The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons:
Medical Operation of the 2nd
Machine,Production and Commissioning Status of Machines No. 3 to 7
H. Rcken, M. Abdel-Bary, E. Akcltekin, P. Budz, T. Stephani, J. Wittschen
VARIAN Medical SystemsParticle Therapy GmbHFriedrich-Ebert-Str. 1D-51429 BERGISCH GLADBACHGERMANY
-
8/12/2019 Varian 250 Mev Sc Pt
3/54
The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons:
Medical Operation of the 2nd
Machine,Production and Commissioning Status of Machines No. 3 to 7
H. Rcken, M. Abdel-Bary, E. Akcltekin, P. Budz, T. Stephani, J. Wittschen
VARIAN Medical SystemsParticle Therapy GmbHFriedrich-Ebert-Str. 1D-51429 BERGISCH GLADBACHGERMANY
-
8/12/2019 Varian 250 Mev Sc Pt
4/544The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
and became in 2009
Varian Medical Systems Particle Therapy GmbH
Further split-ups: > RI Research Instruments GmbH> BASC Bruker Advanced Supercon GmbH
VARIAN PT ?
Former ACCEL Instruments
was acquired in 2007 by
VARIAN Medical Systems
-
8/12/2019 Varian 250 Mev Sc Pt
5/545The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
OUTLINE
Introduction
Operating Cyclotrons #1 and #2Patient Treatment / Uptime Statistics
Cyclotrons under Commissioning#3 Assembly, SC Magnet Ramping, Test Quench, Magnetic Field Mapping
Examples for New ComponentsSolid State Amplifier, Digital Low Level RF
Cyclotron Production Site
Production of Next Machines#4, #5, #6, #7
Cyclotron and Scanning Nozzle Test Cell
Conclusion
-
8/12/2019 Varian 250 Mev Sc Pt
6/546The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Beam - Energy 250 MeV- Extracted current (max) 800 nA- Emittance of extracted beam < 3 / 5 mm mrad (2 )- Momentum spread p/p 0.04% (i.e. 200keV @ 250MeV)- Number of turns 650- Extraction efficiency (multi-turn extraction mode) ~80%- Dynamic range for intensity modulation 1:800- Fast intensity modulation via electrostatic deflector, >10% in 100 s
VARIAN PT Cyclotron System Parameters(Engineering Goals)
RF System - Frequency 72.8 MHz (2 nd harmonic)- Voltage source to puller / @ extraction radius 80 kV / 130 kV
- RF power 115 kW
Iron Yoke - Outer diameter 3.1 m- Height 1.6 m- Weight
-
8/12/2019 Varian 250 Mev Sc Pt
7/547The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Operating VARIAN PT Cyclotrons #1 and #2
1. Paul Scherrer Institut PSI (CH), treating patients since beginning of 2007.
2. Rinecker Proton Therapy Center RPTC (D) treating patients since
beginning of 2009!This facility is widely equipped with VARIAN technology, like
superconducting compact 250 MeV proton cyclotrondegrader for energy adjustmentenergy selection system for energy filteringbeam line for beam transportation
4 rotational isocentric gantries for 360
irradiation+ 1 fixed beam for head / neck treatmentsdelivery nozzles providing pencil beam spot scanningsafety systems
treatment control software
-
8/12/2019 Varian 250 Mev Sc Pt
8/548The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Patient Treatment at RPTC
On website
www.rptc.de :
PATIENT TREATMENTSTARTED MARCH 16 th, 2009
TREATMENT REPORTS ARE AVAILABLE
STATUS REPORTS AND
MEDICAL CASE STUDIES ARE AVAILABLE
-
8/12/2019 Varian 250 Mev Sc Pt
9/549The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Patient Treatment at RPTC
On website
www.rptc.de :
PATIENT TREATMENTSTARTED MARCH 16 th, 2009
TREATMENT REPORTS ARE AVAILABLE
STATUS REPORTS AND
MEDICAL CASE STUDIES ARE AVAILABLE
-
8/12/2019 Varian 250 Mev Sc Pt
10/5410The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
RPTC Uptime during Patient Treatment
RPTC presentation on
PTCOG 48 conference(specialized particletherapy event)
6 months after start of operation:
Poster presented by RPTC at PTCOG 48
-
8/12/2019 Varian 250 Mev Sc Pt
11/54
-
8/12/2019 Varian 250 Mev Sc Pt
12/5412
The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotrons under CommissioningCyclotron #3 Assembly and FAT
Cyclotron #3 will be widely pre-assembled,
tested (with beam!) in the factory,
and shipped to its destination in
2 large lots (upper / lower part).
It is currently in the final stageof assembly and is undergoingFATs in parallel.
-
8/12/2019 Varian 250 Mev Sc Pt
13/5413
The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotrons under CommissioningCyclotron #3 Assembly and FAT
Cyclotron #3 will be widely pre-assembled,
tested (with beam!) in the factory,
and shipped to its destination in
2 large lots (upper / lower part).
It is currently in the final stageof assembly and is undergoingFATs in parallel.
-
8/12/2019 Varian 250 Mev Sc Pt
14/54
14The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotrons under Commissioning#3 SC Magnet Ramping and Test Quench
First excitation of thesuperconducting magnet tookplace on May 18, 2010 on thefirst attempt.
The obligatory test quenchcould not be forced by fast
ramping and had to betriggered by the dedicatedquench heaters.
After cool down (5 hrs) allforces on the support links aswell as the magnetic fieldmap remained unchanged:
stable, quench proof andquench tolerant system
-
8/12/2019 Varian 250 Mev Sc Pt
15/54
15The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotrons under Commissioning#3 SC Magnet Ramping and Test Quench
First excitation of thesuperconducting magnet tookplace on May 18, 2010 on thefirst attempt.
The obligatory test quenchcould not be forced by fast
ramping and had to betriggered by the dedicatedquench heaters.
After cool down (5 hrs) allforces on the support links aswell as the magnetic fieldmap remained unchanged:
stable, quench proof andquench tolerant system
-
8/12/2019 Varian 250 Mev Sc Pt
16/54
16The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotrons under Commissioning#3 SC Magnet Ramping and Test Quench
First excitation of thesuperconducting magnet tookplace on May 18, 2010 on thefirst attempt.
The obligatory test quenchcould not be forced by fast
ramping and had to betriggered by the dedicatedquench heaters.
After cool down (5 hrs) allforces on the support links aswell as the magnetic fieldmap remained unchanged:
stable, quench proof andquench tolerant system
-
8/12/2019 Varian 250 Mev Sc Pt
17/54
17The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
A measured field map
VARIAN PT Cyclotrons under Commissioning#3 Magnetic Field Mapping
Initially the field showed afirst harmonic of ~29 Gauss.
is compared to itssymmetrized form to revealdeviations from perfect 4-foldsymmetry.
This could be compensated
Some remaining deviationson the extraction radius mustbe shimmed locally.
down to
-
8/12/2019 Varian 250 Mev Sc Pt
18/54
18The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
A measured field map
VARIAN PT Cyclotrons under Commissioning#3 Magnetic Field Mapping
1 st Harmonic of Initial Field Map
29 Gauss
Initially the field showed afirst harmonic of ~29 Gauss.
is compared to itssymmetrized form to revealdeviations from perfect 4-foldsymmetry.
This could be compensated
Some remaining deviationson the extraction radius mustbe shimmed locally.
down to
-
8/12/2019 Varian 250 Mev Sc Pt
19/54
19The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
A measured field map
VARIAN PT Cyclotrons under Commissioning#3 Magnetic Field Mapping
1 st Harmonic of Initial Field Map
29 Gauss
Initially the field showed afirst harmonic of ~29 Gauss.
is compared to itssymmetrized form to revealdeviations from perfect 4-foldsymmetry.
This could be compensated
Some remaining deviationson the extraction radius mustbe shimmed locally.
down to
-
8/12/2019 Varian 250 Mev Sc Pt
20/54
20The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
RF power amplifiers used at PSI and RPTC:3-stage tetrode tube based , several electrical cabinetsfor power transformers and high voltage supplies
Supplied byCryoelectra GmbH
New design is tested:transistor based , 20 parallel working RF power modulesTest setup completed a >1000h test with 25kW,
allowed reflected power limit >15%
VARIAN PT Cyclotrons under CommissioningSolid State Amplifier
-
8/12/2019 Varian 250 Mev Sc Pt
21/54
21The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Currently the final setup consisting of 6 cabinets with a total of 120 power
modules is under test in the factory.
VARIAN PT Cyclotrons under CommissioningSolid State Amplifier
Via its redundancy, the design features ahigher
- availability,- maintainability,- cost reduction, ...
The digitally controlled modularizedsystem provides extended diagnosticscapabilities.
-
8/12/2019 Varian 250 Mev Sc Pt
22/54
-
8/12/2019 Varian 250 Mev Sc Pt
23/54
-
8/12/2019 Varian 250 Mev Sc Pt
24/54
24The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotrons under CommissioningDigital Low Level RF
VARIAN will use a digital LLRF with itsfuture systems.
Supplied byCryoelectra GmbH
The dLLRF has already passedperformance tests at the supplier andwill be delivered in September to theVARIAN factory for system integrationtests.
Like the SSAmp, the dLLRF is designedfor high redundancy. This yields a high
fault tolerance and increases systemuptime.
The dLLRF is faster than the previouslyused system and provides much morediagnostic signals and functionality.
-
8/12/2019 Varian 250 Mev Sc Pt
25/54
25The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotrons under CommissioningDigital Low Level RF
VARIAN will use a digital LLRF with itsfuture systems.
Supplied byCryoelectra GmbH
The dLLRF has already passedperformance tests at the supplier andwill be delivered in September to theVARIAN factory for system integrationtests.
Like the SSAmp, the dLLRF is designedfor high redundancy. This yields a high
fault tolerance and increases systemuptime.
The dLLRF is faster than the previouslyused system and provides much morediagnostic signals and functionality.
l d
-
8/12/2019 Varian 250 Mev Sc Pt
26/54
26The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotrons under CommissioningDigital Low Level RF
VARIAN will use a digital LLRF with itsfuture systems.
Supplied byCryoelectra GmbH
The dLLRF has already passedperformance tests at the supplier andwill be delivered in September to theVARIAN factory for system integrationtests.
Like the SSAmp, the dLLRF is designedfor high redundancy. This yields a high
fault tolerance and increases systemuptime.
The dLLRF is faster than the previouslyused system and provides much morediagnostic signals and functionality.
VARIAN PT C l P d i Si
-
8/12/2019 Varian 250 Mev Sc Pt
27/54
27The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotron Production SiteOverview
Production site nearCologne / Germany
Allows assembly ofup to 6 cyclotrons in
parallel
and up to 8 - 12
cyclotrons / year
VARIAN PT C l P d i Si
-
8/12/2019 Varian 250 Mev Sc Pt
28/54
28The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotron Production SiteOverview
Production site nearCologne / Germany
Allows assembly ofup to 6 cyclotrons in
parallel
and up to 8 - 12
cyclotrons / year
VARIAN PT C l t P d ti Sit
-
8/12/2019 Varian 250 Mev Sc Pt
29/54
29The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotron Production Site Assembly Stands
VARIAN PT C l t P d ti Sit
-
8/12/2019 Varian 250 Mev Sc Pt
30/54
30The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotron Production Site Assembly Stands
VARIAN PT Cyclotron Production Site
-
8/12/2019 Varian 250 Mev Sc Pt
31/54
31The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotron Production Site Assembly Stands
-
8/12/2019 Varian 250 Mev Sc Pt
32/54
VARIAN PT Cyclotron Production Site
-
8/12/2019 Varian 250 Mev Sc Pt
33/54
33The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotron Production Site Assembly Stands
VARIAN PT Cyclotron Production Site
-
8/12/2019 Varian 250 Mev Sc Pt
34/54
34The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotron Production Site Assembly Stands
VARIAN PT Cyclotron Production Site
-
8/12/2019 Varian 250 Mev Sc Pt
35/54
35The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
VARIAN PT Cyclotron Production Site Assembly Stands
Production of Next Machines
-
8/12/2019 Varian 250 Mev Sc Pt
36/54
36The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Production of Next Machines#4, #5, #6, #7
#4: All major componentsare ready, coil winding andassembly of pole caps is
underway#5: Fine machined ironyoke and pole caps are inthe factory underinspection
#6, #7: Iron parts and longlead items are ordered(iron is casted and forged these days)
Expected build sequenceis ~2 cyclotrons per year at
the moment
#4 coil windingpole caps
yoke rings #5 pole capsyoke rings
Cyclotron and Scanning Nozzle Test Cell
-
8/12/2019 Varian 250 Mev Sc Pt
37/54
37The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Cyclotron and Scanning Nozzle Test CellFactory Beam Test Plans
Adjacent to the manufacturing hallVARIAN has built a concrete bunkerfor cyclotron and scanning nozzle
tests, the so-called Test Cell.This enables the delivery of factorybeam tested systems.
The Test Cell is finalized this monthand cyclotron #3 will move in aftermagnetic shimming.
Cyclotron and Scanning Nozzle Test Cell
-
8/12/2019 Varian 250 Mev Sc Pt
38/54
38The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Cyclotron and Scanning Nozzle Test CellFactory Beam Test Plans
Adjacent to the manufacturing hallVARIAN has built a concrete bunkerfor cyclotron and scanning nozzle
tests, the so-called Test Cell.This enables the delivery of factorybeam tested systems.
The Test Cell is finalized this monthand cyclotron #3 will move in aftermagnetic shimming.
Cyclotron and Scanning Nozzle Test Cell
-
8/12/2019 Varian 250 Mev Sc Pt
39/54
39The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Cyclotron and Scanning Nozzle Test CellFactory Beam Test Plans
Adjacent to the manufacturing hallVARIAN has built a concrete bunkerfor cyclotron and scanning nozzle
tests, the so-called Test Cell.This enables the delivery of factorybeam tested systems.
The Test Cell is finalized this monthand cyclotron #3 will move in aftermagnetic shimming.
Cyclotron and Scanning Nozzle Test Cell
-
8/12/2019 Varian 250 Mev Sc Pt
40/54
40The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
y gFactory Beam Test Plans
Adjacent to the manufacturing hallVARIAN has built a concrete bunkerfor cyclotron and scanning nozzle
tests, the so-called Test Cell.This enables the delivery of factorybeam tested systems.
The Test Cell is finalized this monthand cyclotron #3 will move in aftermagnetic shimming.
Cyclotron and Scanning Nozzle Test Cell
-
8/12/2019 Varian 250 Mev Sc Pt
41/54
41The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
y gFactory Beam Test Plans
Adjacent to the manufacturing hallVARIAN has built a concrete bunkerfor cyclotron and scanning nozzle
tests, the so-called Test Cell.This enables the delivery of factorybeam tested systems.
The Test Cell is finalized this monthand cyclotron #3 will move in aftermagnetic shimming.
Cyclotron and Scanning Nozzle Test Cell
-
8/12/2019 Varian 250 Mev Sc Pt
42/54
42The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
y gFactory Beam Test Plans
Adjacent to the manufacturing hallVARIAN has built a concrete bunkerfor cyclotron and scanning nozzle
tests, the so-called Test Cell.This enables the delivery of factorybeam tested systems.
The Test Cell is finalized this monthand cyclotron #3 will move in aftermagnetic shimming.
Cyclotron and Scanning Nozzle Test Cell
-
8/12/2019 Varian 250 Mev Sc Pt
43/54
43The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
y gFactory Beam Test Plans
Adjacent to the manufacturing hallVARIAN has built a concrete bunkerfor cyclotron and scanning nozzle
tests, the so-called Test Cell.This enables the delivery of factorybeam tested systems.
The Test Cell is finalized this monthand cyclotron #3 will move in aftermagnetic shimming.
-
8/12/2019 Varian 250 Mev Sc Pt
44/54
Cyclotron and Scanning Nozzle Test Cell
-
8/12/2019 Varian 250 Mev Sc Pt
45/54
45The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Factory Beam Test Plans
Adjacent to the manufacturing hallVARIAN has built a concrete bunkerfor cyclotron and scanning nozzle
tests, the so-called Test Cell.This enables the delivery of factorybeam tested systems.
The Test Cell is finalized this monthand cyclotron #3 will move in aftermagnetic shimming.
Cyclotron and Scanning Nozzle Test Cell
-
8/12/2019 Varian 250 Mev Sc Pt
46/54
46The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Factory Beam Test Plans
Adjacent to the manufacturing hallVARIAN has built a concrete bunkerfor cyclotron and scanning nozzle
tests, the so-called Test Cell.This enables the delivery of factorybeam tested systems.
The Test Cell is finalized this monthand cyclotron #3 will move in aftermagnetic shimming.
Cyclotron and Scanning Nozzle Test Cell
-
8/12/2019 Varian 250 Mev Sc Pt
47/54
47The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Factory Beam Test Plans
Adjacent to the manufacturing hallVARIAN has built a concrete bunkerfor cyclotron and scanning nozzle
tests, the so-called Test Cell.This enables the delivery of factorybeam tested systems.
The Test Cell is finalized this monthand cyclotron #3 will move in aftermagnetic shimming.
Cyclotron and Scanning Nozzle Test Cell
-
8/12/2019 Varian 250 Mev Sc Pt
48/54
48The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Factory Beam Test Plans
We plan to test all RF components,ion source, slit systems, extractors, diagnostics, etc.
during a system integration and FAT for cyclotron #3 in this year.
Cyclotron and Scanning Nozzle Test CellF B T Pl
-
8/12/2019 Varian 250 Mev Sc Pt
49/54
49The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Factory Beam Test Plans
We plan to test all RF components,ion source, slit systems, extractors, diagnostics, etc.
during a system integration and FAT for cyclotron #3 in this year.
VARIAN PT Superconducting Proton CyclotronsF D l
-
8/12/2019 Varian 250 Mev Sc Pt
50/54
50The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Future Developments
The proven design
which was built in the past
will be improved continuouslyfor the VARIAN PT Cyclotronwith regard to reliability maintainability performance upgrades cost reduction
Ion Source, Solid State Amplifier,Dee Noses, Digital LLRF, Simplified Media Supply,Iron, Cryosystem, Extraction System, and so on
VARIAN PT Superconducting Proton CyclotronsF t D l t
-
8/12/2019 Varian 250 Mev Sc Pt
51/54
51The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Future Developments
The proven design
which was built in the past
will be improved continuouslyfor the VARIAN PT Cyclotronwith regard to reliability maintainability performance upgrades cost reduction
Ion Source, Solid State Amplifier,Dee Noses, Digital LLRF, Simplified Media Supply,Iron, Cryosystem, Extraction System, and so on
VARIAN PT Superconducting Proton CyclotronsFuture Developments
-
8/12/2019 Varian 250 Mev Sc Pt
52/54
52The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
Future Developments
The proven design
which was built in the past
will be improved continuouslyfor the VARIAN PT Cyclotronwith regard to reliability maintainability performance upgrades cost reduction
Ion Source, Solid State Amplifier,Dee Noses, Digital LLRF, Simplified Media Supply,Iron, Cryosystem, Extraction System, and so on
ConclusionOperating & Future VARIAN PT Cyclotrons
-
8/12/2019 Varian 250 Mev Sc Pt
53/54
53The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
* Iron #5 is under inspection in the factory.
* Cyclotron #3 is currently undergoing FATs.
* Cyclotron #4 parts are currently assembled in the VARIAN factory.
* Irons #6 and #7 are currently being casted and forged
Operating & Future VARIAN PT Cyclotrons
* Paul Scherrer Institute (PSI), treating patients since beginning of 2007.
* Rinecker Proton Therapy Center (RPTC), treating patients sincebeginning of 2009. Gantry #4 @RPTC is handed over right now.
* A contract for the next complete PT installation with a customer from theUSA has been signed.
* There are more projects in Europe and the USA in the pipeline.
more to come
Teams Charity Run
-
8/12/2019 Varian 250 Mev Sc Pt
54/54
54The VARIAN 250 MeV Superconducting Compact Proton Cyclotrons
Lanzhou, China
for the Childrens Cancer Ward of the University Hospital in Cologne:
Thank you!