel the presence of our management staff to explain the housing option will be an important feature that many prospects will enjoy during their tour of Florida Polytechnic University. Once leasing begins, prospective applicants will be required to meet Ambling’s established resident criteria. This process includes a criminal background and credit check. The community will use great care and will always abide by Federal, State and Local Fair Housing Laws when processing all potential resident applications. Leases will require parental guarantees unless a student can qualify on their own. With a significant presence already in the State of Florida, Ambling will always have resources readily available to support this community. Vestcor

Page 66 of 74

Page 77: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Communities will provide further oversight and direction on the operation of the property to ensure we are satisfying the needs of both our residents and the University. Our team has already begun a collaborative effort of design concepts and knowledge sharing to ensure we deliver a product that will be viewed as an amenity and selling feature by the University.

Page 67 of 74

Page 78: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Florida Polytechnic University - Development of Residential Housing Proposed Construction Team

Construction Schedule!e proposed Student Housing structure is based on an approximate 90,000 total gross square footage for the entire building. For construction planning purposes, the building will be broken down into three sections (areas). Each section contains 20 units per section yielding 6,000 square foot pad per section. !e construction of Student Housing will follow three distinct phases: erection of Building Structure, installation of the Exterior of Buildings and the application of Interior Finishes. Each phase is brie"y described below and will approximate the work"ow for each phase.

Building Structure:!e Building Structure is planned to have foundations with concrete footings and piers supporting a steel structure with elevated concrete decks.

Exterior of Buildings:!e exterior metal framing of buildings will be enclosed with Densglass Exterior Board and contain a waterproo#ng membrane covered with painted stucco. Windows and storefronts will provide the entrances and natural light for Student Housing.

Interior Finishes:!e interior #nishes will be supported by metal framing with masonry elevator and stairway sha$s. Mechanical, Plumbing, Electrical, and Sprinkler Systems will roughed-in and inspected before covered with drywall and include a textured #nish. !e #nished drywall will be painted and the interior build-out includes #nished cabinets with tops, vinyl "oors and trim applied to all areas. !is trim out will be complemented by appliance installation along with the installation of blinds. A rough clean will be performed before carpet is installed along with a #nal paint touch up if needed. !e #nal cleaning of the Student Housing will be performed before inspections by all local agencies having jurisdiction and Polytechnic personnel.

Proposed Construction Period:!e proposed construction period for erection and buildout is approximately 9 months. Notice proceed is planned for 11/4/13 with substantial completion planned for 7/15/14.

The Florida Polytechnic University Innovation Science and Technology Building team discussing critical path items.

Page 68 of 74

Page 79: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Activity

ID

Activity

Description

PHASAREAOrig

Dur

Rem

Dur

% Start Finish

PROJECT MILESTONES

MILESTONES

MILE0900 NTP 0 04NOV13*

MILE1000 Substantial Completion 0 15JUL14

PROCUREMENT

PROCUREMENT

PROC1000 Steel Desgn 80% Comp-Released to Start Shop Dwgs 0 04NOV13

PROC1010 Prepare Steel Shop Drawings 18 04NOV13 27NOV13

PROC1020 Steel Shop Dwg Approval Process 5 02DEC13 06DEC13

PROC1030 Steel Procure Material & Shop Fabrication 18 09DEC13 03JAN14

PROC1040 Deliver Steel / Start Erection 0 06JAN14

AREA 1

BUILDING STRUCTURE

P11000 Foundation - Columns & Footings 15 04NOV13* 22NOV13

P11010 Plumbing & Electrician Slab Rough In 7 25NOV13 05DEC13

P11020 Prep & Pour - Foundation 15 06DEC13 27DEC13

P11030 Erect Steel & Deck 14 06JAN14 23JAN14

P11040 Prep & Pour Elevated Deck 14 24JAN14 12FEB14

EXTERIOR OF BUILDING

P11150 Exterior Framing / Dens Glass 15 13FEB14 05MAR14

P11160 Exterior Waterproofing / Windows 7 06MAR14 14MAR14

P11170 Install Windows 5 17MAR14 21MAR14

P11180 Scaffolding Exterior 5 17MAR14 21MAR14

P11190 Stucco 12 24MAR14 08APR14

P11200 Storefronts 5 09APR14 15APR14

P11210 Exterior Painting / Sealants 15 16APR14 06MAY14

INTERIOR FINISHES

P11240 Core Drilling 5 13FEB14 19FEB14

P11250 Masonry at Elevator & Stairway 10 17FEB14 28FEB14

P11260 Interior Framing 15 24FEB14 14MAR14

P11270 Plumbing Rough 8 05MAR14 14MAR14

P11280 Mechanical Rough 8 10MAR14 19MAR14

P11290 Electric Rough 8 10MAR14 19MAR14

P11300 Sprinkler Rough 8 10MAR14 19MAR14

P11310 Inspections 4 20MAR14 25MAR14

2013 2014OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC J

NTP

Substantial Completion

Steel Desgn 80% Comp-Released to Start Shop Dwgs

Prepare Steel Shop Drawings

Steel Shop Dwg Approval Process

Steel Procure Material & Shop Fabrication

Deliver Steel / Start Erection

Foundation - Columns & Footings

Plumbing & Electrician Slab Rough In

Prep & Pour - Foundation

Erect Steel & Deck

Prep & Pour Elevated Deck

Exterior Framing / Dens Glass

Exterior Waterproofing / Windows

Install Windows

Scaffolding Exterior

Stucco

Storefronts

Exterior Painting / Sealants

Core Drilling

Masonry at Elevator & Stairway

Interior Framing

Plumbing Rough

Mechanical Rough

Electric Rough

Sprinkler Rough

Inspections

© Primavera Systems, Inc.

Start Date 17APR08

Finish Date 15JUL14

Data Date 01OCT13

Run Date 03OCT13 09:34

Early Bar

Progress Bar

Critical Activity

PTDM

Skanska USA Building Inc.

FL Polytechnic Univ Student Housing

Proposal Schedule Layout

Sheet 1 of 4Date Revision Checked Approved

Page 69 of 74

Page 80: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Activity

ID

Activity

Description

PHASAREAOrig

Dur

Rem

Dur

% Start Finish

P11320 Roofing 20 05MAR14 01APR14

P11330 Insulate Exterior Wall 5 28MAR14 03APR14

P11350 Hang Drywall 6 04APR14 11APR14

P11360 Finish Drywall 6 14APR14 21APR14

P11370 Texture Drywall 2 22APR14 23APR14

P11380 Trim Doors 7 24APR14 02MAY14

P11390 Paint 7 05MAY14 13MAY14

P11410 Cabinets / Tops 5 07MAY14 13MAY14

P11420 Vinyl Floors 5 14MAY14 20MAY14

P11430 Plumbing Trim 7 21MAY14 30MAY14

P11440 Electric Trim 7 21MAY14 30MAY14

P11450 Mech Trim 7 21MAY14 30MAY14

P11460 Sprinkler Trim 7 21MAY14 30MAY14

P11470 Appliances / Blinds 5 02JUN14 06JUN14

P11480 Rough Clean 5 09JUN14 13JUN14

P11490 Carpet / Touch Up 5 09JUN14 13JUN14

P11500 Fine Clean / Final Inspections 3 16JUN14 18JUN14

AREA 2

BUILDING STRUCTURE

P21000 Foundation - columns and footings 15 25NOV13 17DEC13

P21010 Plumbing & Electrician Slab Rough In 7 18DEC13 27DEC13

P21020 Prep & Pour - Foundation 15 30DEC13 20JAN14

P21030 Erect Steel & Deck 13 24JAN14 11FEB14

P21040 Prep & Pour Elevated Deck 14 12FEB14 03MAR14

EXTERIOR OF BUILDING

P21150 Exterior Framing / Dens Glass 15 04MAR14 24MAR14

P21160 Exterior Waterproofing / Windows 7 25MAR14 02APR14

P21170 Install Windows 5 03APR14 09APR14

P21180 Scaffolding Exterior 5 03APR14 09APR14

P21190 Stucco 12 10APR14 25APR14

P21200 Storefronts 5 28APR14 02MAY14

P21210 Exterior Painting / Sealants 15 05MAY14 23MAY14

INTERIOR FINISHES

P21240 Core Drilling 5 04MAR14 10MAR14

P21250 Masonry at Elevator & Stairway 10 06MAR14 19MAR14

2013 2014OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC J

Roofing

Insulate Exterior Wall

Hang Drywall

Finish Drywall

Texture Drywall

Trim Doors

Paint

Cabinets / Tops

Vinyl Floors

Plumbing Trim

Electric Trim

Mech Trim

Sprinkler Trim

Appliances / Blinds

Rough Clean

Carpet / Touch Up

Fine Clean / Final Inspections

Foundation - columns and footings

Plumbing & Electrician Slab Rough In

Prep & Pour - Foundation

Erect Steel & Deck

Prep & Pour Elevated Deck

Exterior Framing / Dens Glass

Exterior Waterproofing / Windows

Install Windows

Scaffolding Exterior

Stucco

Storefronts

Exterior Painting / Sealants

Core Drilling

Masonry at Elevator & Stairway

© Primavera Systems, Inc.

Start Date 17APR08

Finish Date 15JUL14

Data Date 01OCT13

Run Date 03OCT13 09:34

Early Bar

Progress Bar

Critical Activity

PTDM

Skanska USA Building Inc.

FL Polytechnic Univ Student Housing

Proposal Schedule Layout

Sheet 2 of 4Date Revision Checked Approved

Page 70 of 74

Page 81: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Activity

ID

Activity

Description

PHASAREAOrig

Dur

Rem

Dur

% Start Finish

P21260 Interior Framing 15 13MAR14 02APR14

P21270 Plumbing Rough 8 24MAR14 02APR14

P21280 Mechanical Rough 8 27MAR14 07APR14

P21290 Electric Rough 8 27MAR14 07APR14

P21300 Sprinkler Rough 8 27MAR14 07APR14

P21310 Inspections 4 08APR14 11APR14

P21320 Roofing 20 24MAR14 18APR14

P21330 Insulate Exterior Wall 5 16APR14 22APR14

P21350 Hang Drywall 6 23APR14 30APR14

P21360 Finish Drywall 6 01MAY14 08MAY14

P21370 Texture Drywall 2 09MAY14 12MAY14

P21380 Trim Doors 7 13MAY14 21MAY14

P21390 Paint 7 22MAY14 02JUN14

P21410 Cabinets / Tops 5 27MAY14 02JUN14

P21420 Vinyl Floors 5 03JUN14 09JUN14

P21430 Plumbing Trim 7 10JUN14 18JUN14

P21440 Electric Trim 7 10JUN14 18JUN14

P21450 Mech Trim 7 10JUN14 18JUN14

P21460 Sprinkler Trim 7 10JUN14 18JUN14

P21470 Appliances / Blinds 5 19JUN14 25JUN14

P21480 Rough Clean 5 19JUN14 25JUN14

P21490 Carpet / Touch Up 5 19JUN14 25JUN14

P21500 Fine Clean / Final Inspections 3 26JUN14 30JUN14

AREA 3

BUILDING STRUCTURE

P31000 Foundation - Columns & Footings 15 18DEC13 09JAN14

P31010 Plumbing & Electrician Slab Rough In 7 10JAN14 20JAN14

P31020 Prep & Pour - Foundation 15 21JAN14 10FEB14

P31030 Erect Steel & Deck 13 12FEB14 28FEB14

P31040 Prep & Pour Elevated Deck 14 03MAR14 20MAR14

EXTERIOR OF BUILDING

P31150 Exterior Framing / Dens Glass 15 21MAR14 10APR14

P31160 Exterior Waterproofing / Windows 7 11APR14 21APR14

P31170 Install Windows 5 22APR14 28APR14

P31180 Scaffolding Exterior 5 22APR14 28APR14

2013 2014OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC J

Interior Framing

Plumbing Rough

Mechanical Rough

Electric Rough

Sprinkler Rough

Inspections

Roofing

Insulate Exterior Wall

Hang Drywall

Finish Drywall

Texture Drywall

Trim Doors

Paint

Cabinets / Tops

Vinyl Floors

Plumbing Trim

Electric Trim

Mech Trim

Sprinkler Trim

Appliances / Blinds

Rough Clean

Carpet / Touch Up

Fine Clean / Final Inspections

Foundation - Columns & Footings

Plumbing & Electrician Slab Rough In

Prep & Pour - Foundation

Erect Steel & Deck

Prep & Pour Elevated Deck

Exterior Framing / Dens Glass

Exterior Waterproofing / Windows

Install Windows

Scaffolding Exterior

© Primavera Systems, Inc.

Start Date 17APR08

Finish Date 15JUL14

Data Date 01OCT13

Run Date 03OCT13 09:34

Early Bar

Progress Bar

Critical Activity

PTDM

Skanska USA Building Inc.

FL Polytechnic Univ Student Housing

Proposal Schedule Layout

Sheet 3 of 4Date Revision Checked Approved

Page 71 of 74

Page 82: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Activity

ID

Activity

Description

PHASAREAOrig

Dur

Rem

Dur

% Start Finish

P31190 Stucco 12 29APR14 14MAY14

P31200 Storefronts 5 15MAY14 21MAY14

P31210 Exterior Painting / Sealants 15 22MAY14 12JUN14

INTERIOR FINISHES

P31240 Core Drilling 5 21MAR14 27MAR14

P31250 Masonry at Elevator & Stairway 10 25MAR14 07APR14

P31260 Interior Framing 15 25MAR14 14APR14

P31270 Plumbing Rough 8 03APR14 14APR14

P31280 Mechanical Rough 8 07APR14 16APR14

P31290 Electric Rough 8 07APR14 16APR14

P31300 Sprinkler Rough 8 07APR14 16APR14

P31310 Inspections 4 17APR14 22APR14

P31320 Roofing 20 03APR14 30APR14

P31330 Insulate Exterior Wall 5 25APR14 01MAY14

P31350 Hang Drywall 6 02MAY14 09MAY14

P31360 Finish Drywall 6 12MAY14 19MAY14

P31370 Texture Drywall 2 20MAY14 21MAY14

P31380 Trim Doors 7 22MAY14 02JUN14

P31390 Paint 7 06JUN14 16JUN14

P31410 Cabinets / Tops 5 10JUN14 16JUN14

P31420 Vinyl Floors 5 17JUN14 23JUN14

P31430 Plumbing Trim 7 24JUN14 02JUL14

P31440 Electric Trim 7 24JUN14 02JUL14

P31450 Mech Trim 7 24JUN14 02JUL14

P31460 Sprinkler Trim 7 24JUN14 02JUL14

P31470 Appliances / Blinds 5 03JUL14 10JUL14

P31480 Rough Clean 5 03JUL14 10JUL14

P31490 Carpet / Touch Up 5 03JUL14 10JUL14

P31500 Fine Clean / Final Inspections 3 11JUL14 15JUL14

2013 2014OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC J

Stucco

Storefronts

Exterior Painting / Sealants

Core Drilling

Masonry at Elevator & Stairway

Interior Framing

Plumbing Rough

Mechanical Rough

Electric Rough

Sprinkler Rough

Inspections

Roofing

Insulate Exterior Wall

Hang Drywall

Finish Drywall

Texture Drywall

Trim Doors

Paint

Cabinets / Tops

Vinyl Floors

Plumbing Trim

Electric Trim

Mech Trim

Sprinkler Trim

Appliances / Blinds

Rough Clean

Carpet / Touch Up

Fine Clean / Final Inspections

© Primavera Systems, Inc.

Start Date 17APR08

Finish Date 15JUL14

Data Date 01OCT13

Run Date 03OCT13 09:34

Early Bar

Progress Bar

Critical Activity

PTDM

Skanska USA Building Inc.

FL Polytechnic Univ Student Housing

Proposal Schedule Layout

Sheet 4 of 4Date Revision Checked Approved

Page 72 of 74

Page 83: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

TAB 7 – BUSINESS TERMS

Page 84: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Proposed Business Terms In general, the form of lease included as Exhibit F is acceptable. Below is a summary of some of the major business terms:

Term of Lease – Commencing on October ___, 2013 and terminating 99 years from August, ____2014

Rent - $100 per year. The rent is negotiable on future leases for future phases, if applicable.

Construction – The land on which the Improvements will be constructed will be delivered “pad  ready” by the Lessor no later than November 1, 2013. Lessor will provide water, sewer, electricity, internet and cable to the site. Lessee will provide 100% Construction Documents to the University for its approval. In the interest of time, the University shall have 5 business days to review the plans  and  specifications  and  provide  comments.    The  University’s  comments  shall be limited to deviations from the State Requirements for Educational Facilities (November 19, 2012), the Florida Building Code (2010), and the   University’s   established   design   and architectural standards (Exhibit E). The Lessee will have sole responsibility for the costs of constructing the Improvements. A payment and performance bond or a guarantee from the contractor will be provided to cover the construction of the Improvements. A representative of Lessee shall meet weekly with Lessor, or a representative of Lessor, during the construction of the Improvements to update Lessor on the progress of construction.

The Improvements shall be completed lien free in accordance with the plans and specifications by August 19, 2014. If the Improvements are not substantially complete by August 19, 2014, Lessee shall pay the cost to house any students that have fully executed leases off campus as well as pay the cost to transport these students to the campus.

Leasehold Financing – Lessee has the right to encumber its leasehold interest as security for financing. Without the prior written consent of the Lessor, neither the land nor the Improvements shall be used as security for financing, and the amount of the financing secured by the leasehold interest shall not exceed 80% of the value of the leasehold interest as determined by an independent appraisal. Unless agreed to by Lessor, Lessor shall not have any obligation or liability related to any financing obtained by Lessee.

Subtenants – Only students matriculating at the University, faculty or visiting faculty shall be tenants of the community.

Marketing – The University shall include this community on its web site, campus, and in all materials provided to prospective students as the sole provider of student housing for the University.

Page 73 of 74

Page 85: Vestcor Communities Inc-Statement of Qualifications-10-07-2013

Property Operations – Lessee shall operate, and maintain the community in a manner consistent with the other on campus student housing in the State University System. The University’s   rules   of   student   conduct   shall   be   incorporated   in   the   rules   for   the   community.    Lessee shall maintain the community in good order and repair and in a safe and sanitary condition, ordinary wear and tear excepted, and reasonably free from trash and debris. Lessee shall be responsible for all services for the interior of the community. The Lessee will work with the University related to services for the exterior of the community, including landscaping, security, and trash removal. Lessee will be responsible for paying all property taxes assessed as a result of the Improvements. Lessee will reimburse the University, at the  University’s cost according to agreements the University has   executed,   for   Lessee’s   usage   of   water,   sewer,  electricity, internet, and cable.

Rental Rates/Financial Reporting – Lessee and Lessor shall meet annually to discuss rental rates. The rental rates shall be comparable to rental rates charged by other comparable on campus student housing in the State University System. Lessee shall have no financial reporting requirements to Lessor.

Insurance - Lessee  shall  provide  worker’s  compensation  insurance  in  compliance with Florida laws, general liability insurance with a $1,000,000 per occurrence and $2,000,000 aggregate coverage, excess liability coverage of $10,000,000, and property coverage for the full replacement cost of the Improvements with a maximum $25,000 deductible, except the maximum deductibles for named storm will be 5%, earthquake will be $250,000 and flood will be $500,000.

Assignment of Lease – The lease can be assigned at any time by Lessee subject to Lessor approval of new Lessee.

Right of First Refusal – If Lessee presents to Lessor an offer from a new Lessee to assume the lease, Lessor shall have the right to terminate the lease by paying the Lessee the amount the Lessee would have received as part of the assignment transaction.

Net Operating Income Guarantee - If the University decides to move forward with additional on-campus housing to be constructed and owned by anyone other than Lessee, or an affiliate of Lessee, the University and Lessee shall enter into an agreement that includes a guarantee to the Lessee at a certain net operating income.

Delinquency Enforcement – The University will assist Lessee in its efforts to collect outstanding balances owed to Lessee by any Subtenants by placing a hold on transcripts, grades, and/or future registration until such balances are paid.

Page 74 of 74