Vedanta Alumi na Ltd. Product ion Planni ng Page 1 of 1
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
SAP R/3 IMPLEMENTATION
BUSINESS BLUEPRINT
Production Planning
Prepared by Checked by Reviewed By Approved By DateAniruddha Mukherjee Vishal Rathore
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
2/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 2 of 2
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
TABLE OF CONTENTSOBJECTIVE OF BUSINESS BLUEPRINT PHASE.........................................................................................................................................................................................3SCOPE OF BPBP DOCUMENT ..................................................................................................................................................................................................................6 PRODUCTION PLANNING IN SAP - OBJECTIVE...............................................................................................................................................................................7 SECTION I .......................................................................................................................................................................................................................................................8 SECTION II....................................................................................................................................................................................................................................................12 ORGANIZATION STRUCTURE ..............................................................................................................................................................................................................12 OTHER MAJOR CONFIGURATION ......................................................................................................................................................................................................17 SECTION III..................................................................................................................................................................................................................................................21 SECTION IV ..................................................................................................................................................................................................................................................78 SPECIAL ORGANIZATIONAL CONSIDERATIONS:.................................................................................................................................................................................80
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
3/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 3 of 3
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
OBJECTIVE OF BUSINESS BLUEPRINT PHASE:
This document is the outcome of the As-Is study, Discussion at Training and during the To-Be process and business process requirement analysisfor the Vedanta Alumina Limited.
Based on this As-Is coupled with inputs from the core team members during To-Be discussion, we arrived at the Business Processes, which are tobe incorporated in the Business Blue Print. The aim of this document is to map the best business processes related to the Production Planningmodule in SAP ECC 5.0. This document is to be studied by core team members & process owners from Vedanta Alumina Limited. The preparationof this document is an essential precursor for prototyping and testing. The development work will start once process owners approval for this BluePrint is obtained followed by a corporate presentation to the senior management team, Vedanta Alumina Limited.
This document will be used for configuring Production Planning module in SAP implementation. Document is based on discussions/presentations
between representatives of VAL & PWC. In other words it contains
1. SAP Organization Model in context of existing business scenario and future requirements/issues as envisaged by VAL.
2. Mapping of business processes/issues brought forward by PwC & VAL, with SAP functionality.
3. Gaps & issues emerged during the discussion between VAL & PwC.
4. Business Process Flows mapped in SAP as per the scope defined.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
4/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 4 of 4
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
5. Closure of Mapping Phase and start of Piloting Phase of implementat ion.
A pictorial presentation of complete SAP implementation is depicted in the following page:
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
5/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 5 of 5
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
6/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 6 of 6
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
SCOPE OF BPBP DOCUMENT
The objective of this Blue Print presented to the Project Sponsor is to document the following:
a) Business Requirements of VAL that need to be translated into SAP.
SAP consultants team members on the basis of As-Is document, factory visit & discussions between PwC SAP consultants and VAL
core team members have prepared this.b) SAP Gaps as identi fied by PwC Team with respect to the present scope of implementation and Business Requirements of VAL.
c) Details of SAP New Business Process description supported by Process Flow diagram with respect to Different SAP process
indicating the desired To be Processes / Business Blue Print.
In order to bring the clarity and better understanding, the document has been divided in five sections:
SECTION I: Scope of SAP Production Planning and Control module for the project.
SECTION II: Organization structure.
SECTION III: Master Data Management, As-Is and / To-Be Business processes, and Gaps identified for business processes as per SAP.
SECTION IV: Appendix-Process ( SAP) Flow Diagrams.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
7/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 7 of 7
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Production Planning in SAP - Objective
To provide a Production Planning, execution, control and record maintenance system fully integrated with Finance, Costing, MaterialsManagement, Sales & Distribution and Quality Management in order to achieve superior operational efficiency, cost reduction and profitability.
The module also provides better handling of all business transaction, statutory compliance, EIS, and MIS for better decision-making managementControl. This is achieved through the following components:
Integration into Process Planning and Control.
Shop Floor Control in the R/3 System.
Special Topics of Production.
An Example of PO Processing.
Creating a Process Order.
Important Tasks within Process Order Processing.
Confirming and Settling Process Orders.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
8/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 8 of 8
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
SECTION I
Scope of Production Planning Module in VAL
PARTICULARS Alumina Power
Master
1.1 General Master Records
1.1.1 Material Master X X1.1.2 Material BOM X X1.1.3 Resource X X1.1.4 Recipe X X1.1.5 Batch
1.2 Production Planning and Procurement Planning1.2.1 Sales and Operations Planning1.2.2 Demand Management X1.2.3 Long-Term Planning1.2.4 MPS
1.2.4 MRP X X (MM)
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
9/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 9 of 9
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
PARTICULARS Alumina Power
1.3 Production1.3.1 Discrete Production1.3.2 Repetitive Manufacturing1.3.3 Process Manufacturing X X
1.3.4 KANBAN1.4 Inventory Management
1.4.1 Batch1.4.2 Batch Search Strategy
1.4.3 Control Cycle1.4.4 Serial Numbers
Business2.1 Production Planning and Procurement Planning
2.1.1 Market-Oriented Planning2.1.1.1 Sales and Operations Planning2.1.1.2 Forecast
2.1.1.3 Demand Management X2.1.1.4 Long-Term Planning2.1.1.5 Master Production Scheduling2.1.1.6 Material Requirements Planning X X (MM)
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
10/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 10 of 10
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
PARTICULARS Alumina Power
2.1.1.7 Evaluations: Logistics Information System X X
2.1.2 Sales Order Oriented Planning2.1.2.1 Master Production Scheduling
2.1.2.2 Material Requirements Planning2.1.2.3 Evaluations: Logistics Information System
2.1.3 Consumption-Driven Planning MM MM2.1.3.1 Forecast2.1.3.2 Material Requirements Planning X X2.1.3.3 Evaluations: Logistics Information System X X
2.2 Production2.2.1 Process Manufacturing
2.2.1.1 Process Order Creation X X2.2.1.2 Material Staging2.2.1.3 Capacity Requirements Planning X X
2.2.1.4 Process Order Execution X X2.2.1.5 Evaluation and Mass Processing X X2.2.1.6 Evaluations: Logistics Information System2.2.1.7 Replenishment Stock Transfer with Reservation X X
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
11/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 11 of 11
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
PARTICULARS Alumina Power
2.2.1.8Replenishment Stock Transfer with Direct TransferPosting X X
2.3 Inventory Management MM2.3.1 Goods Movements
2.4.1.1 Reservation X X2.4.1.4 Goods Receipt X X2.4.1.5 Stock Transfers / Trans. Postings X X2.4.1.6 Goods Issue X X
2.3.2 Physical Inventory & Cycle Counting MM2.4.2.1 Physical Inventory X (MM)
Cross-Application Components3.1 Classification System X X
3.1.1 Characteristics X X3.1.2 Classes X X3.1.3 Classification X X
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
12/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 12 of 12
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Section II
Organization Structure
Plants
The plant is an operating area or branch within a company. The plant is assigned to a single company code. A plant has its own material masterdata. You can maintain data at plant level for the following views on a material master record in particular: MRP, Purchasing, Storage, Workscheduling, Production resources/tools, Forecasting, Quality management, Sales, Costing. Among this, views in bold would be used in case ofVedanta Alumina Ltd.
As per discussion with Finance & Materials, there will be only fourCompany Code (1000,2000,3000,4000) and four plants (Non-Virtual) will becreated which may be as follows:
PRODUCTION PLANT DESCRIPTION
1000 VAL Alumina Plant
2000 VAL Power Plant
3000 VAL Smelter Plant
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
13/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 13 of 13
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Storage Locations
Storage location is an organizational unit allowing the differentiation of material stocks within a plant. All data referring to a particular storagelocation is stored at storage location level. This applies mainly to storage location stocks.
Several storage locations can be assigned to a plant.
The logical and physical storage locations will be configured to track the inventory in the shop floor. The configuration of the storage locations willbe done according to the physical or the logical movement of materials in the shop floor. The detailed discussion on storage locations will come inthe plant specific documentation.
Proposed Storage Locations for plant relevant for PP.
Alumina Plant (1000)
STORAGE LOCATIONS DESCRIPTION
To Be submitted by MM
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
14/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 14 of 14
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Power Plant (2000)
STORAGE LOCATIONS DESCRIPTION
To Be submitted by MM
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
15/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 15 of 15
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Main Resources in Alumina Plant
RESOURCES DESCRIPTION
Calcinations Unit Hydrate is Calcined into Alumina.
Hydrate Unit Alumina as Hydrate is Obtained.
Process Caustic UnitUnit where Process Caustic may becaptured as WIP.
Note: The Resource of caustic may not used on day-to-day basis. It may be used at the end of the month to capture WIP for Caustic and that too
would be used if any other work around is not found at realization and integration testing phase. PwC s Suggestion is to manage WIP through ageneralist approach.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
16/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 16 of 16
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Main Resources in Power Plant
RESOURCES DESCRIPTION
Power Resource for power Plant.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
17/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 17 of 17SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Other Major Configuration
Factory Calendar
Every Plant will be having a factory calendar with details of the working days and the holiday schedule. The Factory calendar will be named as Aland PO for Process and Power plants respectively. Periods and the Fiscal Year will be from April March.
Holiday Calendar
Every Plant will be having a hol iday calendar with details of the holidays as public and other holidays, either as fixed or a moving day in a year. TheFactory calendar will be named as Al and PO for Process and Power plants respectively. Periods and the Fiscal Year will be from April March.
Material Groups
The functional grouping of the materials for reporting and analysis. It can be used to restrict the scope of analysis and searching specificallymaterial master record via search help.
MRP Group
If we are going for different process order types for Alumina (finished materials), power (raw materials for process plant) etc, and then MRP groupcan be created. Material type assignment has to done on one to one basis. One plant may have more than one MRP group. The number of MRPgroup to be finalized in the Realization phase.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
18/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 18 of 18SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
MRP Type
For material those would be planned on the basis of manufacturing requirement would be planned through Classical MRP. For these type ofmaterial MRP type PD would be used in general. Based on this requirement planned Order would be generated in the system for finished product.Raw Materials would be planned through consumption based planning. Relevant information related to Re-order point and safety stock would beprovided in the material master record.
Lot-sizing Procedure
Using this system should calculate the Order quantity for planned order. It is consumed from material planning. We would use Lot-for-Lot OrderQuantity in general (EX).
MRP Controllers
It specifies the group or the number of the controller responsible for Material requirement planning in your organization (Plant or Company). Thematerial, which is relevant for material requirement planning, should be assigned to a MRP controller
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
19/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 19 of 19SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Order Types for Alumina Plant
ORDER TYPE DESCRIPTION
AL Order Type for Alumina.
HY Order Type for Hydrate.
NAOH Order Type for Caustic.
Note: The Order type of caustic may not used on day-to-day basis. It may be used at the end of the month to capture WIP for Caustic and that toowould be used if any other work around is not found in realization phase or integration testing phase. PwC s Suggestion is to manage WIP througha generalist approach.
Order Types for Power Plant
ORDER TYPE DESCRIPTION
POW Order Type for Power.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
20/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 20 of 20SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
To-Be Processes
Production Planning Processes
The Business Blue Print is divided into various sections as defined by the different processes as discussed during to-be and Expectation from SAP.These processes are:
Finished Product Planning. Raw Materials Planning.
Consumables Planning. Production Scheduling. Capacity Evaluation.
Order Execution. Goods Movement.
Cost Analysis. Report Analysis.
To carry out these processes, certain Masters are required to be maintained prior to carry out the Transactions and Reports. This master is listed
below with explanation text. These Masters are created before Go-Live through Mass data upload process. They are fixed or constant in nature.The system would access these master data while the user will be carrying out transaction on day-to-day basis. So from user point of view also itmandatory to understand the relevant or organization specific master data in detail so that actual business process is replicated into the system interms of data and hence phenomenal purity.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
21/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 21 of 21SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Section III
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
1.0
Process Plant-Logistics GeneralData
1.1 Batch Management
Fullysystemsupported
The manufacturing mode of VAL is a typical case of processmanufacturing scenario. Here, batch tracking is not possiblephysically. So production in SAP as well as in reality wont becaptured through batches.
N
1.2MaterialClassification
Fullysystemsupported
Material Classification can be done with the standard materialclassification system in SAP (Class Type 001). This will allowbetter search.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
22/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 22 of 22SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
1.3
ClassificationCreation/change ofClass andCharacteristics
Fullysystemsupported
Characteristic is a property that describes and differentiates
objects.
Example: length, colour, weight, etc.
Class is an assembly of characteristics that can be attributed to aproduct (or to several similar products). It can also be defined as agrouping of similar products according to common characteristics
Example Pump class, Boiler class etc.
N
1.4
MRP Profile
Fully
systemsupported
If the order types are more than one, profiles will help inmaintaining some controlling data. (i.e., automatic selection of
order type during manual order creation).
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
23/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 23 of 23SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
1.5Procurement Type
Fullysystemsupported
This would help the system to identify the procurement type for theparticular material. We use E for produced goods, F for externalprocurement and X for both type of procurement.
N
1.6Strategy Group
Fullysystemsupported
For Material Produced In-House we need to maintain Strategy 11for semi-finished product i.e., Make to stock and GrossRequirement planning.
N
1.7
Availability CheckFullysystem
supported
Based on this system checks the availability. In Vedanta we woulduse checking rule 01 for all semi-finished and finished product.This is used for accumulating the total requirement on daily basis.Any other availability check to be introduced can be considered at
Realization stage.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
24/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 24 of 24SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
2.0
Process Plant-Product DataManagement
2.1Maintain MaterialMaster
Fullysystemsupported
Material master for Finished and Semi finished goods. MaterialClassifications may be used. Views such as Basic data 1, BasicData 2, MRP 1, MRP 2, MRP 3, MRP 4 and work scheduling (asand when required basis). For example: for raw material therewont be any Work Scheduling View.
N
2.1.1Create MaterialMaster
Fullysystemsupported
Create relevant views for each material and give the values ofrespective fields.
N
2.1.2Change MaterialMaster
Fullysystemsupported
Change values of settings as necessary in the material master canbe done anytime, but frequent change is not recommended.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
25/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 25 of 25SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
2.1.3Display MaterialMaster.
Fullysystemsupported
View settings without changing. This purely for read only purpose. N
2.2Maintain Bills ofMaterial
Fullysystemsupported
Create and change, as necessary, master data for Bills of Material.Standard BOM will be created and saved in the system. In case ofProcess manufacturing scenario, this can be done along withrecipe itself.
N
2.2.1Create Bills ofMaterial
Fullysystemsupported
Create BOMs for all materials produced in-house. In case ofProcess manufacturing scenario, this can be done along withrecipe itself.
N
2.2.2Change Bills ofMaterial
Fullysystemsupported
Change values of settings as necessary. In case of Processmanufacturing scenario, this can be done along with recipe itself.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
26/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 26 of 26SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
2.2.3Display Bills ofMaterial
Fullysystemsupported
View settings without changing. This is purely Read Only view forBOM.
N
2.3 Maintain ResourceFullysystemsupported
Create and change, as necessary, master data for Resource. AllResource shall be attached to a Cost Centre. Processing Unitcapacity categories may be used for a Resource. However datarelated to Resource category and Capacity category may bechanged at the time of realization depending on the simulation testresult.
N
2.3.1 Create ResourceFullysystemsupported
Create Resource for all processing facilities in the plant withcapacity categories of Processing Unit. This would capture logicalplace of operation under a plant and at the same time collect thecosting data generated out of activity consumption. Every resourceis assigned to a cost centre.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
27/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 27 of 27SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
2.3.2 Change ResourceFullysystemsupported
This process would enable the user to capture any enhancedfunctionality in future. It can be used to change any existing fieldvalue apart from resource category and capacity category. Anyextra capacity category can be introduced by using the
functionality.
N
2.3.3 Display ResourceFullysystemsupported
View settings without changing. This is used for viewing the masterdata in Read only mode.
N
2.4 RecipeFully
systemsupported
Create and change, as necessary, master data for Recipe.The entire standard recipe will be created in the system for all theplants and material combination. Control Key PI01 can be used upwhile creating the Recipe. However, if required, separate controlkey can be created at time of realization phase.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
28/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 28 of 28SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
2.4.1 Create Recipe.Fullysystem
supported
Create Recipe for all materials produced in-house. The respectiveoperations, their phases, internal relations, material assignmentsare to be mentioned .The standard values for operations can alsobe mapped through this functionality. Control keys like PI01, and
PI05 may be used depending on the business processesintegrated along with the operations.
N
2.4.2 Change RecipeFullysystemsupported
Change values of settings as necessary. Any change in theprocess can be mapped in future through this transaction.
N
2.4.3 Display Recipe.Fullysystemsupported
View settings without changing and in Read Only mode.N
2.4.4 In-Process Inspection Fullysystem
Recipe will have In-Process Inspection Characteristics (Managedby the QM module). This is not under the Purview of current scope
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
29/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 29 of 29SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
supported of the project.
2.5 Production VersionFullysystemsupported
Its a combination of BOM and Recipe. So in case of recipe it is
mandatory to maintain Production version. Functionalities relatedto Lot size, alternative BOM etc can be captured through this.Multiple production versions might be there for a material. It can belocked or Unlocked on as and when required basis.
N
2.5.1Create Productionversion
Fullysystemsupported
At the time of recipe creation system prompts to maintainProduction version. Multiple production versions are only usedwhen more than one production line is there. Here in Vedanta onlyone production version would be created.
N
2.5.2Change Productionversion
Fullysystemsupported
Data related to production version can be changed at anytime. IfNew BOM is to be attached keeping the existing one in the systemwith the same recipe, one production version is generated and theprevious one is locked in changed mode.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
30/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 30 of 30SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
2.5.3
Display production
version
Fully
systemsupported
This is for displaying purpose read only mode. N
Process Plant- Production Planning.
3.0Process Plant-ProductionPlanning (PP-PI)
DemandManagement
Fully
systemsupported
Planning cycle will start from demand management. TheProduction Strategy would be Make to stock. GrossRequirement Planning will be used.
Planned independent requirements are used to perform DemandManagement functions. A planned independent requirementcontains one planned quantity and one date, or a number ofplanned independent requirements schedule lines, that is, oneplanned quantity split over time according to dates.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
31/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 31 of 31SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
3.1 View Demand
Fully
systemsupported
Demand on monthly scale can be viewed from planned
independent requirement. The Requirement for finished product isfed into the system, which will be considered at the time MRP run.
N
3.1.1Create PIR
Fullysystemsupported
Create demand for standard finished product in the system basedon the Rough-cut Planning idea. For Vedanta, this should not bemore than the maximum production capacity since production istotally based on Utilization of Full Plant capacity. It is not driven bysales. Down time of five days can be taken into account in PIR sothat time for opportunity based maintenance or annualmaintenance (Shut down type) can be taken in
To account in production planning in advance.
N
3.1.2 Change PIR Fullysystem
If any change is required in PIR, this process can be used .If MRPelements are not already converted, change would be directly
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
32/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 32 of 32SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
supported taken into account in the stock/requirement list. For affecting theexisting planned Order, MRP has to be run once again.
3.1.3 Display PIR
Fully
systemsupported
View the Planned independent requirement in display mode. N
3.1.4 Production Strategy
Fullysystemsupported
Make to stock production-planning strategy will be used for theProcess plant. This has been decided pertaining to actualphilosophy of production, which is not based on sale requirement.Basic idea is full utilization of plant capacity. Requirement type LSFand/ BSE can be used to meet such requirement.
N
3.1.5Staggered periodSplit
Fullysystemsupported
The requirement of PIR can be split further into smaller periods
(Ex. Months into weeks or weeks into days). On the basis of thesame PIR can be generated further. Hence Planned Orders can besplit automatically for smaller periods. We can use our own periodsplitting key to split the requirement into smaller periods.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
33/81
-
7/31/2019 VAL_BBP_PP_FINAL
34/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 34 of 34SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
4.1Run MRP on material Fully
systemsupported
Activate Materials Planning for all materials at Plant to deriveGross requirements. This transfers the demand created by the PIRfor dependent planning for the BOM items.
N
4.2 Total PlanningFullysystemsupported
Total planning covers the planning of all the materials that arerelevant for requirements planning and includes the BOMexplosion for materials with a bill of material.
You can use total planning for a single plant or you can use thescope of planning to control whether the total planning run isexecuted on a multi-plant level
4.3ViewStock/Requirementlist
Fullysystemsupported
View Stock /requirements list to check stock position in terms ofMRP elements. All the PIR, planned order and Production Orders (if not delivered) would be displayed along with ATP ,safety stock( ifany ) , existing Stock ( if any). User will be able to see the most
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
35/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 35 of 35SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
updated information related to Material Requirement.
4.4 Stock overview
Fully
systemsupported
View Stock overview as and when required. System enables the
user to check stock available for the stock items at various areas ofthe organization.
N
4.5 MRP ListFullysystemsupported
Functionality relevant to MRP i.e., all MRP elements can beviewed from time to time. It will show the conditions of Stock orRequirement at time of last MRP run.
4.6 Planned Order
Fullysystemsupported
Proposal to manufacture after MRP execution is generated trough-planned order. It can be viewed from stock/ Requirement list.
Planned Orders are converted to process order before the start ofprocess in the shop floor. N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
36/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 36 of 36SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
5.0Process Plant-Capacity Planning
The economic use of resources is an objective for many areas of acompany. The component "Capacity Planning" is available in theSystem for this purpose.
N
5.1 Capacity EvaluationFullysystemsupported
Company can use capacity evaluations to analyse capacity loadsin your company. You can adjust the analyses for each useraccording to the planning level, planning horizon and the area ofresponsibility. Available capacities and capacity requirements canbe selected according to various criteria and cumulated using anyperiod split you choose.
N
6.0Process Plant-Process Execution
To manufacture products in the shop floor as per the Recipe andBill of Material (Material BOM)
N
6.1 Process OrderFullysystemsupported
Process orders are used for the production of materials or forrendering of services in a specific quantity on a specific date. Theyenable the planning of resources, control of process ordermanagement, and specify the rules for account assignment andorder settlement.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
37/81
Vedanta Alumi na Ltd. Product ion Planni ngPage 37 of 37
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
Actual confirmation to shop floor to go ahead with manufacturing.This can be obtained from Planned order. Other wise for anyoffline requirement Process Order can also be created manually.
6.2Create/ ChangeProcess Order
Fullysystemsupported
Creating a process order is not a stand-alone process. ProcessOrder is created from stock/Requirement list. But system allowscreation of process Order separately. It is generally done beforethe commencement of manufacturing. The quantity to be producedunder such a process Order has to be mentioned clearly. Thescheduling of process order that has to be followed really for shopfloor happens at this phase and system schedules the processorder. For Vedanta forward scheduling is recommended asscheduling type.
N
6.3 Check MaterialAvailability
Fullysystemsupported
Process order consumes materials (Semi-finished / Raw). The
Materials have to be issued to the Process Orders Or will have tobe back flushed. Logically these materials have to be available insystem before the commencement of process. System woulddisplay missing part list (if any). For Vedanta System will
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
38/81
Vedanta Alumi na Ltd. Product ion Planni ngPage 38 of 38
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
configured in such a way that system should raise warning if thematerial is not available. But decision-making should be at thelevel of user whether the Process Order could be processed aftersuch missing part.
6.4Release ProductionOrder
Fullysystemsupported
Process Order Release is carried out on verge of productioninitiation. In Vedanta this release procedure should be manual i.e.,user has to release the Process Order every time Production isinitiated against a new Process Order.
N
6.5Confirm ProductionOrder
Fullysystemsupported
This is for Confirming actual completion of production for an order,either partial or final. Also actual yield, scrap, time taken, andgoods movements will be confirmed.
N
6.6Confirmationcancellation
Partiallysystemsupported
It is possible to cancel data previously confirmed. Every completionconfirmation entered in the system can be cancelled. Thus, if youentered three confirmations for a phase, you can also cancel three
P
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
39/81
Vedanta Alumi na Ltd. Product ion Planni ngPage 39 of 39
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
confirmations and all confirmations automatically created by them.
6.7Issue Materials &Components
Fullysystemsupported
For Posting goods issued for Production, this functionality will be
used. This will ensure the total consumption for production.Movement type used for this process is 261. For any return ofgoods issue, movement type 262 will be used.
Unplanned materials can also be issued for a process order.
N
6.8 By-product receiptFullysystemsupported
Any by-product should also be taken as a component (-ve qty) intothe BOM of in-house produced materials and that by-product willbe receipt into the stock at the time of confirmation. Standard SAPmovement type is 531. For Vedanta Red Mud Can be taken as byProduct /Waste.
6.9Receive ProducedMaterials
Fullysystem
Goods Receipt for produced goods is captured through thisfunctionality. After Goods receive store will be updated in
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
40/81
Vedanta Alumi na Ltd. Product ion Planni ngPage 40 of 40
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
supported inventory. Generally 101 is standard SAP movement type throughwhich goods receipt against production is captured.
6.10 View Cost
Fully
systemsupported
The Planned vs. actual costs can be viewed after all issues and
activities are completed in the process Order changemode/display mode.
6.11
Technical Closure(TECO)
Fullysystemsupported
Once the process order is confirmed fully i.e., desired yield isconfirmed in terms of Goods movement and activity confirmation isalso done along with, it has to be declared Technically complete.The entire reservation list pending (if any) for the Process Order isdeleted after this activity by the system itself.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
41/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 41 of 41
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
7.0 ReportsFullysystemsupported
Reports are generated in the SAP system based on theinformation fed on day-to-day basis. This enables the user to takedecision related to business.
N
7.1 Stock OverviewFullysystemsupported
It can be used to view Stocks for different material taking Plant andstorage location as additional selection criteria.
N
7.2Extend materialviews
Fullysystemsupported
It shows the historical data related to material extension at differentpoint of time.
N
7.3
List of material
Storage locationassignment.
Fullysystemsupported
Shows the exhaustive list for material- storage locationassignment.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
42/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 42 of 42
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
7.4 Material ListFullysystemsupported
Shows Detail of a material on basis of selection criteria like plant,material, material type, material group and created by.
N
7.5Material list with priceand inventory values
Fullysystemsupported
Gives the detail of standard price, Per unit price, Currency Key etc.N
7.6 Resource ListFullysystemsupported
Gives detail of resources.N
7.7 Cost Centreassignment.
Fully
systemsupported
Shows the details assignment of cost centres to Resources. N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
43/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 43 of 43
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
7.8 Resources CapacityFullysystemsupported
Shows the capacity records (Master) for different resources listwise.
N
7.9Where used list-Resource
Fullysystemsupported
Lists the different recipes where resources are used.N
7.10Where Used List -Material
Fullysystemsupported
Lists of material Used into different BOM.N
7.11 Stock/Requirementlist-collective display
Fully
Systemsupported
Gives the stock /requirement scenario for a MRP area or plant N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
44/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 44 of 44
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
7.12
Multi level OrderReport
FullySystemsupported
Gives multilevel order report for Process Order with differentinformation.
N
7.13Missing Part Info-System
FullySystemsupported
Gives the list of missing parts on plant. Material and differentselection criteria for plant.
N
7.14
Stock/Requirementlist
Fullysystemsupported
Shows the detail scenario of stock or requirement scenario.N
7.15
Collective Display of
Planned Order.
FullySystem
supported
Can display the planned orders collectively on the basis of MRP
controller, Material and production version.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
45/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 45 of 45
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
7.16MRP List
FullySystemsupported
Functionality relevant to MRP i.e., all MRP elements can beviewed from time to time. It will show the conditions of Stock orRequirement at time of last MRP run. This is of static type.
N
7.17
MRP List CollectiveDisplay
FullySystemsupported
Same as previous, only it can be displayed MRP area wise.N
7.18Process OrderInformation System
FullySystemsupported
Gives the detail of the information regarding process Ordermanagement.
N
7.19Process OrderIndividual list display.
FullySystemsupported
Gives the detail of the information regarding process Ordermanagement object wise.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
46/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 46 of 46
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
7.20Resource analysis
FullySystemsupported
Gives plant wise analysis of resources.N
7.21Operation analysis
FullySystemsupported
Gives the shop floor information operation wise.N
7.22Material Analysis
FullySystemsupported
Shop floor material analysis information.N
7.23 Process OrderAnalysis
Fully
Systemsupported
Shop floor analysis for Process Order. N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
47/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 47 of 47
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
7.24Product CostAnalysis
FullySystemsupported
Shop floor Product cost analysis.N
7.25Exception analysis
FullySystemsupported Exception analysis at material, plant and Process Order Level.
N
7.26Capacity Planning
FullySystemsupported
Resource Load Analysis.N
7.27 Capacity Planning
Fully
Systemsupported
Process Order Level. N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
48/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 48 of 48
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
7.28Capacity Planning
FullySystemsupported
Resource Overload Analysis.N
7.29Resource View
FullySystemsupported Enhanced capacity evaluation-resource wise.
N
7.30Order View
FullySystemsupported
Enhanced capacity evaluation-Order wise.N
7.31 MaterialConsumption
Fully
Systemsupported Material Consumption analysis.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
49/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 49 of 49
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
7.32Capacity PlanningTable
FullySystemsupported
Capacity Planning table- Process Order View.N
7.33Material to be costed.
FullySystemsupported
Display of material to be costed.N
7.34 Result of Costing run.FullySystemsupported
Analyse or compare material cost estimates.N
7.35 Price Vs. CostEstimate.
Fully
Systemsupported
Analyse or compare Material Cost Estimates. N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
50/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 50 of 50
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
7.40Costed Multi levelBOM
FullySystemsupported
Multi level BOM: Value /Amount/StatusN
7.41Cost components
FullySystemsupported
Analyse cost component split for planned cost: cost component N
8.0
Power Plant-Logistics GeneralData
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
51/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 51 of 51
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
8.2 Batch Management
Fullysystemsupported
The manufacturing mode of VAL is a typical case of processmanufacturing scenario. Here, batch tracking is not possiblephysically, neither it is required. So production in SAP as well as inreality wont be captured through batches in case of power plant.
N
8.3MaterialClassification
Fullysystemsupported
Material Classification can be done with the standard materialclassification system in SAP (Class Type 001). This will allowbetter search. N
8.4
ClassificationCreation/change ofClass and
Characteristics
Fullysystem
supported
Characteristic is a property that describes and differentiatesobjects.
Example: length, colour, weight, etc.
Class is an assembly of characteristics that can be attributed to a
product (or to several similar products). It can also be defined as agrouping of similar products according to common characteristics
Example Pump class, Boiler class etc.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
52/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 52 of 52
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
8.5MRP Profile
Fullysystemsupported
If the order types are more than one, profiles will help inmaintaining some controlling data. (i.e., automatic selection oforder type during manual order creation).
N
8.6Procurement Type
Fullysystemsupported
This would help the system to identify the procurement type for theparticular material. We use E for produced goods, F for externalprocurement and X for both type of procurement.
N
8.7 Availability CheckFullysystemsupported
Based on this system checks the availability. In Vedanta we woulduse checking rule 01 for all semi-finished and finished product.This is used for accumulating the total requirement on daily basis.Any other availability check to be introduced can be considered atRealization stage.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
53/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 53 of 53
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
9.0Product DataManagement
9.1Maintain MaterialMaster
Fullysystemsupported
Material master for Finished and Semi finished goods. MaterialClassifications may be used. Views such as Basic data 1, BasicData 2, MRP 1, MRP 2, MRP 3, MRP 4 and work scheduling ( asand when required basis ). For example: For raw material therewont be any Work Scheduling View.
N
9.1.1Create MaterialMaster
Fullysystemsupported
Create relevant views for each material and give the values ofrespective fields.
N
9.1.2Change MaterialMaster
Fully
systemsupported
Change values of settings as necessary in the material master canbe done anytime, but frequent change is not recommended. N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
54/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 54 of 54
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
9.1.3Display MaterialMaster.
Fullysystemsupported
View settings without changing. This purely for read only purpose. N
9.2Maintain Bills ofMaterial
Fullysystemsupported
Create and change, as necessary, master data for Bills of Material.Standard BOM will be created and saved in the system. In case ofProcess manufacturing scenario, this can be done along withrecipe itself.
N
9.2.1Create Bills ofMaterial
Fullysystemsupported
Create BOMs for all materials produced in-house. In case ofProcess manufacturing scenario, this can be done along withrecipe itself.
N
9.2.2Change Bills ofMaterial
Fullysystemsupported
Change values of settings as necessary. In case of Processmanufacturing scenario, this can be done along with recipe itself.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
55/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 55 of 55
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
9.2.3Display Bills ofMaterial
Fullysystemsupported
View settings without changing. This is purely Read Only view forBOM.
N
9.3 Maintain ResourceFullysystemsupported
Create and change, as necessary, master data for Resource. AllResource shall be attached to a Cost Centre. Processing Unitcapacity categories may be used for a Resource. However datarelated to Resource category and Capacity category may bechanged at the time of realization depending on the simulation testresult.
N
9.3.1 Create ResourceFullysystemsupported
Create Resource for all processing facilities in the plant withcapacity categories of Processing Unit. This would capture logicalplace of operation under a plant and at the same time collect thecosting data generated out of activity consumption.
N
9.3.2 Change Resource Fullysystem
This process would enable the user to capture any enhancedfunctionality in future. It can be used to change any existing field
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
56/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 56 of 56
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
supported value apart from resource category and capacity category. Anyextra capacity category can be introduced by using thefunctionality.
9.3.3 Display ResourceFullysystemsupported
View settings without changing. This is used for viewing the masterdata in Read _only mode.
N
9.4 Maintain RecipeFullysystemsupported
Create and change, as necessary, master data for Recipe.The entire standard recipe will be created in the system for all theplants and material combination. PI01 can be used up whilecreating the Recipe.
N
9.4.1 Create Recipe.Fullysystemsupported
Create Recipe for all materials produced in-house. The respectiveoperations, their phases, internal relations, material assignmentsare to be mentioned .The standard values for operations can alsobe mapped through this functionality. Control keys like PI01, PI22
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
57/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 57 of 57
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
and PI05 may be used depending on the business processesintegrated along with the operations.
9.4.2 Change Recipe
Fully
systemsupported
Change values of settings as necessary. Any change in theprocess can be mapped in future through this transaction.
N
9.4.3 Display Recipe.Fullysystemsupported
View settings without changing and in Read Only mode.N
9.5 Production VersionFullysystem
supported
Its a combination of BOM and Recipe. So in case of recipe it ismandatory to maintain Production version. Functionalities relatedto Lot size, alternative BOM etc. Multiple production version might
be there for a material. It can be locked or Unlocked on as andwhen required basis.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
58/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 58 of 58
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
9.5.1Create Productionversion
Fullysystemsupported
At the time of recipe creation system prompts to maintainProduction version. Multiple production versions are only usedwhen more than one production line is there. Here in Vedanta onlyone production version would be created.
N
9.5.2Change Productionversion
Fullysystemsupported
Data related to production version can be changed at anytime. IfNew BOM is to be attached keeping the existing one in the systemwith the same recipe , one production version is generated and theprevious one is locked in changed mode.
N
9.5.3Display productionversion
Fullysystem
supported
This is for displaying purpose read only mode.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
59/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 59 of 59
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
Process Plant- Production Planning.
10.0ProductionPlanning (PP-PI)
10.1 Production Strategy
Fullysystemsupported
Make to stock production-planning strategy will be used for theProcess plant. This has been decided pertaining to actualphilosophy of production, which is not based on requirement. Basicidea is full utilization of plant capacity. Requirement type LSF and/BSE can be used to meet such requirement. For Power plant thisfunctionality is used if and only if long term planning is done.
N
11.0
Material
RequirementPlanning
The main function of material requirements planning is toguarantee material availability, that is, it is used to procure orproduce the requirement quantities on time both for internal
purposes and for sales and distribution. This process involves themonitoring of stocks and, in particular, the automatic creation ofprocurement proposals for purchasing and production.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
60/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 60 of 60
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
In doing so, MRP tries to strike the best balance possible between
Optimising the service level and
Minimizing costs and capital lockup.
For power plant planning would be done either throughConsumption based planning (MM) or Long term Planning. Butfor Refinery Classical MRP (Deterministic) PP andconsumption based (MM), both can be used.
11.1Run MRP on material Fully
systemsupported
For power plant planning would be done either throughConsumption based planning or Long term Planning. But forRefinery Classical MRP (Deterministic) PP and consumptionbased (MM), both can be used.
N
11.2 Total PlanningFullysystemsupported
Total planning covers the planning of all the materials that arerelevant for requirements planning and includes the BOMexplosion for materials with a bill of material.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
61/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 61 of 61
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
You can use total planning for a single plant or you can use thescope of planning to control whether the total planning run isexecuted on a multi-plant level.For power plant planning would bedone either through Consumption based planning ( MM ) or Longterm Planning. But for Refinery Classical MRP (Deterministic) PP
and consumption based (MM), both can be used.
11.3ViewStock/Requirementlist
Fullysystemsupported
View Stock /requirements list to check stock position in terms ofMRP elements. All the PIR, planned order and Production Orders (if not delivered) would be displayed along with ATP ,safety stock( ifany ) , existing Stock ( if any). User will be able to see the mostupdated information related to Stock/Requirement list. For powerplant planning would be done either through Consumptionbased planning (MM) or Long term Planning. But for RefineryClassical MRP (Deterministic) PP and consumption based(MM), both can be used.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
62/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 62 of 62
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
11.4 Stock overviewFullysystemsupported
View Stock overview as and when required. System enables theuser to check stock available for the stock items at various areas ofthe organization.
N
11.5 MRP ListFullysystemsupported
Functionality relevant to MRP i.e., all MRP elements can beviewed from time to time. It will show the conditions of Stock orRequirement at time of last MRP run. For power plant planningwould be done either through Consumption based planning(MM) or Long term Planning. But for Refinery Classical MRP(Deterministic) PP and consumption based (MM), both canbe used.
11.6 Planned Order
Fully
systemsupported
Proposal to manufacture after MRP execution is generated trough-planned order. It can be viewed from stock/ Requirement list.
Planned Orders are converted to process order before the start ofprocess in the shop floor.For power plant planning would be doneeither through Consumption based planning (MM) or Long termPlanning. But for Refinery Classical MRP (Deterministic) PP and
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
63/81
Vedanta Alumi na Ltd.
Product ion Planni ngPage 63 of 63
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
consumption based (MM), both can be used.
12.0 Capacity Planning The economic use of resources is an objective for many areas of acompany. The component "Capacity Planning" is available in theSystem for this purpose.
N
12.1 Capacity EvaluationFullysystemsupported
Company can use capacity evaluations to analyse capacity loadsin your company. You can adjust the analyses for each useraccording to the planning level, planning horizon and the area ofresponsibility. Available capacities and capacity requirements canbe selected according to various criteria and cumulated using anyperiod split you choose.
N
13.0 Process ExecutionTo manufacture products in the shop floor as per the Recipe andBill of Material (Material BOM)
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
64/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 64 of 64
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
13.1 Process OrderFullysystemsupported
Process orders are used for the production of materials or forrendering of services in a specific quantity on a specific date. Theyenable the planning of resources, control of process ordermanagement, and specify the rules for account assignment andorder settlement.Actual confirmation to shop floor to go ahead with manufacturing.This can be obtained from Planned order. Other wise for anyoffline requirement Process Order can also be created manually.
N
13.2Create/ ChangeProcess Order
Fullysystemsupported
Creating a process order is not a stand-alone process. It isgenerally done before the commencement of manufacturing. Thequantity to be produced under such a process Order has to bementioned clearly. The scheduling of process order that has to befollowed really for floor happens at this phase and systemschedules the process order. For Vedanta forward scheduling is
recommended as scheduling type.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
65/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 65 of 65
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
13.3Check Material
Availability
Fully
systemsupported
Process order consumes materials (Semi-finished / Raw). TheMaterials have to be issued to the Process Orders Or will have tobe back flushed. Logically these materials have to be available insystem before the commencement of process. System woulddisplay missing part list (if any). For Vedanta System willconfigured in such a way that system should raise warning if thematerial is not available. But decision-making should be at thelevel of user whether the Process Order could be processed aftersuch missing part.
N
13.4Release ProductionOrder
Fullysystemsupported
Process Order Release is carried out on verge of productioninitiation. In Vedanta this release procedure should be manual i.e.,user has to release the Process Order every time Production isinitiated against a new Process Order.
N
13.5Confirm ProductionOrder
Fullysystemsupported
This is for Confirming actual completion of production for an order,either partial or final. Also actual yield, scrap, time taken, andgoods movements will be confirmed.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
66/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 66 of 66
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
13.6 Confirmationcancellation Partiallysystemsupported
It is possible to cancel data previously confirmed. Every completion
confirmation entered in the system can be cancelled. Thus, if youentered three confirmations for a phase, you can also cancel threeconfirmations and all confirmations automatically created by them.
P
13.7Issue Materials &Components
Fullysystemsupported
For Posting goods issued for Production, this functionality will beused. This will ensure the total consumption for production.Movement type used for this process is 261. For any return ofgoods issue, movement type 262 will be used.
Unplanned materials can also be issued for a process order.
N
13.8 By-product receiptFullysystemsupported
Any by-product should also be taken as a component (-ve qty) intothe BOM of in-house produced materials and that by-product willbe receipt into the stock at the time of confirmation. Standard
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
67/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 67 of 67
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
movement type is 531.For reversal 532 may be used.
13.9 Receive ProducedMaterials
Fully
systemsupported
Goods Receipt for produced goods is captured through this
functionality. After Goods receive store will be updated ininventory. Standard movement type 101. For reversal 102 may beused.
N
13.10 View CostFullysystemsupported
The Planned vs. actual costs can be viewed after all issues andactivities are completed in the process Order changemode/display mode.
13.11
Technical Closure
(TECO)
Fully
systemsupported
Once the process order is confirmed fully i.e., desired yield isconfirmed in terms of Goods movement and activity confirmation is
also done along with, it has to be declared Technically complete.The entire reservation list pending (if any) for the Process Order isdeleted after this activity by the system itself.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
68/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 68 of 68
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
14.0 Reports
14.0 ReportsFullysystemsupported
Reports are generated in the SAP system based on theinformation fed on day-to-day basis. This enables the user to take
decision related to business.
N
14.1 Stock OverviewFullysystemsupported
It can be used to view Stocks for different material taking Plant andstorage location as additional selection criteria.
N
14.2Extend materialviews
Fullysystemsupported
It shows the historical data related to material extension at differentpoint of time.
N
14.3List of materialStorage locationassignment.
Fullysystemsupported
Shows the exhaustive list for material- storage locationassignment.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
69/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 69 of 69
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
14.4 Material ListFullysystemsupported
Shows Detail of a material on basis of selection criteria like plant,material, material type, material group and created by.
N
14.5Material list with priceand inventory values
Fullysystemsupported
Gives the detail of standard price, Per unit price, Currency Key etc.N
14.6 Resource ListFullysystemsupported
Gives detail of resources.N
14.7
Cost Centre
assignment.
Fully
systemsupported Shows the details assignment of cost centres to Resources. N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
70/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 70 of 70
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
14.8 Resources CapacityFullysystemsupported
Shows the capacity records ( Master) for different resources listwise.
N
14.9Where used list-Resource
Fullysystemsupported
Lists the different recipes where resources are used.N
14.10Where Used List -Material
Fullysystemsupported
Lists of material Used into different BOM.N
14.11
Stock/Requirement
list-collective display
Fully
Systemsupported Gives the stock /requirement scenario for a MRP area or plant N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
71/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 71 of 71
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
14.12
Multi level OrderReport
FullySystemsupported
Gives multilevel order report for Process Order with differentinformation.
N
14.13Missing Part Info-System
FullySystemsupported
Gives the list of missing parts on plant. Material and differentselection criteria for plant.
N
14.14
Stock/Requirementlist
Fullysystemsupported
Shows the detail scenario of stock or requirement scenario.N
14.15
Collective Display ofPlanned Order.
FullySystem
supported
Can display the planned orders collectively on the basis of MRP
controller, Material and production version.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
72/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 72 of 72
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
14.16MRP List
FullySystemsupported
Functionality relevant to MRP i.e., all MRP elements can beviewed from time to time. It will show the conditions of Stock orRequirement at time of last MRP run. This is of static type.
N
14.17
MRP List CollectiveDisplay
FullySystemsupported
Same as previous, only it can be displayed MRP area wise.N
14.18Process OrderInformation System
FullySystemsupported
Gives the detail of the information regarding process Ordermanagement.
N
14.19 Process OrderIndividual list display.
FullySystemsupported
Gives the detail of the information regarding process Ordermanagement object wise.
N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
73/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 73 of 73
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
14.20Resource analysis
FullySystemsupported
Gives plant wise analysis of resources.N
14.21Operation analysis
FullySystemsupported
Gives the shop floor information operation wise.N
14.22Material Analysis
FullySystemsupported
Shop floor material analysis information.N
14.23
Process Order
Analysis
Fully
Systemsupported Shop floor analysis for Process Order. N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
74/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 74 of 74
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
14.24Product CostAnalysis
FullySystemsupported
Shop floor Product cost analysis.N
14.25Exception analysis
FullySystemsupported Exception analysis at material, plant and Process Order Level.
N
14.26Capacity Planning
FullySystemsupported
Resource Load Analysis.N
14.27
Capacity Planning
Fully
Systemsupported Process Order Level. N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
75/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 75 of 75
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
14.28Capacity Planning
FullySystemsupported
Resource Overload Analysis.N
14.29Resource View
FullySystemsupported Enhanced capacity evaluation-resource wise.
N
14.30Order View
FullySystemsupported
Enhanced capacity evaluation-Order wise.N
14.31
Material
Consumption
Fully
Systemsupported Material Consumption analysis. N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
76/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 76 of 76
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
14.32Capacity PlanningTable
FullySystemsupported
Capacity Planning table- Process Order View.N
14.33Display Material to becosted.
FullySystemsupported
Display of material to be costed.N
14.34 Result of Costing run.FullySystemsupported
Analyse or compare material cost estimates.N
14.35
Price Vs. Cost
Estimate.
Fully
Systemsupported Analyse or compare Material Cost Estimates. N
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
77/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 77 of 77
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Sl.No.
Process Name Mode Process Description/remarksGap(Y/N)
Remarks
14.40Costed Multi levelBOM
FullySystemsupported
Multi level BOM: Value /Amount/StatusN
14.41Cost components
FullySystemsupported
Analyse cost component split for planned cost: cost componentN
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
78/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 78 of 78
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
SECTION IV
Process Plant: ( SAP Flow Diagram)
Release
CreateDemand
Raise PIR Run MRP
PurchaseRequisition
Integrationwith MM
Planned Order
Convert Planned
Order to Process
Order/ProcessOrder Creation
SchedulingCapacity
AvailabilityCheck
Integration
With PM
Material
AvailabilityCheck
Integrationwith MM
Calculation of
Planned cost atthe time ofsaving
Integration
with FI-CO
Goods IssueagainstProcess
ProcessOrderConfirmation
Integration
With FI-COand MM
Accounting Document,
Material Document andControlling documentGenerated.
GoodsReceived
UsageDecision(QM
Integration)
Ready For
Delivery(SDIntegration
TechnicalCompletionof Order
Closing
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
79/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 79 of 79
SAP ECC 5.0 I MPLEMENTATI ON Business Process Bluepr in t Version No 1.2
CONFIDENTIAL
Power Plant:
Release
Process Order Creation
SchedulingCapacity
AvailabilityCheck
Integration
Material
AvailabilityCheck
Integrationwith MM
Calculation of
Planned cost atthe time ofsaving
Integration
with FI-CO
Goods Issue
againstProcess
ProcessOrderConfirmation
IntegrationWith FI-CO
and MM
Accounting Document,
Material Document and
Controlling documentGenerated.
Goods
Received
Technical
Completionof Order
Closing
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com/http://www.pdffactory.com/ -
7/31/2019 VAL_BBP_PP_FINAL
80/81
Vedanta Alumi na Ltd. Product ion Planni ng Page 80 of