Version Mars 12, 2002 Zensol Automation Inc.
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
NEXT PREVIOUS
BACK PAGE 1
Perform timing tests on a 3 contact Perform timing tests on a 3 contact breakerbreaker
• Breaker preparation for the testBreaker preparation for the test
• Cable installation by the operatorsCable installation by the operators
• Travel transducer kit installationTravel transducer kit installation
• The CBA-32PThe CBA-32P
• perform the test with CBA WIN test planperform the test with CBA WIN test plan
• ConclusionConclusion
![Page 2: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/2.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Isolate the breaker thanks to the sectionnors Isolate the breaker thanks to the sectionnors
NEXT PREVIOUS
BACK PAGE 1
The sectionnors are openThe sectionnors are open
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 3: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/3.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Ground the breakerGround the breaker
NEXT PREVIOUS
BACK PAGE 1
Grounding of Grounding of the breakerthe breaker
Ground cableGround cable
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 4: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/4.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Cable of the CBA-32PCable of the CBA-32P
NEXT PREVIOUS
BACK PAGE 1
Contact cablesContact cables
Ground cableGround cable
Command cableCommand cable
Extension Extension cablescables
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 5: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/5.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
The CBA-32PThe CBA-32P
Grounding Grounding of CBA-of CBA-
32P32P
24 contact 24 contact CBA-32PCBA-32P
CommandCommand
6 analog 6 analog inputsinputs
Fiber optic Fiber optic linklink
Standard Standard labtop labtop computercomputer
NEXT PREVIOUS
BACK PAGE 1
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 6: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/6.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Installation of CBA-Installation of CBA-32P32P
NEXT PREVIOUS
BACK PAGE 1
Breaker with 3 Breaker with 3 separate tanksseparate tanks
CBA-32PCBA-32P
Control Control cabinetcabinet
computercomputer
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 7: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/7.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Contact connectionsContact connections
NEXT PREVIOUS
BACK PAGE 1
Simple Simple contactcontact
ResistiveResistivecontactcontact
Double Double resistive resistive contactcontact
Typical configuration of a 3 contact breakerTypical configuration of a 3 contact breaker
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 8: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/8.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Command connectionsCommand connections
NEXT PREVIOUS
BACK PAGE 1
Ouverture des Ouverture des contactscontacts
Fermeture Fermeture des contactsdes contacts
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 9: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/9.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Travel transducer kit installationTravel transducer kit installation
NEXT PREVIOUS
BACK PAGE 1
Mechanical basis allowing Mechanical basis allowing the positionning of the the positionning of the
transducer on the breakertransducer on the breaker
Linear travel Linear travel transducertransducer
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 10: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/10.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Load a test plan with the CBA Win Load a test plan with the CBA Win ©© software software
NEXT PREVIOUS
BACK PAGE 1
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 11: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/11.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Performing the testPerforming the test
NEXT PREVIOUS
BACK PAGE 1
Fiber optic Test Fiber optic Test linklink
Cable test linkCable test link
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 12: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/12.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Fiber optic test link Fiber optic test link
NEXT PREVIOUS
BACK PAGE 1
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 13: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/13.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Cable test linkCable test link
NEXT PREVIOUS
BACK PAGE 1
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 14: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/14.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
We can now start the testWe can now start the test
NEXT PREVIOUS
BACK PAGE 1
Start Start acquisitionacquisition
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 15: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/15.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Test : CloseTest : Close
NEXT PREVIOUS
BACK PAGE 1
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 16: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/16.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Test : OpenTest : Open
NEXT PREVIOUS
BACK PAGE 1
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 17: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/17.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Test : Close OpenTest : Close Open
NEXT PREVIOUS
BACK PAGE 1
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 18: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/18.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Tabular reportTabular report
NEXT PREVIOUS
BACK PAGE 1
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA
![Page 19: Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation](https://reader036.vdocuments.us/reader036/viewer/2022062423/56649f005503460f94c16622/html5/thumbnails/19.jpg)
Version Mars 12, 2002 Zensol Automation Inc.
Tabular report (continued)Tabular report (continued)
NEXT PREVIOUS
BACK PAGE 1
TIMING TESTS - TIMING TESTS - ALABAMAALABAMA