ventilation statement - welcome to the aylesbury …€¦ · · 2016-07-11this ventilation...
TRANSCRIPT
Planning Application for the Aylesbury Estate Regeneration
Plot 18 Reserved Matters Application
v1Aecom
Ventilation Statement
Aylesbury Regeneration:Plot 18 Reserved Matters Application
Ventilation Statement
April 2016
Document Number 60341461 / Ventilation Statement
Prepared by: ........................................................... Checked by: .....................................................................Jonathan Umpleby Carmen LauPrincipal Engineer Principal Engineer
Approved by: ......................................Colin PageRegional Director
Rev No Comments Checked by Approvedby
Date
A Issued for Comment CL CP 15/04/2016B Issued for Planning CL CP 29/04/2016
36 Storey's Way, Cambridge, CB3 0DTTelephone: 01223 488000 Website: http://www.aecom.com
Job No 60341461 Date Created April 2016
This document has been prepared by AECOM Limited for the sole use of our client (the “Client”) and in accordance withgenerally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM Limited andthe Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM Limited,unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and expresswritten agreement of AECOM Limited.
f:\projects\services - nhh aylesbury plot 18\7-0 reports and specifications\7-3 stage 3 (planning)\2016_04_14 ventilation planningstatement.docx
0
1 Introduction................................................................................................................................................................ 1
2 North Block Ventilation .............................................................................................................................................. 2
3 South Block Ventilation ............................................................................................................................................. 4
4 Other Plant Flues and Exhausts ................................................................................................................................ 6
5 Appendices ................................................................................................................................................................ 7
Table of Contents
1
1.1 BackgroundThis Ventilation Statement has been preparedby AECOM to support the application for theapproval of Reserved Matters in relation toDevelopment Parcel 18 (Plot 18).
Plot 18 is part of the wider Aylesbury EstateRegeneration Scheme which covers an area of22.1 ha, and for which there is Outline PlanningPermission (LPA ref: 13/AP/3844) granted on5th August 2015.
1.2 Plot 18 Proposed DevelopmentThe Plot 18 site itself is 1.02 ha and consists ofSubplot 18a (North Block) and Subplot 18b
(South Block). The North Block comprises thefollowing uses:
Residential Use (122 units)
Community Facility (Library, AfterhoursFacility, Stay and Play, Meeting Rooms,Creation Trust Office)
Commercial Use
The South Block comprises the following uses:
Health Centre
Early Years Facility
Basement BOH and car park
Figure 1: Plot 18 site in context
1 Introduction
2
2.1 Residential Dwellings [C3]All dwellings will be ventilated in accordancewith Part F of Building Regulations.
Each apartment will be provided with ‘wholehouse’ heat recovery ventilation (MVHR) toextract air from the kitchen, bathroom(s) andutility room and to provide fresh air to the livingareas and bedrooms.
Ventilation extract boost will be operated by aswitch located in the kitchen. The MVHR willalso incorporate summer bypass.
Extract grilles shall come with integratedremovable filters to comply with the latest NHBCstandards.
All ductwork will be rigid plastic ductwork. Therewill be no use of flexible ductwork. Intake andexhaust ductwork will be insulated to preventcondensation.
A double air brick on the façade shall berequired for connecting the MVHR ventilationductwork intake and discharge points to outside.
Purge ventilation to each room will be providedthrough the use of an openable window.
Cookers will be provided with recirculationhoods, as specified by the Architect.
2.2 Community Facility [D1]The Community Facility shall be provided withmechanical supply and extract ventilation basedon 10l/s/person and in compliance with BuildingRegulations Part F. Ventilation shall be suppliedfrom two central air handling units (AHU) asfollows:
Library AHU
This AHU is located at high level in Block 2 cyclestore (making use of the high floor to under soffitdimensions). The AHU will comprise of filters,heating and cooling coils and a thermal wheel.Air intake and exhaust shall be via high levellouvres on the façade at ground floor level (seeFigure 2).
Stay & Play and Community Trust AHU
This AHU is located at high level within theBuggy Store ceiling void. The AHU will compriseof filters, heating and cooling coils and a plateheat exchanger. Air intake and exhaust shall bevia high level louvres on the façade at groundfloor level (see Figure 2).
Refer to Appendix A for detailed ventilationdrawing of the North block ground floor.
Figure 2: Community Facility ventilation strategy
44444
2 North Block Ventilation
CommunityFacility
AHU
ExhaustIntake
Exha
ust
AH
U
Stay &Play
CreationTrust
3
2.3 Commercial unit [A1]The commercial unit is being designed as a shelland core for fit out by tenant. As part of the shelland core provision, high level louvres will beprovided at ground floor level on each façade forthe ventilation units to discharge exhaust air andbring in fresh air (see Figure 3).
Final ventilation shall be designed and providedby the Fit-out contractor to suit the use of thespace.
Refer to Appendix A for detailed ventilationdrawing of the North block ground floor.
2.4 Cafe [A1 / A3 ]The cafe is being designed as a shell and corefor fit out by tennant. As part of the shell and coreprovision, high level louvres will be provided atground floor at the front façade for the ventilationunits to discharge exhaust air and bring in freshair (see Figure 3).
Final ventilation shall be designed and providedby the Fit-out contractor to suit the use of thespace.
Refer to Appendix A for detailed ventilationdrawing of the North block ground floor.
Figure 3: Commercial unit and Café shell and core ventilation strategy
44444
Intake / Exhaustlouvre
Commercialunit
(Pharmacy)
Cafe
Intake / Exhaustlouvre
Inta
ke/E
xhau
stlo
uvre
4
3.1 Health Centre [D1]The Health Centre shall be provided withmechanical supply and extract ventilation inaccordance with Health Technical Memorandum(HTM) 03-01. Ventilation shall be supplied froma central air handling units (AHU) at roof level.
The AHU will comprise of filters, heating andcooling coils and a thermal wheel. Air intake andexhaust shall be at roof level and separated by adistance of circa 10m and on different facades ofthe roof plant enclosure. Two smoke extract fanswill also provide smoke clearance to the stairlobbies at each floor (see Figure 4).
Refer also to Appendix B for a detailed roof leveldrawing of the South Block.
3.2 Early Years [D1]The Earl Years nursery shall be provided withmechanical ventilation in accordance with Part Fof Building Regu
lations.
Ventilation shall be supplied from two central airhandling units
Early Years Facility and General AHU
This AHU is located at roof level and willcomprise of filters, heating and cooling coils anda plate heat exchanger. Air intake and exhaustshall also be at roof level and separated by adistance of circa 10m and on different facades ofthe roof plant enclosure (see Figure 4).
Early Years Facility Kitchen AHU and extract fan
The kitchen extract system shall meet thestandard required by DEFRA Guidance on 'Thecontrol of odour and noise from commercialkitchen exhaust systems' (2011).
A kitchen extract fan shall be provided at rooflevel with the exhaust also at roof level. Make-upsupply air will be provided by a dedicated supplyonly AHU at roof levelThe AHU will comprise offilters and heating coils.
The air intake will be at roof level and separatedfrom the exhaust by a distance of circa 10m andon different facades of the roof plant enclosure(see Figure 4).
Refer also to Appendix B for a detailed roof leveldrawing of the South Block.
Figure 4: South Block roof layout with ventilation units
3 South Block Ventilation
Intake
IntakeIntake
ExhaustExhaust
(Health Centreand Kitchen)
Health CentreAHU
BasementBOH supply
AHU
Early YearsAHU
Kitchen AHUand separate
extract fanStair lobbysmoke extract
fan
Stair lobbysmoke extract
fan
Exhaust
Exhaust
Generator (seesection 4.3)
Line of roof plant enclosure
5
3.3 South Block Basement BOH [D1]The Basement Back of House (BOH) areas shall beprovided with mechanical ventilation in accordancewith Part F of Building Regulations.
Supply air ventilation shall be supplied from a roofmounted AHU and will comprise of filters, heatingcoils and a run-around heat recover coil linked tothe extract unit located in the basement. Air intakeis at roof level and is ducted through the building tothe basement level to supply fresh air (see figure 4above).
The BOH areas of the basement shall have airextracted via an extract fan at basement level. Theextracted air will be exhausted to outside at groundfloor via louvres integrated into landscape feature(see Figure 5).
This system will also run to provide smoke extract(albeit with dedicated smoke extract fans) in linewith the Fire strategy.
3.4 South Block Basement Car Park [D1]The basement car park will be mechanicallyventilated in accordance with Building RegulationsApproved Document Part F and Part B and willachieve the standards set out in BS 7346-7: 2013.
Dedicated duty / standby car park extract fans willextract air from one end of the car park andexhausting the air to outside at ground floor. Innormal mode it will extract 6 ac/hr. In fire mode itwill extract 10ac/hr.
Make-up air will be drawn in naturally via the carpark ramp entrance.
In order to achieve good distribution of air flow, themechanical ventilation will be supported with animpulse fan (see Figure 5).
Refer also to Appendix C for a detailed basementdrawing of the South Block ventilation.
Figure 5: South Block basement veniltation strategy
Car parkextract fans
BOH extractfans
ExhaustExhaust
AirIntake
Impulse fan
HealthCentre BOH
Health CentreCar Park
6
4.1 Temporary gas fire boilersA purpose-built flue riser will accommodate thetemporary boiler flues in the North Block heatingplantroom.
An individual flue will be provided for each boiler,running horizontally to the flue riser in Block 1and will then rise vertically to discharge toatmosphere at the highest point of level 15 rooflevel to comply with the requirements of theClean Air Act (see Figure 6)
The condensing boilers shall be low NOx typeachieving 35mg/kWh NOx emissions.
Refer also to Appendix D for a detailed drawingof the North block roof with MEP services.
4.2 North Block Life safety generatorA life safety generator will be provided for backup electricity on failure of mains electricity to lifesafety systems in the North Block.
The generator will be located at roof level withthe flue discharging above the generator to meetthe Clean Air Acts requirement (see Figure 6).
As the generator is proposed for emergencyonly, it will only be running during scheduledtests or in the event of a power cut.
Refer also to Appendix D for a detailed drawingof the North block roof with MEP services.
4.3 South Block Life safety generatorA life safety generator will be provided for backup electricity on failure of mains electricity to lifesafety systems in the South Block.
The generator will be located at roof level withthe flue discharging above the generator to meetthe Clean Air Acts requirement (see Figure 4 onpage 4).
As the generator is proposed for emergencyonly, it will only be running during scheduledtests or in the event of a power cut.
Refer also to Appendix B for a detailed roof leveldrawing of the South Block.
Figure 6: North Block Flue discharge poin
4 Other Plant Flues and Exhausts
Three tempoerary boilerfluea discharge 1m abovehighest point of building atLevel 15
Life safetypackagedgenerator withflue above unit
Core 1 residential corridorsmoke extract and day today environmental extracfan
Exhaustair
7
Appendix A: North block ground floor ventilation drawing no. NHH-P18-NB-M-0100
Appendix B: South block roof level MEP drawing no. NHH-P18-SB-MEP-0001
Appendix C: South block basement ventilation drawing no. NHH-P18-SB- MEP-0002
Appendix D: North block roof level MEP drawing no. NHH-P18-NB-MEP-0001
5 Appendices
ISO A
1 5
94
mm x 8
41
mm
KEY PLAN
CONSULTANT
PROJECT
CLIENT
Recycled Content Paper
Printed on ___% Post-Consumer
PROJECT NUMBER
This dra
win
g h
as b
een pre
pare
d for th
e u
se of A
EC
OM’s clie
nt. It
may n
ot be u
sed,
modifie
d, re
pro
duced or relie
d u
pon b
y third p
arties, except as a
gre
ed b
y A
EC
OM or as required b
y la
w. A
EC
OM a
ccepts n
o responsibility, and d
enies a
ny lia
bility w
hats
oever, to a
ny p
arty that uses or relie
s o
n this dra
win
g without A
EC
OM’s e
xpre
ss written c
onsent. D
o n
ot scale this d
ocu
ment. All
measure
ments m
ust be o
btain
ed fro
m the state
d dim
ensio
ns
NHH AYLESBURY
PLOT 18
NORTH BUILDING
ASSOCIATION
HOUSING
NOTTING HILL
AECOM
36 Storey's Way
Cambridge, Cambridgeshire
CB3 0DT
United Kingdom
www. aecom.com
Tel +44 (0)1223 488 000
NOTES
60341461
intake
Resi LV
Electrical
Riser
Co
mms
1100 litre
Euro
bin
1370x1260
1100 litre
Euro
bin
1370x1260
1100 litre
Euro
bin
1370x1260
1100 litre
Euro
bin
1370x1260
1100 litre
Euro
bin
1370x1260
1100 litre
Euro
bin
1370x1260
1100 litre
Euro
bin
1370x1260
1100 litre
Euro
bin
1370x1260
1100 litre
Euro
bin
1370x1260
1100 litre
Euro
bin
1370x1260
1100 litre
Euro
bin
1370x1260
1100 litre
Euro
bin
1370x1260
Refuse
Block 1
BINS
12
Cafe:
96 Cycles
Block 1
Post
FFL 3.35
82.7m²
Entrance
Block 01
Kitchen
Meeting Rm 2
17m²Area: 17m²Area:
Meeting Rm 1
Entrance
Block 03
Entrance
Block 02
+3.00
+3.00
+3.34
+3.00
Store
Buggy
DWC
Staff Room
44m²Area:
S+P Storage
Refuse
Block 2
DW
C
F
Kitchen
Child WC
40 Cycles
Block 2
WC
115.9m²
Commercial:
FFL 2.75
45 Cycles
Block 3
Fire Escape
Sub St.
Refuse
Block 3
CF R
efuse
48m²
Community Trust:
Brief: 59m²
Brief: 65m²
452.94m²
Area:
Library
110m²:
Multi Use space
Escape
Cloaks
Work Room
29m²Area:
store
Cleaners
8m²Area:
10m²Area:
S+P Storage
7m²Area:
Entrance
Block 01
Lockers
Electric
Comms
Cooling
Heating
Water
Cold
Domestic
Cupboard
Life Safety
Zone
Children's
Study Group
Teenagers
Photocopier Payment
Periodicals
Display
Quiet Study
Display
Service
Self
Service
Self
Service
Self
Technology
Information
Displa
y
Display Display
Display
Display
Printing
Server Room
10m²Area:
FFL 3.00
FFL 3.00
9m²Area:
Htg
Electric
Co
mms
Cupboard
Life S
afety
Clg
+3.34
M
inta
ke
water
Mains
FFL 3.10
FU
TU
RE W
ALL LIN
E
NORTH BLOCK GROUND FLOOR PLANTROOMS AND RISERS IN PREFERRED LOCATIONS
$Filena
me_
NE$
$Last_
Saved_Last_
Plotted_
NE$
SHEET TITLE
SHEET NUMBER
Appro
ved:
Checked:
Desig
ner:
Project
Manage
ment Initials:
I/R DATE DESCRIPTION
ISSUE/REVISION
____
____
____
B
A
NORTH BUILDING
18/04/2016 PRELIMINARY ISSUE
SUPPLY.
UTILITIES AND ANY OTHER ROOM WITHOUT A BALANCED AIR
MADE FOR FLOOR FINISH) TO ALL WCs, SHOWERS, DIRTY
BE PROVIDED VIA THE DOOR UNDERCUT (WITH ALLOWANCE
7. A MINIMUM OF 10mm DEPTH OF VENTILATION AREA IS TO
DRAWINGS)
GRILLE / CHILLED BEAM (NOTE - NOT SHOWN ON STAGE D
VCD ON EACH MAJOR BRANCH AND EACH FINAL BRANCH TO
REQUIRED FOR COMMISSIONING PURPOSES INLCUDING A
6. VOLUME CONTROL DAMPERS ARE TO BE INSTALLED AS
DRAWINGS.
MUST BE INDICATED ON CONTRACTOR WORKING
EQUIPMENT IN ACORDANCE WITH DW/142. ACCESS DOORS
CLEANING PURPOSES AND FOR ACCESS TO DUCT MOUNTED
5. DUCT ACCESS DOORS ARE TO BE INSTALLED FOR
SMOKE DAMPER PANEL.
PROVIDED WHICH WILL BE ACTUATED BY AN ADDRESSIBLE
COMPARTMENT WALLS, SMOKE DAMPERS WILL BE
WHICH IT PENETRATES. IN 1 HOUR OR 2 HOUR
TO AT LEAST THE SAME RATING AS THE WALL THROUGH
4. FIRE DAMPERS SHALL BE PROVIDED IN ALL DUCTWORK
THE SPECIFICATION UNLESS STATED OTHERWISE
ACCORDANCE WITH DW144 TO THE STANDARD DETAILED IN
CONSTRUCTED FROM GALVANISED SHEET STEEL IN
3. GROUND FLOOR DUCTWORK FROM SHALL BE
SCHEDULES
ENGINEERING DRAWINGS, REPORTS, SPECIFICATIONS AND
RELEVANT ARCHITECT, MEP AND STRUCTURAL
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL
1. WORK TO FIGURED DIMENSIONS ONLY
GROUND FLOOR
VENTILATION SERVICES LAYOUT
NHH-P18-ACM-NB-M-0100
TRANSFER GRILLE
DUCT MOUNTED LTHW RE-HEAT BATTERY
LEGEND
LINEAR EXTRACT GRILLE
LINEAR SUPPLY DIFFUSER
SQUARE LOUVREED FACE CEILING SUPPLY DIFFUSER
SQUARE LOUVREED FACE CEILING EXTRACT GRILLE
APPEARANCE OF CIRCULAR CHILLED BEAM)
CIRCULAR CEILING SUPPLY DIFFUSER (TO MATCH
4-PIPE CIRCULAR ACTIVE CHILLED BEAM
APPEARANCE OF CIRCULAR CHILLED BEAM)
CIRCULAR CEILING EXTRACT GRILLE (TO MATCH
HEAT RECOVERY
COOLING COILS AND PLATE HEAT EXCHANGER
UNIT. AHU TO INCLUDE HEATING COILS,
AT HIGH LEVEL WITH ACCESS FROM BELOW THE
COMMUNITY FACILITY AIR HANDLING UNIT AHU 6
AHU 6
6 AT HIGH LEVEL
LOUVRE FOR AHU
EXHAUST
AHU 5
1000x250 EXTRACT DUCT
1000x250 S
UP
PL
Y D
UC
T
TO THE SIDE OF THE UNIT FOR MAINTENANCE.
ACCESS ZONE TO BE KEPT CLEAR OF SERVICES
AND THERMAL WHEEL HEAT RECOVERY.
AHU TO INCLUDE HEATING AND COOLING COILS
AHU 5 AT HIGH LEVEL ABOVE CYCLE STORE.
LIBRARY AND WORK ROOM AIR HANDLING UNIT
1000x250 SUPPLY DUCT
1000x250 EXTRACT DUCT
600x500 I
NT
AK
E D
UC
T
600x500 EXHAUST DUCT
1000x250 INTAKE DUCT
EX
HA
US
T D
UC
T
1000x250
LEVEL FOR AHU 5 AND AHU 6
INTAKE LOUVRE AT HIGH
AHU 5 AT HIGH LEVEL
EXHAUST LOUVRE FOR
AT
T.
AT
T.
AT
T.
AT
T.
LOUVRED DOORS
VENTILATION VIA
NATURAL
LOUVRED DOORS
VENTILATION VIA
NATURAL LOUVRED DOORS
VENTILATION VIA
NATURAL DOORS
VIA LOUVRED
VENTILATION
NATURAL DOORS
VIA LOUVRED
VENTILATION
NATURAL
LOUVRED DOORS
VENTILATION VIA
NATURAL
LOUVRED DOORS
VENTILATION VIA
NATURAL
VIA LOUVRED DOORS
NATURAL VENTILATION
REFUSE STORE WITH
AND EXHAUST)
UNITS (E.G. INTAKE, SUPPLY, EXTRACT
EXTERNAL SIDE OF ALL AIR HANDLING
PROVIDED ON THE THE ROOM SIDE AND
DUCT MOUNTED ATTENUATORS TO BE
VENTILATION
NATURAL
VENTILATION
NATURAL
VENTILATION
NATURAL
TO USE FOR VENTIALTION
FACADE FOR FIT OUT CONTRACTOR
HIGH LEVEL LOUVRE STRIP ALONG
CONTRACTOR.
FIT-OUT
VENTILATION BY
TO USE FOR VENTIALTION
FACADE FOR FIT OUT CONTRACTOR
HIGH LEVEL LOUVRE STRIP ALONG
CONTRACTOR.
FIT-OUT
VENTILATION BY
TO USE FOR VENTIALTION
FACADE FOR FIT OUT CONTRACTOR
HIGH LEVEL LOUVRE STRIP ALONG
CROSS VENTILATION
SUBSTATION TO PROMOTE
DUCT DROPS TO L.L. AT BACK OF
SPECIFICATION
LOUVRED DOORS TO UKPN
WITH LOUVRE AT FRONTAGE.
DURASTEEL DUCTWORK AT H.L.
UKPN SPECIFICATION. 1585x350
SUBSTATION VENTILATION TO
(TYPICAL)
FOR HEATING AND COOLING
4 PIPE ACTIVE CHILLED BEAM
CEILING MOUNTED CIRCULAR
CHILLED BEAMS (TYPICAL)
REQUIREMENTS NOT PROVIDED BY
REMAINING FRESH AIR
SUPPLY DIFFUSER FOR SUPPLY
THE CIRCULAR CHILLED BEAM
MATCH (OR CLOSELY MATCH)
SELECTION OF GRILLE TO
CIRCULAR EXTRACT GRILLE.
NOISE BREAK OUT FROM AHU
BUGGY STORE TO MINIMISE
ACOUSTIC CEILING REQUIRED IN
VENTILATION
NATURAL
A1 PLAN
Scale 1:100
23/04/2016 STAGE D ISSUE
ISO A
1 5
94
mm x 8
41
mm
KEY PLAN
CONSULTANT
www.aecom.com
PROJECT
CLIENT
Recycled Content Paper
Printed on ___% Post-Consumer
PROJECT NUMBER
This dra
win
g h
as b
een pre
pare
d for th
e u
se of A
EC
OM’s clie
nt. It
may n
ot be u
sed,
modifie
d, re
pro
duced or relie
d u
pon b
y third p
arties, except as a
gre
ed b
y A
EC
OM or as required b
y la
w. A
EC
OM a
ccepts n
o responsibility, and d
enies a
ny lia
bility w
hats
oever, to a
ny p
arty that uses or relie
s o
n this dra
win
g without A
EC
OM’s e
xpre
ss written c
onsent. D
o n
ot scale this d
ocu
ment. All
measure
ments m
ust be o
btain
ed fro
m the state
d dim
ensio
ns
60341461
SOUTH BUILDING
PLOT 18
NHH AYLESBURY
ASSOCIATION
HOUSING
NOTTING HILL
AECOM
36 Storey's Way
Cambridge, Cambridgeshire
CB3 0DT
United Kingdom
Tel +44 (0)1223 488 000
NOTES
140
15
60
LIFE SAFETY GENERATOR
8
7
5
4
3
2
1
A B C E HFD G
8
7
5
4
3
2
1
6 6
EYLiftshaft overrun
+20.225 m
+17.225 m
+20.225 m
+20.225 m
Comms: 650x600mmHC
Power: 1750x600mmHC
Access HatchDoubles As 1000x1000x150mmAOV:
+17.950 mPlant LVL 01
+18.825mPlant LVL 02
+18.825mPlant LVL 02
+15.075 m
3000
7500
3300
7375
5425
3575
7425
3000
7150 2775 4750 2575 7250 7100
$Filena
me_
NE$
$Last_
Saved_Last_
Plotted_
NE$
SHEET TITLE
SHEET NUMBER
Appro
ved:
Checked:
Desig
ner:
Project
Manage
ment Initials:
I/R DATE DESCRIPTION
ISSUE/REVISION
.
.
.
.
B
A
. .
. .
. .
. .
06/04/2016
SOUTH BUILDING
PRELIMINARY ISSUE
JU
AN
CP
ROOF LEVEL
COMBINED SERVICES LAYOUT
NHH-P18-ACM-SB-MEP-0001
WSP TO CONFIRM PROGRESS WITH UKPN
BUILDING THIS GENERATOR WILL NOT BE REQUIRED.
PROVIDE A SECONDARY LIFE-SAFETY SUPPLY FOR THE
DIESIL OIL DAY TANK. IF UKPN CONFIRM THEY WILL
PACKAGED LIFE SAFETY GENERATOR WITH INTEGRAL
SECONDARY SUPPLY GRP ENCLOSURE
SMOKE EXTRACT FANS SEF4 A&B, RUN AND STANDBY
LIFE-SAFETY RISER OVER THE TOP OF LIFT OVERUN
CONTAINMENT ROUTE FROM GENERATOR TO
WITHIN RISER
SECONDARY SUPPLY CONTAINMENT DROPS TO BELOW
HEAT RECOVERY
HEATING AND COOLING COILS AND THERMAL WHEEL
HEALTH CENTRE AIR HANDLING UNIT (AHU1) WITH
AIR INTAKE LOUVRES FOR AHU1 (H.L.) AND AHU4 (M.L.)
AIR COOLED CHILLER ON ANTI-VIBRATION MOUNTS
EXTRACT FAN EF2 (L.L.)
EXHAUST LOUVRE FOR AHU1 (H.L.) AND KITCHEN
WITH AHU1 EXHAUST DUCT ABOVE AT H.L.
KITCHEN SUPPLY AIR HANDLING UNIT (AHU4) AT M.L.
- PRIMARY CHW PUMPS P15 (A&B)
- SECONDARY E.CHW PUMPS P17 (A&B)
- SECONDARY CHW PUMPS P16 (A&B)
AS FOLLOWS FROM TOP TO BOTTOM:
FLOOR MOUNTED CHILLED WATER CIRCULATION PUMPS
VESSEL
EXPANSION
PRESSURISATION UNIT
MC
C
E.CHW F&R AT L.L. TO RISER BELOW
C.T. LTHW F&R F.B. TO L.L. TO SERVE AHU HEATING COILS
800x400 SUPPLY DUCT FROM AHU3 T.B.
800x400 EXTRACT DUCT FROM AHU3 T.B.
COILS AND PLATE HEAT EXCHANGER HEAT RECOVERY
EARLY YEARS AIR HANDLING UNIT (AHU3) WITH HEATING
AIR INTAKE LOUVRES FOR AHU3
REF DX7
EARLY YEARS SERVER DX OUTDOOR UNIT
REF DX8
EARLY YEARS SERVER DX OUTDOOR UNIT
SMOKE EXTRACT SHAFT THROUGH BUILDING
SMOKE EXTRACT DUCT CONNECTS TO
EXTRACT MAKE-UP AIR
AOV AT TOP OF STAIR WELL FOR SMOKE
SERVER ROOMS
SERVING BASEMENT HEALTH CENTRE
(DOUBLE STACKED) REF DX1 TO DX6
6no. WALL MOUNTED DX OUTDOOR UNITS
T.B. WITHIN VENTILATION RISER
1200x550 H/C SUPPLY DUCT AT H.L DROPS
T.B. WITHIN VENTILATION RISER
1200x550 H/C EXTRACT DUCT AT L.L DROPS
T.B. WITHIN VENTILATION RISER
1200x550 H/C EXTRACT DUCT AT L.L DROPS
T.B. WITHIN VENTILATION RISER
1200x550 H/C SUPPLY DUCT AT H.L DROPS
DROPS T.B. WITHIN VENTILATION RISER
850x500 BASEMENT SUPPLY DUCT AT L.L
EXHAUST LOUVRE FOR AHU3 AT H.L.
UNIT AT BASEMENT LEVEL
HEAT RECOVERY COILS LINKED TO EXTRACT
DECK WITH HEATING COIL AND RUN-AROUND
BASEMENT AIR HANDLING UNIT SUPPLY
INTAKE LOUVRE SERVING AHU2 AT L.L.
LOUVRE
TO RUN ABOVE AHU2 TO EXHAUST
AHU3 EXHAUST DUCT FROM L.L. TO H.L.
AHU1
AHU2
AH
U3
CHILLER
AHU4
GRP ENCLOSURE
SMOKE EXTRACT FANS WITHIN
SECONDARY SUPPLY ATS FOR
PIPEWORK FROM BASEMENT RISES TO H.L.
AHU2 RUN AROUND HEAT RECOVERY
EXTRACT MAKE-UP AIR
AOV AT TOP OF STAIR WELL FOR SMOKE
COIL W
ITH
DR
AW
AL Z
ON
E
COIL W
ITH
DR
AW
AL Z
ON
E
A
A
SECTON A
HEAT RECOVERY
HEATING AND COOLING COILS AND THERMAL WHEEL
HEALTH CENTRE AIR HANDLING UNIT (AHU1) WITH
AHU1 EXHAUST DUCT AT H.L.
WITH AHU1 EXHAUST DUCT ABOVE AT H.L.
KITCHEN SUPPLY AIR HANDLING UNIT (AHU4) AT M.L.
KITCHEN EXTRACT FAN EF2 AT L.L.
KITCHEN EXTRACT EF2 FAN AT L.L.
THERMAL WHEEL SECTION OF AHU
T.B. WITHIN VENTILATION RISER
1200x550 H/C SUPPLY DUCT AT H.L DROPS
MAINTAIN MAINTENANCE ACCESS
AHU1 SUPPLY DUCT RISES TO H.L. TO
T.B. WITHIN VENTILATION RISER
1200x550 H/C EXTRACT DUCT AT L.L DROPS
VENITLATION RISER AT THIRD FLOOR
1400x850 SUPPLY DUCT AT H.L.
1400x850 EXTRACT DUCT AT L.L.
1400x850 EXTRACT DUCT AT L.L.
1400x850 SUPPLY DUCT AT H.L. AND
DUCT AT H.L.
1400x1200 SUPPLY
DUCT AT H.L.
1400x1400 EXTRACT
IN THE SPECIFICATION.
PROVIDED WITH WEATHERPROOF INSULATION AS DETAILED
5. ALL EXTERNAL PIPEWORK AND DUCTWORK TO BE
4. ALL EXTERNAL PIPEWORK TO BE TRACE HEATED
MAINTENANCE ACCESS
3. PLANT EQUIPMENT TO BE INSTALLED WITH ADEQUATE
SCHEDULES
ENGINEERING DRAWINGS, REPORTS, SPECIFICATIONS AND
RELEVANT ARCHITECT, MEP AND STRUCTURAL
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL
1. WORK TO FIGURED DIMENSIONS ONLY
COOLING PLANT ENCLOSED PLANTROOM TO BE PROVIDED BY THE ARCHITECT
Scale: 1:100 @ A1
Plan
26/04/2016 STAGE D ISSUE
AND STANDBY
SEF5 A&B, RUN
EXTRACT FANS
SMOKE
ISO A
1 5
94
mm x 8
41
mm
KEY PLAN
CONSULTANT
www.aecom.com
PROJECT
CLIENT
Recycled Content Paper
Printed on ___% Post-Consumer
PROJECT NUMBER
This dra
win
g h
as b
een pre
pare
d for th
e u
se of A
EC
OM’s clie
nt. It
may n
ot be u
sed,
modifie
d, re
pro
duced or relie
d u
pon b
y third p
arties, except as a
gre
ed b
y A
EC
OM or as required b
y la
w. A
EC
OM a
ccepts n
o responsibility, and d
enies a
ny lia
bility w
hats
oever, to a
ny p
arty that uses or relie
s o
n this dra
win
g without A
EC
OM’s e
xpre
ss written c
onsent. D
o n
ot scale this d
ocu
ment. All
measure
ments m
ust be o
btain
ed fro
m the state
d dim
ensio
ns
60341461
SOUTH BUILDING
PLOT 18
NHH AYLESBURY
ASSOCIATION
HOUSING
NOTTING HILL
AECOM
36 Storey's Way
Cambridge, Cambridgeshire
CB3 0DT
United Kingdom
Tel +44 (0)1223 488 000
NOTES
8
7
5
4
3
2
1
A B C E HFD G
8
7
5
4
3
2
1
6 6
-0.900 m
06
07
11
12
22
23
01
04
21
19
09*
08
10
18
31.2sqm HC ShowersB-13
3 Long stay EY19 Long stay HC43.1sqmCycle StoreB-02
14
15
16
02 13
20*
17
Power: 1750x600mmHC
Comms: 650x600mmHC
Large Car
Heating: 700x600mmHC
Cooling: 700x600mmHC
Power: 1750x600mmHC
Comms: 650x600mmHC
mm350x600Water: HC
Cooling: 700x600mmHC
Heating: 700x600mmHC
800x500mmBasement Smoke Extract
350 x 500mmSecondary elec supp.
03
05
showerDDA
6x4m, 23.9sqm Electrical Switch RoomB-04
7x5m, 39.1sqmPlate Exchange roomB-05
6.2sqm RoomCleaner's B-19
18.8sqm Deliveries CB-18
683.0sqmto ongoing coordination23 spaces subjectCarparkB-01
18.7sqm (GP)MainServer B-08
2.1sqmcommslandlordIncoming B-20
4.3sqmSwitch roomSecondary B-21
5.5sq
mStora
ge
B-2
2
- TBC BY ICT SPECIALIST)
(INDICATIVE RACK LAYOUT
9.7sqm3x2m, Coms RoomB-10
9.7sqm server roomGSTTB-11
7.6 sqm DDA WC
111.3sqm (12x10.5) Sprinkler Room
4x4m, 21.2sqmBoosted cold waterB-06
HEAD HEIGHT)
PLANTROOM (WITH RESTRICTED
PLATE HEAT EXCHANGER
7.8sqm FilesGP Archive B-14
8.1sqm MaintenanceFM B-15
ABOVE
SUBSTATION
UKPN
AND BMS HEAD END (IF REQUIRED)
VENTILATION PLANTROOM
VENTILATION EXHAUST SHAFT TO GROUND LEVEL
-0.750 m
11.6sqm Deliveries GP
B-17
17.3sqm recordsMedical
B-16
3000
7500
500
500
2300
500
6000
2400
4800
3300
7375
5425
3575
7425
3000
7150 2775 4750 2575 7250 7100
$Filena
me_
NE$
$Last_
Saved_Last_
Plotted_
NE$
SHEET TITLE
SHEET NUMBER
Appro
ved:
Checked:
Desig
ner:
Project
Manage
ment Initials:
I/R DATE DESCRIPTION
ISSUE/REVISION
.
.
.
.
A
. .
. .
. .
. .
06/04/2016
SOUTH BUILDING
PRELIMINARY ISSUE
JU
AN
CP
COMBINED SERVICES LAYOUT
NHH-P18-ACM-SB-MEP-0002
IN THE SPECIFICATION.
PROVIDED WITH WEATHERPROOF INSULATION AS DETAILED
5. ALL EXTERNAL PIPEWORK AND DUCTWORK TO BE
4. ALL EXTERNAL PIPEWORK TO BE TRACE HEATED
MAINTENANCE ACCESS
3. PLANT EQUIPMENT TO BE INSTALLED WITH ADEQUATE
SCHEDULES
ENGINEERING DRAWINGS, REPORTS, SPECIFICATIONS AND
RELEVANT ARCHITECT, MEP AND STRUCTURAL
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL
1. WORK TO FIGURED DIMENSIONS ONLY
BASEMENT
FEATURE (DETAIL BY LANDSCAPE ARCHITECT)
EXHAUST PLENUM CONNECTS TO LANDSCAPE
3000x600 BASEMENT GENERAL AND SMOKE
BY LANDSCAPE ARCHITECT)
CONNECTS TO LANDSCAPE FEATURE (DETAIL
5500x600 CAR PARK EXHAUST PLENUM
PLENUM
EXTRACT DECK CONNECTS TO EXHAUST
1000x450 EXHAUST DUCT AT H.L. FROM AHU2
FLOOR MOUNTED SPINKLER PUMP SET 1
FLOOR MOUNTED SPINKLER PUMP SET 2
FLOOR MOUNTED SPINKLER JOCKEY PUMP
4000H)
SPRINKLER STORAGE TANK (8000L x 6000W x
SUPPLY DECK AT ROOF LEVEL
DECK WITH RUN AROUND COILS CONNECTED TO
BASEMENT AIR HANDLING UNIT AHU2 EXTRACT
1000x450 EXTRACT DUCT AT H.L.
ELECTRICAL LV PANEL
HEALTH CENTRE AND EARLY YEARS
CONSULTANT
CABINETS TO BE CONFIRMED BY THE ICT
NUMBER AND SIZE OF SERVER ROOM
HEATING PLANTROOM MCC
LTHW SYSTEM EXPANSION VESSEL
LTHW SYSTEM PRESSURISATION UNIT
A&B (DUTY / STANDBY)
HEATING PLATE HEAT EXCHANGERS PHX 5
P17 (A&B)
SECONDARY V.T. LTHW CIRCULATION PUMPS
P15 (A&B)
PRIMARY C.T. LTHW CIRCULATION PUMPS
P16 (A&B)
SECONDARY C.T. LTHW CIRCULATION PUMPS
PRELIMINARY SIZE 2000W x 2000L x 2000H
DOMESTIC COLD WATER STORAGE TANK.
DOMESTIC COLD WATER BOOSTER SET
CHLORINE DIOXIDE DOSING SYSTEM
CAR PARK EXTRACT GRILLE
BASEMENT EXTRACT DUCT AT H.L.
SPIRNKLER PLANTROOM EXTRACT DUCT AT H.L.
ALONG WALL
ZONE FOR ELECTRICAL SUB MAINS VERTICALLY
SAFE ACCESS ABOVE TANK
1200mm HIGH RAIL ABOVE SPRINKLER TANK FOR
SPRINKLER TANK FOR SAFE MAINTENANCE ACCESS
SECONDARY STEELWORK PLANTROOM AROUND
GROUND BY 500mm
PLINTHS FOR RAISING SPINKLER TANK ABOVE
4000H)
SPRINKLER STORAGE TANK (8000L x 6000W x
CAR PARK EXTRACT GRILLE
SPRINKLER TANK FOR SAFE MAINTENANCE ACCESS
SECONDARY STEELWORK PLANTROOM AROUND
SECTION A
SPINKLER PLANTROOM
ELECTRICAL LV PLANTROOM
SPINKLER PLANTROOM
CAR PARK
CAR PARK
CONSULTANT)
SERVER ROOMS (BY ICT
PLANTROOM
COLD WATER
PLANTROOM
HEATING
PLANTROOM
VENTILATION
PLANTROOM
VENTILATION
INCOMING FIRE WATER MAIN SUPPLY
INCOMING MAINS WATER SUPPLY
INCOMING BT ROUTE
HEATING PLANTROOM
INCOMING C.T. LTHW F&R FROM NORTH BLOCK
WITH BRANCH TO SEPARATE SMOKE EXTRACT FANS
1000x450 BASEMENT AHU2 EXHAUST DUCT RISES TO H.L.
LAYOUT
FOR DUCTWORK
VENTILATION LAYOUT
REFER TO BASEMENT
Scale: 1:100 @ A1
Plan
26/04/2016 STAGE D ISSUEB
DOUBLE STACKED
BASEMENT SMOKE EXTRACT FANS EF2 (S) A&B
BASEMENT SMOKE EXTRACT FANS EF3 (S) A&B
SERVING HEALTH CENTRE
INTEGRAL ANTI-STRATIFICATION PUMP
2no. HOT WATER CALORIFIERS WITH
CIRCULATION PUMP P23
EARLY YEARS HOT WATER RETURN
SERVING EARLY YEARS
INTEGRAL ANTI-STRATIFICATION PUMP
2no. HOT WATER CALORIFIERS WITH
CIRCULATION PUMP P22
EARLY YEARS HOT WATER RETURN
DOUBLE STACKED
BASEMENT SMOKE EXTRACT FANS EF2 (S) (A&B)
PACKAGED CAT 5 WATER TANK AND BOOSTER SET
ISO A
1 5
94
mm x 8
41
mm
KEY PLAN
CONSULTANT
PROJECT
CLIENT
Recycled Content Paper
Printed on ___% Post-Consumer
PROJECT NUMBER
This dra
win
g h
as b
een pre
pare
d for th
e u
se of A
EC
OM’s clie
nt. It
may n
ot be u
sed,
modifie
d, re
pro
duced or relie
d u
pon b
y third p
arties, except as a
gre
ed b
y A
EC
OM or as required b
y la
w. A
EC
OM a
ccepts n
o responsibility, and d
enies a
ny lia
bility w
hats
oever, to a
ny p
arty that uses or relie
s o
n this dra
win
g without A
EC
OM’s e
xpre
ss written c
onsent. D
o n
ot scale this d
ocu
ment. All
measure
ments m
ust be o
btain
ed fro
m the state
d dim
ensio
ns
NHH AYLESBURY
PLOT 18
NORTH BUILDING
ASSOCIATION
HOUSING
NOTTING HILL
AECOM
36 Storey's Way
Cambridge, Cambridgeshire
CB3 0DT
United Kingdom
www. aecom.com
Tel +44 (0)1223 488 000
NOTES
60341461
Communal Amenity
Roof Garden
$Filena
me_
NE$
$Last_
Saved_Last_
Plotted_
NE$
SHEET TITLE
SHEET NUMBER
Appro
ved:
Checked:
Desig
ner:
Project
Manage
ment Initials:
I/R DATE DESCRIPTION
ISSUE/REVISION
____
____
____
C
B
A
NORTH BUILDING
ROOF LEVEL
COMBINED SERVICES LAYOUT
NHH-P18-ACM-NB-MEP-0001
WATER SYSTEM
SERVING LIBRARY CHILLED
ANTI-VIBRATION MOUNTS
AIR COOLED CHILLER ON
SERVING BLOCK 3
SATELITE DISH ARRAY
SERVING BLOCK 2
SATELITE DISH ARRAY
SERVING BLOCK 1
SATELITE DISH ARRAY
CONFIRM PROGRESS WITH UKPN
GENERATOR WILL NOT BE REQUIRED. WSP TO
LIFE-SAFETY SUPPLY FOR THE BUILDING THIS
CONFIRM THEY WILL PROVIDE A SECONDARY
INTEGRAL DIESIL OIL DAY TANK. IF UKPN
PACKAGED LIFE SAFETY GENERATOR WITH
CONTRACTOR
AND FUTURE RETAIL UNIT FIT-OUT
EQUIPMENT PROVIDED BY THE CAFE
ZONE FOR ROOF MOUNTED COOLING
INCLINATION
ROOF MOUNTED AT 30DEG
PV ARRAY 1 (12 PANELS)
PV INVERTER FOR PV ARRAY 1
BY ARCHITECT
MAINTENANCE ACCESS DOORS
VISUAL SCREEN AND
BY ARCHITECT
MAINTENANCE ACCESS DOORS
VISUAL SCREEN AND
INCLINATION
ROOF MOUNTED AT 30DEG
PV ARRAY 2 (24 PANELS)
EXTRACT FAN EXHAUST
ENVIRONMENTAL
LEVEL
TERMINATING 1m ABOVE ROOF
3no. TEMPORARY BOILER FLUES
RISER
OF FLUE / HEATING PIPEWORK
VENTILATION LOUVRE AT TOP
COMMUNITY SERVER ROOM
UNITS (REF 9 & 10) SERVING
2no. DUTY / STANDBY DX OUTDOOR
L.L. TO RISER BELOW.
AND CONTROLS CABLE CONTAINMENT AT
DX REFRIDGERANT PIPEWORK AND POWER SECONDARY SIPPLY GRP ENCLOSURE
RUN AND STANDBY
SMOKE EXTRACT FANS SEF4 A&B
SMOKE EXTRACT EXHAUST
SHAFT THROUGH BUILDING BELOW
SMOKE EXTRACT BUILDERSWORK
EXTRACT FANS WITHIN GRP ENCLOSURE
SECONDARY SUPPLY ATS FOR SMOKE
SIDE OF FAN
FAN EF 1 WITH ATTENUATORS EITHER
DAY-TO-DAY ENVIRONMENTAL EXTRACT
PV INVERTER FOR PV ARRAY 2
ELECTRICAL CABLES AT L.L.
CONTAINMENT FOR PV
PV INVERTER FOR PV ARRAY 3
INCLINATION
ROOF MOUNTED AT 30DEG
PV ARRAY 3 (28 PANELS)
PARAPET WALL
LIBRARY CHILLER, ALL AT L.L. ALONG
PHARMACY COOLING SYSTEM AND
SATELITTE DISH ARRAY SYSTEM,
SEPARATE CONTAINMENT AT L.L. FOR
PHARMACY FIT-OUT CONTRACTOR
EQUIPMENT PROVIDED BY THE
ZONE FOR ROOF MOUNTED COOLING
AT L.L. SERVING LIBRARY
CHILLED WATER PIPEWORK
BELOW WITHIN RISER
CHW F&R AT L.L. DROPS TO
RISER
L.L. DROPS TO BELOW WITHIN
ELECTRICAL CONTAINMENT AT
12/04/2016 PRELIMINARY ISSUE
EXTRACT MAKE-UP AIR
AOV AT TOP OF STAIR WELL FOR SMOKE
IN THE SPECIFICATION.
PROVIDED WITH WEATHERPROOF INSULATION AS DETAILED
5. ALL EXTERNAL PIPEWORK AND DUCTWORK TO BE
4. ALL EXTERNAL PIPEWORK TO BE TRACE HEATED
MAINTENANCE ACCESS
3. PLANT EQUIPMENT TO BE INSTALLED WITH ADEQUATE
SCHEDULES
ENGINEERING DRAWINGS, REPORTS, SPECIFICATIONS AND
RELEVANT ARCHITECT, MEP AND STRUCTURAL
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL
1. WORK TO FIGURED DIMENSIONS ONLY
EXTRACT MAKE-UP AIR
AOV AT TOP OF STAIR WELL FOR SMOKE
EXTRACT MAKE-UP AIR
AOV AT TOP OF STAIR WELL FOR SMOKE
SECONDARY PV PANEL CABLE TRAY
PRIMARY PV PANEL CABLE TRAY
PRIMARY PV PANEL CABLE TRAY
SECONDARY PV PANEL CABLE TRAY
PANEL CABLE TRAY
SECONDARY PV
PRIMARY PV PANEL CABLE TRAY
CONTROL CABLES
ELECTRICAL SUPPLY AND
TRAY FOR CHILLER
BLOCK 2 & 3 ROOFS
LEVEL AND ROUTES ACROSS TO
CABLES FROM BLOCK 1 ROOF
TRAY FOR SECONDARY SUPPLY
18/04/2016 PRELIMINARY ISSUE
A1 PLAN
Scale 1:100
23/04/2016 STAGE D ISSUE