October 2006 Department of Facilities VASSAR STREET WEST Surface Enhancements • Durable high quality pavements • Street trees • Contemporary street lights and furnishings • Solar in-pavement lights • Undergrounding of overhead utilities Background As part of MIT’s building program, Vassar Street, a public way that bisects MIT’s campus, is being transformed from a nondescript urban byway into a vibrant urban boulevard with bicycle tracks, spacious sidewalks, street trees, and contem- porary streetlights. The project will significantly improve the pedestrian and cyclist experience and will realize the vision for the entirety of Vassar Street that started with the implementation of Vassar East, completed in 2004. The project has been years in the making and is the product of an intensive and productive collaboration between the City of Cambridge and MIT. Our steady partners in the development and execution of the plan include the City Manager’s Office, the City Council, Community Development Department, the Traffic, Parking and Transportation Department, the Department of Public Works, the Law Department, the Electrical and Water Departments. Features Operational Improvements • Traffic calming • Narrower roadway • Wider sidewalk • Cycle track separated from cars • Well lit, well marked crosswalks • Curb extensions at crosswalks & intersections • Speed table at Simmons Crosswalk • Parallel parking vs. angle

Upload: nguyentu

Post on 10-Jun-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VASSAR STREET WEST - MIT - Massachusetts …web.mit.edu/facilities/maps/Vassar_Street_West.pdfVassar Street West SIMMONS HALL SIMMONS HALL VASSAR WEST Created Date 10/12/2006 11:06:49

October 2006Department of Facil i t ies�

VASSAR STREET WEST

Surface Enhancements• Durable high quality pavements• Street trees• Contemporary street lights and furnishings• Solar in-pavement lights• Undergrounding of overhead utilities

Background

As part of MIT’s building program, Vassar Street, a public way that bisects MIT’s campus, is being transformed from a nondescript urban byway into a vibrant urban boulevard with bicycle tracks, spacious sidewalks, street trees, and contem-porary streetlights. The project will significantly improve the pedestrian and cyclist experience and will realize the vision for the entirety of Vassar Street that started with the implementation of Vassar East, completed in 2004.

The project has been years in the making and is the product of an intensive and productive collaboration between the City of Cambridge and MIT. Our steady partners in the development and execution of the plan include the City Manager’s Office, the City Council, Community Development Department, the Traffic, Parking and Transportation Department, the Department of Public Works, the Law Department, the Electrical and Water Departments.

FeaturesOperational Improvements• Traffic calming• Narrower roadway• Wider sidewalk• Cycle track separated from cars• Well lit, well marked crosswalks• Curb extensions at crosswalks & intersections• Speed table at Simmons Crosswalk• Parallel parking vs. angle

Page 2: VASSAR STREET WEST - MIT - Massachusetts …web.mit.edu/facilities/maps/Vassar_Street_West.pdfVassar Street West SIMMONS HALL SIMMONS HALL VASSAR WEST Created Date 10/12/2006 11:06:49

October 2006Department of Facil i t ies�

ScheduleCONSTRUCTION START:

November 2006

SUBSTANTIAL COMPLETION: November 2008

LANDSCAPE COMPLETION: May 2009

Design TeamCAROL R. JOHNSON ASSOCIATES, INC.

Landscape Architects

JUDITH NITSCH ENGINEERING, INC. Civil Engineering

SEA CONSULTANTS, INC. Utilities Engineering

RIZZO ASSOCIATES, INC. Transportation Engineering

IRRIGATION CONSULTING, INC. Irrigation Design

PETER COXE ASSOCIATES Lighting Design

ContractorMCCOURT CONSTRUCTION COMPANY, INC.South Boston, MA

Vassar Street West

SIMMONS HALL

SIMMONS HALL

VA S S A R W E S T