KING STREET VA-7 SEMINARY ROAD HENRY G SHIRLEY MEMORIAL HIGHWAY I-395 VAN DORN STREET VA-401 DUKE STREET VA-236 CAPITAL BELTWAY I-495 EISENHOWER AVENUE MILL ROAD HOLLAND ROAD HOOFF'S RUN DRIVE TELEGRAPH ROAD VA-611 PROJECT SITE VA-420

Upload: others

Post on 18-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • KING STREET

    VA-7

    SEMINARY ROADHENR

    Y G SH

    IRLE

    Y

    MEMO

    RIAL

    HIG

    HWAY

    I-395

    VAN

    DO

    RN

    STR

    EET

    VA-4

    01

    DUKE STREETVA-236

    CAPITAL B

    ELTWAY I-4

    95

    EISENHOWERAVENUE

    MILL ROAD

    HOLLAND ROAD

    HOOFF'S RUN DRIVETELEGRAPHROAD VA-611

    PROJECT SITE

    VA-420

  • B-2

    B-3

    B-4

    B-5

    B-6

    B-7

    B-8

    B-9

    B-10

    B-11

    B-12

    B-13

    B-14

    B-15

    B-16

    SD

    SD

    SD

    10174° TWIST

    10230° TWIST

    10330° TWIST

    10413° TWIST

    105-17° TWIST

    MATCHLINE

    XX-102

    MATCHLINE

    XX-101

    MAT

    CHLI

    NE X

    X-10

    3M

    ATCH

    LINE

    XX-

    102

    MAT

    CH

    LIN

    E XX

    -104

    MAT

    CH

    LIN

    E XX

    -103

    MAT

    CH

    LIN

    E XX

    -105

    MAT

    CH

    LIN

    E XX

    -104

    ALEXRENEW

    PRCARLYLE

    LLC

    CARLYLEPLAZA LLC

    PERPETUALREALTY EAST LLC

    CITY OFALEXANDRIADETENTION

    CENTER

    H

    O

    O

    FF

    'S

    R

    U

    N

    O

    L

    D

    C

    A

    M

    E

    R

    O

    N

    R

    U

    N

    I-495 CAPITALBELTWAY

    LIMERICK ST

    HO

    OFF

    'S R

    UN

    DR

    SOUT

    H PA

    YNE

    ST

    ALEXRENEW

    MATCHLINE XX-103BMATCHLINE XX-103

    103B30° TWIST

    0 100' 200'50'

    SCALE: 1"=100'

  • E

    LOD/TP

    LOD/TP

    LOD/T

    P

    LOD/TP LOD/TP LOD/TP LOD/TPCTVCTV

    LOD/TP

    LOD/TP

    LOD/TP LOD/TP LOD/TP LOD/TP LOD/TP

    LOD/TP

    LOD/TP CTVCTVCTVCTVCTVCTV

    CTVCTV LOD

    /TP

    E

    EE EE

    W W W W W WCTV CTV CTV CTV CTV CTV

    UGT UGT UGT UGT UGT

    TV

    TV

    TVTV

    TV

    TV

    TV

    TV

    TV TVTV TV TV TV

    TV

    TVTV

    TV

    TVTV TV TV TV TV TV

    TV

    CATV D

    EP

    CATV D

    EP

    E

    E

    E

    METER METER

    FPFP

    FP

    FP

    FP FP FPFP FP

    FPFP FP

    FP

    FP

    FP

    FP

    FP

    B-11B-12B-13

    B-14

    B-15

    B-16

    SYMBOL DESCRIPTION

    FIRST LIGHT TECHNOLOGY IPL SERIES SOLAR, TYPE 3 LIGHT DISTRIBUTION WITH 12` TALL POLE AND HELICAL SCREWFOOTING. COLOR TEMPERATURE 2700K. SEE LIGHTING DETAILSFOR TYPICAL PHOTOMETRIC STUDIES, CUT SHEETS, CONTROLOPTIONS, & SECTIONS.

    SYMBOL DESCRIPTION

    POROUS CONCRETE OR POROUS ASPHALT. SEE TYPICAL SECTION CS-301 AND CW SHEETS.

    VDOT STANDARD CONCRETE RAMP

    VDOT STANDARD DETECTABLE WARNING SURFACE

    VDOT STANDARD CONCRETE CURB/GUTTER

    MATERIALS SCHEDULE CS-101

    CONSTRUCTION NOTES: SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.

    LOD/TP

    CTVUGT

    W WE E

    OHTOHE OHE

    FOKEY PLAN

    SCALE: 1 : 1,000

    1

    23

    54

    3B

    0 20' 40'10'

    SCALE: 1"=20'

    RIGHT-OF-WAY/EASEMENT/PROPERTY LINE NOTE:LABELS FOR THESE LINES ARE NOT SHOWN ON THIS SHEETFOR GRAPHIC CLARITY. SEE VF-101 FOR LINE LABELS.

  • LOD/TP

    LOD/TPLOD/TP

    LOD/TP LOD/TPLOD/TP

    LOD/TP

    LOD/TP

    LOD/TPLOD/TP

    LOD/TPLOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    CTVCTVCTVCTV

    CTV

    CTVCTV

    LOD

    /TP

    UG

    T

    LOD/TP LOD/TP LOD/TPLOD/TP

    TV

    TV

    TVTV TV

    TV TV TV TV

    TVTV

    TVTV

    TV

    TV

    TV

    CATV

    DEP

    E

    FPFP

    FP

    FP

    FP

    FP

    FP FPFP

    FP FPFP FP

    FP FPFP F

    PFP

    FP

    FP FP

    FPFP

    B-4B-5

    B-6

    B-7B-8B-9

    B-10

    SYMBOL DESCRIPTION

    FIRST LIGHT TECHNOLOGY IPL SERIES SOLAR, TYPE 3 LIGHT DISTRIBUTION WITH 12` TALL POLE AND HELICAL SCREWFOOTING. COLOR TEMPERATURE 2700K. SEE LIGHTING DETAILSFOR TYPICAL PHOTOMETRIC STUDIES, CUT SHEETS, CONTROLOPTIONS, & SECTIONS.

    SYMBOL DESCRIPTION

    POROUS CONCRETE OR POROUS ASPHALT. SEE TYPICAL SECTION CS-301 AND CW SHEETS.

    MATERIALS SCHEDULE CS-102

    CONSTRUCTION NOTES: SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.

    LOD/TP

    CTVUGT

    W WE E

    0 20' 40'10'

    SCALE: 1"=20'

    KEY PLANSCALE: 1 : 1,000

    1

    23

    54

    3B

    RIGHT-OF-WAY/EASEMENT/PROPERTY LINE NOTE:LABELS FOR THESE LINES ARE NOT SHOWN ON THIS SHEETFOR GRAPHIC CLARITY. SEE VF-102 FOR LINE LABELS.

  • LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    15.97 FG

    1.8%

    15.89 FGLOD/TP

    LOD/TP

    11.33FG/EX

    4.8%

    16.08 FG

    21.08

    FG20

    .89 FG

    4.7%

    CTV

    OH

    TO

    HT

    OH

    TO

    HT

    OH

    TO

    HT

    OH

    T

    OHT

    OHT

    OHT

    OH

    EO

    HE

    OH

    EO

    HE

    OH

    EO

    HE

    OH

    E

    OHE

    OHE

    OHE

    OHE

    LOD/TP

    SD

    SDSD

    FO

    FO

    FO

    FO

    FO

    FO

    °

    TV

    FO

    FO

    FO

    FO

    FO

    FO

    FO

    FO

    FO

    FO

    FO

    FO

    FPFP

    FP

    FPFP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP FP

    FP

    B-2

    B-3

    BRIDGE CONCRETE DECK. SEE SD SHEETS.

    PEDESTAL FOR 10` LIGHT POLE ON SIDE OF BRDGE

    VDOT STANDARD CONCRETE CURB/GUTTER

    FULL DEPTH ASPHALT PER CITY OF ALEXANDRIA OR ALEX RENEW STANDARD

    CONSTRUCTION NOTES: SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.

    LOD/TP CTVUGT

    W WE E

    OHTOHE OHE

    FO

    SYMBOL DESCRIPTION

    FIRST LIGHT TECHNOLOGY IPL SERIES SOLAR, TYPE 3 LIGHT DISTRIBUTION WITH 12` TALL POLE AND HELICAL SCREWFOOTING. COLOR TEMPERATURE 2700K. SEE LIGHTING DETAILSFOR TYPICAL PHOTOMETRIC STUDIES, CUT SHEETS, CONTROLOPTIONS, & SECTIONS.

    PROPOSED DISTRIBUTION POWER POLE (CONCEPT LAYOUT - FINAL DESIGN BY VIRGINIA DOMINION POWER)

    SOLAR-POWERED LED LIGHT POLE ON BRIDGE, 10` HEIGHT, SPACED APPROXIMATELY 50` O.C.

    SYMBOL DESCRIPTION

    POROUS CONCRETE OR POROUS ASPHALT. SEE TYPICAL SECTION CS-301 AND CW SHEETS.

    VDOT STANDARD ASPHALT MILL/OVERLAY OR OVERLAY ATOP EXISTING ASPHALT

    MATERIALS SCHEDULE CS-103

    KEY PLANSCALE: 1 : 1,000

    1

    23

    54

    3B

    0 20' 40'10'

    SCALE: 1"=20'

    RIGHT-OF-WAY/EASEMENT/PROPERTY LINE NOTE:LABELS FOR THESE LINES ARE NOT SHOWN ON THIS SHEETFOR GRAPHIC CLARITY. SEE VF-103 FOR LINE LABELS.

    CONSTRUCTION NOTE: SEE CS-103B FOR VERTICAL PROFILE.

  • DESCRIPTION DETAIL

    FIRST LIGHT TECHNOLOGY IPL SERIES SOLAR, TYPE 3 LIGHT DISTRIBUTION WITH 12` TALL POLE AND HELICAL SCREWFOOTING. COLOR TEMPERATURE 2700K. SEE LIGHTING DETAILSFOR TYPICAL PHOTOMETRIC STUDIES, CUT SHEETS, CONTROLOPTIONS, & SECTIONS.

    DESCRIPTION DETAIL

    POROUS CONCRETE OR POROUS ASPHALT. SEE TYPICAL SECTION CS-301 AND CW SHEETS.

    MATERIALS SCHEDULE CS-102

    SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.

    LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    LOD/TP

    FO

    FO

    FO

    FO

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FPFP

    FPFP

    FP

    FP

    FP

    FP

    FP

    FPFP FP FP

    FP

    SYMBOL DESCRIPTION

    VDOT STANDARD ASPHALT MILL/OVERLAY OR OVERLAY ATOP EXISTING ASPHALT

    MATERIALS SCHEDULE CS-103B

    CONSTRUCTION NOTES: SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.

    LOD/TP

    KEY PLANSCALE: 1 : 1,000

    1

    23

    54

    3B

    0 20' 40'10'

    SCALE: 1"=20'

    RIGHT-OF-WAY/EASEMENT/PROPERTY LINE NOTE:LABELS FOR THESE LINES ARE NOT SHOWN ON THIS SHEETFOR GRAPHIC CLARITY. SEE VF-103B FOR LINE LABELS.

  • FOFO

    FO

    FOFO F

    O FO FO

    FOFO FO FO

    FOFO

    FO

    FOFO FO

    FO FOFO

    FO FO FO

    FP FP FP FP FP FP

    FP FP FP FPFP

    FP FP FP FP FP FPFP FP FP FP FP FP FP

    SYMBOL DESCRIPTION

    FIRST LIGHT TECHNOLOGY IPL SERIES SOLAR, TYPE 3 LIGHT DISTRIBUTION WITH 12` TALL POLE AND HELICAL SCREWFOOTING. COLOR TEMPERATURE 2700K. SEE LIGHTING DETAILSFOR TYPICAL PHOTOMETRIC STUDIES, CUT SHEETS, CONTROLOPTIONS, & SECTIONS.

    SYMBOL DESCRIPTION

    VDOT STANDARD ASPHALT MILL/OVERLAY OR OVERLAY ATOP EXISTING ASPHALT

    MATERIALS SCHEDULE CS-104

    CONSTRUCTION NOTES: SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.

    LOD/TP

    0 20' 40'10'

    SCALE: 1"=20'

    KEY PLANSCALE: 1 : 1,000

    1

    23

    54

    3B

    RIGHT-OF-WAY/EASEMENT/PROPERTY LINE NOTE:LABELS FOR THESE LINES ARE NOT SHOWN ON THIS SHEETFOR GRAPHIC CLARITY. SEE VF-104 FOR LINE LABELS.

  • SYMBOL DESCRIPTION DETAIL

    FIRST LIGHT TECHNOLOGY IPL SERIES SOLAR, TYPE 3 LIGHT DISTRIBUTION WITH 12` TALL POLE AND HELICAL SCREWFOOTING. COLOR TEMPERATURE 2700K. SEE LIGHTING DETAILSFOR TYPICAL PHOTOMETRIC STUDIES, CUT SHEETS, CONTROLOPTIONS, & SECTIONS.

    SYMBOL DESCRIPTION DETAIL

    VDOT STANDARD ASPHALT MILL/OVERLAY OR OVERLAY ATOP EXISTING ASPHALT

    VDOT STANDARD CONCRETE RAMP

    VDOT STANDARD DETECTABLE WARNING SURFACE

    MATERIALS SCHEDULE CS-105

    CONSTRUCTION NOTES: SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.

    °

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    FP

    LOD/TP

    KEY PLANSCALE: 1 : 1,000

    1

    23

    54

    3B

    0 20' 40'10'

    SCALE: 1"=20'

    RIGHT-OF-WAY/EASEMENT/PROPERTY LINE NOTE:LABELS FOR THESE LINES ARE NOT SHOWN ON THIS SHEETFOR GRAPHIC CLARITY. SEE VF-105 FOR LINE LABELS.

  • NOTES:1. SHARED-USE PATH SHALL COMPLY WITH VDOT ROAD DESIGN

    MANUAL (LATEST EDITION) AND AASHTO GUIDE FOR THEDEVELOPMENT OF BICYCLE FACILITIES (LATEST EDITION).

    2. TRAIL CONSTRUCTION BASELINE SHALL MATCH PROPOSEDPROFILE GRADE.

    3. REFER TO PLANS FOR DEVIATIONS IN TRAIL ASSEMBLY.4. PROVIDE A 10' TALL VERTICAL CLEARANCE FROM ANY

    OVERHEAD OBSTRUCTIONS (I.E., TREE LIMBS).

    3'-0" MIN.6'-0" MAX.

    UPCOMPACTED SUBGRADE PERINFILTRATION REQUIREMENTS. INSTALLGEOGRID PER GEOTECHNICALENGINEER RECOMMENDATIONS.

    CLEAN WASHED & OPEN GRADED RESERVOIRBASE COURSE, AASHTO #57 OR APPROVED EQUAL

    PERVIOUS PORTLAND CEMENT CONCRETE

    6"

    NOTES:1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH VDOT'S LATEST STANDARDS FOR

    POROUS PORTLAND CEMENT CONCRETE/POROUS ASPHALT PAVEMENT.2. AGGREGATE LAYERS SHALL MEET CURRENT APPROVED VDOT SPECIFICATION FOR

    AGGREGATES FOR PERMEABLE PAVEMENT.3. WHERE IN-SITU SOILS ARE NOT CONDUCIVE TO INFILTRATON OF 1.2" RETENTION

    VOLUME WTHIN 72 HOURS, UNDERDRAIN SHALL BE USED.4. AGGREGATE DEPTH SHALL BE EQUAL TO OR GREATER THAN STORAGE VOLUMES

    REQUIRED ON CW SHEETS.5. BOTTOM OF PERMEABLE PAVEMENT SHALL BE AT LEAST 2' ABOVE THE SEASONAL HIGH

    WATER TABLE OR BEDROCK.6. TOP OF PAVEMENT SHALL PROVDE 1% MINIMUM SLOPE N ANY DIRECTION.7. PROVIDE CONTROL AND EXPANSION JOINTS IN ACCORDANCE WITH VDOT STANDARDS.8. PERVIOUS CONCRETE CONSTRUCTION MUST BE PERFORMED BY NATIONAL READY

    MIXED ASSOCIATION CERTIFIED PERVIOUS CONCRETE INSTALLER. ALL CONSTRUCTIONMUST BE DONE PER ACI 522.13.

    GEOGRID PER GEOTECHNICALENGINEER RECOMMENDATIONS.

    2"4" TOPSOIL BACKFILLON SHOULDERS

    4"

    POROUS CONCRETE TYPICAL SECTION

    1.5% MAX. CROSS SLOPE5% MAX. LONGITUDINAL SLOPE

    1'-0"

    3"

    POROUS ASPHALT TYPICAL SECTION

    1.5% MAX. CROSS SLOPE5% MAX. LONGITUDINAL SLOPE

    ℄UPCOMPACTED SUBGRADE PERINFILTRATION REQUIREMENTS. INSTALLGEOGRID PER GEOTECHNICALENGINEER RECOMMENDATIONS.

    112" POROUS ASPHALT SURFACE COURSE (HMA 12.5MM)OVER 3" POROUS ASPHALT BASE COURSE (HMA 25MM)

    6"

    GEOGRID PER GEOTECHNICALENGINEER RECOMMENDATIONS.

    2"4" TOPSOIL BACKFILLON SHOULDERS

    412"

    4" SCHEDULE 40 PERFORATED PVC UNDERDRAIN. 38"HOLES 4" O.C., 90° AROUND PIPE. WRAPPED INGEOTECHNICAL FABRIC, SEE UTILITY PLANS AND DETAILS

    1'-0"

    3"

    3:1

    0% CROSS SLOPE

    3:1

    5% MIN, 3:1 MAXTIE-OUT TO EXISTING

    10'-0" SHARED USE PATH (POROUS CONCRETE OR POROUS ASPHALT)

    1.5% MAX. CROSS SLOPE

    2'-0" CLEARZONE/SHOULDER

    2'-0" CLEARZONE/SHOULDER2'-0" SWALE SIDE SLOPE4'-0" SWALE BOTTOM2'-0" SWALE SIDE SLOPE

    5% TO6:1% MAX

    .

    4'-0

    " MIN

    . 5'-0

    " MAX

    .

    5% TO6:1% MAX. 5% MIN, 3:1 MAXTIE-OUT TO EXISTING

    TYPICAL SECTION B:APPROX. STA. 21+75.00 TO STA. 24+07.26

    10'-0" SHARED USE PATH (POROUS CONCRETE OR POROUS ASPHALT)

    1.5% MAX. CROSS SLOPE

    CLEAR ZONE/SHOULDER (WIDTH VARIES) 2'-0" CLEARZONE/SHOULDER

    5% TO6:1% MAX.

    TYPICAL SECTION A:APPROX. STA. 20+80.65 TO STA. 21+75.00

    EXISTING ROADWAY TO REMAIN

    10'-0" SHARED USE PATH (POROUS CONCRETE OR POROUS ASPHALT)

    1.5% MAX. CROSS SLOPE

    2'-0" CLEARZONE/SHOULDER

    5% TO6:1% MAX.3:1 MAX TIE-OUTTO EXISTING

    TYPICAL SECTION D:APPROX. STA. 30+23.89 TO STA. 35+96.56

    2'-0" CLEARZONE/SHOULDER

    3:1 MAX TIE-OUTTO EXISTING

    1.5% TO 5% CROSS SLOPE

    3:1 MAX TIE-OUTTO EXISTING

    5% TO6:1% MAX.

    EXISTING GRADE (VARIES)

    EXISTING GRADE (VARIES)

    EXISTING GRADE (VARIES)

    4" TOPSOIL TYP TO MATCHEXISTING CONDITIONS

    4" TOPSOIL TYP TO MATCHEXISTING CONDITIONS

    4" TOPSOIL TYP TO MATCHEXISTING CONDITIONS

    OCRT TYPICAL SECTIONS1" = 1'-0"

    8"

    CLASS SE PERMEABLE NON-WOVENGEOTEXTILE FABRIC, SUCH AS MIRAFI 140NOR APPROVED EQUAL. OVERLAP 12" MINOVER DOWNWARD PIECE. SIDES ONLY.

    8"

    4" SCHEDULE 40 PERFORATEDPVC UNDERDRAIN. 38" HOLES 4"O.C., 90° AROUND PIPE.WRAPPED IN GEOTECHNICALFABRIC, SEE UTILITY PLANSAND DETAILS

    CLASS SE PERMEABLE NON-WOVENGEOTEXTILE FABRIC, SUCH AS MIRAFI 140NOR APPROVED EQUAL. OVERLAP 12" MINOVER DOWNWARD PIECE. SIDES ONLY.

    CLEAN WASHED & OPEN GRADED RESERVOIRBASE COURSE, AASHTO #57 OR APPROVED EQUAL

    1033301-03

  • Edge of stream

    Constr. C of trail

    Edge of stream

    &

    EL

    EV

    ATIO

    N

    GE

    NE

    RA

    L

    PL

    AN

    SD-501

    PLAN

    GENERAL NOTES:

    1"=20’

    o

    S 48-57’-05" W

    312’-10"

    312’-10"

    (Ty

    p.)

    7’-

    0"

    (Ty

    p.)

    1’-

    0"

    RECOMMENDED CONSTRUCTION PROCEDURE

    ABUTMENT A ABUTMENT B

    ABUTMENT BABUTMENT A

    DEVELOPED SECTION ALONG CL

    elev. XX.XX

    Ordinary high water

    Sta. 35+96.51

    End of slab

    Beginning of bridge

    Span a

    155’-0" 155’-0"

    Span b

    PIER 1

    Fix. Fix.

    Exp.

    Exp.

    and C OCRT-30

    Existing profile on B

    Span a Span b

    8’-0" typ.

    Fill

    FOR CONSTRUCTION OF BRIDGE

    THESE PLANS NOT TO BE USED

    PRELIMINARY PLANS

    the site.

    maintain the required clearance from the overhead utility lines that cross

    At all steps in the process, all personnel, equipment and materials must

    Stabilize the site and remove environmental remediation measures.15.

    Construct the approach pathway.14.

    Place deck reinforcement and pour the concrete for the deck.12.

    Install truss segments per the specifications of the fabricator.11.

    Set the truss bearings per the specifications of the fabricator.10

    Backfill at all substructure units.9.

    Pour the concrete for the abutment/pier stems.8.

    the plans and place formwork.

    Place abutment/pier stem reinforcement as indicated on7.

    Pour the concrete for the footing. 6.

    and place formwork.

    Place footing reinforcement as indicated on the plans5.

    at the locations indicated on the plans.

    Install helical piles per the specifications of the fabricator4.

    Dewater excavated locations (repeat as necessary).3.

    at each substructure unit.

    Excavate to the bottom of the footing elevation2.

    Place environmental remediation measures.1.

    Sta. 35+96.51

    End of slab

    Beginning of bridge

    Sta. 39+09.34

    End of slab

    End of bridge

    Sta. 39+09.34

    End of slab

    End of bridge

    Sta. 35+97.51

    of bearing

    Line thru center

    Sta. 39+08.34

    of bearing

    Line thru center

    o

    90 typ.

    CAMER

    ON

    RUN

    HO

    OF’S

    RU

    N Retaining wall

    B.M.: see roadway plans.

    on geotechnical recommendations.

    Assumed foundation is helical piles, which is subject to change based

    Geotechnical report has not been provided at time of this report.

    and construction tolerances.

    bars except where otherwise noted and are subject to fabrication

    reinforcing bar dimensions on the detailed drawings are to centers of

    Deformed reinforcing bars shall conform to ASTM A615, Grade 60. All

    Concrete in substructure: pier, abutments, and wingwalls shall be class A3.

    Finish paint color shall be _______, 595-_______.

    documents.

    specifications and special provisions included in the contract

    These plans are incomplete unless accompanied by the supplemental

    Bridge Standards, 2016; including all current revisions.

    Virginia Department of Transportation Road andStandards:

    Bridges, 2nd edition, 2009 and VDOT modifications.

    LRFD Guide Specifications for Design of Pedestrian

    2017 and VDOT modifications.

    AASHTO LRFD Bridge Design Specifications, 8th edition,Design:

    Specifications, 2016.

    Construction: Virginia Department of Transportation Road and Bridge

    Specifications:

    Drainage Area: 2.80 sq. mi.

    Capacity: H-10, and pedestrian loading.

    Span layout: 155’-155’ two simple spans

    Width: 14’-0" face-to-face of railing.

    full extent of the applicable laws.

    scanned signatures is illegal. Violators will be prosecuted to the

    the VDOT Central Office. Any misuse of electronic files, including

    The original approved sheet, including original signatures, is filed in

    1.90%

    Fill

    Finish grade

    Finish grade

    SCALE:

    SHEET

    DE

    SIG

    NE

    D

    BY:

    DR

    AW

    N

    BY:

    CIT

    Y

    OF

    ALE

    XA

    ND

    RIA,

    VIR

    GINIA

    DA

    TE:

    DA

    TE:

    CH

    EC

    KE

    D

    BY:

    DA

    TE:

    ALE

    XA

    ND

    RIA,

    VIR

    GINIA 22313

    301

    KIN

    G

    ST

    RE

    ET

    DE

    PA

    RT

    ME

    NT

    OF

    PR

    OJE

    CT IM

    PLE

    ME

    NT

    ATIO

    N

    DE

    SC

    RIP

    TIO

    NB

    YD

    AT

    E

    RE

    VISIO

    NS

    AP

    PR

    OV

    ED

    BY:

    DA

    TE:

    ALE

    XA

    ND

    RIA

    PR

    OJE

    CT

    NO.:

    DA

    TE

    OF

    PL

    AN IS

    SU

    AN

    CE:

    CO

    NS

    ULT

    AN

    T

    PR

    OJE

    CT ID.:

    TS

    &

    L

    DE

    SIG

    N

    SU

    BMIT

    TA

    LP

    ROJE

    CT

    NA

    ME:

    OL

    D

    CA

    ME

    RO

    N

    RU

    N

    TR

    AIL

    AM

    T-

    AM

    T-

    AM

    T-

    AM

    T-

    17-

    0920

    FE

    B.

    2019

    16-

    019

    1-800-552-7001

    DIAL 811 IN VIRGINIA OR

    CALL BEFORE YOU DIG.

    KNOW WHAT’S BELOW.

  • TY

    PIC

    AL

    SE

    CTIO

    NS

    SD-502

    "=1’-0"21

    1

    4

    1

    4

    Top of grade

    Face of backwall

    Top of seatTop of grade

    Geocomposite wall drainGeocomposite wall drain

    1’-3’’1’-9’’

    4’-

    1’’

    3’-

    0’’

    Appro

    x.

    3’-0’’

    6’-0’’

    6’’

    3’-

    0’’

    4’-0’’

    4’-0’’

    7’-0’’

    11’-

    0"

    Appro

    x.

    1’-3’’1’-9’’

    4’-

    1’’

    3’-

    0’’

    Appro

    x.

    3’-0’’

    6’-0’’

    6’’

    1’-6’’ 1’-6’’ 1’-6’’ 1’-6’’ 1’-6’’ 1’-6’’

    14’-0’’

    3’-

    6’’

    6’’

    3’-

    11’’

    Varie

    s 2’-

    0" to 9’-

    0"

    Varie

    s 5’-

    11" to 12’-

    11"

    Brace diagonalFloor beam

    TRANSVERSE SECTION

    ABUTMENT B TYPICAL SECTIONABUTMENT A TYPICAL SECTION

    C PierL

    L

    10" 10"

    2’-0’’

    L

    Face of curb

    7’-0’’

    Level

    Face of backwall

    3’-

    0’’

    3’-

    0’’

    L

    L

    L

    PIER 1 TYPICAL SECTION

    of bearings

    Line thru center

    of bearings

    Line thru center

    B and C OCRT-30

    7’-0’’

    Top chord typ.

    Face of curb

    Brace diagonal typ.Vertical typ.

    Rub rail typ.

    Safety rail typ.

    Toe rail typ.

    Side dam typ.

    Bottom chord typ.

    FOR CONSTRUCTION OF BRIDGE

    THESE PLANS NOT TO BE USED

    PRELIMINARY PLANS

    typ.

    ty

    p.

    1’-

    0’’

    C Helical pile typ.

    C Helical pile typ.

    ty

    p.

    1’-

    0’’

    C Helical pile typ.

    ty

    p.

    1’-

    0’’

    Concrete deck

    Formdeck

    finished grade

    Point of

    SCALE:

    SHEET

    DE

    SIG

    NE

    D

    BY:

    DR

    AW

    N

    BY:

    CIT

    Y

    OF

    ALE

    XA

    ND

    RIA,

    VIR

    GINIA

    DA

    TE:

    DA

    TE:

    CH

    EC

    KE

    D

    BY:

    DA

    TE:

    ALE

    XA

    ND

    RIA,

    VIR

    GINIA 22313

    301

    KIN

    G

    ST

    RE

    ET

    DE

    PA

    RT

    ME

    NT

    OF

    PR

    OJE

    CT IM

    PLE

    ME

    NT

    ATIO

    N

    DE

    SC

    RIP

    TIO

    NB

    YD

    AT

    E

    RE

    VISIO

    NS

    AP

    PR

    OV

    ED

    BY:

    DA

    TE:

    ALE

    XA

    ND

    RIA

    PR

    OJE

    CT

    NO.:

    DA

    TE

    OF

    PL

    AN IS

    SU

    AN

    CE:

    CO

    NS

    ULT

    AN

    T

    PR

    OJE

    CT ID.:

    TS

    &

    L

    DE

    SIG

    N

    SU

    BMIT

    TA

    LP

    ROJE

    CT

    NA

    ME:

    OL

    D

    CA

    ME

    RO

    N

    RU

    N

    TR

    AIL

    AM

    T-

    AM

    T-

    AM

    T-

    AM

    T-

    17-

    0920

    FE

    B.

    2019

    16-

    019

    1-800-552-7001

    DIAL 811 IN VIRGINIA OR

    CALL BEFORE YOU DIG.

    KNOW WHAT’S BELOW.

  • 01 GI-00107 GI-0072020-05-29 30% OCRT Plans 2 CS-101 to CB-503.pdf23 CS-10124 CS-10225 CS-10326 CS-103B27 CS-10428 CS-10567 CS-30173 SD-50174 SD-50281 CS-503