v & v walsh new chiller building wastewater design report

11
Suite 1 / 101 Scarborough Beach Road Mount Hawthorn Western Australia 6016 PO Box 335 Mount Hawthorn Western Australia 6915 telephone (08) 9443 3466 email [email protected] Sanitary l Stormwater l Water Service l Gas Service l Recycling l Fire Protection V & V Walsh New Chiller Building Wastewater Design Report Issue Date: Thursday, 18 November 2021 Revision: FINAL

Upload: others

Post on 28-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: V & V Walsh New Chiller Building Wastewater Design Report

S

uit

e 1 / 101 S

carb

oro

ugh B

each R

oad M

ount H

aw

thorn

W

este

rn A

ustr

alia

6016

P

O B

ox

335 M

ount H

aw

thorn

W

este

rn A

ustr

alia

6

915

tele

ph

on

e

(08)

9443 3

466 e

mail

em

ail@

pjw

rig

hta

ndassocia

tes.c

om

.au

Sanitary l Stormwater l Water Service l Gas Service l Recycling l Fire Protection

V & V Walsh

New Chiller Building

Wastewater Design Report

Issue Date: Thursday, 18 November 2021 Revision: FINAL

Page 2: V & V Walsh New Chiller Building Wastewater Design Report

Page 1

V & V Walsh New Chiller November 2021 Wastewater Design Report

1. SITE AND CONDITIONS.

It is proposed that a new chiller building (the development) be constructed on Lots 5 and 1050 Rawlings Road Davenport (the Site). The lots have the following areas:

a) Lot 5 3.9588 Ha / 39,588 square metres. b) Lot 1050 1.4421 Ha / 14,421 square metres.

Total Site Area 5.4009 Ha / 54,009 square metres.

P.J. Wright and Associates Pty Ltd (PJWAA) have been advised by Wiley Group (Project Managers) that a site-specific geotechnical report has been arranged and will be forwarded once the testing has been completed. 1.1 GROUND / SITE CONDITIONS In preparing this report, PJWAA have referenced a geotechnical report dated September 2016. This report was prepared for a commercial development in close proximity to the Site.

PJWAA assume that the data contained in the September 2016 report is indicative of the regional ground conditions, and accordingly, the ground conditions are similar.

The assumed conditions are as follows:

a) A minimum of 1 metre depth of ‘Bassendean’ sand over a silty sand with a sub strata clay layer.

b) The ground water table is variable across the site consistent with a perched water table over the clay layer.

c) The ground water flow across the site is in easterly direction towards Preston River.

d) Imported fill is required where wastewater disposal systems are installed.

e) Based upon the site survey, the land is flat with gentle gradient towards the east.

Page 3: V & V Walsh New Chiller Building Wastewater Design Report

Page 2

V & V Walsh New Chiller November 2021 Wastewater Design Report

2. GOVERNMENT SEWER POLICY AND CONDITIONS.

The Government Sewer Policy 2019 (GSP) outlines the conditions for approval that must be met for onsite waste treatment. Where these conditions cannot be met, the development must be connected to a reticulated sewer scheme. This report will address each condition as they apply to this development. 2.1 CONDITION 5.1.1: REQUIREMENT TO CONNECTION TO RETICULATED

SEWERAGE. Water Corporation Ezi-net data indicates that a 300mm sewer main has been constructed in McCombe Road. McCombe Road is located on the west side of South-West Highway (refer to Figure 1).

Figure 1 Water Corporation Ezi-net data. The closest point of connection to the Site is located over 200 metres away from the sewer. The sewer would need to extend south, then east, to cross the highway and return along the eastern side of the highway. The sewer extension would be approximately 530 metres in length.

Page 4: V & V Walsh New Chiller Building Wastewater Design Report

Page 3

V & V Walsh New Chiller November 2021 Wastewater Design Report

It is the opinion of PJWAA that:

a) Condition 5.1.1 does not apply to this development; and

b) Compliance with Section 5.2 of the GSP is required. 2.2 CONDITION 5.2.2: SEPARATION FROM WATER RESOURCES. The GSP mapping system shows that the site is located within 1km of ‘Significant’ wetlands. (Refer to Figure 2).

Figure 2: GSP Sewer Sensitive areas (green indicates within 1km of significant wetlands). The closest wetland to the development is a small creek located to the southwest and is approximately 600 metres away from the proposed wastewater disposal zone. The Preston River is approximately 700 to 800 metres east of the proposed wastewater disposal zone. Condition 5.2.2 requires the development be a minimum 100 metres from a waterway or ‘Significant’ wetland. The development meets this requirement. It is the opinion of PJWAA that condition 5.2.2 has been fulfilled. 2.3 CONDITION 5.2.3: SEPARATION FROM GROUND WATER. The site is located in a sewer sensitive area and therefore a minimum clearance of 1.5 metres is required to seasonal ground water conditions. Subject to the completion of the site-specific geotechnical report, PJWAA assume that the perched water table will be at the clay layer. The wastewater disposal zone will require filling to maintain the minimum clearance to the clay layer, and allow dispersal of the effluent over the maximum area.

Page 5: V & V Walsh New Chiller Building Wastewater Design Report

Page 4

V & V Walsh New Chiller November 2021 Wastewater Design Report

2.4 CONDITION 5.2.3: LAND APPLICATION AREA (LAA). The total site area is 54,009 square metres. 2.4.1 Site and Soil Evaluation. PJWAA have undertaken a desktop ‘site and soil evaluation’ based on the ground conditions outlined in 1.1 of this report. For the purpose of this wastewater review and subject to completion of the final site-specific geotechnical report, PJWAA have assessed the soil as Category 3 with a high/moderate structure. Under table 5.1 of AS 1547 this soil category has an indicative permeability rate of 1.5 to 3.0 metres per day. 2.4.2 Wastewater Loading Wastewater design loads have been based upon the following occupancy and data: a) Domestic

No Reg 29 loading Load

i) Staff 20 (showering) 70l/p/day 1,400 l/day. Total 1,400 l/day.

b) Trade Waste

No loading Load

i) Washdown 40m2 10l/m2/day 400 l/day. Total 400 l/day. Total System Wastewater Loading 1,800 l /day.

2.4.3 LAA Calculation. Table 2 in Schedule 2 of the GSP indicates that a Category 3 soil with secondary treatment requires a conversion factor of 0.25. The minimum Land Application Area is as follows: 1,800l /day x 0.25 = 450 square metres. As the site has a total area ort 54,009 square metres, it is the opinion of PJWAA that the development meets the requirements of Condition 5.2.4 of the GSP. 2.5 CONDITION 5.2.5 TYPE OF ONSITE TREATMENT. As the development is located within a ‘Sewer Sensitive’ area, a secondary treatment system is required under the GSP.

Page 6: V & V Walsh New Chiller Building Wastewater Design Report

Page 5

V & V Walsh New Chiller November 2021 Wastewater Design Report

Secondary treatment of sewerage allows the use of smaller disposal areas under Australian Standards. This is because the effluent produced is less likely to silt or block up disposal systems. PJWAA propose to utilise the ‘Aquarius Wastewater O3’ Anerobic Treatment Unit (ATU) which is nutrient retentive, therefore the levels of phosphate and nitrate within the effluent are reduced. The ‘Aquarius Wastewater O3’ ATU has ozone disinfection in lieu of chlorine. Chlorine is utilised in most other systems. Ozone disinfection produces no chemical by-products or residual odours that are usually associated with chlorine disinfection systems. The trade waste stream is limited to condensate, defrost and clean washdown water. This waste will be screened and settled prior to combining with the domestic waste stream. The chiller will have a daily dry vacuuming cleaning procedure. PJWAA are of the opinion that the trade waste stream will be clean and free from product contaminates. It is the opinion of PJWAA that the proposed ATU will meet the requirements of Condition 5.2.45 of the GSP.

3. EFFLUENT DISPOSAL SYSTEM

The proposed ATU provides secondary grade effluent, which permits the use of smaller more efficient disposal systems such as flatbed leach drains and subsurface drippers. 3.1 FLAT BED LEACH DRAINS. Flatbed leach drains have been developed for disposal of effluent in regions where the underlying sub strata may have poor percolation properties. Flatbed leach drains are shallow wide span dispersal systems that can be terraced and soft landscaped with hardy grasses and plants such as spinifex and small clumping grasses. 3.2 DISPOSAL SYSTEM SIZING Based upon a wastewater load of 1,800 litres per day and a percolation rate of 50l/m2 for secondary treatment, 36 square metres of disposal area will be required. The ‘DS Agencies’ flatbed leach drain has a 2.4m2 per linear metre dispersal area. Therefore a total of 15 metres of flatbed leach drain is required in the system. PJWAA propose:

a) A single zone disposal field incorporating 2 No x 15 metre flatbed leach drains.

b) An indexing valve will control the even distribution of effluent to each leach drain.

c) The existing soil to be removed to a depth of 1 metre, or the clay layer, whichever is the highest.

Page 7: V & V Walsh New Chiller Building Wastewater Design Report

Page 6

V & V Walsh New Chiller November 2021 Wastewater Design Report

d) Where exposed, the clay layer will be raked to break up the surface and aid dispersal.

e) A clean sand fill will be placed over the dispersal area to obtain a minimum clearance of 1.5 metres to the clay layer.

f) Planting along each side of the leach drains will aid through transpiration.

g) The shallow depth of the flatbed leach drains permit evaporation as well as percolation through the underlaying soil structure.

4. SCHEMATIC DESIGN DRAWING REGISTER

Drawing No Title

P.01 Site Plan Overall.

P.02 Site Plan New Chiller site.

P.03 Floor Plan Drainage.

P.04 Details.

5. LIAISON

PJWAA have commenced discussions with ‘Aquarius Wastewater’ who are considered specialist equipment suppliers. When the design development stage is commenced and the site-specific geotechnical report is available, PJWAA will update this report and drawings for the City of Bunbury Environmental Health office and WA Health for review and comment. If you require further information or clarification, please do not hesitate to contact this office.

Philip J Wright OAM; JP Anthony R Serek Principal Engineer Managing Director Senior Hydraulic Service Engineer Grad.Cert.Law; Dip.Hyd.Serv.Design; Dip.Eng.(Const.Hyd.); Dip. Eng. (Const.Hyd.); Dip.Plumb.Design; Cert.Arch.Draft; LCIBSE, Eng.Tech(UK); SoPHE; LCIBSE,Eng.Tech(UK); SoPHE LMAHSCA; MIPA; LMAHSCA; MIPA. Plumb.Cont.Lic PL 486.

Page 8: V & V Walsh New Chiller Building Wastewater Design Report

H

H H

H

FRIDGE MW MWFRIDGE MW MW FRIDGE MW MW

EXIT

EXIT

rr

Freezer

Chiller

PortableAmenitiesBuilding

Fire

Acc

ess

Roa

d

Gatehouse

Carpark

Entry/e

xit

Hilton Chiller

Hilton Production Area

V+ V Walsh

Offices

V+V WalshAmenitiesBuilding

Dry G

oodsStore N

° 1

WW PlantRoom

HW

Units

V+V Walsh SkinShed

Female Am

enities

Switch

Room

RunnerRoom

BeefC

hiller 2

BeefC

hiller 1Beef C

hiller4

BeefC

hiller 3Chiller 5

Sheep Loadout

Trim And Tasty

Chiller 8

Offal

PackingR

oom

CartonMarshalling Area

1

SmallgoodsRoom

PlateFreezer

Area

Carton

Marshalling 2

Sheep Offal

Room

Hogger

GasflushRoom

Gas Flush LoadOut

Chiller 7

Chiller Passage

Passage

Drivew

ay

Bypass roadway

Natural GasCompound

LAUN

DR

Y &PR

OPAN

E

SHEEP

STICKIN

GAR

EA

HO

OK

CLEAN

ING

RO

OM

LAUN

DR

Y

BOILER

HO

USE

Beef Floor

BEEFO

FFALR

OO

M

Beef Chiller 2

MAIN

TENAN

CE W

OR

KSHO

P

Beef Sticking &Legging

BEEF LAIRAG

E

REN

DER

ING

PLANT

SHEEP LAIR

AGE 1

SHEEP LAIRAGE 2

SHEEP LAIRAGE 3

Lamb

Chiller

Refrigeration

Plant Room

Main

Switchboard

V&V Walsh H

VSw

itchroom

AQIS Amenities

BeefC

hiller

Pallet store

Freezer

Load Out

Freezer

Prep.R

oomM

arshalling

FreezerFreezer

PONDS

RAWLING ROAD

LOT 5

BUILDINGRL 11.70

11.20

10.40

11.00

11.00

Diesel Tank& Oil Shed

EngineeringStore

V&V WalshSubstation

10.35

10.05

11.5311

.54

SOUTH

Telstra Pit

WESTERN

HIG

HW

AY

GAS

PP PP

PP

PP

POWER(U/G)

Telstra Pit

Kerb

D.S.in RoadR.L.= 10.34m AHD

R.R.M.S.I.P in ConcreteR.L.= 11.22m AHD

Gate

10.33

10.12

10.48

10.23

9.92

10.16

10.28

10.14

10.11

9.96

10.14

9.92

10.28

11.62

10.00

11.60

10.01

11.46

10.76

10.82

9.74

10.10

10.19

11.38

9.89

9.83

10.92

9.80

10.22

10.09

10.18

10.98

10.30

10.32

10.19

9.93

10.13

10.29

10.19

9.92

9.94

10.44

10.90

11.25

9.74

9.98

9.74

10.11

9.94

11.76

10.05

11.04

11.24

10.16

9.94

10.90

10.85

9.90

10.72

9.98

9.91

9.79

10.04

9.85

9.96

11.48

9.77

10.08

10.05

10.85

9.92

11.53

10.05

9.89

10.13

9.97

11.90

9.92

10.83

11.71

9.88

10.25

10.79

11.90

10.19

10.32

9.92

10.01

11.63

10.13

10.52

9.82

10.22

11.01

10.29

10.00

10.99

9.87

10.70

10.59

9.90

11.02

10.14

10.24

10.32

9.89

10.23

10.73

9.90

10.43

10.09

10.23

10.27

10.30

10.01

10.49

9.90

10.13

11.11

9.77

10.57

10.84

10.13

10.07

10.11

10.30

10.16

10.16

11.56

9.86

10.81

9.86

10.21

10.64

10.13

11.22

9.81

10.16

10.12

10.23

11.90

10.10

10.26

9.98

10.59

9.98

10.02

9.90

10.25

9.87

9.94

10.10

11.28

9.93

10.00

9.96

10.39

11.28

10.22

9.88

11.83

10.90

10.48

9.96

10.08

10.38

10.24

10.72

10.00

10.74

10.95

10.17

10.30

9.97

9.94

10.31

9.96

11.75

10.53

10.21

9.88

11.83

10.05

9.94

10.93

10.86

10.82

11.28

10.21

10.33

10.02

10.15

11.06

10.79

9.96

11.96

9.80

10.38

9.72

10.39

10.03

9.89

9.92

10.85

9.88

10.21

10.09

10.95

11.84

10.31

11.24

11.09

10.97

11.17

10.81

11.06

11.18

10.98

11.26

11.06

11.12

11.09

10.88

10.99

11.07

11.06

11.51

10 . 00

10.5

0 10 . 50

10 . 50

11 . 50

10 . 25

10. 7

5

11 . 25

HYDRAULIC SERVICES

V&V WALSH - COLD STORAGE

P.01

RAWLINGS ROADBUNBURY

LOCATION PLAN

This drawing is an Autocad format document and manual adjustment of plots or prints is not permitted.

Revision Date Description

Drawing Title

Project

Drawn

Scale

Date Drawing Number Revision

NORTH POINT

P.J. WRIGHT & ASSOCIATES PTY LTD Suite 2 / 101 Scarborough Beach Road Mount Hawthorn Western Australia 6016PO Box 335 Mount Hawthorn Western Australia 6915telephone (08) 9443 3466 facsimile (08) 9242 2304 email [email protected]

Hydraulic & Fire Design Consultants

·

·

·

XP.xx

xxx

DESIGN CERTIFICATIONThis drawing the referenced copy and issue as noted inthe Technical Design Certification as issued in compliancewith the Building Act 2011.Refer to Design Certificate dated same for referencedesign standardsSubsequent revisions after the date of certification must bereferenced by the installing contractor when submittingfinal certification.

Authorized Engineering Staff For PJ Wright& Assoc. Date

1 LOCATION PLANSCALE 1:1000

REFER TO P.02 FORPART SITE PLAN

ATU

LEACH DRAINS

AutoCAD SHX Text
1050
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
1
AutoCAD SHX Text
5
AutoCAD SHX Text
1050
AutoCAD SHX Text
1.4421ha
AutoCAD SHX Text
3.9588ha
AutoCAD SHX Text
6.2582ha
AutoCAD SHX Text
(TOTAL = 7.7003ha)
AutoCAD SHX Text
01
AutoCAD SHX Text
1:1000@A1
AutoCAD SHX Text
TRS
AutoCAD SHX Text
OCT 2021
AutoCAD SHX Text
INCORPORATED
AutoCAD SHX Text
CONSULTANTS AUSTRALIA
AutoCAD SHX Text
HYDRAULIC SERVICES
AutoCAD SHX Text
THE ASSOCIATION OF
AutoCAD SHX Text
AHSCA
AutoCAD SHX Text
LINEWORK LEGEND (APPLICABLE TO DRAINAGE SHEETS) (APPLICABLE TO DRAINAGE SHEETS) SOIL DRAINAGE INDUSTRIAL WASTES STORMWATER FLOOR WASTE REDUNDANT SERVICE COLD WATER HOT WATER FIRE HYDRANT NATURAL GAS SERVICE
AutoCAD SHX Text
FW
AutoCAD SHX Text
FW
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
GENERAL NOTES ALL WORKS SHALL BE UNDERTAKEN BY LICENSED TRADES PERSONS UNDER THE DIRECT SUPERVISION OF THE LICENSED PLUMBING CONTRACTOR RESPONSIBLE FOR THE PROJECT. ALL WORKS SHALL BE CARRIED OUT IN A TRADESMEN LIKE MANNER WITH THE STANDARD OF WORKMANSHIP ACCEPTABLE TO THE PLB INSPECTOR AND THE MASTER PLUMBING ASSOCIATION. ALLOW TO COORDINATE THE INSTALLATION OF ALL PLUMBING SERVICES WITH OTHER TRADES AND SERVICES PRIOR TO COMMENCING WORKS ON SITE.
AutoCAD SHX Text
ABBREVIATIONS APPLICABLE TO SERVICE DRAWINGS AAV AIR ADMITTANCE VALVE AIR ADMITTANCE VALVE AFFL ABOVE FINISHED FLOOR LEVEL ABOVE FINISHED FLOOR LEVEL A/C AIR CONDITIONING AIR CONDITIONING AP ACCESS PANEL ACCESS PANEL BS BRASS BRASS BV BALL VALVE BALL VALVE C COPPER COPPER CI CAST IRON CAST IRON CP CHROME PLATED CHROME PLATED CV CHECK VALVE CHECK VALVE CW COLD WATER COLD WATER DCV DOUBLE CHECK VALVE (TESTABLE U.O.N.) DOUBLE CHECK VALVE (TESTABLE U.O.N.) DP DOWNPIPE DOWNPIPE DPO DOWNPIPE ON LEVEL OVER DOWNPIPE ON LEVEL OVER DHB DISABLED HAND BASIN DISABLED HAND BASIN DWC DISABLED WATER CLOSET DISABLED WATER CLOSET FA FROM LEVEL ABOVE (DROPPER) FROM LEVEL ABOVE (DROPPER) FB FROM LEVEL BELOW (RISER) FROM LEVEL BELOW (RISER) FFL FINSIHED FLOOR LEVEL FINSIHED FLOOR LEVEL FG FLOOR WASTE GULLY FLOOR WASTE GULLY FW FLOOR WASTE FLOOR WASTE FWST FLOOR WASTE STACK FLOOR WASTE STACK GSP GAVLANISED STEEL PIPE GAVLANISED STEEL PIPE GV GATE VALVE GATE VALVE GAVL'D GALVANISED GALVANISED HB HAND BASIN HAND BASIN HW HOT WATER HOT WATER HWU HOT WATER UNIT HOT WATER UNIT I.O. INPSECTION OPENING OR INSPECTION GATE INPSECTION OPENING OR INSPECTION GATE IWSP INDUSTRIAL WASTE SAMPLING POINT INDUSTRIAL WASTE SAMPLING POINT IWT INDUSTRIAL WASTE TRAP INDUSTRIAL WASTE TRAP LIT LEVEL INVERT TAPER LEVEL INVERT TAPER NRV NON RETURN VALVE NON RETURN VALVE PE POLYETHYLENE (HD- HIGH DENSITY MD MEDIUM DENSITY) POLYETHYLENE (HD- HIGH DENSITY MD MEDIUM DENSITY) PP POLYPROPYLENE POLYPROPYLENE PVC POLY VINYL CHLORIDE (UNPLASTICISED U.O.N.) POLY VINYL CHLORIDE (UNPLASTICISED U.O.N.) RE ROD END ROD END RS RISING SHAFT RISING SHAFT RPZD REDUCED PRESSURE ZONE DEVICE REDUCED PRESSURE ZONE DEVICE SC STOPCOCK STOPCOCK SK SINK SINK SP STAND PIPE STAND PIPE SS STAINLESS STEEL STAINLESS STEEL SST SOIL STACK SOIL STACK ST# STACK (# = DESIGNATION/ NUMBER) STACK (# = DESIGNATION/ NUMBER) SW STORMWATER STORMWATER TA TO LEVEL ABOVE (RISER) TO LEVEL ABOVE (RISER) TB TO LEVEL BELOW ( DROPPER) TO LEVEL BELOW ( DROPPER) TD TUNDISH TUNDISH TCV TEMPERING VALVE TEMPERING VALVE TMV THERMOSTATIC CONTROL VALVE THERMOSTATIC CONTROL VALVE WC WATER CLOSET - (TOILET PAN) WATER CLOSET - (TOILET PAN) VPR VENT PIPE RISERVENT PIPE RISER
AutoCAD SHX Text
xx
AutoCAD SHX Text
FU
AutoCAD SHX Text
X
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
DWG NUMBER
AutoCAD SHX Text
SERVICE TYPE
AutoCAD SHX Text
NOMINAL BORE
AutoCAD SHX Text
NOMINAL FIXTURE UNITS
AutoCAD SHX Text
DEVELOPMENT APPROVAL
AutoCAD SHX Text
P.01
AutoCAD SHX Text
GENERAL NOTE: ALL POSITIONS OF FIXTURES, TAPWARE AND APPLIANCES SHALL BE CO-ORDINATED WITH ALL DISCIPLINES AND TRADES WITH REFERENCE MADE TO ALL CONTRACT DOCUMENTS RELATIVE TO SETTING OUT OF TILING, CABINETRY,ETC. THE CONTRACTORS SHALL BE RESPONSIBLE FOR CARRYING OUT THE CO-ORDINATION OF THE HYDRAULIC SERVICES SCOPE OF WORKS. THE CONTRACTOR SHALL PRIOR TO COMMENCING ANY WORKS SHALL EXCAVATE AND LOCATE AND CONFIRM THE LOCATION OF EXISTING SERVICES AT THE NOMINATED CONNECTION POINTS AS SHOWN ON DRAWINGS. ALL EXISTING SERVICES SHOWN ARE INDICATIVE ONLY BASED UPON PREVIOUS DESIGNS AND AS CONSTRUCTED DRAWINGS. ALLOW TO TEMPORARILY DIVERT ANY SERVICES AS SHOWN OR NOMINATED ON THIS DRAWING TO MAINTAIN SERVICES TO THE OTHER BUILDINGS.
AutoCAD SHX Text
NOTE: PRIOR TO ANY WORKS COMMENCING ALLOW TO UNDERTAKE A FULL HYDRAULIC SERVICES SURVEY TO LOCATE AND CONFIRM ALL SERVICES WITHIN THE DESIGNATED SITE AREA. ALLOW TO RECORD ALL SERVICES FOUND DURING INVESTIGATIONS THAT DO NOT REQUIRE REMOVAL OR SEALING.
AutoCAD SHX Text
40PE
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
00 29/10/21 ISSUED FOR DEVELOPMENT APPROVAL
AutoCAD SHX Text
01 12/11/21 LEACH DRAINS LOCATED
AutoCAD SHX Text
PROPOSED WASTEWATER TREATMENT AND DISPOSAL SYSTEM
Page 9: V & V Walsh New Chiller Building Wastewater Design Report

Freezer

Chiller

PortableAmenitiesBuilding

Fire

Acc

ess

Roa

d

Gatehouse

Carpark

Entry/e

xit

V+ V Walsh

Offices

Dry G

oodsStore N

° 1

Natural GasCompound

Switchboard

AQIS Amenities

Load Out

Freezer

RAWLING ROAD

LOT 5

BUILDINGRL 11.70

11.20

10.40

11.00

11.00

Diesel Tank& Oil Shed

EngineeringStore

V&V WalshSubstation

10.35

10.05

SOUTH

Telstra Pit

WESTERN

PPPP

Telstra Pit

Kerb

D.S.in RoadR.L.= 10.34m AHD

R.R.M.S.I.P in ConcreteR.L.= 11.22m AHD

10.33

10.12

10.48

10.23

9.92

10.16

10.28

10.14

10.11

9.96

10.14

9.92

10.28

10.00

10.01

10.76

10.82

9.74

10.10

10.19

9.89

9.83

10.92

9.80

10.22

10.09

10.18

10.30

10.32

10.19

9.93

10.13

10.29

10.19

9.92

9.94

10.44

10.90

9.74

9.98

9.74

10.11

9.94

10.05

11.04

10.16

9.94

10.90

10.85

9.90

10.72

9.98

9.91

9.79

10.04

9.85

9.96

9.77

10.08

10.05

10.85

9.92

10.05

9.89

10.13

9.97

9.92

10.83

9.88

10.25

10.79

10.19

10.32

9.92

10.01

10.13

10.52

9.82

10.22

11.01

10.29

10.00

9.87

10.70

10.59

9.90

11.02

10.14

10.24

10.32

9.89

10.23

10.73

9.90

10.43

10.09

10.23

10.27

10.30

10.01

10.49

9.90

10.13

9.77

10.57

10.84

10.13

10.07

10.11

10.30

10.16

10.16

9.86

10.81

9.86

10.21

10.64

10.13

9.81

10.16

10.12

10.23

10.10

10.26

9.98

10.59

9.98

10.02

9.90

10.25

9.87

9.94

10.10

9.93

10.00

9.96

10.3910.22

9.88

10.90

10.48

9.96

10.08

10.38

10.24

10.72

10.00

10.74

10.95

10.17

10.30

9.97

9.94

10.31

9.96

10.53

10.21

9.88

10.05

9.94

10.93

10.86

10.82

10.21

10.33

10.02

10.15

11.06

10.79

9.96

9.80

10.38

9.72

10.39

10.03

9.89

9.92

10.85

9.88

10.21

10.09

10.95

10.31

11.24

11.09

10.97

11.17

10.81

11.06

11.18

10.98

11.26

11.06

11.12

11.09

10.88

10.99

11.07

11.06

11.51

10 . 00

10.5

0 10 . 50

10 . 50

10 . 25

10.7

5

HYDRAULIC SERVICES

V&V WALSH - COLD STORAGE

P.02

RAWLINGS ROADBUNBURY

PART SITE PLAN

This drawing is an Autocad format document and manual adjustment of plots or prints is not permitted.

Revision Date Description

Drawing Title

Project

Drawn

Scale

Date Drawing Number Revision

NORTH POINT

P.J. WRIGHT & ASSOCIATES PTY LTD Suite 2 / 101 Scarborough Beach Road Mount Hawthorn Western Australia 6016PO Box 335 Mount Hawthorn Western Australia 6915telephone (08) 9443 3466 facsimile (08) 9242 2304 email [email protected]

Hydraulic & Fire Design Consultants

DESIGN CERTIFICATIONThis drawing the referenced copy and issue as noted inthe Technical Design Certification as issued in compliancewith the Building Act 2011.Refer to Design Certificate dated same for referencedesign standardsSubsequent revisions after the date of certification must bereferenced by the installing contractor when submittingfinal certification.

Authorized Engineering Staff For PJ Wright& Assoc. Date

1 EXISTING FLOOR PLANSCALE 1:200

GV

rpzd

LEACH DRAINS

ATU

HYDRANT

HYDRANT

HYDRANT

GV

AutoCAD SHX Text
5
AutoCAD SHX Text
3.9588ha
AutoCAD SHX Text
01
AutoCAD SHX Text
1:500@A1
AutoCAD SHX Text
TRS
AutoCAD SHX Text
OCT 2021
AutoCAD SHX Text
INCORPORATED
AutoCAD SHX Text
CONSULTANTS AUSTRALIA
AutoCAD SHX Text
HYDRAULIC SERVICES
AutoCAD SHX Text
THE ASSOCIATION OF
AutoCAD SHX Text
AHSCA
AutoCAD SHX Text
DEVELOPMENT APPROVAL
AutoCAD SHX Text
P.02
AutoCAD SHX Text
GENERAL NOTE: ALL POSITIONS OF FIXTURES, TAPWARE AND APPLIANCES SHALL BE CO-ORDINATED WITH ALL DISCIPLINES AND TRADES WITH REFERENCE MADE TO ALL CONTRACT DOCUMENTS RELATIVE TO SETTING OUT OF TILING, CABINETRY,ETC. THE CONTRACTORS SHALL BE RESPONSIBLE FOR CARRYING OUT THE CO-ORDINATION OF THE HYDRAULIC SERVICES SCOPE OF WORKS. THE CONTRACTOR SHALL PRIOR TO COMMENCING ANY WORKS SHALL EXCAVATE AND LOCATE AND CONFIRM THE LOCATION OF EXISTING SERVICES AT THE NOMINATED CONNECTION POINTS AS SHOWN ON DRAWINGS. ALL EXISTING SERVICES SHOWN ARE INDICATIVE ONLY BASED UPON PREVIOUS DESIGNS AND AS CONSTRUCTED DRAWINGS. ALLOW TO TEMPORARILY DIVERT ANY SERVICES AS SHOWN OR NOMINATED ON THIS DRAWING TO MAINTAIN SERVICES TO THE OTHER BUILDINGS.
AutoCAD SHX Text
NOTE: PRIOR TO ANY WORKS COMMENCING ALLOW TO UNDERTAKE A FULL HYDRAULIC SERVICES SURVEY TO LOCATE AND CONFIRM ALL SERVICES WITHIN THE DESIGNATED SITE AREA. ALLOW TO RECORD ALL SERVICES FOUND DURING INVESTIGATIONS THAT DO NOT REQUIRE REMOVAL OR SEALING.
AutoCAD SHX Text
ALLOW TO EXCAVATE AND LOCATE EXISTING FIRE SERVICE. CUT IN NEW BRANCH AND INSTALL GATE VALVE AS SHOWN
AutoCAD SHX Text
100
AutoCAD SHX Text
exTWIN HEAD HYDRANT
AutoCAD SHX Text
EX 160PE FS
AutoCAD SHX Text
EX 160PE FS
AutoCAD SHX Text
EX 160PE FS
AutoCAD SHX Text
EX 160PE FS
AutoCAD SHX Text
EX 160PE FS
AutoCAD SHX Text
EX 160PE FS
AutoCAD SHX Text
AQWEST 150BB WATER MAIN
AutoCAD SHX Text
AQWEST 150BB WATER MAIN
AutoCAD SHX Text
AQWEST 150BB WATER MAIN
AutoCAD SHX Text
180PE
AutoCAD SHX Text
MAKE APPLICATION AND PAY ALL FEES TO AQWEST TO UPGRADE EXISTING WATER METER TO NEW 25MM DOMESTIC WATER CONNECTION, BOUNDARY VALVE AND METER WITH A PEAK FLOW RATE OF 40 LITRES PER MINUTE.
AutoCAD SHX Text
MOUNT ASSEMBLY 450mm ABOVE FPL WITH HOT DIP GALVANIZED LOCKABLE BOX ON MASONRY WALL. TEST AND REGISTER DEVICE WITH AQWEST. (HIGH HAZARD RATING)
AutoCAD SHX Text
25
AutoCAD SHX Text
WILKINS SERIES 375 # 25-375XLC
AutoCAD SHX Text
NOTE: A GEOTECHNICAL REPORT IS REQUIRED TO DETERMINE SOIL TYPE, GROUND WATER MAXIMUM LEVEL AND INFILTRATION CONDITIONS. ATU DISPOSAL SIZING IS INDICATIVE ONLY
AutoCAD SHX Text
EX 160PE FS
AutoCAD SHX Text
ZONE 1
AutoCAD SHX Text
ZONE 2
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
40PE EFFLUENT
AutoCAD SHX Text
160PE PN16 FS
AutoCAD SHX Text
160PE PN16 FS
AutoCAD SHX Text
160PE
AutoCAD SHX Text
160PE PN16 FS
AutoCAD SHX Text
160PE PN16 FS
AutoCAD SHX Text
160PE PN16 FS
AutoCAD SHX Text
160PE PN16 FS
AutoCAD SHX Text
160PE PN16 FS
AutoCAD SHX Text
160PE PN16 FS
AutoCAD SHX Text
ALLOW TO EXCAVATE AND LOCATE EXISTING FIRE SERVICE. CUT IN NEW BRANCH AND INSTALL GATE VALVE AS SHOWN
AutoCAD SHX Text
150
AutoCAD SHX Text
40PE PN12.5 CW
AutoCAD SHX Text
00 29/10/21 ISSUED FOR DEVELOPMENT APPROVAL
AutoCAD SHX Text
REFER TO REPORT REF: 1592 WASTEWATER DESIGN REPORT PREPARED BY PJWAA FOR SPECIFIC GSP AND WASTEWATER SIZING.
AutoCAD SHX Text
01 12/11/21 LEACH DRAINS LOCATED
AutoCAD SHX Text
DS AGENCIES FLAT BED LEACH DRAINS IN ELEVATED DISPERSAL FIELD. 2NO X 15M LONG ZONES. INSTALL WATERMARKED AND APPROVED TWO PORT INDEXING VALVE ABOVE GROUND WITH SUPPORT POSTS.
Page 10: V & V Walsh New Chiller Building Wastewater Design Report

Freezer

Chiller

PortableAmenitiesBuilding

Fire

Acc

ess

Roa

d

V+ V Walsh

AQIS Amenities

Freezer

BUILDINGRL 11.70

10.40

Diesel Tank& Oil Shed

EngineeringStore

V&V WalshSubstation

10.48

10.14

10.11

9.96

10.00

10.10

10.19

10.18

10.19

10.13

10.19

10.16

9.94

10.04

10.85

10.13

9.97

10.25

10.01

10.13

11.02

10.14

10.09

10.23

10.49

9.90

10.13

10.57

10.84

10.07

10.11

10.21

10.64

10.23

10.02

9.94

10.38

10.00

10.95

9.94

10.31

10.21

10.93

10.02

10.15

10.79

9.96

10.09

11.24

11.09

11.17

11.18

11.26

11.06

11.12

11.09

11.06

11.51

HYDRAULIC SERVICES

V&V WALSH - COLD STORAGE

P.03

RAWLINGS ROADBUNBURY

FLOOR PLAN

This drawing is an Autocad format document and manual adjustment of plots or prints is not permitted.

Revision Date Description

Drawing Title

Project

Drawn

Scale

Date Drawing Number Revision

NORTH POINT

P.J. WRIGHT & ASSOCIATES PTY LTD Suite 2 / 101 Scarborough Beach Road Mount Hawthorn Western Australia 6016PO Box 335 Mount Hawthorn Western Australia 6915telephone (08) 9443 3466 facsimile (08) 9242 2304 email [email protected]

Hydraulic & Fire Design Consultants

DESIGN CERTIFICATIONThis drawing the referenced copy and issue as noted inthe Technical Design Certification as issued in compliancewith the Building Act 2011.Refer to Design Certificate dated same for referencedesign standardsSubsequent revisions after the date of certification must bereferenced by the installing contractor when submittingfinal certification.

Authorized Engineering Staff For PJ Wright& Assoc. Date

1 EXISTING FLOOR PLANSCALE 1:200

ATU

SETTLEMENTPIT

AutoCAD SHX Text
01
AutoCAD SHX Text
1:200@A1
AutoCAD SHX Text
TRS
AutoCAD SHX Text
OCT 2021
AutoCAD SHX Text
INCORPORATED
AutoCAD SHX Text
CONSULTANTS AUSTRALIA
AutoCAD SHX Text
HYDRAULIC SERVICES
AutoCAD SHX Text
THE ASSOCIATION OF
AutoCAD SHX Text
AHSCA
AutoCAD SHX Text
DEVELOPMENT APPROVAL
AutoCAD SHX Text
P.03
AutoCAD SHX Text
GENERAL NOTE: ALL POSITIONS OF FIXTURES, TAPWARE AND APPLIANCES SHALL BE CO-ORDINATED WITH ALL DISCIPLINES AND TRADES WITH REFERENCE MADE TO ALL CONTRACT DOCUMENTS RELATIVE TO SETTING OUT OF TILING, CABINETRY,ETC. THE CONTRACTORS SHALL BE RESPONSIBLE FOR CARRYING OUT THE CO-ORDINATION OF THE HYDRAULIC SERVICES SCOPE OF WORKS. THE CONTRACTOR SHALL PRIOR TO COMMENCING ANY WORKS SHALL EXCAVATE AND LOCATE AND CONFIRM THE LOCATION OF EXISTING SERVICES AT THE NOMINATED CONNECTION POINTS AS SHOWN ON DRAWINGS. ALL EXISTING SERVICES SHOWN ARE INDICATIVE ONLY BASED UPON PREVIOUS DESIGNS AND AS CONSTRUCTED DRAWINGS. ALLOW TO TEMPORARILY DIVERT ANY SERVICES AS SHOWN OR NOMINATED ON THIS DRAWING TO MAINTAIN SERVICES TO THE OTHER BUILDINGS.
AutoCAD SHX Text
NOTE: PRIOR TO ANY WORKS COMMENCING ALLOW TO UNDERTAKE A FULL HYDRAULIC SERVICES SURVEY TO LOCATE AND CONFIRM ALL SERVICES WITHIN THE DESIGNATED SITE AREA. ALLOW TO RECORD ALL SERVICES FOUND DURING INVESTIGATIONS THAT DO NOT REQUIRE REMOVAL OR SEALING.
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
40PE
AutoCAD SHX Text
NEW AQUARIUS O-2 1.8KL COMMERCIAL ALTERNATIVE TREATMENT UNIT CONSISTING OF PRIMARY ANAEROBIC CHAMBER, AERATION TANK, ALUM DOSING & CLARIFYING TANK. ENGAGE APPROVED SERVICE AGENCY TO UNDERTAKE SUPPLY, INSTALLATION AND COMMISSIONING OF SYSTEM IN ACCORDANCE WITH DEPT OF HEALTH CODE OF PRACTICE
AutoCAD SHX Text
WASTEWATER CALCULATIONS - NON HUMAN WASTE ATU HYDRAULIC LOADS Sizing to Health Act - Supplement to Regulation 29 Maximum 20 Staff @ 70L/person/day @ 70L/person/day 70L/person/day Allowance for Chiller Discharge 400L/day 400L/day TOTAL SYSTEM HYDRAULIC LOADING = 1800 LITRES PER DAY = 1800 LITRES PER DAY HYDRAULIC LOAD 1800 LITRES PER DAY. Infiltration Zone Sizing to AS/NZS 1547 Dispersal Rate 30L/sqm/ day (Loam) INFILTRATION ZONE SIZING BY SECONDARY TREATED EFFLUENT TO LEACH DRAINS 1800L / 30 = 60 SQUARE METERS TOTAL INFILTRATION ZONE BY DS AGENCIES FLATBED LEACH DRAINS 2 ZONES OF 31.25 SQUARE METERS EACH REQUIRED (12.5M LONG BY 2.5M WIDE)
AutoCAD SHX Text
ATU THE SUPPLY AND INSTALLATION OF THE AQUARIUS 0³ 1.8KL NUTRIENT RETENTIVE ATU SHALL BE ARRANGED THROUGH THE APPROVED AQUARIUS WASTEWATER SUB-CONTRACTOR, INCLUDING SUBMISSION TO LOCAL AUTHORITY AND HEALTH DEPARTMENT ON BEHALF OF THE CLIENT . THE HYDRAULIC SERVICES CONTRACTOR SHALL CONTACT AND COORDINATE THE INSTALLATION WITH INSTALLER AND OTHER TRADES ASSOCIATED WITH THE REDEVELOPMENT. THE HYDRAULIC SERVICES CONTRACTOR SHALL EXCAVATE AND LAY A 100MM COMPACTED SAND BASE AND PREPARE THE SITE FOR THE INSTALLATION OF THE ATU BY THE AQUARIUS WASTEWATER SUB-CONTRACTOR. THE AQUARIUS WASTEWATER SUB-CONTRACTOR SHALL BACK FILL AND COMPACT THE EXCAVATION SURROUNDING THE ATU TO THE SATISFACTION.OF THE STRUCTURAL ENGINEER. THE HYDRAULIC SERVICES CONTRACTOR ALLOW TO INSTALL 100PVC CONDUITS BELOW GROUND TO FACILITATE THE ELECTRICAL INSTALLATION REQUIRED TO PUMPS, CONTROLLERS AND ASSOCIATED EQUIPMENT. EFFLUENT PRESSURE MAINS THE HYDRAULIC SERVICES CONTRACTOR SHALL INSTALL THE 40PE PN12.5 PIPE WITH ELECTROFUSION JOINTS FROM THE ATU DISCHARGE LINE TO INDEXING VALVE AND EXTEND 40uPVC PUMPED EFFLUENT PIPES TO SUB SURFACE FLAT BED LEACH DRAINS AS INDICATED ON THIS DRAWING. INSTALL ALL EFFLUENT PRESSURE MAIN BELOW GROUND ON A COMPACTED 100MM THICK IMPORTED SAND BED FREE FROM ROCKS AND PROTRUSIONS. DISPERSAL ZONES ALLOW TO REMOVE TOP SOIL TO A DEPTH OF NOT LESS THAN 400MM . ALLOW TO CUT AND FILL TO ENSURE NATURAL GROUND FALL DOES NOT EXCEED 1 :20 BATTER FILLED AREAS TO NATURAL GROUND LEVELS BEYOND INFILTRATION ZONES AREA. INSTALL A LAYER OF NOT LESS THAN 100mm OF CLEAN IMPORTED FILL OVER THE ENTIRE DISPERSAL AREA EXCAVATION. LAY FLAT BED LEACH DRAINS AS SPECIFIED AND COVER FULLY WITH DS FILTER FABRIC. BACKFILL WITH CLEAN FILL VOID OF ROCKS AND DEBRIS.
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
100PVC 60
AutoCAD SHX Text
CONNECT TO 50PVC PUMP DISCHARGE LINE OUTLET FROM CLARIFYING TANK AND EXTEND BELOW PAVING WITH 50MM GATE AND CHECK VALVE IN CAST IRON VALVE BOXES. REDUCE AND CHANGE TO 40PE.
AutoCAD SHX Text
NEW GRAF CARAT POLY 2700L SETTLEMENT PIT
AutoCAD SHX Text
100PVC CONNECTION TO AMENITIES BUILDING
AutoCAD SHX Text
100PVC CONNECTION TO FREEZER DISCHARGE
AutoCAD SHX Text
100PVC CONNECTION TO FREEZER DISCHARGE
AutoCAD SHX Text
100PVC CONNECTION TO AQIS BUILDING
AutoCAD SHX Text
00 29/10/21 ISSUED FOR DEVELOPMENT APPROVAL
AutoCAD SHX Text
01 12/11/21 LEACH DRAINS LOCATED
Page 11: V & V Walsh New Chiller Building Wastewater Design Report

HYDRAULIC SERVICES

V&V WALSH - COLD STORAGE

P.04

RAWLINGS ROADBUNBURY

DETAILS

This drawing is an Autocad format document and manual adjustment of plots or prints is not permitted.

Revision Date Description

Drawing Title

Project

Drawn

Scale

Date Drawing Number Revision

NORTH POINT

P.J. WRIGHT & ASSOCIATES PTY LTD Suite 2 / 101 Scarborough Beach Road Mount Hawthorn Western Australia 6016PO Box 335 Mount Hawthorn Western Australia 6915telephone (08) 9443 3466 facsimile (08) 9242 2304 email [email protected]

Hydraulic & Fire Design Consultants

DESIGN CERTIFICATIONThis drawing the referenced copy and issue as noted inthe Technical Design Certification as issued in compliancewith the Building Act 2011.Refer to Design Certificate dated same for referencedesign standardsSubsequent revisions after the date of certification must bereferenced by the installing contractor when submittingfinal certification.

Authorized Engineering Staff For PJ Wright& Assoc. Date

PRIMARYSECONDARY/AERATION CLARIFICATION/DISCHARGE

DETAIL: AQUARIUS 0-2NR 1.8kL C ATUDIAGRAMMATIC

1

DETAIL: DS AGENCIES FLAT BED LEACH DRAINS1:20 APPROX

3

SECTION

ISOMETRIC

INDEXINGVALVE

PLAN: FLAT BED LEACH DRAINSDIAGRAMMATIC

2

AutoCAD SHX Text
00
AutoCAD SHX Text
1:100@A1
AutoCAD SHX Text
OCT 2021
AutoCAD SHX Text
MAY 2020
AutoCAD SHX Text
INCORPORATED
AutoCAD SHX Text
CONSULTANTS AUSTRALIA
AutoCAD SHX Text
HYDRAULIC SERVICES
AutoCAD SHX Text
THE ASSOCIATION OF
AutoCAD SHX Text
AHSCA
AutoCAD SHX Text
DEVELOPMENT APPROVAL
AutoCAD SHX Text
LIQUID LEVEL
AutoCAD SHX Text
1No X AERATION PUMPS 1No X INJECTORS
AutoCAD SHX Text
2No X DISCHARGE PUMPS
AutoCAD SHX Text
1050mm
AutoCAD SHX Text
ELECTRICAL CONTROL PANEL FIXED TO 80MM GALV'D STEEL POST AND FOOTING
AutoCAD SHX Text
POLY ALUM TANK INSIDE 900x1200 CONCRETE TANK 25MM POLY LINE GRADED TO FALL TO SECONDARY CHAMBER
AutoCAD SHX Text
SLAB
AutoCAD SHX Text
LIQUID LEVEL
AutoCAD SHX Text
AutoCAD SHX Text
AIR INTAKE VALVE
AutoCAD SHX Text
MIN 600mm
AutoCAD SHX Text
200mm
AutoCAD SHX Text
LIQUID LEVEL
AutoCAD SHX Text
900mm
AutoCAD SHX Text
HIGH LEVEL ALARM MAIN CONTROL FLOAT SWITCH
AutoCAD SHX Text
B/U CV SC
AutoCAD SHX Text
BV
AutoCAD SHX Text
20mm TO ALUM
AutoCAD SHX Text
TREATED EFFLUENT DISCHARGE LINE TO INDEXING VALVE AND DISPOSAL SYSTEM AS SHOWN ON SITE PLAN.
AutoCAD SHX Text
600mm
AutoCAD SHX Text
P.04
AutoCAD SHX Text
600mm DIAMETER CONCRETE MANHOLE ACCESS
AutoCAD SHX Text
600mm DIAMETER CONCRETE MANHOLE ACCESS
AutoCAD SHX Text
DISTRIBUTION CHANNEL
AutoCAD SHX Text
50MM FLAT BED CELLS
AutoCAD SHX Text
P.04
AutoCAD SHX Text
DISTRIBUTION CHANNEL
AutoCAD SHX Text
FULLY COVER CELLS WITH DS FILTER FABRIC (TOP AND SIDES ONLY)
AutoCAD SHX Text
50MM FLAT BED CELLS
AutoCAD SHX Text
BACK FILL AROUND CELLS TO BE CLEAN SAND FREE FROM CLAY AND ROCKS
AutoCAD SHX Text
FULLY COVER CELLS WITH DS FILTER FABRIC (TOP AND SIDES ONLY)
AutoCAD SHX Text
40PE EFFLUENT PUMP LINE
AutoCAD SHX Text
DS AGENCIES MODULAR 50MM FLAT BED LEACH DRAIN CELLS WITH 100 X 50MM DISTRIBUTION CHANNEL ON GRADED SAND BED.
AutoCAD SHX Text
40mm uPVC PUMPED DISCHARGE LINE TO RISE AND CONNECT INTO A HYDRAULIC DIVERSION VALVE . EXTEND 40mm u PVC DISCHARGE PORTS TO BELOW GROUND AND RUN 40PVC PRESSURE PIPE TO DISPOSAL ZONES AS SHOWN.
AutoCAD SHX Text
P.04
AutoCAD SHX Text
INDICATIVE NATURAL GROUND
AutoCAD SHX Text
SAND FILL
AutoCAD SHX Text
300mm LIMESTONE RETAINING BLOCKS OR SIMILAR
AutoCAD SHX Text
300mm LIMESTONE RETAINING BLOCKS OR SIMILAR
AutoCAD SHX Text
00 29/10/21 ISSUED FOR DEVELOPMENT APPROVAL
AutoCAD SHX Text
ASSUMED IMPERVIOUS LAYER
AutoCAD SHX Text
EXISTING SOIL ABOVE IMPERVIOUS LAYER TO BE CHECKED BY TESTING TO CONFIRM SUITABILITY UNDER AS 1545.
AutoCAD SHX Text
EXISTING SOIL ABOVE IMPERVIOUS LAYER TO BE CHECKED BY TESTING TO CONFIRM SUITABILITY UNDER AS 1545.