vecom meeting november 11, 2016 - wordpress.com · the net control is responsible for writing down...
TRANSCRIPT
![Page 1: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/1.jpg)
VECOM Meeting November 11, 2016
![Page 2: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/2.jpg)
![Page 3: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/3.jpg)
https://assets.documentcloud.org/docu
ments/3152696/CR16-State-AAR-Final-
Draft-Oct-21-2016.pdf
![Page 4: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/4.jpg)
![Page 5: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/5.jpg)
![Page 6: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/6.jpg)
![Page 7: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/7.jpg)
https://training.fema.gov/nims/
![Page 9: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/9.jpg)
![Page 10: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/10.jpg)
of AZ
Barrett 2050 xcvr
Tokyo HyPower 1KW
5-30 LPDA @ 90ft
![Page 11: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/11.jpg)
of
3KW?
Antenna?
QTH?
![Page 12: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/12.jpg)
![Page 13: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/13.jpg)
![Page 14: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/14.jpg)
![Page 15: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/15.jpg)
• Press 25
• Press 26
• Press 13
• Press 2
![Page 16: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/16.jpg)
This document is intended to help VECOM net controls to provide a general sequence of
events for the Wednesday morning 9am net on the 145.15 repeater.
It is NOT intended to be a script that would be read over the air verbatim.
Net Control Operators should read and understand the concept before leading a net.
Goals of this net
Practice communicating in a simulated disaster
Short and concise, net completed by 9:30
Deal with chaos
Create records of the communications
Verify radio operations
RF coverage
Audio level and quality
Sending ICS213 forms using voice and digital communications
Provide guidance, training, and experience for both new and more experienced hams.
Switching channels from main to backup repeater or repeater to simplex.
Rotate net control each week, anyone could do it
Practice relaying messages and communicating to an EOC entity.
Q&A with requesters so that short concise messages can be sent to the EOC
1 of 4
![Page 17: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/17.jpg)
BOLD UNDERLINE TEXT IS SUGGESTED OVER THE AIR WORDING
This is only a drill. This is only a drill.
This is [Name] [Call] [Location] assuming net control on behalf of Jefferson County
Emergency Services. Explain that if this were an actual emergency, we would need to
quickly determine the general nature of the disaster and who was an available
Communicationresource, where you were located, and what capability you had. We
would also want everyone to be monitoring their neighborhood FRS channel.
This is only a drill.
Any real emergency traffic?
Provide time for any new hams want to check in now to verify your signal strength
and audio quality. We want to encourage all Jefferson County and nearby or visiting
hams to participate in this net.
Separately work through the EOC, agency, and coordination centers. We should do this
early in the net so that when sending a message is needed, we know who is available to
receive them.
Any DEM, EOC, agency, or coordination centers available? Check in now.
2 of 4
![Page 18: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/18.jpg)
Explain that red (life threatening) messages can break in at any time by stating
"break break". When acknowledged they should start by stating this is only a drill.
Explain that yellow messages (major damage and outage) messages can break in at
any time (as long as a red message is not in progress) by stating a single "break".
When acknowledged they should start by stating this is only a drill.
Explain that green messages (status updates, etc) will likely be requested
after red and yellow are handled. When acknowledged they should start by
stating this is only a drill.
Net participants are encouraged to create simulated messages.
Work through all users without regard to coordination area. My call suffix is [y] because
my call is [xx#yzz]. From call suffix A to G, come with your call. Encourage them to space
it out to minimize FM capture.
Stations without red, yellow, or green traffic check in now.
Please space out your calls and wait for an acknowlegement.
Callsign Suffix A through G
Callsign Suffix H through M
Callsign Suffix N through T
Callsign Suffix U through Z
3 of 4
![Page 19: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/19.jpg)
Net control acknowledges each call by saying the received callsign (most readable if multiple simultaneous signals) and receives info from that call before moving onto the next call. Remind users to just state their call, location and capabilities (however that is defined by net control for that particular week).
Initially all message handling can be simulated by the sending and receiving parties leaving the net (they could still just monitor the net or actually pass the message) for 2 minutes and then getting net control attention that you have passed the message and are back on the net.
The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information can initially be sent by email to [email protected] As we get more sophisticated we will be sending via voice or digital modes, perhaps on a separate simplex channel. We may want to have a main and alternate net control assigned at the beginning of the net so that the alternate is also taking notes and is ready for a quick handoff.
The user capabilities could focus on different aspects each week to gradually build up a resource matrix.
The net control should be rotated weekly, not monthly. Perhaps there would be no preassignment but rather a quick initial concensus on the air each Wednesday. We may also practice net control handoffs in the middle of the net.
After calling for A-G, H-M, N-T, U-Z, there could be time for any announcements. The alphabet segments could be adjusted to equalize the collisions.
We could also practice MT63 by sending a message/form during each net. People might be encouraged to get set up to decode it.
Close the net with this was only a drill.
4 of 4
![Page 20: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/20.jpg)
![Page 21: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/21.jpg)
![Page 22: VECOM Meeting November 11, 2016 - WordPress.com · The net control is responsible for writing down the calls, locations (including coordination area?), and capabilities. This information](https://reader033.vdocuments.us/reader033/viewer/2022050500/5f9316607876b93fd72ee0f1/html5/thumbnails/22.jpg)
Prepare yourself…
So you can support others.