vale - indicative price - sap bpc, srm & mobile - technical presentation - v-2.3
DESCRIPTION
bTRANSCRIPT
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
One Sap Vale BW-BPC, SRM and Mobile Infrastructure Solutions
August 06 , 2012 Carlos Arca, Edmar Borges, Alexandre Benini
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.2
AgendaBW-BPC, SRM and Moblie infrastructure
• Alignment of the technical solution;
• Macro timeline for implementation;
• RU / Volume alignment;
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.3
DisclaimersCONFIDENTIALITY STATEMENT
This statement ensures Vale that HP shall maintain absolute secrecy of the facts (Procedures and Values) that shall be disclosed to HP. This information shall be used for HP procedures only. The activities comply with the Installment of Service Contract, which shall not be disclosed to others without prior consent from Vale.PROPERTY STATEMENT
The information contained in this document, especially prepared for Vale, is confidential and belongs to HP. HP presents this document on the understanding that it shall be maintained in strict confidentiality by Vale, which shall only use it for evaluation of the services proposed.Vale should not disclose the subject matter of this document or the items here described, including organizational concepts, and should neither duplicate it nor use it for other purposes without formal consent from HP. Upon confirmation of the proposed service as here described, through an HP contract, such contract shall establish the conditions for usage of such information.PROPOSAL STATEMENT
This document was prepared in order to provide general information about the services that HP shall be able to offer. More specific terms and conditions shall be defined in the agreement for the services.This document is not a legally binding offer of services. Therefore, its acceptance does not constitute any contractual obligation. HP has the commitment to negotiate in good faith an agreement that fairly represents a business contract of mutual acceptance. No legal obligation for HP shall exist until the agreement is duly signed by HP.
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
BW-BPC
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.5
Sizing x Servers configurationBW-BPC
Sizing:
Servers configurations:
Important: Memory are adjusted 16GB/Core because hardware performance, and core for Apps are based (N, N +N), where +N is stand-by server, then 16 cores will be configuration (8, 8 +8) = 24 are needed;
SAP application
System Role
Target Server Qty O.S. Recommended
Config/server Scenario 1
BW-LSA + BPC
DB/CI Cluster
SD-2 1 vPar
HP-UX 14 cores, 128GB
SD-2 1 vPar
HP-UX 14 cores, 128GB
APP Servers Bl890 i2 2 HP-
UX 16 cores, 256GB Scenario 2
BW-LSA + BPC
DB/CI Cluster
SD-2 1 vPar
HP-UX 16 cores, 128GB
SD-2 1 vPar
HP-UX 16 cores, 128GB
APP Servers Bl890 i2 2 HP-
UX 28 cores, 256GB
Phase Action Item
TypeEnvir
.Instanc
e Function Platform Hostname O.S.Core Initia
lMemory Initial
Core Sized
Memory Sized
Core Adde
d
Memory
AddedHardware required RU by
socket
1(+) add HW PRD LP0, LPJ db SD2-1 CATOR2ENCLUS011/
VLUNX045HP-UX 8 128 14 224 6 961/2 - SD2 BL - 2 quad proc. x 128gb Small
1 (+) add HW PRD LP0, LPJ db SD2-3 CATOR2ENCLUS013/
VLUNX046HP-UX 8 128 14 224 6 961/2 - SD2 BL - 2 quad proc. x 128gb Small
1 (+) add HW DR LP0, LPJ db SD2-5 CAMKH1ENCLUS003/
CAVACN36HP-UX 8 128 14 224 6 961/2 - SD2 BL - 2 quad proc. x 128gb Small
1 (+) add HW DR LP0, LPJ apps Bl890C i2 -
stacked NEWSERVER01 HP-UX 6 48 16 256 10 208 Using BL890C I2 ordered @ Mobile
Phase 1 (MCC) Medium
1(+) add HW PRD LP0, LPJ apps Bl890C i2 -
stacked NEWSERVER02 HP-UX 9 72 24 384 15 312 1x Physical BL890C I2 to SCC Medium
2(+) expand HW PRD LP0,
LPJ db SD2-1 CATOR2ENCLUS011/VLUNX045
HP-UX 14 224 16 256 2 32Using Blades SD-2 ordered @ Phase 1 Small
2 (+) expand HW PRD LP0,
LPJ db SD2-3 CATOR2ENCLUS013/VLUNX046
HP-UX 14 224 16 256 2 32Using Blades SD-2 ordered @ Phase 1 Small
2 (+) expand HW DR LP0,
LPJ db SD2-5 CAMKH1ENCLUS003/CAVACN36
HP-UX 14 224 16 256 2 32Using Blades SD-2 ordered @ Phase 1 Small
2 (+) expand HW DR LP0,
LPJ apps Bl890C i2 - stacked NEWSERVER01 HP-
UX 16 256 28 384 12 128 1x Physical BL890C I2 Medium
2(+) expand HW PRD LP0,
LPJ apps Bl890C i2 - stacked NEWSERVER02 HP-
UX 24 384 42 576 18 192 1x Physical BL890C I2 Large
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.6
Core and memory configuration for LP0/LPJ AppsBW-BPC
Current Scenario 1Scenario 2
PRD:
DR:
vlunx003 vlunx010 cavavs0
803cores x 24GB
03cores x 24GB
03cores x 24GB
= 06 cores x 48 GB (sizing) HA (N+1)
vlunx027 vlnux02503cores x
24GB03cores x
24GB= 06 cores x 48GB (sizing)
vlnux003/010 cavavs08 newserver
02
08cores x 128GB
08cores x 128GB
08cores x 128GB
= 16 cores x 256 GB (sizing) HA (N+1)
vlunux027/025
newserver01
08cores x 128GB
08 cores x 128GB
= 16 cores x 256GB (sizing)
Vlnux003/010 cavavs08 newserver
02
14cores x 192GB
14cores x 192GB
14cores x 192GB
= 28 cores x 384GB (sizing) HA (N+1)
vlunx027/025
newserver01
14cores x 192GB
14cores x 192GB
= 28 cores x 384GB (sizing)
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.7
BW-BPCPhase 1
Hardware:• Installation of 03 Physical SD-2 blade on PRD/DR for LP0/LPJ DB/CI;• Installation of 02 Physical BL890Ci2 blade on PRD/DR for LP0/LPJ Apps
Operating Systems:• Installation of 02 (two) O.S. Instances in PRD/DR LP0/LPJ Apps;• Support for hardware installation of 02 Physical SD-2 blade on PRD/DR
for LP0/LPJ DB/CI;
Sap DB/CI and Apps:• Support for hardware installation for 02 Physical SD-2 blade on
PRD/DR for LP0/LPJ DB/CI;• Installation of 04 (four) APPS instances in new Physical BL890Ci2
blade on (02) PRD and (02) DR for LP0/LPJ Apps;• Adjustments in 10 (ten) APPS instances in re-size of proc. and
memory;
Installation and/or expansionPhas
eInstanc
eEnvi
r.Func
t.Action Type Action Hardware O.S
.D.B.
SAP CI
SAP App
s1 2 14
LP0, LPJ DR apps HW (+) add 1/2 - Physical BL890C I2
OS image (+) add 1
SAP APP (+) add 2 (+)
expand 4
db HW (+) add 1/2 - SD2 BL - 2 quad proc. x 128gb
OS image
(+) expand
PRD apps HW (+) add 1/2 - Physical BL890C I2 OS
image (+) add 1 SAP APP (+) add 2 (+)
expand 6
db HW (+) add 1/2 - SD2 BL - 2 quad proc. x 128gb
OS image
(+) expand
SAP DB/CI
(+) expand
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.8
BW-BPCPhase 2
Hardware• Expansion for LPO/LPJ DB/CI and Apps using the SD-2 blades ordered
@phase 1• Installation of 02 Physical BL890Ci2 blade on PRD/DR for LP0/LPJ Apps
Operating systems• Support for hardware expansion for LPO/LPJ DB/CI and Apps;• Installation of 02 (two) O.S. Instances in PRD/DR LP0/LPJ Apps;
SAP DB/CI and Apps: • Support for hardware expansion for LPO/LPJ DB/CI and Apps ;
Installation and/or expansionPhas
eInstan
ceEnvi
r.Func
t.Action Type Action Hardware O.
S.D.B.
SAP CI
SAP App
s2
LP0, LPJ DR apps HW (+)
expand 1x Physical BL890C I2 MCC
OS image
(+) expand
SAP APP (+) expand
db HW (+) expand
Using Blades SD-2 ordered @ Phase 1
OS image
(+) expand
PRD apps HW (+) expand 1x Physical BL890C I2 MCC
OS image
(+) expand
SAP APP (+) expand
db HW (+) expand
Using Blades SD-2 ordered @ Phase 1
OS image
(+) expand
SAP DB/CI
(+) expand
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.9
Other activitiesBW-BPC
All phases• Set up of storage and SAN networks;• Set up ofbackup agents, backup servers, tape libraries and VTL, set of tapes;• Configuration of ITSM tools, monitoring agents, threshold parameter;• BCRS, adjustments in Technical Disaster & Recovery Plan;
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.10
Servers overview @ MCC/SCCBW-BPC
DR: DB/CI Apps
PDY/QAS: DB/CI & Apps
DEV: DB/CI & Apps
PRD: DB/CI
Apps
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.11
Servers distributionBW-BPC
DB/CI currentBW-LSA Phase 1:
DB/CI with BW-LSA Phase 1 + BPC Phase 1 :
Part. Type
HostnameSD2-1Enc:
Cator2enclus011
HostnameSD2-3Enc:
Cator2enclus013
HostnameSD2-5Enc:
Camkh1enclus003SAP Application
SCC PRODSids
MCCPRE-PROD
SidsBlade total
proc (quad core)
total cores sized
Phase1
cores ACTIVE
cores iCAPed ram
total cores sized
add cores
needed
Min. Proc. Needed (quad)
N vlunx001 vlunx002 vlunx043 ECC EP0 EC0 3 6 8 8 16 384 24 ~ ~N vlunx014 vlunx015 vlunx049 BI BP0 ~ 1 2 4 4 4 128 8 ~ ~N vlunx005 vlunx028 vlunx050 EP WP0 ~ 1 2 4 4 4 128 8 ~ ~V vlunx045 vlunx046 cavacn36 BW-LSA LP0/LPJ ~ 1 2 4 8 ~ 128 8 2 1 (4 core)V V
Part. Type
HostnameSD2-1Enc:
Cator2enclus011
HostnameSD2-3Enc:
Cator2enclus013
HostnameSD2-5Enc:
Camkh1enclus003SAP Application
SCC PRODSids
MCCPRE-PROD
SidsBlade total
proc (quad core)
total cores sized
Phase1
cores ACTIVE
cores iCAPed ram
total cores sized
add cores
needed
Min. Proc. Needed (quad)
N vlunx001 vlunx002 vlunx043 ECC EP0 EC0 3 6 8 8 16 384 24 ~ ~N vlunx014 vlunx015 vlunx049 BI BP0 ~ 1 2 4 4 4 128 8 ~ ~N vlunx005 vlunx028 vlunx050 EP WP0 ~ 1 2 4 4 4 128 8 ~ ~V vlunx045 vlunx046 cavacn36 BW-LSA+BPC LP0/LPJ ~
24 14 ~ 224 14
V NEW NEW NEW MI HP0 ~ 1 4 64 V ~ ~ ~
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.12
Servers distributionBW-BPC
Applications:
MCC Blade Servers for PPR/DR 'App' Servers SCC Blade Servers for PRODUCTION 'App' Servers
BLADEBlad
e Mod
el
Processor Arch
OSProcessor
sCOREs
Threads
RAM GB
Max RAM for
iVMsTier
ABAP Dia Inst
JAVA Dia Inst
DUAL Dia Inst
max sized cores
max sized RAM comment BLADE
Blade
Model
Processor Arch
OSProcessor
sCOREs
Threads
RAM GB
Max RAM for
iVMsTier
ABAP Dia Inst
JAVA Dia Inst
DUAL Dia Inst
max sized cores
max sized RAM comment
VLUNX02
6
Bl890C i2
ia64 HP-UX 8 32 64 512 450
PPR ER0 ~ ~ 16 128 installed
VLUNX003
Bl890C i2
ia64 HP-UX 8 32 64 512 450
PROD EP0 ~ ~ 16 128 installed
PPR ~ ~ ~ 0 0 no longer needed PROD ~ ~ BP0 0 0 no longer
neededPPR ~ ~ PR0 3 24 needed PROD ~ ~ PP0 3 24 neededPPR NR0 ~ ~ 3 24 needed PROD NP0 ~ ~ 3 24 neededPPR ~ ~ ~ 3 24 needed PROD ~ ~ WP0 3 24 neededPPR ~ ECR ~ 3 24 needed PROD ~ ECP ~ 3 24 neededPPR LP0 LPJ ~ 14 112 new PROD LP0 LPJ ~ 0 0 newPPR HP0 ~ ~ 8 64 new PROD HP0 ~ ~ 0 0 new
CPU utilization (average, peak) v. low v. low total > 50 400 CPU utilization (average, peak) v. low v. low total > 28 224
Memory Utilization (average, peak) v. low v. low Memory Utilization (average,
peak) v. low v. low
VLUNX02
7
Bl890C i2
ia64 HP-UX 8 32 64 512 450
PPR ER0 ~ ~ 16 128 needed
VLUNX010
Bl890C i2
ia64 HP-UX 8 32 64 512 450
PROD EP0 ~ ~ 16 128 installed
PPR ~ ~ ~ 0 0 no longer needed PROD ~ ~ BP0 0 0 no longer
neededPPR ~ ~ PR0 3 24 needed PROD ~ ~ PP0 3 24 neededPPR NR0 ~ ~ 3 24 needed PROD NP0 ~ ~ 3 24 neededPPR ~ ~ ~ 3 24 needed PROD ~ ~ WP0 3 24 neededPPR ~ ECR ~ 3 24 needed PROD ~ ECP ~ 3 24 neededPPR LP0 LPJ ~ 14 112 new PROD LP0 LPJ ~ 14 112 newPPR HP0 ~ ~ 8 64 new PROD HP0 ~ ~ 8 64 new
CPU utilization (average, peak) v. low v. low total > 50 400 CPU utilization (average, peak) v. low v. low total > 50 400Memory Utilization (average,
peak) v. low v. low Memory Utilization (average,
peak) v. low v. low
NEWSERVER01
Bl890C i2
ia64 HP-UX 8 32 64 51
2 450
PPR ER0 ~ ~ new
CAVAVS08
Bl890C i2
ia64 HP-UX 8 32 64 512 450
PROD EP0 ~ ~ 16 128 needed
PPR ~ ~ ~ new PROD ~ ~ BP0 0 0 no longer needed
PPR ~ ~ PR0 new PROD ~ ~ PP0 3 24 neededPPR NR0 ~ ~ new PROD NP0 ~ ~ 3 24 neededPPR ~ ~ ~ new PROD ~ ~ WP0 3 24 neededPPR ~ ECR ~ new PROD ~ ECP ~ 3 24 neededPPR LP0 LPJ ~ new PROD LP0 LPJ ~ 14 112 newPPR HP0 ~ ~ new PROD HP0 ~ ~ 8 64 new
CPU utilization (average, peak) v. low v. low total > 0 0 CPU utilization (average, peak) v. low v. low total > 50 400Memory Utilization (average,
peak) v. low v. low Memory Utilization (average,
peak) v. low v. low
NEWSERVER02
Bl890C i2
ia64 HP-UX 8 32 64 512 450
PROD EP0 ~ ~ newPROD ~ ~ BP0 newPROD ~ ~ PP0 newPROD NP0 ~ ~ newPROD ~ ~ WP0 newPROD ~ ECP ~ newPROD LP0 LPJ ~ newPROD HP0 ~ ~ new
CPU utilization (average, peak) total > 0 0Memory Utilization (average,
peak)
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
SRM
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.14
Sizing x Servers configurationSRM
Sizing:
Servers configurations:
SAP app.
System Role Target Server O.S. Recommended configuration per wave
Pilot Wave 1 Wave 2 Wave 3
SRM
DB/CI Cluster
SD-2 HP-UX 1 vPar, 4 cores, 16GB
1 vPar, 8 cores, 80GB 1 vPar, 10 cores, 96GB 1 vPar, 14 cores,
128GBSD-2 HP-UX 1 vPar, 4 cores,
16GB1 vPar, 8 cores, 80GB 1 vPar, 10 cores, 96GB 1 vPar, 14 cores,
128GB
APP Servers Bl460 G7 or Gen8 Linux 2 bl460 G7 2 bl460 G7
(12c/96GB)
2 bl460 G7 (12c/96GB) + 1 bl460 Gen8 (12c/128GB)
2 bl460 G7 (12c/96GB) +2 bl460 Gen8 (12c/128GB)
Portal (wp0) BL890iC2 HP-UX 2 core, 16GB 2 core, 16GB 2 core, 16GB 3 core, 24GB
Phase Action Item
TypeEnvir
.Instanc
e Function Platform Hostname O.S. Core Initial
Memory Initial
Core Sized
Memory Sized
Core Adde
d
Memory
AddedHardware required RU by
socket
pilot (+) add HW DR WP0 web/apps
Bl890C i2 - stacked NEWSERVER03 HP-
UX 0 0 2 16 2 16 Using BL890C I2 ordered @ Mobile Phase 1 (MCC) Small
pilot (+) add HW PRD WP0 web/apps
Bl890C i2 - stacked NEWSERVER04 HP-
UX 0 0 3 24 3 24 Using BL890C I2 ordered @ BPC Phase 1 (SCC) Small
1 (+) expand HW PRD SP0,
SPJ db SD2-2 CATOR2ENCLUS012/CAVACN27
HP-UX 7 104 8 128 1 24 Using Blades SD-2 current Small
1 (+) expand HW PRD SP0,
SPJ db SD2-4 CATOR2ENCLUS014/CAVACN28
HP-UX 7 104 8 128 1 24 Using Blades SD-2 current Small
1 (+) expand HW DR SP0,
SPJ db SD2-6 CAMKH1ENCLUS004/CAVACN34
HP-UX 7 104 8 128 1 24 Using Blades SD-2 current Small
2 (+) add HW PRD SP0, SPJ db SD2-2 CATOR2ENCLUS012/
CAVACN27HP-UX 8 128 10 160 2 32 1 - SD2 BL - 2 quad proc. x 128gb Small
2 (+) add HW PRD SP0, SPJ db SD2-4 CATOR2ENCLUS014/
CAVACN28HP-UX 8 128 10 160 2 32 1 - SD2 BL - 2 quad proc. x 128gb Small
2 (+) add HW DR SP0, SPJ db SD2-6 CAMKH1ENCLUS004/
CAVACN34HP-UX 8 128 10 160 2 32 1 - SD2 BL - 2 quad proc. x 128gb Small
2 (+) add HW PRD SP0, SPJ apps Bl460C G8 -
stacked NEWSERVER05 Linux 0 0 12 128 12 128 1x bl460 Gen8 (12c/128GB) Large
2 (+) add HW DR SP0, SPJ apps Bl460C G8 -
stacked NEWSERVER06 Linux 0 0 12 128 12 128 1x bl460 Gen8 (12c/128GB) Large
3 (+) expand HW PRD SP0,
SPJ db SD2-2 CATOR2ENCLUS012/CAVACN27
HP-UX 10 160 14 224 4 64 Using Blades SD-2 ordered @ Phase 2 Small
3 (+) expand HW PRD SP0,
SPJ db SD2-4 CATOR2ENCLUS014/CAVACN28
HP-UX 10 160 14 224 4 64 Using Blades SD-2 ordered @ Phase 2 Small
3 (+) expand HW DR SP0,
SPJ db SD2-6 CAMKH1ENCLUS004/CAVACN34
HP-UX 10 160 14 224 4 64 Using Blades SD-2 ordered @ Phase 2 Small
3 (+) add HW PRD SP0, SPJ apps Bl460C G8 -
stacked NEWSERVER07 Linux 0 0 12 128 12 128 1x bl460 Gen8 (12c/128GB) Large
3 (+) add HW DR SP0, SPJ apps Bl460C G8 -
stacked NEWSERVER08 Linux 0 0 12 128 12 128 1x bl460 Gen8 (12c/128GB) Large
3 (+) expand HW DR WP0 web/
appsBl890C i2 - stacked NEWSERVER03 HP-
UX 2 16 3 16 1 8 Using BL890C I2 ordered @ Mobile Phase 1 (MCC) Small
3 (+) expand HW PRD WP0 web/
appsBl890C i2 - stacked NEWSERVER04 HP-
UX 3 24 4 24 1 8 Using BL890C I2 ordered @ BPC Phase 1 (SCC) Small
At superdome (SD-2) was used 16 GB of memory per Core for hardware recommendatin
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.15
Core and memory configuration for WPOSRM
Pilot Phase 2/3PRD:
DR:
vlunx003 vlunx010 cavavs0801 core x
8GB01 core x
08GB01 core x
08GB= 02 cores x 16 GB
(sizing) HA (N+1)
vlunx027 vlnux02501 core x
8GB01 core x
08GB= 02 cores x 16 GB
(sizing)
vlunx003 Vlunx010 cavavs08 newserver02
01 core x 8GB
01 core x 08GB
01 core x 08GB
01 core x 08GB
= 03 cores x 24 GB (sizing) HA (N+1)
vlunx027 vlnux025 newserver01
01 core x 8GB
01 core x 08GB
01 core x 08 GB
= 03 cores x 24GB (sizing)
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.16
SRMPilot
Hardware:• Expansion of hardware for 02 Physical BL890Ci2 blade on
PRD/DR for WPO;Operating Systems:• Installation of 02 (two) O.S. Instances in PRD/DR for WPO;Sap DB/CI and Apps:• Installation of 10 DB/CI instances;• Installation of 04 has done by NSSR, it will have only ongoing
costs;• Installation of 14 APPS instances;
Phase 1Hardware• Expansion of hardware for in PRD/DR(PDY) for SP0/SPJ using the
blades current; SAP DB/CI and Apps: • Support for hardware expansion in PRD/DR(PDY) for SPO/SPJ
DB/CI ;
Installation and/or expansion
.Phase
Instance
Envir. Function Action
Type Action Hardware O.S.
D.B.
SAP CI
SAP Apps
pilot 2 14 14 14
SD0, SDJ 2 2
SD1, SDG DEV apps/db SAP
DB/CI (0) keep 2 2
SP0, SPJ DR apps SAP APP (+) add 4
PRD apps SAP APP (+) add 4 db SAP
DB/CI (+) add 2 2
SQ0, SQJ QAS apps/db SAP
DB/CI (+) add 2 2
SQ1, SQG QAS apps/db SAP
DB/CI (0) keep 2 2
SR0, SRJ PPR apps/db SAP
DB/CI (+) add 2 2
SY1, SYG PDY apps SAP APP (+) add 4
db SAP DB/CI (+) add 2 2
WP0 DR web/apps HW (+) add 1/2 - Physical BL890C I2
(Same BPC)
OS image (+) add 1
SAP APP (+) add 1 PRD web/
apps HW (+) add 1/2 - Physical BL890C I2 (Same BPC)
OS image (+) add 1
SAP APP (+) add 11
SP0, SPJ DR db HW (+)
expand Using Blades SD-2 current
PRD db HW (+) expand Using Blades SD-2 current
SAP DB/CI
(+) expand
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.17
SRMPhase 2Hardware:• Installation of 03 Physical SD-2 blade in PRD/DR (PDY) for
SP0/SPJ DB/CI;• Installation of 02 BL460 Gen8 in PRD/DR (PDY) for SP0/SPJ AppsOperating Systems:• Installation of 02 O.S. instances in PRD/DR(PDY) for SPO/SPJ
Apps;Sap DB/CI and Apps:• Support for hardware expansion in PRD/DR(PDY) for SPO/SPJ
DB/CI;• Installation of 04 APPS instances in PRD/DR (PDY) for SPO/SPJ;Phase 3Hardware:• Expansion of hardware SD-2 blade in PRD/DR(PDY) for SP0/SPJ
DB/CI;• Installation of 02 BL460 Gen8 in PRD/DR(PDY) for SP0/SPJ AppsOperating Systems:• Installation of 02 O.S. instances in PRD/DR (PDY) for SPO/SPJ
Apps;Sap DB/CI and Apps:• Support for hardware expansion in PRD/DR(PDY) for SPO/SPJ
DB/CI;• Installation of 04 APPS instances in PRD/DR(PDY) for SPO/SPJ;
Installation and/or expansion.Phas
eInstanc
eEnvi
r. Function Action Type Action Hardware O.
S.D.B.
SAP CI
SAP Apps
2 2 4 SP0,
SPJ DR apps HW (+) add 1x bl460 Gen8 (12c/128GB)
OS image (+) add 1
SAP APP (+) add 2 db HW (+) add 1 - SD2 BL - 2 quad proc. x
128gb PRD apps HW (+) add 1x bl460 Gen8 (12c/128GB) OS
image (+) add 1 SAP APP (+) add 2 db HW (+) add 1 - SD2 BL - 2 quad proc. x
128gb
SAP DB/CI
(+) expand
3 2 4 SP0,
SPJ DR apps HW (+) add 1x bl460 Gen8 (12c/128GB)
OS image (+) add 1
SAP APP (+) add 2 db HW (+)
expandUsing Blades SD-2 ordered @ Phase 2
PRD apps HW (+) add 1x bl460 Gen8 (12c/128GB) OS
image (+) add 1 SAP APP (+) add 2 db HW (+)
expandUsing Blades SD-2 ordered @ Phase 2
SAP DB/CI
(+) expand
WP0 DR web/apps HW (+)
expand1/2 - Physical BL890C I2 (Same BPC)
PRD web/apps HW (+)
expand1/2 - Physical BL890C I2 (Same BPC)
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.18
Other activitiesSRM
All phases• Set up of storage and SAN networks;• Set up ofbackup agents, backup servers, tape libraries and VTL, set of tapes;• Configuration of ITSM tools, monitoring agents, threshold parameter;• BCRS, adjustments in Technical Disaster & Recovery Plan;
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.19
Servers overview @ MCC/SCCSRM
PDY (DR): DB/CI Apps
QAS: DB/CI & Apps
DEV: DB/CI & Apps
PRD: DB/CI
Apps
PRD: Portal
SY1 app xxSYG app xx
SP0 app DRSPJ app DR
SP0 app DRSPJ app DR
SY1 app xxSYG app xx
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.20
Servers distributionSRM
DB/CI Current:
DB/Ci with SRM :
Part. Type
HostnameSD2-2Enc:
Cator2enclus012
HostnameSD2-4Enc:
Cator2enclus014
HostnameSD2-6Enc:
Camkh1enclus004SAP Application
SCC PRODSids
MCCPRE-PROD
SidsBlade total proc
total cores sized
Phase1
cores ACTIVE
cores iCAPed ram
total cores sized
addit. cores
needed
Min. Proc. Needed (quad)
N vlunx008 vlunx009 vlunx011 PI/GRC-NFE PP0/NP0 PR0/NR0 1 2 4 4 4 128 8 ~ ~V vlunx047 vlunx030 vlunx052 EC ECP ECR
4
2 4 8 ~ 128 8 ~ ~V cavacn25 cavacn26 cavacn33 CRM/MI CP0/CPJ/HP0 CR0/CRJ 1 1 4 ~ 64 4 ~ ~V cavacn27 cavacn27 cavacn34 EP WPE WRE 2 3 8 ~ 128 14 6 2 (8core)V cavacn29 cavacn30 cavacn35 MDM/Search-UI MPC/SCP MRC/SCR 2 5 8 ~ 128 13 5 1 (4core)V cavacn31 cavacn32 ~ GRC-AC GP0 ~ 1 3 4 ~ 64 6 2 1 (4core)V ~ ~ ~ N vlunx019 vlunx020 vlunx053 MDM MP0 1 2 4 4 4 128 8 ~ ~
Part. Type
HostnameSD2-2Enc:
Cator2enclus012
HostnameSD2-4Enc:
Cator2enclus014
HostnameSD2-6Enc:
Camkh1enclus004SAP Application
SCC PRODSids
MCCPRE-PROD
SidsBlade total proc
total cores sized
Phase1
cores ACTIVE
cores iCAPed ram
total cores sized
addit. cores
needed
Min. Proc. Needed (quad)
N vlunx008 vlunx009 vlunx011 PI/GRC-NFE PP0/NP0 PR0/NR0 1 2 4 4 4 128 8 ~ ~V vlunx047 Vlunx030 vlunx052 EC ECP ECR
4
2 4 8 ~ 128 8 ~ ~V cavacn25 Cavacn26 cavacn33 CRM CP0/CPJ CR0/CRJ 1 1 4 ~ 64 4 ~ ~V cavacn27 Cavacn27 cavacn34 EP/and SRM WPE/SP0/SPJ WRE/SY1/SYG 1 8 8 ~ 128 16 8 2(8cores)V cavacn29 Cavacn30 cavacn35 MDM/Search-UI MPC/SCP MRC/SCR 2 5 8 ~ 128 13 5 1 (4core)V cavacn31 Cavacn32 ~ GRC-AC GP0 ~ 1 3 4 ~ 64 6 2 1 (4core)V ~ ~ ~ N vlunx019 Vlunx020 vlunx053 MDM MP0 1 2 4 4 4 128 8 ~ ~
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.21
Servers distributionSRM
Applications
Intel Blades for SAP Dia Inst [CRM/EP/SRM] @ MCC Intel Blades for SAP Dia Inst [CRM/EP/SRM] @ SCC
BLADEBlade Mode
l
Processor Arch
OS Processors
COREs
Threads
RAM GB
Max RAM for SAP
Tier ABAP DIA Inst
JAVA Dia Inst
Max Cores Sized
Max RAM Sized Comments BLADE
Blade Mode
l
Processor Arch
OS Processors
COREs
Threads
RAM GB
Max RAM for
iVMsTier ABAP
DIA InstJAVA
Dia InstMax
Cores Sized
Max RAM Sized Comments
cavaas39
BL460C G7
x86_64
RHEL
Server 5.7
2 12 24 96 85
PPR CR0 CRJ installed
cavaas37
BL460C G7
x86_64
RHEL
Server 5.7
2 12 24 96 85
PPR CR0 CRJ installedPPR ~ WRE installed PPR ~ WRE installedPPR SR0 SRJ # # new PPR SR0 SRJ # # new
CPU utilization (average, peak) ? ? CPU utilization (average, peak) ? ? Memory Utilization (average,
peak) ? ? Memory Utilization (average, peak) ? ?
cavaas40
BL460C G7
x86_64
RHEL
Server 5.7
2 12 24 96 85
PPR CR0 CRJ installed
cavaas38
BL460C G7
x86_64
RHEL
Server 5.7
2 12 24 96 85
PPR CR0 CRJ installedPPR ~ WRE installed PPR ~ WRE installedPPR SR0 SRJ # # new PPR SR0 SRJ # # new
CPU utilization (average, peak) ? ? CPU utilization (average, peak) ? ? Memory Utilization (average,
peak) ? ? Memory Utilization (average, peak) ? ?
new wave 1
BL460C G8
x86_64
RHEL
Server 5.7
2 12 24 128 85
PPR CR0 CRJ installed
new
wave 1
BL460C G8
x86_64
RHEL
Server 5.7
2 12 24 128 85
PPR CR0 CRJ installedPPR ~ WRE installed PPR ~ WRE installedPPR SR0 SRJ # # new PPR SR0 SRJ # # new
CPU utilization (average, peak) na na CPU utilization (average, peak) na na Memory Utilization (average,
peak) na na Memory Utilization (average, peak) na na
new wave 2-3
BL460C G8
x86_64
RHEL
Server 5.7
2 12 24 128 85
PPR CR0 CRJ installed
new
wave 2-3
BL460C G8
x86_64
RHEL
Server 5.7
2 12 24 128 85
PPR CR0 CRJ installedPPR ~ WRE installed PPR ~ WRE installedPPR SR0 SRJ # # new PPR SR0 SRJ # # new
CPU utilization (average, peak) na na CPU utilization (average, peak) na na Memory Utilization (average,
peak) na na Memory Utilization (average, peak) na na
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Mobile
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.23
Sizing x Servers configurationMobile
Sizing:System
Role Target Server Recommended Config per Phase
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
DB/CI Cluster
SD-2 1 vPar, 4 cores, 48GB
1 vPar, 4 cores, 48GB
1 vPar, 4 cores, 48GB
1 vPar, 4 cores, 48GB
1 vPar, 4 cores, 48GB
SD-2 1 vPar, 4 cores, 48GB
1 vPar, 4 cores, 48GB
1 vPar, 4 cores, 48GB
1 vPar, 4 cores, 48GB
1 vPar, 4 cores, 48GB
APP Servers 2 x BL890 i2 (shared APP svr) 03 cores, 32GB 04 cores, 48GB 06 cores, 64GB 08 cores, 80GB 08 cores, 80GB
Sup data tier vwmare 1 vM, 4 cores, 32GB 1 vM, 4 cores,
32GB1 vM, 4 cores,
32GB1 vM, 4 cores,
32GB1 vM, 4 cores,
32GBSup Apps vwmare 2 vM, 4 cores, 32GB 2 vM, 4 cores,
32GB2 vM, 4 cores,
32GB2 vM, 4 cores,
32GB2 vM, 4 cores,
32GBRelay server vwmare 2 vM, 2 cores, 8GB 2 vM, 2 cores, 8GB 2 vM, 2 cores, 8GB 2 vM, 2 cores, 8GB 2 vM, 2 cores, 8GBAfaria server vwmare 2 vM, 2 cores, 8GB 2 vM, 2 cores, 8GB 2 vM, 2 cores, 8GB 2 vM, 2 cores, 8GB 2 vM, 2 cores, 8GB
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.24
Sizing x Servers configurationMobile
Servers configurations:Phas
e Action Item Type
Envir.
Instance Function Platform Hostname O.S. Core
InitialMemory Initial
Core Sized
Memory Sized
Core Adde
d
Memory
AddedHardware required
RU by socke
t1(+) add HW PRD HP0 nw/db SD2-1 CATOR2ENCLUS
011 HP-UX 4 64 4 64 1/2 - SD2 BL - 2 quad proc. x 128gb (Same BPC) Small
1(+) add HW PRD HP0 nw/db SD2-3 CATOR2ENCLUS013 HP-UX 4 64 4 64 1/2 - SD2 BL - 2 quad proc. x 128gb
(Same BPC) Small
1(+) add HW DR HP0 nw/db SD2-5 CAMKH1ENCLUS003 HP-UX 4 64 4 64 1/2 - SD2 BL - 2 quad proc. x 128gb
(Same BPC) Small
1(+) add HW PRD HP0 nw/apps Bl890C i2 - stacked NEWSERVER09 HP-UX 6 48 6 48 Using BL890C I2 ordered @ BPC
Phase 1 (SCC) Small
1(+) add HW DR HP0 nw/apps Bl890C i2 - stacked NEWSERVER10 HP-UX 4 32 4 32 1x Physical BL890C I2 to MCC Small
1(+) expand HW PRD AP0,
UPO sup/afaria/db Vmware CAVAAS50 Windows 2 16 4 32 2 16 VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) virtual
1(+) add HW PRD UP0 sup/apps Vmware NEWSERVER11 Windows 4 32 4 32 VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) virtual
1(+) add HW PRD UP0 sup/apps Vmware NEWSERVER12 Windows 4 32 4 32 VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) virtual
1(+) expand HW DR AP0,
UPO sup/afaria/db Vmware CAVAAS45 Windows 2 16 4 32 2 16 VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) virtual
1(+) add HW DR UP0 sup/apps Vmware NEWSERVER13 Windows 4 32 4 32 VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) virtual
1(+) add HW DR UP0 sup/apps Vmware NEWSERVER14 Windows 4 32 4 32 VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) virtual
1(+) expand HW QAS UQ0,
AQ0sup/afa/apps/db Vmware CAVAAS46 Window
s 2 16 4 32 2 16 VMWare Farm > BL620C HW (05 = 3 prd, 03 dr) virtual
1(+) expand HW DEV UD0,
AD0sup/afa/apps/db Vmware CAVAAS44 Window
s 2 16 4 32 2 16 VMWare Farm > BL620C HW (05 = 3 prd, 03 dr) virtual
1(+) add HW PRD AP0 afaria/apps Vmware NEWSERVER15 Windows 2 8 2 8 VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) virtual
1(+) add HW PRD AP0 afaria/apps Vmware NEWSERVER16 Windows 2 8 2 8 VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) virtual
1(+) add HW DR AP0 afaria/apps Vmware NEWSERVER17 Windows 2 8 2 8 VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) virtual
1(+) add HW DR AP0 afaria/apps Vmware NEWSERVER18 Windows 2 8 2 8 VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) virtual
1(+) add HW PRD RP0 relay Vmware NEWSERVER21 Windows 2 8 2 8 VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) virtual
1(+) add HW PRD ctl VMWARE Site RM. Vmware NEWSERVER24 Window
s 2 8 2 8 VMWare Farm > BL620C HW (05 = 3 prd, 03 dr) virtual
1(+) add HW DR ctl VMWARE Site RM. Vmware NEWSERVER25 Window
s 2 8 2 8 VMWare Farm > BL620C HW (05 = 3 prd, 03 dr) virtual
2(+) expand HW PRD HP0 nw/apps Bl890C i2 -
stacked NEWSERVER09 HP-UX 6 48 9 72 3 24 28% BL890C I2 to SCC Small
2(+) expand HW DR HP0 nw/apps Bl890C i2 -
stacked NEWSERVER10 HP-UX 4 32 6 48 2 16 28% BL890C I2 to MCC Small
3(+) expand HW PRD HP0 nw/apps Bl890C i2 -
stacked NEWSERVER09 HP-UX 9 72 18 144 9 72 42% BL890C I2 to SCC Medium
3(+) expand HW DR HP0 nw/apps Bl890C i2 -
stacked NEWSERVER10 HP-UX 6 48 12 96 6 48 42% BL890C I2 to MCC Small
4(+) expand HW PRD HP0 nw/apps Bl890C i2 -
stacked NEWSERVER09 HP-UX 18 144 24 192 6 48 30% BL890C I2 to SCC Small
4(+) expand HW DR HP0 nw/apps Bl890C i2 -
stacked NEWSERVER10 HP-UX 12 96 16 128 4 32 30% BL890C I2 to MCC Small
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.25
Core and memory configuration for HP0 AppsMobile
Phase 1, Phase 2,Phase 3, Phase 4/5
PRD:
DR:
vlunx003 /
vlunx010newserver
02 newserver09
02 cores x 16GB
02 cores x 16GB
02 cores x 16GB
= 04 cores x 32 GB (sizing) HA (N+1)
newserver01 newserver10
02 cores x 16GB
02 cores x 16GB
= 04 cores x 32 GB (sizing)
newserver09 newserver10
03 cores x 24GB
03 cores x 24GB
= 06 cores x 48 GB (sizing)
newserver09 newserver10
06 cores x 48GB
06 cores x 48GB
= 12 cores x 96GB (sizing)
newserver09 newserver10
08 cores x 64GB
08 cores x 64GB
= 16 cores x 128 GB (sizing)
vlunx003 /
vlunx010newserver
04 newserver09
03 cores x 24GB
03 cores x 24GB
03 cores x 48GB
= 06 cores x 48GB (sizing) HA (N+1)
vlunx003 /
vlunx010newserver
04 newserver09
06 cores x 48GB
06 cores x 48GB
06 cores x 48GB
= 12 cores x 96GB (sizing) HA (N+1)
vlunx003 /
vlunx010newserver
04 newserver09
08 cores x 64GB
08 cores x 64GB
08 cores x 64GB
= 16 cores x 128GB (sizing) HA (N+1)
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.26
MobilePhase 1
Hardware:• Installation of 02 Physical BL890C I2 (Share BPC) in PRD/DR for
HPO Netweaver Mobile;• Installation of VMWare Farm > BL620C HW (05 = 3 prd, 03 dr) to
support PRD/DR for SUP, Afaria, Relay and utility servers;
Operating Systems:• Installation of 13 O.S. Instances in PRD/DR;
Sap DB/CI and Apps:• Migration of 01 DB instances, 01 NetWeaver PRD to new vPar;• Installation of 06 DB instances, 02 NetWeaver DR/TRN, 02 sup, 02
Afaria in PRD/DR;• Installation of 05 CI “like” instances ctrl, vmware, relay, and
NetWeaver; • Installation of 15 APPS instances;
Installation and/or expansion.
Phase
Instance
Envir. Function Action
Type Action Hardware O.S.
D.B.
SAP CI
SAP App
1 13 6 5 15 HP0 DR nw/apps HW (+) add 1x Physical BL890C I2 OS image (+) add 1 SAP APP (+) add 3 nw/db HW (+) add 1/2 - SD2 BL - 2 quad proc. x 128gb
(Same BPC) OS image (+) add PRD nw/apps HW (+) add 1x Physical BL890C I2 OS image (+) add 1 SAP APP (+) add 4 nw/db HW (+) add 1/2 - SD2 BL - 2 quad proc. x 128gb
(Same BPC) OS image (+) add SAP DB/CI (+) add 1 1 HT0 TRN nw/apps/db SAP DB/CI (+) add 1 1 ctl DR VMMARE Site
RM. HW (+) add VMWare Farm > BL620C HW (05 = 3 prd, 03 dr)
OS image (+) add 1 SAP DB/CI (+) add 1 PRD VMWARE Site
RM. HW (+) add VMWare Farm > BL620C HW (05 = 3 prd, 03 dr)
OS image (+) add 1 SAP DB/CI (+) add 1 UP0 DR sup/apps HW (+) add VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) OS image (+) add 2 SAP APP (+) add 2 PRD sup/apps HW (+) add VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) OS image (+) add 2 SAP APP (+) add 2 UQ0,
AQ0 QAS sup/afa/apps/db HW (+)
expandVMWare Farm > BL620C HW (05 = 3 prd, 03 dr)
UD0, AD0 DEV sup/afa/
apps/db HW (+) expand
VMWare Farm > BL620C HW (05 = 3 prd, 03 dr)
AP0 DR afaria/apps HW (+) add VMWare Farm > BL620C HW (05 = 3 prd, 03 dr)
OS image (+) add 2 SAP APP (+) add 2 PRD afaria/apps HW (+) add VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) OS image (+) add 2 SAP APP (+) add 2 RP0 PRD relay HW (+) add VMWare Farm > BL620C HW (05 = 3
prd, 03 dr) OS image (+) add 1 SAP CI (+) add 1 AP0,
UPO DR sup/afaria/db HW (+) expand
VMWare Farm > BL620C HW (05 = 3 prd, 03 dr)
SAP DB (+) add 2 PRD sup/afaria/db HW (+)
expandVMWare Farm > BL620C HW (05 = 3 prd, 03 dr)
SAP DB (+) add 2
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.27
MobilePhase 2, 3 and 4
Hardware:• Installation/Expansion of hardware using BL890C I2 in PRD/DR for
HP0; Operating Systems:• Support expansion of hardware in PRD/DR for HPO O.S. instances;Sap DB/CI and Apps:• Support for hardware expansion in PRD/DR for HPO Apps instances;
Phase 5Hardware:• There isn´t no change, the sizing is the same of Phase 4;Operating Systems:• There isn´t no change, the sizing is the same of Phase 4;Sap DB/CI and Apps:• There isn´t no change, the sizing is the same of Phase 4;
Installation and/or expansion.Phas
eInst
Envir.
Function
Action Type Action Hardware O.
S.D.B.
SAP CI
SAP App
s2
HP0 DR nw/
apps HW (+) add 1x BL890C I2 to MCC (shared with BPC phase 2)
OS image (+) expand
SAP APP (+) expand
PRD nw/apps HW (+) add 1x BL890C I2 to SCC (shared with BPC
phase 2)
OS image (+) expand
SAP APP (+) expand
3 HP
0 DR nw/apps HW (+)
expandUsing BL890C I2 ordered @ Phase before
OS image (+) expand
SAP APP (+) expand
PRD nw/apps HW (+)
expandUsing BL890C I2 ordered @ Phase before
OS image (+) expand
SAP APP (+) expand
4 HP
0 DR nw/apps HW (+)
expandUsing BL890C I2 ordered @ Phase before
OS image (+) expand
SAP APP (+) expand
PRD nw/apps HW (+)
expandUsing BL890C I2 ordered @ Phase before
OS image (+) expand
SAP APP (+) expand
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.28
Other activitiesMobile
All phases• Set up of storage and SAN networks;• Set up ofbackup agents, backup servers, tape libraries and VTL, set of tapes;• Configuration of ITSM tools, monitoring agents, threshold parameter;• BCRS, adjustments in Technical Disaster & Recovery Plan;
Important: • Vale need to provide network infra-structure for the deploy of Mobile Environment;• 2 x 2 connections 10GB networks ports for connect mobile SD2 vPar;
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.29
Servers overview @ MCC/SCCMobile
QAS: DB/CI & Apps
DEV: DB/CI & Apps
PRD: DB/CI
Apps
DR: DB/CI Apps
SD2-1CATOR2ENCLUS0
11vPAR
newserverTBD
HP-UX
SD2-3CATOR2ENCLUS0
13vPAR
newserverTDB
HP-UX
SD2-5CATOR2ENCLUS00
3vPAR
newserverTBD
HP-UX
HP0
HP0
HP0
HP0
HP0
HP0
HP0
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.30
Servers distributionMobile
DB/CI Current:
DB/Ci with SRM :
Part. Type
HostnameSD2-2Enc:
Cator2enclus012
HostnameSD2-4Enc:
Cator2enclus014
HostnameSD2-6Enc:
Camkh1enclus004SAP Application
SCC PRODSids
MCCPRE-PROD
SidsBlade total proc
total cores sized
Phase1
cores ACTIVE
cores iCAPed ram
total cores sized
addit. cores
needed
Min. Proc. Needed (quad)
N vlunx008 vlunx009 vlunx011 PI/GRC-NFE PP0/NP0 PR0/NR0 1 2 4 4 4 128 8 ~ ~V vlunx047 vlunx030 vlunx052 EC ECP ECR
4
2 4 8 ~ 128 8 ~ ~V cavacn25 cavacn26 cavacn33 CRM/MI CP0/CPJ/HP0 CR0/CRJ 1 1 4 ~ 64 4 ~ ~V cavacn27 cavacn27 cavacn34 EP WPE WRE 2 3 8 ~ 128 14 6 2 (8core)V cavacn29 cavacn30 cavacn35 MDM/Search-UI MPC/SCP MRC/SCR 2 5 8 ~ 128 13 5 1 (4core)V cavacn31 cavacn32 ~ GRC-AC GP0 ~ 1 3 4 ~ 64 6 2 1 (4core)V ~ ~ ~ N vlunx019 vlunx020 vlunx053 MDM MP0 1 2 4 4 4 128 8 ~ ~
Part. Type
HostnameSD2-1Enc:
Cator2enclus011
HostnameSD2-3Enc:
Cator2enclus013
HostnameSD2-5Enc:
Camkh1enclus003SAP Application
SCC PRODSids
MCCPRE-PROD
SidsBlade total
proc (quad core)
total cores sized
Phase1
cores ACTIVE
cores iCAPed ram
total cores sized
add cores
needed
Min. Proc. Needed (quad)
N vlunx001 vlunx002 vlunx043 ECC EP0 EC0 3 6 8 8 16 384 24 ~ ~N vlunx014 vlunx015 vlunx049 BI BP0 ~ 1 2 4 4 4 128 8 ~ ~N vlunx005 vlunx028 vlunx050 EP WP0 ~ 1 2 4 4 4 128 8 ~ ~V vlunx045 vlunx046 cavacn36 BW-LSA+BPC LP0/LPJ ~
24 14 ~ 224 14
V NEW NEW NEW MI HP0 ~ 1 4 64 V ~ ~ ~
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.31
Servers distributionMobile
Applications
MCC Blade Servers for PPR/DR 'App' Servers SCC Blade Servers for PRODUCTION 'App' Servers
BLADEBlad
e Mod
el
Processor Arch
OSProcessor
sCOREs
Threads
RAM GB
Max RAM for
iVMsTier
ABAP Dia Inst
JAVA Dia Inst
DUAL Dia Inst
max sized cores
max sized RAM comment BLADE
Blade
Model
Processor Arch
OSProcessor
sCOREs
Threads
RAM GB
Max RAM for
iVMsTier
ABAP Dia Inst
JAVA Dia Inst
DUAL Dia Inst
max sized cores
max sized RAM comment
VLUNX02
6
Bl890C i2
ia64 HP-UX 8 32 64 512 450
PPR ER0 ~ ~ 16 128 installed
VLUNX003
Bl890C i2
ia64 HP-UX 8 32 64 512 450
PROD EP0 ~ ~ 16 128 installed
PPR ~ ~ ~ 0 0 no longer needed PROD ~ ~ BP0 0 0 no longer
neededPPR ~ ~ PR0 3 24 needed PROD ~ ~ PP0 3 24 neededPPR NR0 ~ ~ 3 24 needed PROD NP0 ~ ~ 3 24 neededPPR ~ ~ ~ 3 24 needed PROD ~ ~ WP0 3 24 neededPPR ~ ECR ~ 3 24 needed PROD ~ ECP ~ 3 24 neededPPR LP0 LPJ ~ 14 112 new PROD LP0 LPJ ~ 0 0 newPPR HP0 ~ ~ 8 64 new PROD HP0 ~ ~ 0 0 new
CPU utilization (average, peak) v. low v. low total > 50 400 CPU utilization (average, peak) v. low v. low total > 28 224
Memory Utilization (average, peak) v. low v. low Memory Utilization (average,
peak) v. low v. low
VLUNX02
7
Bl890C i2
ia64 HP-UX 8 32 64 512 450
PPR ER0 ~ ~ 16 128 needed
VLUNX010
Bl890C i2
ia64 HP-UX 8 32 64 512 450
PROD EP0 ~ ~ 16 128 installed
PPR ~ ~ ~ 0 0 no longer needed PROD ~ ~ BP0 0 0 no longer
neededPPR ~ ~ PR0 3 24 needed PROD ~ ~ PP0 3 24 neededPPR NR0 ~ ~ 3 24 needed PROD NP0 ~ ~ 3 24 neededPPR ~ ~ ~ 3 24 needed PROD ~ ~ WP0 3 24 neededPPR ~ ECR ~ 3 24 needed PROD ~ ECP ~ 3 24 neededPPR LP0 LPJ ~ 14 112 new PROD LP0 LPJ ~ 14 112 newPPR HP0 ~ ~ 8 64 new PROD HP0 ~ ~ 8 64 new
CPU utilization (average, peak) v. low v. low total > 50 400 CPU utilization (average, peak) v. low v. low total > 50 400Memory Utilization (average,
peak) v. low v. low Memory Utilization (average,
peak) v. low v. low
NEWSERVER01
Bl890C i2
ia64 HP-UX 8 32 64 51
2 450
PPR ER0 ~ ~ new
CAVAVS08
Bl890C i2
ia64 HP-UX 8 32 64 512 450
PROD EP0 ~ ~ 16 128 needed
PPR ~ ~ ~ new PROD ~ ~ BP0 0 0 no longer needed
PPR ~ ~ PR0 new PROD ~ ~ PP0 3 24 neededPPR NR0 ~ ~ new PROD NP0 ~ ~ 3 24 neededPPR ~ ~ ~ new PROD ~ ~ WP0 3 24 neededPPR ~ ECR ~ new PROD ~ ECP ~ 3 24 neededPPR LP0 LPJ ~ new PROD LP0 LPJ ~ 14 112 newPPR HP0 ~ ~ new PROD HP0 ~ ~ 8 64 new
CPU utilization (average, peak) v. low v. low total > 0 0 CPU utilization (average, peak) v. low v. low total > 50 400Memory Utilization (average,
peak) v. low v. low Memory Utilization (average,
peak) v. low v. low
NEWSERVER02
Bl890C i2
ia64 HP-UX 8 32 64 512 450
PROD EP0 ~ ~ newPROD ~ ~ BP0 newPROD ~ ~ PP0 newPROD NP0 ~ ~ newPROD ~ ~ WP0 newPROD ~ ECP ~ newPROD LP0 LPJ ~ newPROD HP0 ~ ~ new
CPU utilization (average, peak) total > 0 0Memory Utilization (average,
peak)
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.32
Servers distributionMobile
VMWareVIRTUAL MACHINES - Non-Prod - MCC VMWARE Farm VIRTUAL MACHINES - PRODUCTION - SCC VMWARE Farm
Environment Virtual Machine Role SAP Sids Tier OS vCPU RAM Temp or Perm Comments Environment Virtual Machine Role SAP Sids Tier OS vCPU RAM Temp or Perm CommentsTIBCO CAMKH1TIBCAS001 Agent ~~~~ NSSR W2K8 2 8 temp or perm installed TREX cator2valeas076 SAP Trex - Slave 1 TP0 PROD RHEL 2 8 Perm installedTIBCO CAMKH1TIBCAS002 Ems #1 ~~~~ NSSR W2K8 4 16 temp or perm installed TREX cator2valeas077 SAP Trex - Slave 2 TP0 PROD RHEL 2 8 Perm installed
DocumentumCAMKH1TIBCAS003 Test Server #1 ~~~~ NSSR RHEL 4 16 temp or perm installed TREX cator2valeas084 SAP Trex Master TP0 PROD RHEL 2 8 Perm installedTIBCO CAMKH1TIBCAS004 BW/BC #1 ~~~~ NSSR W2K8 4 16 temp or perm installed TREX cator2valeas085 SAP Trex Master Backup TP0 PROD RHEL 2 8 Perm installedTIBCO CAMKH1TIBCAS005 BW/BC #2 ~~~~ NSSR W2K8 4 16 temp or perm installed VMWARE cator2valeus484 VMWare Virtual Center ~~~~ PROD W2K8 8 24 Perm installedTIBCO CAMKH1TIBCAS006 BC (DMZ) ~~~~ NSSR W2K8 1 1 temp or perm installed EP Web Disp cavaas31 Web Dispatcher (DMZ) DP0 PROD RHEL 2 8 Perm installedTIBCO CAMKH1TIBCAS007 Mgmt ~~~~ NSSR W2K8 2 8 temp or perm installed EP Web Disp cavaas32 Web Dispatcher (DMZ) DP0 PROD RHEL 2 8 Perm installedTIBCO CAMKH1TIBCAS008 Agent ~~~~ NSSR W2K8 2 8 temp or perm installed SYBASE cavaas49 Sysbase Relay Server (DMZ) ~~~~ PROD W2K8 2 8 Perm installedTIBCO CAMKH1TIBCAS009 EMS #1 ~~~~ NSSR W2K8 4 16 temp or perm installed SYBASE cavaas50 Unwired Platform / Afaria ~~~~ PROD W2K8 2 16 Perm installed
DocumentumCAMKH1TIBCAS010 Test Server #2 ~~~~ NSSR RHEL 4 16 temp or perm installed SYBASE new SUP Data tier PROD W2K8 4 32 Perm newTIBCO CAMKH1TIBCAS011 BW/BC #1 ~~~~ NSSR W2K8 4 16 temp or perm installed SYBASE new SUP Server #1 PROD W2K8 4 32 Perm newTIBCO CAMKH1TIBCAS012 BW/BC #2 ~~~~ NSSR W2K8 4 16 temp or perm installed SYBASE new SUP Server #2 PROD W2K8 4 32 Perm newTIBCO CAMKH1TIBCAS013 BC (DMZ) ~~~~ NSSR W2K8 1 1 temp or perm installed SYBASE new Sybase Relay Server (DMZ) #1 PROD W2K8 2 8 Perm newTIBCO CAMKH1TIBCAS014 Mgmt ~~~~ NSSR W2K8 2 8 temp or perm installed SYBASE new Sybase Relay Server (DMZ) #2 PROD W2K8 2 8 Perm newTREX CAMKH1VALEAS018 SAP Trex TP0 dr DR RHEL 2 8 perm installed SYBASE new Afaria Server#1 PROD W2K8 2 8 Perm newTREX CAMKH1VALEAS019 SAP Trex TQ0 QAS RHEL 2 8 perm installed SYBASE new Afaria Server#2 PROD W2K8 2 8 Perm newTREX CAMKH1VALEAS020 SAP Trex TD0 DEV RHEL 2 8 perm installed SYBASE new Sybase Control Center PROD W2K8 2 8 Perm new
VMWARE camkh1valeus042 VMWare Virtual Center ~~~~ NonP, DR W2K8 1 8 perm installed VMWARE new VMWARE Site Recovery Mgr PROD W2K8 2 8 Perm newEP Web Disp cavaas41 Web Dispatcher (DMZ) DQ0, DP0 DR NonP, DR RHEL 2 8 perm installed Mercury BPM new SAP Business Process Monitor ~~~~ PROD XP ? 2 4 Perm
SYBASE cavaas43 Sysbase Relay Server (DMZ) ~~~~ DEV W2K8 2 8 perm installed SYBASE cavaas44 Unwired Platform / Afaria ~~~~ DEV W2K8 2 16 perm installed SYBASE cavaas45 Unwired Platform / Afaria ~~~~ DR W2K8 2 16 perm installed SYBASE cavaas46 Unwired Platform / Afaria ~~~~ QAS W2K8 2 16 perm installed SYBASE cavaas47 Sysbase Relay Server (DMZ) ~~~~ DR W2K8 2 8 perm installed SYBASE cavaas48 Sysbase Relay Server (DMZ) ~~~~ QAS W2K8 2 8 perm installed
BO Explorer CAVAAS51 BO Explorer POC ~~~~ NSSR W2K8 4 16 temp installed VMWARE new VMs for DR with SRM (?) PROD W2K8 2 8 Perm new
total vCPU and RAM Assigned 69 136 total vCPU and RAM Assigned 50 244
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.33
Overview of all components in PRD: NetWeaver Mobile, Sybase Relay, SUP and Afaria
Mobile
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Macro timeline
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.35
Macro timeline
Macro timelineMacro timeline
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Clustering
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.37
HP ServiceGuardSet-up a high-availability clustering solution
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Downtime/outages
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.39
BW-BPC Downtime (and MI)
• In BPC phase 1 we will need to add new HW (SD2 blade). • This requires a reboot to add the HW to the nPAR. • Estimated downtime for the reboot is 02 hours• It will impact BW-LSA, no impact to ECC (EP0), BI
(BP0) or EP (WP0).
• In BPC phase 2 we will need to re-assign the SD2 blade HW released from BI (BP0) Decomisioning.
• This requires a reboot to add this HW to the BW-LSA and MI nPAR.
• Estimated downtime for the reboot is 02 hours • it will impact BW-LSA and MI, no impact to ECC (EP0)
or EP (WP0).
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.40
SRM Downtime
• During installation and cluster configuration / testing we will have 10-20 hours (estimated) of downtime;
• • It will impact all applications
running on hosts cavacn27 and cavacn28: EP and TREX (nfs share) environment.
• And in the future wave 2 will be need to add new HW (SD2 blade) and then will have another downtime (at least 2 hours) for the nPar
• it will impact all the vPARs running in it: SRM-MDM Catalog, SearchUI, GRC-AC ,CRM and EC environment, EP TREX and SRM.
• In future Phase 2 for SRM project, when the other SD2 blade hw is added, this would also require downtime (for a reboot, at least 2 hours) unless both blades were added at the same time.
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.41
Mobile Downtime
• In this case will need to move Mobile to new and dedicated vPar to segregate from CRM environment.
• And will have a downtime (3-6 hour estimated) in current mobile environment.
• Note: a second downtime will be needed to add HW to the BW-LSA/MI nPAR after it is released from BI.
• Estimate is aproximately 2 hours. (See slide from BPC).
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Impact of CRM on the IP
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.43
Impact of SRM on the PI1. PI is currently running stacked with GRC on a SD-2 partition. Below is the current nPar config:
This means that the current nPar supports ~5,000 SAPS, and can support ~10,000 SAPS after the activation of the 4 iCAP cores;
2. Additional interfaces will be added to the PI system as part of the SRM implementation. The table below summarizes the requirements to handle these new interfaces:
3. We considerate a 3-tier PI deployment, with the PI APP servers running on HP-UX, we can assume that the current nPar can support current PI + GRC + new interfaces, after the activation of the iCAP cores:
• GRC Phase 2 DB: 6,400 SAPS• Current PI: SAPS (assuming 2,000 SAPS)• New interfaces: 1000 SAPS• Total: ~9,400 SAPS (ok on the 8-way nPar, but will be use 04 cores ICAPed, and add new SAP Dialog instances for PP0, in
vnlux003, vnlux010 and cavavs08);4. The cost of this expansion of PI (04 cores ICAPed and new SAP Dialog) is not included in
this project;
SAP Application SCC PROD Sids MCC PRE-PROD Sids Blade total proc total cores sized
Phase1 cores ACTIVE cores iCAPed ramPI/GRC-NFE PP0/NP0 PR0/NR0 1 2 4 4 4 128
Release SAPS (total) Memory (GB)PI 7.1 5,200 42
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
List of hardware
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.45
Components of hardware
System SCC MCC
BPC Scenario 1/ Mobile Phase 1 1x BL890c i2 1x BL890c i22x CB900 1x CB900
Mobile Phase 1 3x BL620 x86 3x BL620 x86
BPC Scenario 2/ Mobile Phase 2 1x BL890c i2 1x BL890c i2
SRM Phase 2 1x BL460 x86 1x BL460 x862x Cb900 1x CB900
SRM Phase 3 1x BL460 x86 1x BL460 x86
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Next steps
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.47
Next steps
• Clear all technical doubts
• Make some technical adjusts
• Guarantee that the volume x RU is correct
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Thank you