# Varun plastics make PVC pipes of nine different sizes by
following same manufacturing process and facility.
# But the pipes which have most demand and hence
produced more are pipes having diameter 1 inch, 2 inchand 2.5 inches.
# Same machinery, facility and input is used for
manufacturing pipes of different sizes, they only change
the die size for pipes of different diameters.
-
8/8/2019 Varun Plastics - An Operations Case Study
5/20
) The plant covers an area of 120 ft by 45 ft and is divided into many
sections. About one third of the space is meant for machines and two
third is meant for storage and other purposes.5
-
8/8/2019 Varun Plastics - An Operations Case Study
6/20
-
8/8/2019 Varun Plastics - An Operations Case Study
7/20
) Administrative Office :
Forecasting, scheduling of machines, ordering and procurement of rawmaterials and delivery to the customers.
) Stabilizer Unit :
Its basically a huge mixing
machine.
Raw materials (PVC rasin andstablizer) in the form ofpowder are poured ration of4:1.
They are mixed for 10-15minutes and the resultantmaterial is used as the rawmaterial for the extrusionprocess.
-
8/8/2019 Varun Plastics - An Operations Case Study
8/20
) Pipe Extrusion Machine :
The mixture is grounded into the
extrusion machine and resultant pasteis molded into pipes under very high
temperature.
The hot pipes are then passed throughthe two coolers to reduce itstemperature in stages, so that it gets
hardened and set.
When the hard pipes touch the end part
of the machine, it gets diced offautomatically (using a switch and saw)
thus regulating the length of all the
pipes at a uniform level.
-
8/8/2019 Varun Plastics - An Operations Case Study
9/20
) Coupling Section :
The finished pipes are heated at the openings to make it soft and then are forced
on the die to make the edges bell shaped.
This is in accordance with the requirements of the dealers and customers, for
the various usage purposes.
) Weighing Machine : Each pipe is weighed to ensure the quality and meet the specifications of
customer.
) Cutting area :
Used to cut some of the pipes into smaller pieces to be used as hinges and
joints.
) Finished Goods Stock :
Area within and outside the manufacturing factory. No fear of rusting.
-
8/8/2019 Varun Plastics - An Operations Case Study
10/20
Molding Cooling
-
8/8/2019 Varun Plastics - An Operations Case Study
11/20
) Generator Unit : kept in an isolated sound proof room so that the noise generated doesnt
affect the regular production process.
A 125 kw diesel generator is used for alternate power supply in the plant.
Using power from generator costs 1.5 times the normal electricity chargesand is usually used for 150-250 hrs per month.
) Quality testing lab :
Quality testing lab consists of various equipments for testing the pipes ondifferent parameters.
One pipe from each lot (once in an hour) is selected randomly to test onall the parameters specified under government standards.
-
8/8/2019 Varun Plastics - An Operations Case Study
12/20
Quality Testing Lab Finished Good inventory
-
8/8/2019 Varun Plastics - An Operations Case Study
13/20
X The high quality product at competitive price and good relationship
with suppliers are the reason of success of Varun plastic in this highlyfragmented and fiercely competitive market.
X According to the owner of Varun plastics the total market size of PVCpipes in Karnataka is 5000 tons per week.
X This is highly fragmented market dominated by many players. Earlier
there were 12 competitors but now only eight have remained.
X The sales of Varun plastic per year hover around 500-550 metric ton.
The break even production is around 400 metric ton.
X Sales are around 3 crores and profit margin around 2-3 % each yeargiving PAT approximately 9 lakhs.
-
8/8/2019 Varun Plastics - An Operations Case Study
14/20
Forecasting :
The sales data from the past year is used to do the sales forecasting.
They have maintained the data for sales of last ten years.
Also based on the past sales data, demand from the suppliers and some
personal experience is used to determine which kind of pipes will be in
more demand in coming year.
Those kinds of pipe are produced in abundance. The demand is not uniform throughout the year.
The 70 % of the demand comes in four months from December to Marcheach year.
They use the lean period to manufacture and stock the products so asto meet the demand of peak period.
During peak season they work for 7 days a week , but in lean season
work 6 days a week.
Since PVC pipes are rust free, they are stored in open area throughout
the year.
-
8/8/2019 Varun Plastics - An Operations Case Study
15/20
-
8/8/2019 Varun Plastics - An Operations Case Study
16/20
Highly quality conscious : ISO 9001:2000 certification.
Lab test within the plant :Cost of quality .
The total cost of the lab is around 3.5 lakhs.
Quality check within half an hour whenever new production starts.
Regular check every one hour.
If any product fails the quality test, the entire batch of that productis discarded.
On an average 5-6 % of total production is discarded each year. Thisdiscarded material is not reused but sold to others on 15-16% oforiginal rate.
-
8/8/2019 Varun Plastics - An Operations Case Study
17/20
Maintenance :
Every year during month, of July plant is closed for three weeks formaintainace work.
All equipments are dismantled and each part is looked for any wearand tear and then appropriately repaired or replaced. This is done to
avoid any breakdown during production periods.
All electric wiring and other building infrastructure is also checked
thoroughly.
All repair work is done by in-house workers.
-
8/8/2019 Varun Plastics - An Operations Case Study
18/20
-
8/8/2019 Varun Plastics - An Operations Case Study
19/20
The problem area is the stabilizer.
Reason for problems is the exact composition of stabilizer is notfixed.
It depends upon manufacturer to manufacture.
Earlier Varun Plastics used to manufacture in house stabilizer by
purchasing the different components of stabilizer and then
mixing them.
But now they have buy is from outside vendor.
This has improved the quality and decreased the failure rate but
the products still fail quality tests.
-