Page 1: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Value at Risk

Page 2: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

“What loss level is such that we are X% confident it will not be exceeded in N business days?”

Value at Risk is an attempt to provide a single number summarizing the total risk in a portfolio of financial assets.

Page 3: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

THE VaR MEASURE

I am X percent certain there will not be a loss of more than V dollars in the next N days

The variable V is the VaR of the portfolio. It is a function of two parameters: the time horizon (N days) and the confidence level (X%).

For example, when N=5 and X=97, VaR is the third percentile of the distribution of changes in the value of the portfolio over the next 5 days.

Page 4: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

THE VaR MEASURE

All senior managers are very comfortable with the idea of compressing all the Greek letter for all the market variables underlying a portfolio into a single number.

Page 5: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

THE VaR MEASURE

VaR is the loss level that will not be exceeded with a specified probability

C-VaR (or expected shortfall) is the expected loss given that the loss is greater than the VaR level

Although C-VaR is theoretically more appealing, it is not widely used

Page 6: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

THE VaR MEASURE

Regulators base the capital they require banks to keep on VaR

The market-risk capital is k times the 10-day 99% VaR where k is at least 3.0

Page 7: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

THE VaR MEASURE

Time Horizon Instead of calculating the 10-day, 99% VaR di

rectly analysts usually calculate a 1-day 99% VaR and assume

This is exactly true when portfolio changes on successive days come from independent identically distributed normal distributions

day VaR1-day VaR-10 10

Page 8: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Historical Simulation

Create a database of the daily movements in all market variables.

Suppose that VaR is to be calculated for portfolio using a 1-day time horizon, a 99% confidence level, and 501 days of data.

Scenario 1 is where the percentage changes in the values of all variable are the same as they were between Day0 and Day1.

Page 9: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Historical Simulation

This defines a probability distribution for daily changes in the value of the portfolio.

Page 10: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Historical Simulation Today is Day 500, tomorrow is Day501 The ith trial assumes that the value of the market variabl

e tomorrow (i.e., on day m+1) is

In our example, m=500. For the first variable, the value today, V500 , is 25.85. Also V0=20.33 and V1=20.78. It follows that the value of the first market variable in the first scenario is 25.85×20.78÷20.33=26.42

1i

im v

vv

Page 11: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Historical Simulation

Page 12: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Historical Simulation

We are interested in the 1-percentile point of the distribution of changes in the portfolio value.

Because there are total of 500 scenarios in Table 20.2 we can estimate this as the fifth-worst number in the final column of the table.

Page 13: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Model-Building Approach

Daily Volatilities In option pricing we measure volatility “per ye

ar” In VaR calculations we measure volatility “per

day

252year

day

Page 14: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Model-Building Approach

Strictly speaking we should define day as the standard deviation of the continuously compounded return in one day

In practice we assume that it is the standard deviation of the percentage change in one day

Page 15: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Model-Building Approach

Single-Asset Case Microsoft Example (page 448)

We have a position worth $10 million in Microsoft shares

The volatility of Microsoft is 2% per day (about 32% per year)

We use N=10 and X=99

Page 16: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Model-Building Approach

Microsoft Example (page 448)

The standard deviation of the change in the portfolio in 1 day is $200,000

The standard deviation of the change in 10 days is

200 000 10 456, $632 ,

Page 17: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Model-Building Approach

Microsoft Example continued

We assume that the expected change in the value of the portfolio is zero (This is OK for short time periods)

We assume that the change in the value of the portfolio is normally distributed

Since N(–2.33)=0.01, the VaR is

2 33 632 456 473 621. , $1, ,

Page 18: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Model-Building Approach

AT&T Example (page 449)

Consider a position of $5 million in AT&T The daily volatility of AT&T is 1% (approx 16

% per year) The S.D per 10 days is

50 000 10 144, $158,

Page 19: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Model-Building Approach

AT&T Example (page 449)

The VaR is

158114 2 33 405, . $368,

Page 20: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Model-Building Approach

Two-Asset Case Now consider a portfolio consisting of both

Microsoft and AT&T Suppose that the correlation between the

returns is 0.3 A standard result in statistics states that

YXYXYX 222

Page 21: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Model-Building Approach

In this case X = 200,000 andY = 50,000 and = 0.3. The standard deviation of the change in the portfolio value in one day is therefore 220,227

The 10-day 99% VaR for the portfolio is

The benefits of diversification are

(1,473,621+368,405)–1,622,657=$219,369

657,622,1$33.210220,227

Page 22: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Model-Building Approach

Less than perfect correlation leads to some of the risk being “diversified away”

Page 23: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

The Linear Model

We assume The daily change in the value of a portfolio is

linearly related to the daily returns from market variables

The returns from the market variables are normally distributed

Page 24: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

The Linear Model

deviation standard sportfolio' the is and variable of volatility the is where

P

i

n

iijjiji

jiiiP

n

i

n

jijjijiP

n

iii

i

xP

1

222

1 1

2

1

2

Page 25: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

The Linear Model

In the example considered in the previous section, S1=0.02, S2=0.01, and the correlation between the returns is 0.3.

The 10-day 99% VaR is 0.22×2.33×√10=1.623 million

Page 26: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

The Linear Model

Handling Interest Rates: One possibility is to assume that only parallel

shifts in the yield curve occur△P = -DPΔy This approach does not usually give enough

accuracy.

Page 27: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

The Linear Model

Handling Interest Rates: Cash Flow Mapping We choose as market variables bond prices with

standard maturities (1mth, 3mth, 6mth, 1yr, 2yr, 5yr, 7yr, 10yr, 30yr)

a simple example of a portfolio consisting of a long position in a single Treasury bond with a principal of 1million maturing in 0.8 year

We suppose that the bond provides a coupon of 10% per annum payable semiannually

Page 28: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

The Linear Model

Page 29: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

The Linear Model

When Linear Model Can be Used Portfolio of stocks Portfolio of bonds Forward contract on foreign currency Interest-rate swap

Page 30: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

The Linear Model

The Linear Model and Options

Consider a portfolio of options dependent on a single stock price, S. Define

S

P

and

S

Sx

Page 31: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

The Linear Model

As an approximation

Similarly when there are many underlying market variables

where i is the delta of the portfolio with respect to the ith asset

xSSP

i

iii xSP

Page 32: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

The Linear Model

Example Consider an investment in options on Microsoft

and AT&T. Suppose the stock prices are 120 and 30 respectively and the deltas of the portfolio with respect to the two stock prices are 1,000 and 20,000 respectively

As an approximation where x1 and x2 are the percentage changes

in the two stock prices

21 000,2030000,1120 xxP

Page 33: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Quadratic Model

Gamma is defined as the rate of change of the delta with respect to the market variable.

Gamma measures the curvature of the relationship between the portfolio value and an underlying market

variable.

Page 34: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Quadratic Model

Page 35: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Quadratic Model

Page 36: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Quadratic Model

For a portfolio dependent on a single stock price it is approximately true that

2)(2

1SSP

this becomes

22 )(2

1xSxSP

Page 37: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Quadratic Model

With many market variables we get an expression of the form

n

i

n

ijiijjiiii xxSSxSP

1 1 2

1

jiij

ii SS

P

S

P

2

where

This is not as easy to work with as the linear model

Page 38: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Monte Carlo Simulation

To calculate VaR using M.C. simulation we Value portfolio today Sample once from the multivariate distributio

ns of the xi Use the xi to determine market variables at

end of one day Revalue the portfolio at the end of day

Page 39: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Monte Carlo Simulation

Calculate P Repeat many times to build up a probability di

stribution for P VaR is the appropriate percentile of the distri

bution times square root of N For example, with 1,000 trial the 1 percentile i

s the 10th worst case.

Page 40: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Monte Carlo Simulation

Speeding Up Monte Carlo

Use the quadratic approximation to calculate P

Page 41: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Comparison of Approaches

Model building approach assumes normal distributions for market variables. It tends to give poor results for low delta portfolios

Historical simulation lets historical data determine distributions, but is computationally slower

Page 42: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Stress Testing And Back Testing

Stress Testing This involves testing how well a portfolio performs under some of the most extreme market moves seen in the last 10 to 20 years

Back-Testing Tests how well VaR estimates would have performe

d in the past We could ask the question: How often was the actua

l 10-day loss greater than the 99%/10 day VaR?

Page 43: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Principal Components Analysis

One approach to handing the risk arising from groups of highly correlated market variable is principal components analysis.

This takes historical data on movements in the market variables and attempts to define a set of components or factors that explain the movement

The approach is best illustrated with an example. The market variable we will consider are 10 US

Treasury rates with maturities between 3 months and 30 years.

Page 44: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Principal Components Analysis

Page 45: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Principal Components Analysis

The first factor is a roughly parallel shift (83.1% of variation explained)

The second factor is a twist (10% of variation explained)

The third factor is a bowing (2.8% of variation explained)

Page 46: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Principal Components Analysis

Example: Sensitivity of portfolio to rates ($m)

Sensitivity to first factor is from Table 18.3:10×0.32 + 4×0.35 − 8×0.36 − 7 ×0.36 +2 ×0.36

= −0.08

Similarly sensitivity to second factor = − 4.40

1 yr 2 yr 3 yr 4 yr 5 yr

+10 +4 -8 -7 +2

1 yr 2 yr 3 yr 4 yr 5 yr

+10 +4 -8 -7 +2

Page 47: Value at Risk. “What loss level is such that we are X % confident it will not be exceeded in N business days?” Value at Risk is an attempt to provide

Principal Components Analysis

As an approximation

The f1 and f2 are independent The standard deviation of P (from Table

20.4) is

The 1 day 99% VaR is 26.66 × 2.33 = 62.12

21 40.408.0 ffP

66.2605.640.449.1708.0 2222