verifying tof and lps in alice

22
Verifying TOF and LPS in Alice Josh Briegal 21/08/12

Upload: isadora-prosper

Post on 30-Dec-2015

21 views

Category:

Documents


4 download

DESCRIPTION

Verifying TOF and LPS in Alice. Josh Briegal 21/08/12. Aims. Verify the longitudinal compression scheme in ALICE Confirm Peter’s ELEGANT model is correct Re create data taken by Peter and Frank in shifts #3058 (AR1-BPM06) and #3076 (ST2-BPM04). LC1GS Varied AR1-QUAD01/04 Varied #3058. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Verifying TOF and LPS in Alice

Verifying TOF and LPS in Alice

Josh Briegal 21/08/12

Page 2: Verifying TOF and LPS in Alice

Aims

• Verify the longitudinal compression scheme in ALICE

• Confirm Peter’s ELEGANT model is correct

• Re create data taken by Peter and Frank in shifts #3058 (AR1-BPM06) and #3076 (ST2-BPM04)

Page 3: Verifying TOF and LPS in Alice

LC1GS VariedAR1-QUAD01/04 Varied#3058

AR1-BPM06Before Chicane

Shifted Parabola

ELEGANT consistently steeper

Confirms isochronous condition (~2.16A QUAD01/04)

Page 4: Verifying TOF and LPS in Alice

LC1GS VariedAR1-QUAD01/04 Varied#3076

ST2-BPM04Post Chicane

Page 5: Verifying TOF and LPS in Alice

LC1GS VariedAR1-SEXT01 Varied#3058

AR1-BPM06Before Chicane

Page 6: Verifying TOF and LPS in Alice

LC1GS VariedAR1-SEXT01 Varied#3076

ST2-BPM04Post Chicane

Note:

Frank used 2.23A on AR1-QUAD01/04 not 2.19

Page 7: Verifying TOF and LPS in Alice

Further Investigations

• Vary LC2GS instead of LC1 (Frank shift #3056)• Vary AR1-SEXT02 instead of AR1-SEXT01

Page 8: Verifying TOF and LPS in Alice

LPS plots

• Tracking LPS as beam goes through the chicane

• Compare for different sextupole and quadrupole strengths at nominal energy

• Comparing LPS based on different beam distributions for different setups (THZ and FEL)

• All at nominal energy (~26MeV)

Page 9: Verifying TOF and LPS in Alice

Before Chicane

AR1-SEXT01 varied

Black 0ARed 3ABlue 9A

Page 10: Verifying TOF and LPS in Alice

Current Histogram

Before Chicane

AR1-SEXT01 varied

Black 0ARed 3ABlue 9A

Page 11: Verifying TOF and LPS in Alice

Post Chicane

AR1-SEXT01 varied

Black 0ARed 3ABlue 9A

Page 12: Verifying TOF and LPS in Alice

Current Histogram

Post Chicane

AR1-SEXT01 varied

Black 0ARed 3ABlue 9A

Page 13: Verifying TOF and LPS in Alice

Before Chicane

AR1-QUAD01/04 varied

Red 2.11ABlue 2.15ABlack 2.19AGreen 2.23A

Page 14: Verifying TOF and LPS in Alice

Current Histogram

Before Chicane

AR1-QUAD01/04 varied

Red 2.11ABlue 2.15ABlack 2.19AGreen 2.23A

Page 15: Verifying TOF and LPS in Alice

Post Chicane

AR1-QUAD01/04 varied

Red 2.11ABlue 2.15ABlack 2.19AGreen 2.23A

Page 16: Verifying TOF and LPS in Alice

Current Histogram

PostChicane

AR1-QUAD01/04 varied

Red 2.11ABlue 2.15ABlack 2.19AGreen 2.23A

Page 17: Verifying TOF and LPS in Alice

THZ setup

Before Chicane

Page 18: Verifying TOF and LPS in Alice

THZ setup

Post Chicane

Page 19: Verifying TOF and LPS in Alice

FEL Black

THZ Red

Before Chicane

Page 20: Verifying TOF and LPS in Alice

Current histogram

FEL Black

THZ Red

Before Chicane

Page 21: Verifying TOF and LPS in Alice

FEL Black

THZ Red

Post Chicane

Page 22: Verifying TOF and LPS in Alice

Current histogram

FEL Black

THZ Red

Post Chicane