    Value of Upgrading to Release 12.1 for E-Business Suite Projects

    Dean Herback Adwait Marathe

    Oracle EBS Projects Strategy Oracle EBS Projects Development

  • 7/27/2019 Value of Upgrading to R12

    3/41

    3

    Program Agenda

    R12.1 Upgrade Overview Functional

    Recent Release History

    Projects Specific Changes

    Upgrade Considerations and Resources

    R 12.1 Upgrade Overview Technical

    Overview

    Upgrade Best Practices

    Lessons Learnt

    12.1 Customer Success PICO Holdings

  • 7/27/2019 Value of Upgrading to R12

    4/41

    4

    The following is intended to outline our general

    product direction. It is intended for information

    purposes only, and may not be incorporated into any

    contract. It is not a commitment to deliver any

    material, code, or functionality, and should not berelied upon in making purchasing decisions.

    The development, release, and timing of any

    features or functionality described for Oracles

    products remains at the sole discretion of Oracle.

  • 7/27/2019 Value of Upgrading to R12

    5/41

    5

    Functional Overview

  • 7/27/2019 Value of Upgrading to R12

    6/41

    6

    EBS Product Update:Continued Releases And Innovation

    EBSR12

    EBSR12.1

    EBS12.1.2

    EBS12.1.3

    Planned

    2004 2007 2009 2010 2011+

    Released

    Financials,

    TechnologyProcurement, HCM, Service, SCM, Projects,

    Financials, Technology, MDMFunctional

    Innovation

    Major Release

    Minor Release

    EBS11i10

    EBS

    12.x

    NewEBS R12.1.3 released on Aug 20, 2010

    Functional Enhancements across suite, plus statutory/regulatory updates and error

    corrections

  • 7/27/2019 Value of Upgrading to R12

    7/4177

    THINK GLOBALLY

    To Make the Right Decisions

    MANAGE GLOBALLY

    To Lower Cost & Increase

    Performance

    E-Business Suite Release 12The Global Business Release Oracle Projects

    Project Portfolio Analysis

    Achieve global view of customer,

    supplier, partner & operations

    Subledger Accounting

    eTax

    Simplified Maintenance

    Management

    Implement, manage, and scale

    global applications easier

    Multi-Org Access

    Control

    Removal of Supplier

    Cost AdjustmentRestrictions

    Enhance Expenditure

    Inquiry with batched

    adjustments

    Work better across applications,

    divisions, and regions

    WORK GLOBALLY

    To Be More Competitive

  • 7/27/2019 Value of Upgrading to R12

    8/418

    Increase Operational Control and EfficiencyWhats New in Projects

    Procurement

    SupplyChain

    HumanCapital

    Customer &

    Master DataManagement

    Financials& Projects

    ApplicationsTechnology

    E-BusinessSuite

    Results:

    Automating Project Operationsand Finances

    Managing your full ProjectLifecycle with less effort

    Make better decisions withgreater insight

  • 7/27/2019 Value of Upgrading to R12

    9/4199

    ApplicationIntegration

    ProductInnovation

    E-Business Suite Release 12.1Oracle Projects

    MSP 2007 Certification

    Improved Services

    Procurement

    Integration

    Advance Processing -

    Enhanced Integration

    between AR and

    Project Billing

    Extend enterprise boundaries with

    enhanced business processes

    Project Manager

    Reporting Pack

    Self-Services

    Expenditure Inquiry

    Increased Automation in

    Resource Management

    Improve user satisfaction through

    increased productivity

    UPK Content for EBS

    BI Publisher Reporting

    Setup Automation

    Implement, manage and upgrade

    applications at lower cost

    Superior OwnershipExperience

  • 7/27/2019 Value of Upgrading to R12

    10/4110

    Oracle Projects Release 12.1, 12.1.2, 12.1.3

    Project Analytics

    Federal Financials

    Analytics

    iSetup/R12 Diagnostics

    UI Improvements

    Planning Enhancements

    P6 Integration

    MSP Integration

    Enhancements

    Supplier Cost Dashboard

    Self Services Expenditure

    Inquiry

    Performance Reporting

    Setup Audit

    Reporting Performance

    Improvements

    Program APIs

    Enhanced Change

    Management

    Enterprise and Project Insight

    Project ResourceManagement

    Project CostingProject Billing

    Project Contracts

    ProjectCollaboration

    ProjectManagement

    Personalized

    Role-Based Views

    GlobalProject

    Repository

    Project Portfolio Analysis

    Resource Management

    Project Billing

    Integrated Services

    Procurement

    Supplier Payment Controls

    E&C Deduction Processing

    Project Security in Oracle

    Purchasing

    Project Billing

    Project Costing

    Project Foundation

    Project Reporting

    Project Management

    Prepayment ReceiptApplication

    Effective Date Funds

    Consumption

    Improved Searches

    Date Validations & Defaults

    Streamlined Navigation

  • 7/27/2019 Value of Upgrading to R12

    11/4111

    R 12.1 Upgrade OverviewFunctional

    Architectural/Financial uptakes that benefit projects

    users

    Catch up all of 11i10 M RUP4 enhancements/patches

    New functionality leveraging Fusion technology

    Easier upgrade path if and when you decide to move

    to Fusion

  • 7/27/2019 Value of Upgrading to R12

    12/4112

    Building the Business Case for Upgrading

    Evaluate the new 12.1 features in the products you arecurrently running

    Opportunities to eliminate customizations

    Greater flexibility to match the needs of your business

    Opportunities for additional automation and process improvement

    Look for adjacent products that might add value

    Many products are much stronger at the 12.1 level than they were

    in 11.5.10

    Adding modules is low cost since you are leveraging the

    implementation work you have already done Some customers have justified the upgrade primarily by the need

    to get to the 12.1 level so they could implement additional

    products

  • 7/27/2019 Value of Upgrading to R12

    13/4113

    Upgrade Considerations

    Secure consulting skills early

    12.1.x implementation experience will be in short supply for

    the next while

    The number of customers upgrading to 12.1 will be

    significantly higher than to 12.0 Some customers might want to consider a

    reimplementation rather than an upgrade

    Consider increasing UAT and Training timeframes

    Significant number of enhancements will increase timerequired

  • 7/27/2019 Value of Upgrading to R12

    14/4114

    Key Message to EBS 11i CustomersUpgrade to EBS 12.1 and Get More Return on Your Investment

    Release VALUE: 12.1 provides business value across thesuite in addition to the Financials focused Release 12

    Customers should evaluate the business value of the Release 12.1

    Leverage complementary Apps including Fusion Applications

    QUALITY Results: Customers are live today on 12.1 New and existing customers are already live and upgrading

    Customers are achieving predictable results => use OCS,

    Experienced SIs or Oracle On Demand.

    Choose ROADMAP: 11i support deadlines are coming up Premier Support ends in Nov 2010; uplift fee waived until Nov 2011

    Extended Support ends in Nov 2013

  • 7/27/2019 Value of Upgrading to R12

    15/4115

    Agilysys: Upgrade from 11i10

    Projects, Assets, Payables,iProcurement

    Needed integrated ERP system

    manage and balance maintenanceto support continued growth

    McDonalds : Upgrade from 11i10

    Projects, Assets, Payables, iProc

    Standardize construction mgmtprocesses, track and manage costs byproject areas and ensure continuedsystem support

    CPS: Upgrade from 11i10

    New Features and Functionality

    Datacard: Upgrade from 11i9

    40+ Modules: Financials, OM, Inv,WMS, iSupplier, CRM, Projects,OTL, iProcurement, Purchasing, etc.

    ATT: Upgrade from 11i10

    Financials, AP, FA Largest Payables Deployment WW

    Pentel America: Upgrade from 11i9

    Financials, Inventory, WMS

    Better functionality; better supportoptions; ability to eliminatecustomizations

    Oracle Corp. Upgrade from Release 12

    Financials, HR, Procurement, SSHR,Contracts, etc.

    Usana Health Sciences: Upgradefrom 11i10

    Financials, PM, Adv Plan, Inv, WMS

    Support the multi-national company,Improved inventory control, demandvisibility, reduce cost of managingmfg processes

    Oracle E-Business Suite Release 12.1A Sample of Customers Who have Upgraded!

  • 7/27/2019 Value of Upgrading to R12

    16/41

    16

    Oracle ProjectsFor More Information

    Link to the Release Content Document for Projects Up to and including R 12.1.3

    https://metalink2.oracle.com/metalink/plsql/ml2_documents.show

    Document?p_database_id=NOT&p_id=561580.1

    For more information about Oracle Applicationshttp://www.oracle.com/applications/home.html

    Building the Business Case for your Upgrade

    Upgrade Advisor My Oracle Support note and communitieshttps://support.oracle.com/CSP/main/article?cmd=show&type=NOT&id=250.1

    https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1http://www.oracle.com/applications/home.htmlhttps://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1http://www.oracle.com/applications/home.htmlhttps://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1
  • 7/27/2019 Value of Upgrading to R12

    17/41

    17

    Building the Business Case for your UpgradeAccelerate your evaluation and planning

    http://launch.oracle.com/?OOW

    http://launch.oracle.com/http://launch.oracle.com/
  • 7/27/2019 Value of Upgrading to R12

    18/41

    18

    Upgrade Advisor on My Oracle Support

  • 7/27/2019 Value of Upgrading to R12

    19/41

    19

    Technical Overview

  • 7/27/2019 Value of Upgrading to R12

    20/41

    20

    12.1 upgrade overview

    R12.1 was generally available (GA) in May 2009

    Via Oracle Electronic Product Delivery (EPD)and oracle Store

    For all the supported platforms and languages

    Can be used by new and upgrading customers(11.5.9 and above) to go directly to R12.1

    If you are on R11i, use R12.1 Rapid Install from EPD. Follow

    instructions from the Upgrade Guide: 11i to 12.1

    If you are on R12.0.X, use R12.1 Maintenance Pack

    (7303030) from MyOracle Support (MOS). Follow instructionsfrom R12.1Maintenance Pack Install Instructions 752619.1)

  • 7/27/2019 Value of Upgrading to R12

    21/41

    21

    12.1 upgrade overviewUpgrade Paths

    Minimum EBS suite level for direct upgrade to R12.1

    11i9, 11i9CU1, 11i9CU2 or above

    11i10, 11i10CU1, 11i10CU2 or above

    R12.0.0 and above

    Minimum EBS suite level required for database to be at

    10gr2 (10.2.0.4) : 11i9CU2, 11i10CU2 11gr1 (11.1.0.7) : 11i10CU2, R12.0.4

    11gr2 (11.2.0.1) : 11i10CU2, R12.0.4

    One or more of the following choices apply based on

    your current configuration and your target configuration Upgrade database and EBS level in a single downtime

    Upgrade database and EBS level in separate downtimes

  • 7/27/2019 Value of Upgrading to R12

    22/41

    22

    12.1 upgrade overviewR12.1 Technology Stack

    Technology

    Component

    Version

    included

    11.5.10.2

    Version

    included

    12.0.4 RI

    Version included

    R12.1 RI

    Version

    certified

    with

    Minimum

    required

    version

    for upgrade

    Apps Mid tier

    -

    Forms/Repor

    ts

    6.0.8.25 10.1.2.2 10.1.2.3 10.1.2.3

    Apps Mid

    tier- Java

    Oracle Home

    /

    Apps Mid

    tier-JDK

    1.0.2.2/ 1.4.2 10.1.3.0/

    1.5

    10.1.3.4/1.6.0 10.1.3.5 10.1.3.4/1.6.0

    Database/JD

    BC

    drivers

    9.2.0.6/9.2.0.6 10.2.0.3 11.1.0.7/11.1.0.7 11.2.0.1 10.2.0.4/11.1.

    0.7

    Complete list at Oracle E-Business Suite Release 12.1.1 Maintenance Pack Installation Instructions(752619.1)

  • 7/27/2019 Value of Upgrading to R12

    23/41

    23

    12.1 upgrade overviewTechnology advantages

    Rich UI

    Look ahead LOVs

    Hover-over pop-ups

    Spider graphs

    Widgets

    Better look and feel XML Publisher Customize reporting needs

    Reporting Pack solution

    Every RDF , report is converted in xml. xml and RDF do co

    exists for e.g. PAXAUMTC & PAXAUMTC_XML

  • 7/27/2019 Value of Upgrading to R12

    24/41

    24

    Hover your cursor on Project Number in the project listtable to view project details

    24

    12.1 upgrade overviewSample of hover over pop-up

  • 7/27/2019 Value of Upgrading to R12

    25/41

    25

    Operational Advantages

    Supportability

    Stability

    Better performance / Opportunity to re engineer

    Frequent CUs Less Maintenance Costs

  • 7/27/2019 Value of Upgrading to R12

    26/41

    2626

    Identification of required patches

    Prepare a complete list of pre and post patches andrecommended code levels

    Keep the system current on AD/ATG/OAM code e.g. latest

    AD/ATG RUPs on 11i/R12.0 and once on R12.1

    High priority patches from My Oracle Support

    Consolidated Upgrade Patches (CUP) and required one offsthat need to be applied in pre-install mode. R12.1 CUP1

    (7303029:12.1.0) is available now

    Review Known-issues sections from key documents to

    determine additional pre or post upgrade patches :

    Release notes, MP Install Instructions

    Upgrade Best Practices

  • 7/27/2019 Value of Upgrading to R12

    27/41

    2727

    Patch merging and sequencing

    Take advantage of patch merge, hot patching and apply patches

    in the correct sequence. For e.g. apply MLS as hot patches

    Complete pre upgrade activities

    Identify and execute tasks that could be completed in a separate

    downtime period, prior to the production upgrade

    Use applicable steps mentioned in the "Downtime reduction"and Upgrade By Request appendices E and G of the R12.1

    upgrade guide

    Upgrade RDBMS version to latest certified for the current APPS

    level ( 11.2.0.1 / 11.1.0.7 / 10.2.0.4 )

    Convert to Oracle Applications Tablespace Model(OATM) Compacts database, optimizes storage settings and reduces I/O

    Other planned HW or OS upgrades

    Upgrade Best Practices

  • 7/27/2019 Value of Upgrading to R12

    28/41

    2828

    Pre-upgrade activities continued...

    Use TUMS (The Upgrade Manual Script) to avoid runningtasks that are not relevant for your system

    Convert to multiple organization architecture Document

    210193.1)

    Drop MRC schema ( 11.5.10 and above )

    Gather stats with GATHER_AUTO option for all schemas Minimize historical data to be upgraded as per business

    requirementsUpgrade By Request

    Purge old and/or transient data before upgrading

    Over 260 standard purge programs in R12

    Use new Purge Portal in OAM to administrate

    Upgrade Best Practices

  • 7/27/2019 Value of Upgrading to R12

    29/41

    2929

    Adpatch options and other reporting tools

    Use applicable adpatch options to reduce downtime and trackkey upgrade aspects using in-built tools

    Key recommended fixes (Pre Upgrade)

    Affecting Upgrade Performance

    AD-Parallel improved scalability: 8917381 (Part of

    9179588 AD CUP)

    Forms/reports generation regression with 11g: 8557019

    Projects

    PJ_PF Oracle Projects Consolidated Upgrade Patch

    (CUP) for 12.1.1 : 9071598 (Part of 7303029 AU CUP)

    General

    Review documents 244040.1 and 950896.1 for latest EBS

    recommended performance fixes

    Upgrade Best Practices

  • 7/27/2019 Value of Upgrading to R12

    30/41

    3030

    PRE Upgrade

    Interface with payables Adjustments on existing Prepayments, Prepayment Discounts

    and Prepayment Applications will be prohibited.

    Customers have to ensure that all necessary adjustments are

    performed before upgrading to R12.

    Ensure all the adjustmenst to Expense reports and SupplierInvoices are fully processed prior to upgrade. (pa120u05.sql )

    POST Upgrade

    MRC : If you have some custom columns defined for MRC

    amounts, those may generate errors! Understand and configure new pillar features like ebtax, sla,

    moac etc.

    Upgrade Pre & Post Recommendations

  • 7/27/2019 Value of Upgrading to R12

    31/41

    31

    Lessons Learnt Properly size RDBMS for upgrade

    init.ora

    Undo

    Shared pool

    DB Cache

    PGA Aggregate Target

    Plan for additional storage for staging patches, pre-builtcode

    Use production like hardware for UAT

    Optimize CBO stats

    Set plsql_no_compile=yes

    Use higher batch size (10000-20000)

    Choose adequate numbers of workers

  • 7/27/2019 Value of Upgrading to R12

    32/41

    32

    Lessons Learnt

    Repeat the upgrade until all issues are fixed and

    downtime is consistent Ensure new customizations comply to new standard

    Test ! Test ! & More Test !

  • 7/27/2019 Value of Upgrading to R12

    33/41

    33

    ReferencesFor More Information

    R12.1 documentation roadmap (790942.1)

    Oracle E-Business Suite Release 12.1 Info center (806593.1)

    Database preparation guidelines for R12.1 upgrade (761570.1)

    Patching FAQs (459156.1, 225165.1)

    Using staged or shared APPL_TOP and distributed AD

    (734025.1, 384248.1, 236469.1)

    OAM Patch Wizard overview and FAQ (976188.1, 976688.1)

    AD Command Line Options for Release R12 (1078973.1)

    Recommended Performance Fixes (244040.1, 950896.1)R12 Upgrade Sizing & Best Practices (399362.1)

    https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1https://metalink2.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=561580.1
  • 7/27/2019 Value of Upgrading to R12

    34/41

    34

    PICO Holdings

    O l O W ld 2010

  • 7/27/2019 Value of Upgrading to R12

    35/41

    Oracle OpenWorld 2010EBS Projects Session Schedule

    Title Presenters Date/Time Location

    Project Management Best Practices Barbara Fox, OracleSelva Mudaliar, Oracle

    Wednesday

    4:45 PMMarriott Hotel

    Golden Gate B

    Oracle Project Analytics for Oracle E-

    Business Suite

    Patrick Krause, IT

    Convergence

    Rao Adivikolanu, Oracle

    Thursday

    9:00 AMMoscone West

    L3 3000

    CISDI's Transformed Enterprise: Running the

    Business with Oracle Projects 12

    Rongxiang Liao, CISDI

    Li Zhiyou, CISDI

    Dean Herback, OracleKazim Isfahani, Oracle

    Thursday

    10:30 AMMoscone West

    L3 3000

    Managing Project Risk Using Oracle Projects

    at M. A. Mortenson Company

    Jeff Flake, M.A. Mortenson

    Dean Herback, Oracle

    Thursday

    1:30 PMMarriott Hotel

    Golden Gate B

    Quick Wins that will make you a hero: E-

    Business Suite Projects

    Carl Morley, Oracle Thursday1:30 PM

    Moscone West

    L3 3000

  • 7/27/2019 Value of Upgrading to R12

    36/41

    Questions

  • 7/27/2019 Value of Upgrading to R12

    37/41

    37

    Oracle OpenWorldLatin America 2010

    December 79, 2010

  • 7/27/2019 Value of Upgrading to R12

    38/41

    38

    Oracle OpenWorldBeijing 2010

    December 1316, 2010

  • 7/27/2019 Value of Upgrading to R12

    39/41

    39

    Oracle Products Available Online

    Oracle Store

    Buy Oracle license and support

    online today atoracle.com/store

  • 7/27/2019 Value of Upgrading to R12

    40/41

    40

    Th J t B i V l

  • 7/27/2019 Value of Upgrading to R12

    41/41

    Continue on Your Current Path

    Move to Fusion Step by Step

    Upgrade to Fusion Applications

    Evaluate the latest Applications releasesto add value to your business

    Enhance business value by augmentingApplications Unlimited with Fusion

    Middleware and Fusion Applications

    Upgrade by pillars or a global singleinstance

    APPLICATIONS UNLIMITED

    The Journey to Business ValueChoose a Path Thats Right for You