va-7king street henry g shirleymemorial highway i-395 … · 2020. 5. 29. · 6. top of pavement...
TRANSCRIPT
-
KING STREET
VA-7
SEMINARY ROADHENR
Y G SH
IRLE
Y
MEMO
RIAL
HIG
HWAY
I-395
VAN
DO
RN
STR
EET
VA-4
01
DUKE STREETVA-236
CAPITAL B
ELTWAY I-4
95
EISENHOWERAVENUE
MILL ROAD
HOLLAND ROAD
HOOFF'S RUN DRIVETELEGRAPHROAD VA-611
PROJECT SITE
VA-420
-
B-2
B-3
B-4
B-5
B-6
B-7
B-8
B-9
B-10
B-11
B-12
B-13
B-14
B-15
B-16
SD
SD
SD
10174° TWIST
10230° TWIST
10330° TWIST
10413° TWIST
105-17° TWIST
MATCHLINE
XX-102
MATCHLINE
XX-101
MAT
CHLI
NE X
X-10
3M
ATCH
LINE
XX-
102
MAT
CH
LIN
E XX
-104
MAT
CH
LIN
E XX
-103
MAT
CH
LIN
E XX
-105
MAT
CH
LIN
E XX
-104
ALEXRENEW
PRCARLYLE
LLC
CARLYLEPLAZA LLC
PERPETUALREALTY EAST LLC
CITY OFALEXANDRIADETENTION
CENTER
H
O
O
FF
'S
R
U
N
O
L
D
C
A
M
E
R
O
N
R
U
N
I-495 CAPITALBELTWAY
LIMERICK ST
HO
OFF
'S R
UN
DR
SOUT
H PA
YNE
ST
ALEXRENEW
MATCHLINE XX-103BMATCHLINE XX-103
103B30° TWIST
0 100' 200'50'
SCALE: 1"=100'
-
E
LOD/TP
LOD/TP
LOD/T
P
LOD/TP LOD/TP LOD/TP LOD/TPCTVCTV
LOD/TP
LOD/TP
LOD/TP LOD/TP LOD/TP LOD/TP LOD/TP
LOD/TP
LOD/TP CTVCTVCTVCTVCTVCTV
CTVCTV LOD
/TP
E
EE EE
W W W W W WCTV CTV CTV CTV CTV CTV
UGT UGT UGT UGT UGT
TV
TV
TVTV
TV
TV
TV
TV
TV TVTV TV TV TV
TV
TVTV
TV
TVTV TV TV TV TV TV
TV
CATV D
EP
CATV D
EP
E
E
E
METER METER
FPFP
FP
FP
FP FP FPFP FP
FPFP FP
FP
FP
FP
FP
FP
B-11B-12B-13
B-14
B-15
B-16
SYMBOL DESCRIPTION
FIRST LIGHT TECHNOLOGY IPL SERIES SOLAR, TYPE 3 LIGHT DISTRIBUTION WITH 12` TALL POLE AND HELICAL SCREWFOOTING. COLOR TEMPERATURE 2700K. SEE LIGHTING DETAILSFOR TYPICAL PHOTOMETRIC STUDIES, CUT SHEETS, CONTROLOPTIONS, & SECTIONS.
SYMBOL DESCRIPTION
POROUS CONCRETE OR POROUS ASPHALT. SEE TYPICAL SECTION CS-301 AND CW SHEETS.
VDOT STANDARD CONCRETE RAMP
VDOT STANDARD DETECTABLE WARNING SURFACE
VDOT STANDARD CONCRETE CURB/GUTTER
MATERIALS SCHEDULE CS-101
CONSTRUCTION NOTES: SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.
LOD/TP
CTVUGT
W WE E
OHTOHE OHE
FOKEY PLAN
SCALE: 1 : 1,000
1
23
54
3B
0 20' 40'10'
SCALE: 1"=20'
RIGHT-OF-WAY/EASEMENT/PROPERTY LINE NOTE:LABELS FOR THESE LINES ARE NOT SHOWN ON THIS SHEETFOR GRAPHIC CLARITY. SEE VF-101 FOR LINE LABELS.
-
LOD/TP
LOD/TPLOD/TP
LOD/TP LOD/TPLOD/TP
LOD/TP
LOD/TP
LOD/TPLOD/TP
LOD/TPLOD/TP
LOD/TP
LOD/TP
LOD/TP
LOD/TP
CTVCTVCTVCTV
CTV
CTVCTV
LOD
/TP
UG
T
LOD/TP LOD/TP LOD/TPLOD/TP
TV
TV
TVTV TV
TV TV TV TV
TVTV
TVTV
TV
TV
TV
CATV
DEP
E
FPFP
FP
FP
FP
FP
FP FPFP
FP FPFP FP
FP FPFP F
PFP
FP
FP FP
FPFP
B-4B-5
B-6
B-7B-8B-9
B-10
SYMBOL DESCRIPTION
FIRST LIGHT TECHNOLOGY IPL SERIES SOLAR, TYPE 3 LIGHT DISTRIBUTION WITH 12` TALL POLE AND HELICAL SCREWFOOTING. COLOR TEMPERATURE 2700K. SEE LIGHTING DETAILSFOR TYPICAL PHOTOMETRIC STUDIES, CUT SHEETS, CONTROLOPTIONS, & SECTIONS.
SYMBOL DESCRIPTION
POROUS CONCRETE OR POROUS ASPHALT. SEE TYPICAL SECTION CS-301 AND CW SHEETS.
MATERIALS SCHEDULE CS-102
CONSTRUCTION NOTES: SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.
LOD/TP
CTVUGT
W WE E
0 20' 40'10'
SCALE: 1"=20'
KEY PLANSCALE: 1 : 1,000
1
23
54
3B
RIGHT-OF-WAY/EASEMENT/PROPERTY LINE NOTE:LABELS FOR THESE LINES ARE NOT SHOWN ON THIS SHEETFOR GRAPHIC CLARITY. SEE VF-102 FOR LINE LABELS.
-
LOD/TP
LOD/TP
LOD/TP
LOD/TP
LOD/TP
LOD/TP
LOD/TP
LOD/TP
LOD/TP
LOD/TP
LOD/TP
15.97 FG
1.8%
15.89 FGLOD/TP
LOD/TP
11.33FG/EX
4.8%
16.08 FG
21.08
FG20
.89 FG
4.7%
CTV
OH
TO
HT
OH
TO
HT
OH
TO
HT
OH
T
OHT
OHT
OHT
OH
EO
HE
OH
EO
HE
OH
EO
HE
OH
E
OHE
OHE
OHE
OHE
LOD/TP
SD
SDSD
FO
FO
FO
FO
FO
FO
°
TV
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FPFP
FP
FPFP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP FP
FP
B-2
B-3
BRIDGE CONCRETE DECK. SEE SD SHEETS.
PEDESTAL FOR 10` LIGHT POLE ON SIDE OF BRDGE
VDOT STANDARD CONCRETE CURB/GUTTER
FULL DEPTH ASPHALT PER CITY OF ALEXANDRIA OR ALEX RENEW STANDARD
CONSTRUCTION NOTES: SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.
LOD/TP CTVUGT
W WE E
OHTOHE OHE
FO
SYMBOL DESCRIPTION
FIRST LIGHT TECHNOLOGY IPL SERIES SOLAR, TYPE 3 LIGHT DISTRIBUTION WITH 12` TALL POLE AND HELICAL SCREWFOOTING. COLOR TEMPERATURE 2700K. SEE LIGHTING DETAILSFOR TYPICAL PHOTOMETRIC STUDIES, CUT SHEETS, CONTROLOPTIONS, & SECTIONS.
PROPOSED DISTRIBUTION POWER POLE (CONCEPT LAYOUT - FINAL DESIGN BY VIRGINIA DOMINION POWER)
SOLAR-POWERED LED LIGHT POLE ON BRIDGE, 10` HEIGHT, SPACED APPROXIMATELY 50` O.C.
SYMBOL DESCRIPTION
POROUS CONCRETE OR POROUS ASPHALT. SEE TYPICAL SECTION CS-301 AND CW SHEETS.
VDOT STANDARD ASPHALT MILL/OVERLAY OR OVERLAY ATOP EXISTING ASPHALT
MATERIALS SCHEDULE CS-103
KEY PLANSCALE: 1 : 1,000
1
23
54
3B
0 20' 40'10'
SCALE: 1"=20'
RIGHT-OF-WAY/EASEMENT/PROPERTY LINE NOTE:LABELS FOR THESE LINES ARE NOT SHOWN ON THIS SHEETFOR GRAPHIC CLARITY. SEE VF-103 FOR LINE LABELS.
CONSTRUCTION NOTE: SEE CS-103B FOR VERTICAL PROFILE.
-
DESCRIPTION DETAIL
FIRST LIGHT TECHNOLOGY IPL SERIES SOLAR, TYPE 3 LIGHT DISTRIBUTION WITH 12` TALL POLE AND HELICAL SCREWFOOTING. COLOR TEMPERATURE 2700K. SEE LIGHTING DETAILSFOR TYPICAL PHOTOMETRIC STUDIES, CUT SHEETS, CONTROLOPTIONS, & SECTIONS.
DESCRIPTION DETAIL
POROUS CONCRETE OR POROUS ASPHALT. SEE TYPICAL SECTION CS-301 AND CW SHEETS.
MATERIALS SCHEDULE CS-102
SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.
LOD/TP
LOD/TP
LOD/TP
LOD/TP
LOD/TP
LOD/TP
LOD/TP
FO
FO
FO
FO
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FPFP
FPFP
FP
FP
FP
FP
FP
FPFP FP FP
FP
SYMBOL DESCRIPTION
VDOT STANDARD ASPHALT MILL/OVERLAY OR OVERLAY ATOP EXISTING ASPHALT
MATERIALS SCHEDULE CS-103B
CONSTRUCTION NOTES: SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.
LOD/TP
KEY PLANSCALE: 1 : 1,000
1
23
54
3B
0 20' 40'10'
SCALE: 1"=20'
RIGHT-OF-WAY/EASEMENT/PROPERTY LINE NOTE:LABELS FOR THESE LINES ARE NOT SHOWN ON THIS SHEETFOR GRAPHIC CLARITY. SEE VF-103B FOR LINE LABELS.
-
FOFO
FO
FOFO F
O FO FO
FOFO FO FO
FOFO
FO
FOFO FO
FO FOFO
FO FO FO
FP FP FP FP FP FP
FP FP FP FPFP
FP FP FP FP FP FPFP FP FP FP FP FP FP
SYMBOL DESCRIPTION
FIRST LIGHT TECHNOLOGY IPL SERIES SOLAR, TYPE 3 LIGHT DISTRIBUTION WITH 12` TALL POLE AND HELICAL SCREWFOOTING. COLOR TEMPERATURE 2700K. SEE LIGHTING DETAILSFOR TYPICAL PHOTOMETRIC STUDIES, CUT SHEETS, CONTROLOPTIONS, & SECTIONS.
SYMBOL DESCRIPTION
VDOT STANDARD ASPHALT MILL/OVERLAY OR OVERLAY ATOP EXISTING ASPHALT
MATERIALS SCHEDULE CS-104
CONSTRUCTION NOTES: SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.
LOD/TP
0 20' 40'10'
SCALE: 1"=20'
KEY PLANSCALE: 1 : 1,000
1
23
54
3B
RIGHT-OF-WAY/EASEMENT/PROPERTY LINE NOTE:LABELS FOR THESE LINES ARE NOT SHOWN ON THIS SHEETFOR GRAPHIC CLARITY. SEE VF-104 FOR LINE LABELS.
-
SYMBOL DESCRIPTION DETAIL
FIRST LIGHT TECHNOLOGY IPL SERIES SOLAR, TYPE 3 LIGHT DISTRIBUTION WITH 12` TALL POLE AND HELICAL SCREWFOOTING. COLOR TEMPERATURE 2700K. SEE LIGHTING DETAILSFOR TYPICAL PHOTOMETRIC STUDIES, CUT SHEETS, CONTROLOPTIONS, & SECTIONS.
SYMBOL DESCRIPTION DETAIL
VDOT STANDARD ASPHALT MILL/OVERLAY OR OVERLAY ATOP EXISTING ASPHALT
VDOT STANDARD CONCRETE RAMP
VDOT STANDARD DETECTABLE WARNING SURFACE
MATERIALS SCHEDULE CS-105
CONSTRUCTION NOTES: SEE GI-002 FOR GENERAL PROJECTNOTES. SEE GI-005 FOR ADDITIONAL DEMOLITION NOTES.
°
FP
FP
FP
FP
FP
FP
FP
FP
LOD/TP
KEY PLANSCALE: 1 : 1,000
1
23
54
3B
0 20' 40'10'
SCALE: 1"=20'
RIGHT-OF-WAY/EASEMENT/PROPERTY LINE NOTE:LABELS FOR THESE LINES ARE NOT SHOWN ON THIS SHEETFOR GRAPHIC CLARITY. SEE VF-105 FOR LINE LABELS.
-
NOTES:1. SHARED-USE PATH SHALL COMPLY WITH VDOT ROAD DESIGN
MANUAL (LATEST EDITION) AND AASHTO GUIDE FOR THEDEVELOPMENT OF BICYCLE FACILITIES (LATEST EDITION).
2. TRAIL CONSTRUCTION BASELINE SHALL MATCH PROPOSEDPROFILE GRADE.
3. REFER TO PLANS FOR DEVIATIONS IN TRAIL ASSEMBLY.4. PROVIDE A 10' TALL VERTICAL CLEARANCE FROM ANY
OVERHEAD OBSTRUCTIONS (I.E., TREE LIMBS).
3'-0" MIN.6'-0" MAX.
UPCOMPACTED SUBGRADE PERINFILTRATION REQUIREMENTS. INSTALLGEOGRID PER GEOTECHNICALENGINEER RECOMMENDATIONS.
CLEAN WASHED & OPEN GRADED RESERVOIRBASE COURSE, AASHTO #57 OR APPROVED EQUAL
PERVIOUS PORTLAND CEMENT CONCRETE
6"
NOTES:1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH VDOT'S LATEST STANDARDS FOR
POROUS PORTLAND CEMENT CONCRETE/POROUS ASPHALT PAVEMENT.2. AGGREGATE LAYERS SHALL MEET CURRENT APPROVED VDOT SPECIFICATION FOR
AGGREGATES FOR PERMEABLE PAVEMENT.3. WHERE IN-SITU SOILS ARE NOT CONDUCIVE TO INFILTRATON OF 1.2" RETENTION
VOLUME WTHIN 72 HOURS, UNDERDRAIN SHALL BE USED.4. AGGREGATE DEPTH SHALL BE EQUAL TO OR GREATER THAN STORAGE VOLUMES
REQUIRED ON CW SHEETS.5. BOTTOM OF PERMEABLE PAVEMENT SHALL BE AT LEAST 2' ABOVE THE SEASONAL HIGH
WATER TABLE OR BEDROCK.6. TOP OF PAVEMENT SHALL PROVDE 1% MINIMUM SLOPE N ANY DIRECTION.7. PROVIDE CONTROL AND EXPANSION JOINTS IN ACCORDANCE WITH VDOT STANDARDS.8. PERVIOUS CONCRETE CONSTRUCTION MUST BE PERFORMED BY NATIONAL READY
MIXED ASSOCIATION CERTIFIED PERVIOUS CONCRETE INSTALLER. ALL CONSTRUCTIONMUST BE DONE PER ACI 522.13.
GEOGRID PER GEOTECHNICALENGINEER RECOMMENDATIONS.
2"4" TOPSOIL BACKFILLON SHOULDERS
4"
POROUS CONCRETE TYPICAL SECTION
1.5% MAX. CROSS SLOPE5% MAX. LONGITUDINAL SLOPE
℄
℄
1'-0"
3"
POROUS ASPHALT TYPICAL SECTION
1.5% MAX. CROSS SLOPE5% MAX. LONGITUDINAL SLOPE
℄
℄UPCOMPACTED SUBGRADE PERINFILTRATION REQUIREMENTS. INSTALLGEOGRID PER GEOTECHNICALENGINEER RECOMMENDATIONS.
112" POROUS ASPHALT SURFACE COURSE (HMA 12.5MM)OVER 3" POROUS ASPHALT BASE COURSE (HMA 25MM)
6"
GEOGRID PER GEOTECHNICALENGINEER RECOMMENDATIONS.
2"4" TOPSOIL BACKFILLON SHOULDERS
412"
4" SCHEDULE 40 PERFORATED PVC UNDERDRAIN. 38"HOLES 4" O.C., 90° AROUND PIPE. WRAPPED INGEOTECHNICAL FABRIC, SEE UTILITY PLANS AND DETAILS
1'-0"
3"
3:1
0% CROSS SLOPE
3:1
5% MIN, 3:1 MAXTIE-OUT TO EXISTING
10'-0" SHARED USE PATH (POROUS CONCRETE OR POROUS ASPHALT)
℄
℄
1.5% MAX. CROSS SLOPE
2'-0" CLEARZONE/SHOULDER
2'-0" CLEARZONE/SHOULDER2'-0" SWALE SIDE SLOPE4'-0" SWALE BOTTOM2'-0" SWALE SIDE SLOPE
5% TO6:1% MAX
.
4'-0
" MIN
. 5'-0
" MAX
.
5% TO6:1% MAX. 5% MIN, 3:1 MAXTIE-OUT TO EXISTING
TYPICAL SECTION B:APPROX. STA. 21+75.00 TO STA. 24+07.26
10'-0" SHARED USE PATH (POROUS CONCRETE OR POROUS ASPHALT)
℄
℄
1.5% MAX. CROSS SLOPE
CLEAR ZONE/SHOULDER (WIDTH VARIES) 2'-0" CLEARZONE/SHOULDER
5% TO6:1% MAX.
TYPICAL SECTION A:APPROX. STA. 20+80.65 TO STA. 21+75.00
EXISTING ROADWAY TO REMAIN
10'-0" SHARED USE PATH (POROUS CONCRETE OR POROUS ASPHALT)
℄
℄
1.5% MAX. CROSS SLOPE
2'-0" CLEARZONE/SHOULDER
5% TO6:1% MAX.3:1 MAX TIE-OUTTO EXISTING
TYPICAL SECTION D:APPROX. STA. 30+23.89 TO STA. 35+96.56
2'-0" CLEARZONE/SHOULDER
3:1 MAX TIE-OUTTO EXISTING
1.5% TO 5% CROSS SLOPE
3:1 MAX TIE-OUTTO EXISTING
5% TO6:1% MAX.
EXISTING GRADE (VARIES)
EXISTING GRADE (VARIES)
EXISTING GRADE (VARIES)
4" TOPSOIL TYP TO MATCHEXISTING CONDITIONS
4" TOPSOIL TYP TO MATCHEXISTING CONDITIONS
4" TOPSOIL TYP TO MATCHEXISTING CONDITIONS
OCRT TYPICAL SECTIONS1" = 1'-0"
8"
CLASS SE PERMEABLE NON-WOVENGEOTEXTILE FABRIC, SUCH AS MIRAFI 140NOR APPROVED EQUAL. OVERLAP 12" MINOVER DOWNWARD PIECE. SIDES ONLY.
8"
4" SCHEDULE 40 PERFORATEDPVC UNDERDRAIN. 38" HOLES 4"O.C., 90° AROUND PIPE.WRAPPED IN GEOTECHNICALFABRIC, SEE UTILITY PLANSAND DETAILS
CLASS SE PERMEABLE NON-WOVENGEOTEXTILE FABRIC, SUCH AS MIRAFI 140NOR APPROVED EQUAL. OVERLAP 12" MINOVER DOWNWARD PIECE. SIDES ONLY.
CLEAN WASHED & OPEN GRADED RESERVOIRBASE COURSE, AASHTO #57 OR APPROVED EQUAL
1033301-03
-
Edge of stream
Constr. C of trail
Edge of stream
&
EL
EV
ATIO
N
GE
NE
RA
L
PL
AN
SD-501
PLAN
GENERAL NOTES:
1"=20’
o
S 48-57’-05" W
312’-10"
312’-10"
(Ty
p.)
7’-
0"
(Ty
p.)
1’-
0"
RECOMMENDED CONSTRUCTION PROCEDURE
ABUTMENT A ABUTMENT B
ABUTMENT BABUTMENT A
DEVELOPED SECTION ALONG CL
elev. XX.XX
Ordinary high water
Sta. 35+96.51
End of slab
Beginning of bridge
Span a
155’-0" 155’-0"
Span b
PIER 1
Fix. Fix.
Exp.
Exp.
and C OCRT-30
Existing profile on B
Span a Span b
8’-0" typ.
Fill
FOR CONSTRUCTION OF BRIDGE
THESE PLANS NOT TO BE USED
PRELIMINARY PLANS
the site.
maintain the required clearance from the overhead utility lines that cross
At all steps in the process, all personnel, equipment and materials must
Stabilize the site and remove environmental remediation measures.15.
Construct the approach pathway.14.
Place deck reinforcement and pour the concrete for the deck.12.
Install truss segments per the specifications of the fabricator.11.
Set the truss bearings per the specifications of the fabricator.10
Backfill at all substructure units.9.
Pour the concrete for the abutment/pier stems.8.
the plans and place formwork.
Place abutment/pier stem reinforcement as indicated on7.
Pour the concrete for the footing. 6.
and place formwork.
Place footing reinforcement as indicated on the plans5.
at the locations indicated on the plans.
Install helical piles per the specifications of the fabricator4.
Dewater excavated locations (repeat as necessary).3.
at each substructure unit.
Excavate to the bottom of the footing elevation2.
Place environmental remediation measures.1.
Sta. 35+96.51
End of slab
Beginning of bridge
Sta. 39+09.34
End of slab
End of bridge
Sta. 39+09.34
End of slab
End of bridge
Sta. 35+97.51
of bearing
Line thru center
Sta. 39+08.34
of bearing
Line thru center
o
90 typ.
CAMER
ON
RUN
HO
OF’S
RU
N Retaining wall
B.M.: see roadway plans.
on geotechnical recommendations.
Assumed foundation is helical piles, which is subject to change based
Geotechnical report has not been provided at time of this report.
and construction tolerances.
bars except where otherwise noted and are subject to fabrication
reinforcing bar dimensions on the detailed drawings are to centers of
Deformed reinforcing bars shall conform to ASTM A615, Grade 60. All
Concrete in substructure: pier, abutments, and wingwalls shall be class A3.
Finish paint color shall be _______, 595-_______.
documents.
specifications and special provisions included in the contract
These plans are incomplete unless accompanied by the supplemental
Bridge Standards, 2016; including all current revisions.
Virginia Department of Transportation Road andStandards:
Bridges, 2nd edition, 2009 and VDOT modifications.
LRFD Guide Specifications for Design of Pedestrian
2017 and VDOT modifications.
AASHTO LRFD Bridge Design Specifications, 8th edition,Design:
Specifications, 2016.
Construction: Virginia Department of Transportation Road and Bridge
Specifications:
Drainage Area: 2.80 sq. mi.
Capacity: H-10, and pedestrian loading.
Span layout: 155’-155’ two simple spans
Width: 14’-0" face-to-face of railing.
full extent of the applicable laws.
scanned signatures is illegal. Violators will be prosecuted to the
the VDOT Central Office. Any misuse of electronic files, including
The original approved sheet, including original signatures, is filed in
1.90%
Fill
Finish grade
Finish grade
SCALE:
SHEET
DE
SIG
NE
D
BY:
DR
AW
N
BY:
CIT
Y
OF
ALE
XA
ND
RIA,
VIR
GINIA
DA
TE:
DA
TE:
CH
EC
KE
D
BY:
DA
TE:
ALE
XA
ND
RIA,
VIR
GINIA 22313
301
KIN
G
ST
RE
ET
DE
PA
RT
ME
NT
OF
PR
OJE
CT IM
PLE
ME
NT
ATIO
N
DE
SC
RIP
TIO
NB
YD
AT
E
RE
VISIO
NS
AP
PR
OV
ED
BY:
DA
TE:
ALE
XA
ND
RIA
PR
OJE
CT
NO.:
DA
TE
OF
PL
AN IS
SU
AN
CE:
CO
NS
ULT
AN
T
PR
OJE
CT ID.:
TS
&
L
DE
SIG
N
SU
BMIT
TA
LP
ROJE
CT
NA
ME:
OL
D
CA
ME
RO
N
RU
N
TR
AIL
AM
T-
AM
T-
AM
T-
AM
T-
17-
0920
FE
B.
2019
16-
019
1-800-552-7001
DIAL 811 IN VIRGINIA OR
CALL BEFORE YOU DIG.
KNOW WHAT’S BELOW.
-
TY
PIC
AL
SE
CTIO
NS
SD-502
"=1’-0"21
1
4
1
4
Top of grade
Face of backwall
Top of seatTop of grade
Geocomposite wall drainGeocomposite wall drain
1’-3’’1’-9’’
4’-
1’’
3’-
0’’
Appro
x.
3’-0’’
6’-0’’
6’’
3’-
0’’
4’-0’’
4’-0’’
7’-0’’
11’-
0"
Appro
x.
1’-3’’1’-9’’
4’-
1’’
3’-
0’’
Appro
x.
3’-0’’
6’-0’’
6’’
1’-6’’ 1’-6’’ 1’-6’’ 1’-6’’ 1’-6’’ 1’-6’’
14’-0’’
3’-
6’’
6’’
3’-
11’’
Varie
s 2’-
0" to 9’-
0"
Varie
s 5’-
11" to 12’-
11"
Brace diagonalFloor beam
TRANSVERSE SECTION
ABUTMENT B TYPICAL SECTIONABUTMENT A TYPICAL SECTION
C PierL
L
10" 10"
2’-0’’
L
Face of curb
7’-0’’
Level
Face of backwall
3’-
0’’
3’-
0’’
L
L
L
PIER 1 TYPICAL SECTION
of bearings
Line thru center
of bearings
Line thru center
B and C OCRT-30
7’-0’’
Top chord typ.
Face of curb
Brace diagonal typ.Vertical typ.
Rub rail typ.
Safety rail typ.
Toe rail typ.
Side dam typ.
Bottom chord typ.
FOR CONSTRUCTION OF BRIDGE
THESE PLANS NOT TO BE USED
PRELIMINARY PLANS
typ.
ty
p.
1’-
0’’
C Helical pile typ.
C Helical pile typ.
ty
p.
1’-
0’’
C Helical pile typ.
ty
p.
1’-
0’’
Concrete deck
Formdeck
finished grade
Point of
SCALE:
SHEET
DE
SIG
NE
D
BY:
DR
AW
N
BY:
CIT
Y
OF
ALE
XA
ND
RIA,
VIR
GINIA
DA
TE:
DA
TE:
CH
EC
KE
D
BY:
DA
TE:
ALE
XA
ND
RIA,
VIR
GINIA 22313
301
KIN
G
ST
RE
ET
DE
PA
RT
ME
NT
OF
PR
OJE
CT IM
PLE
ME
NT
ATIO
N
DE
SC
RIP
TIO
NB
YD
AT
E
RE
VISIO
NS
AP
PR
OV
ED
BY:
DA
TE:
ALE
XA
ND
RIA
PR
OJE
CT
NO.:
DA
TE
OF
PL
AN IS
SU
AN
CE:
CO
NS
ULT
AN
T
PR
OJE
CT ID.:
TS
&
L
DE
SIG
N
SU
BMIT
TA
LP
ROJE
CT
NA
ME:
OL
D
CA
ME
RO
N
RU
N
TR
AIL
AM
T-
AM
T-
AM
T-
AM
T-
17-
0920
FE
B.
2019
16-
019
1-800-552-7001
DIAL 811 IN VIRGINIA OR
CALL BEFORE YOU DIG.
KNOW WHAT’S BELOW.
-
01 GI-00107 GI-0072020-05-29 30% OCRT Plans 2 CS-101 to CB-503.pdf23 CS-10124 CS-10225 CS-10326 CS-103B27 CS-10428 CS-10567 CS-30173 SD-50174 SD-50281 CS-503