Versioning of MV90 Master Files. Versioning of Master Files. Critical change is deemed when one of the following parameters are changed in the MV90 Master file: # of Channels UOM per Channel Direction of Power Flow Intervals per Hour Pulse Multiplier Meter Multiplier - PowerPoint PPT PresentationTRANSCRIPT
Versioning of MV90 Master Files
Versioning of Master Files• Critical change is deemed when one of the following
parameters are changed in the MV90 Master file:– # of Channels
– UOM per Channel
– Direction of Power Flow
– Intervals per Hour
– Pulse Multiplier
– Meter Multiplier
• NEW registration process designed to handle pulse multiplier and meter multiplier changes
• Applicable only for Compliant Meter Installations
Versioning of Master Files• Meter ki changes (pulse multiplier) and CT tap changes
(meter multiplier) nolonger require re-registration of the meter installation
• Process involves IMO versioning of the master file - master file history is maintained
• MPID is maintained for the life of the installation
• First 3 weeks of historical estimated data is lost - occurs everytime the masterfile is versioned
• Savings of approx. $10k per meter point registration
• Market Manual 3.2 will be updated at next baseline