vacuum observations during the 7 5 and 50 ns bunch spacing operation (md 17-20 nov 2010)
DESCRIPTION
Vacuum observations during the 7 5 and 50 ns bunch spacing operation (MD 17-20 Nov 2010). V. Baglin, G. Bregliozzi, P. Chiggiato, J-M. Jimenez, G. Lanza. CERN TE-VSC , Geneva. 1. 75 ns bunch spacing 2. 50 ns bunch spacing 3. Test r amp with 50ns_109b_12_90_12bpi10inj 2. Conclusion. - PowerPoint PPT PresentationTRANSCRIPT
LHC Beam Commissioning WG- 23 Nov 2010
1
Vacuum observations during the 75 and 50 ns bunch spacing operation
(MD 17-20 Nov 2010)
V. Baglin, G. Bregliozzi, P. Chiggiato, J-M. Jimenez, G. Lanza
CERN TE-VSC, Geneva
1. 75 ns bunch spacing2. 50 ns bunch spacing
3. Test ramp with 50ns_109b_12_90_12bpi10inj2. Conclusion
LHC Beam Commissioning WG- 23 Nov 2010
2
1. 75 ns bunch spacing
LHC beam commissioning 19 nov 2010 3
Stacking 48b to 680 with gaps of 1.85 microsec• Injection of 24+24 bunches separated by 75 ns and 225 ns between b24 and b25• 1.85 µs between trains• Machine full with 2x680b after 14 injections
LHC beam commissioning 19 nov 2010 4
Stacking 48b to 680 with gaps of 1.85 microsec• Average bunch current 0.9 E11 p/bunch• Below interlock level (4e-7 mbar) when machine filled with 2 x 680 b• Mainly pressure increases at D1 and less in other areas• Stayed for ~ 2h before beam dumped
LHC beam commissioning 19 nov 2010 5
Conditionning at 680b1+680b2
• Reduction of ~ a factor 2 at D1 LSS2 and LSS8
LHC beam commissioning 19 nov 2010 6
Pressure increase with machine full
• Linear trend in pt1, 3• Except for pt2, pt 8 where threshold at ~ 70 mA (248+248 b)• No pressure increase in pt5 & 7
LHC beam commissioning 19 nov 2010 7
Pressure increase comparison
• Threshold at 9-10 1010 p/b for 75 ns beams• Beam conditioning Losses ?
LHC beam commissioning 19 nov 2010 8
VGPB.2.5L3.B
Ellipse 52x30 mm
BPMWE
LHC Beam Commissioning WG- 23 Nov 2010
9
2. 50 ns bunch spacing
LHC beam commissioning 19 nov 2010 10
Pressure increase comparison
• Higher slope for 50 ns than 75 ns• A factor 2 between the slopes
LHC Beam Commissioning WG- 23 Nov 2010
11
3. Test ramp with 50ns_109b_12_90_12bpi10inj
LHC beam commissioning 20 nov 2010 12
Fill 1500 – 19th November • Only SR desorption • in LSS2• in LSS3&5• In LSS6&7
LHC beam commissioning 20 nov 2010 13
Fill 1500 – 19th November • Pressure increases at VGI in A4L1• But remains lower than 7E-10 mbar
Bunch lengthincreases
SR at ~ 2 TeV
Bunch lengthdecreases during ramp
Up to 1 TeV
LHC beam commissioning 20 nov 2010 14
Fill 1500 – 19th November • During ramp, bunch length decrease at 19:36 and flattens at 19:40
LHC beam commissioning 20 nov 2010 15
Fill 1500 – 19th November • Some activity in MKIR8 intermodule stimulated by ramp and SR• Start ramp, pressure increase starting from ~ 550 GeV (19:36)• But flattens at 800– 1000 GeV (19:40)
Bunch lengthincreases
SR at ~ 2 TeV
Bunch lengthdecreases during ramp
Up to 1 TeV
LHC Beam Commissioning WG- 23 Nov 2010
16
Same ramp the 31th October
LHC beam commissioning 20 nov 2010 17
Fill 1459 – 31th October • 50ns_109b_12_90_12bpi10inj - Trains well separated i.e. no discussion between trains• Pressure up to 2e-8 mbar
LHC Beam Commissioning WG- 23 Nov 2010
18
4. Conclusions
LHC beam commissioning 20 nov 2010 19
Conclusions
• 2x680 b were injected with 75 ns, pressure remained below interlock level• Beam conditioning was observed during ~ 2h storage time• At 75 ns, threshold around 9-10 1010 p/bunch
• At 50 ns, the pressure rise per mA is ~ 2 x the 75 ns pressure rise per mA
• The test ramp of 50 ns_109b_12_90_12bpi10inj exhibits no pressure rise larger than 7 10-10 mbar
• Beam conditioning is ongoing
LHC Beam Commissioning WG- 23 Nov 2010
20
Backup slides :Same ramp the 31th October
LHC beam commissioning 20 nov 2010 21
Fill 1459 – 31th October • 50ns_109b_12_90_12bpi10inj - Trains well separated i.e. no discussion between trains• Pressure up to 2e-8 mbar
LHC beam commissioning 20 nov 2010 22
Fill 1459 – 31th October • 50ns_109b_12_90_12bpi10inj - Trains well separated i.e. no discussion between trains• Pressure increases due to ecloud in the 1e-9 mbar region
SR at ~ 2 TeV
LHC beam commissioning 20 nov 2010 23
Fill 1459 – 31th October • 50ns_109b_12_90_12bpi10inj - Trains well separated i.e. no discussion between trains• Pressure 4e-9 mbar
SR at ~ 2 TeV
LHC beam commissioning 20 nov 2010 24
Fill 1459 – 31th October • 50ns_109b_12_90_12bpi10inj - Trains well separated i.e. no discussion between trains
SR at ~ 2 TeV