Title slide

Van Oord Offshore Wind ProjectsWind days 2016

Aeolus Innovative Jack-up Vessel

Text (M) & Image (XL)

2

─ 1. Company profile

─ 2. Developing a new JUV

─ 3. Developments in offshore wind, wind turbines, foundations, and vessels

─ 4. Equipment and process optimisations

─ 5. New-building process

─ 6. Short movie

─ 7. Questions

Content

CHAPTER / END

Company profile

3

IMAGE 100%

4

Text (XXL)

1. Load and draught

2. Crane Capacity

3. Jack – Up speed

4. Sailing Speed

5. Reliability

6. Installation accuracy

Design of JUV

5

Loading and

seafastening

Pile

drivingLifting and

pitching

Position, jack

and pre-

loading

Sail

Jack-

down

Sail to next

position or

port

IMAGE 100%

6

Developments in turbines, foundations and installation equipment

Larger Turbines at deeper water and on Jackets

2011 Aeolus

Investment

Decision

IMAGE 100%

Expected Monopile weights

71

1994

Lely

500 kW

230

2006

Egmond

3000 kW

544

2009

Belwind

3000 kW

Expected Limit

Future MPs

900?

2011 Aeolus

Investment Decision:

990 ton Crane

Larger Turbines at deeper water and on Jackets

IMAGE 100%

Developments in MP weights

71

1994

Lely

500 kW

230

2006

Egmond

3000 kW

544

2009

Belwind

3000 kW

917

2015

Gemini

4000 kW

1302

2016

Veja Mate

6000 kW

Text (L) & Image (M)

Hull shape

Propulsion

Vessel Speed

10

Drive-train

Text (L) & Image (M)

Crane

Tailing Crane

Lifting Arrangement

11

Text (L) & Image (M)

Fast

Reliable

Accurate

Gripper

12

Text (L) & Image (M)

Seafastening

& Lifting tools

Tools

13

Text (L) & Image (M)

14

Text (L) & Image (M)

Offshore installation vessel Aeolus

15

Specifications

Length o.a 139.4 m Speed 12 knots

Breadth 38.06 m Accommodation 74 persons

Depth 9.12 m Installation crane 990 tons at 30 m

Draft 5.70 m Total power 18,688 kW

Deadweight 6,000 tons Jack-up system 4 x 81 m legs

Deck space 3,300 m2 Positioning DP2

VIDEO 100%

Van Oord Offshore Wind Projects - Luchterduinen

16

IMAGE 100%

17

Questions?

Wouter DirksManager Engineering & EstimatingVan Oord Offshore Wind Projects

E: [email protected]