WCDMA RAN, Rel. RU50, Operating Documentation
Commissioning Checklist for IPA-RNC
DN0939536 Issue 05
Approval date 2014-02-28
Disclaimer Commissioning Checklist for IPA-RNC
2 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
The information in this document is subject to change without notice and describes only the product defined in the introduction of this documentation. This documentation is intended for the use of Nokia Solutions and Networks customers only for the purposes of the agreement under which the document is submitted, and no part of it may be used, reproduced, modified or transmitted in any form or means without the prior written permission of Nokia Solutions and Networks. The documentation has been prepared to be used by professional and properly trained personnel, and the customer assumes full responsibility when using it. Nokia Solutions and Networks welcomes customer comments as part of the process of continuous development and improvement of the documentation. The information or statements given in this documentation concerning the suitability, capacity, or performance of the mentioned hardware or software products are given "as is" and all liability arising in connection with such hardware or software products shall be defined conclusively and finally in a separate agreement between Nokia Solutions and Networks and the customer. However, Nokia Solutions and Networks has made all reasonable efforts to ensure that the instructions contained in the document are adequate and free of material errors and omissions. Nokia Solutions and Networks will, if deemed necessary Nokia Solutions and Networks, explain issues which may not be covered by the document. Nokia Solutions and Networks will correct errors in this documentation as soon as possible. IN NO EVENT WILL NOKIA SOLUTIONS AND NETWORKS BE LIABLE FOR ERRORS IN THIS DOCUMENTATION OR FOR ANY DAMAGES, INCLUDING BUT NOT LIMITED TO SPECIAL, DIRECT, INDIRECT, INCIDENTAL OR CONSEQUENTIAL OR ANY LOSSES, SUCH AS BUT NOT LIMITED TO LOSS OF PROFIT, REVENUE, BUSINESS INTERRUPTION, BUSINESS OPPORTUNITY OR DATA, THAT MAY ARISE FROM THE USE OF THIS DOCUMENT OR THE INFORMATION IN IT. NSN is a trademark of Nokia Solutions and Networks. Nokia is a registered trademark of Nokia Corporation. Other product names mentioned in this document may be trademarks of their respective owners, and they are mentioned for identification purposes only. Copyright © Nokia Solutions and Networks 2014. All rights reserved.
Nokia Solutions and Networks are continually striving to reduce the adverse environmental effects of its products and services. We would like to encourage you as our customers and users to join us in working towards a cleaner, safer environment. Please recycle product packaging and follow the recommendations for power use and proper disposal of our products and their components. If you should have questions regarding our Environmental Policy or any of the environmental services we offer, please contact us at Nokia Solutions and Networks for additional information.
Commissioning Checklist for IPA-RNC Table of Contents
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
3 /40
Table of Contents This document has 40 pages.
Table of Contents Commissioning Checklist for IPA-RNC
4 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
1 Commissioning checklist .................................................................... 7 1.1 Using this checklist document ................................................................ 7 1.2 Preparation of commissioning ................................................................ 7
2 Safecopying FBEMPTY SW build ........................................................ 9
3 Inspecting hardware .......................................................................... 10
4 Verifying system startup ................................................................... 12 4.1 Powering on ......................................................................................... 12 4.2 Logging into the MMI system for the first time ...................................... 12 4.3 Verifying functional units’ start-up ......................................................... 13
5 Managing network element specific data ......................................... 14 5.1 Changing system name........................................................................ 14 5.2 Setting the calendar date and time ....................................................... 14 5.3 Enabling CPLD upgrade....................................................................... 15
6 Inspecting SW build and HW data..................................................... 16 6.1 Creating Telnet or HTTP connection to OMU ....................................... 16 6.2 Inspecting Hardware Management System .......................................... 17 6.3 Interrogating SW build information ....................................................... 18 6.4 Interrogating equipment database ........................................................ 20 6.5 Verifying hardware data consistency with actual configuration ............. 21 6.6 Checking the memory size of the CCP1D-A plug-in unit....................... 21 6.7 Inspecting I/O system ........................................................................... 21 6.8 Inspecting unit diagnostics and working states ..................................... 22 6.9 Inspecting messaging system .............................................................. 28
7 Inspecting synchronization system .................................................. 31
8 Configuring VDS device .................................................................... 33
9 Connecting RNC to standalone RNC OMS ....................................... 34
10 Verifying OMS system startup .......................................................... 35 10.1 Verifying OMS BIOS system time ......................................................... 35 10.2 Testing TCP/IP connections for OMS ................................................... 35 10.3 Testing OMS software startup .............................................................. 35 10.4 Testing Element Manager applications ................................................. 36 10.5 Testing secure Element Manager MMI window .................................... 36
11 Finalizing commissioning ................................................................. 37 11.1 Checking the delivery dependent functionalities ................................... 37 11.2 Performing SW update ......................................................................... 38 11.3 Safecopying SW build again ................................................................ 38 11.4 Recording item code and serial number ............................................... 38
Commissioning Checklist for IPA-RNC Table of Contents
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
5 /40
12 Commissioning certificate of completion ........................................ 39
Commissioning Checklist for IPA-RNC
6 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
Summary of changes
Changes between issues 04A (2013-04-26, RU40) and 05 (RU50, 2014-02-28) • RNC196 and RNC450 related documents reference are removed.
• CCP10, NI16P1A, NI4S1-B, SF10, SF10E are RNC196/450 specific and removed from Table 15. Interrogating SW build information.
Changes between issues 04 (RU40, 2013-02-22) and 04A (2013-04-26, RU40) Interrogating SW build information (6.3) • Table 16 Boot-SW versions checklist is updated to all supported
plug-in units in RN7.0.
Verifying hardware data consistency with actual configuration (6.5) • The section title is changed from “Interrogating hardware data”.
Checking the memory size of the CCP1D-A plug-in unit (6.6) • This is a new section.
Changes between issues 03B (2012-10-24, RU30) and 04 (2013-02-22, RU40) Document structure and contents have been changed in accordance with the document Commissioning IPA-RNC, issue 17.
Changes between issues 03A and 03B The cover page and references have been updated.
Commissioning Checklist for IPA-RNC Commissioning checklist
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
7 /40
1 Commissioning checklist
Note The hardware product names in the checklists are written without the variant designation unless it is specifically required.
1.1 Using this checklist document
Use this checklist document for recording the success and completion of commissioning procedures. Always carry out the procedures as instructed in the document Commissioning IPA-RNC and mark down the completed steps and procedures in this document.
The checklist tables contain references to other product documents which may be necessary during each particular procedure. Also, keep the Commissioning IPA-RNC document available at all times.
The last section of this document, Commissioning Certificate of Completion, can be used for acceptance.
1.2 Preparation of commissioning
Commissioning phase / related documents Completed
Check the Installation Certificate of Completion and Site Deficiency Reports. Clear out correction requirements for commissioning.
Check the availability of the tools and measurement devices that you need for commissioning. Acquire the needed tools and measurement devices.
Commissioning IPA-RNC
Commissioning checklist Commissioning Checklist for IPA-RNC
8 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
Commissioning phase / related documents Completed
Check the availability of the hardware documents in Operating Documentation delivered online. Acquire the missing hardware documents.
Hardware Configuration Management in IPA-RNC
Cable Lists for RNC2600
Equipment Lists for RNC2600
MGW and IPA-RNC, Jumper Settings of the Plug-in Units and Hard Disk Drives
Software Release Binder
Installing the MGW and IPA-RNC
Hardware Revision List for WCDMA IPA-RNC
Managing IPA-RNC Software Configuration
ATM Links and LAN Connections in RNC2600
Managing I/O System in IPA-RNC
Diagnostics and Testing in IPA-RNC
Administering Recovery and Unit Working States
in IPA-RNC
Synchronization and Timing in IPA-RNC
Database Administration in IPA-RNC
Change Note installation instruction (delivered with each Change Note Set)
IPA-RNC Engineering Description
Table 1. Preparation of commissioning
Commissioning Checklist for IPA-RNC Safecopying FBEMPTY SW build
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
9 /40
2 Safecopying FBEMPTY SW build Commissioning phase / related documents Completed
Make a fallback copy of the SW build and verify it.
Make FB build backup copies on OMU hard disks and/or USB stick
Table 2. Safecopying SW build
Inspecting hardware Commissioning Checklist for IPA-RNC
10 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
3 Inspecting hardware Commissioning phase / related documents Completed
Inspect the door grounding.
Check the inter-cabinet cables of the network element by comparing them with the cable lists in Operating Documentation. Check all connectors for proper contact (for example, no plugs are loose).
Hardware Configuration Management in IPA-RNC
Cable Lists for RNC2600
Check the locations of the plug-in units by comparing them with equipment lists in Operating Documentation.
Hardware Configuration Management in IPA-RNC
Equipment Lists for RNC2600
Check the interchangeability versions of the sub-racks by comparing them with the equipment lists in Operating Documentation.
Hardware Configuration Management in IPA-RNC
Equipment Lists for RNC2600
Hardware Revision List for WCDMA IPA-RNC
Check the interchangeability versions of the plug-in units by comparing them with the equipment lists in Operating Documentation.
Hardware Configuration Management in IPA-RNC
Equipment Lists for RNC2600
Hardware Revision List for WCDMA IPA-RNC
Commissioning Checklist for IPA-RNC Inspecting hardware
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
11 /40
Commissioning phase / related documents Completed
Inspect the power supply:
Measure the input voltages to the Cabinet Power Distributors (CDP80). The voltages must be within the range of -40 V ... -57 V DC.
Record all the values in the table Measured voltages below. Check that the voltages meet the tolerance requirements.
Check the polarities of the supply lines as instructed in Installing the MGW and RNC.
Installing the MGW and IPA-RNC
Inspect the hardware material visually. Pay attention to mechanical damage and scratches, for example.
Inspect accordance with approved site drawings.
Table 3. Inspecting hardware
Cabinet Voltage (V) Polarity checked
RNAC (UB1)
RNAC (UB2)
RNBC (UB1)
RNBC (UB2)
Table 4. Measured voltages
Verifying system startup Commissioning Checklist for IPA-RNC
12 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
4 Verifying system startup 4.1 Powering on
Commissioning phase / related documents Completed
Power on the cabinet(s).
Check that the LEDs on each unit are either blinking green, solid green, or yellow.
Table 5. Powering on
4.2 Logging into the MMI system for the first time
Commissioning phase / related documents Completed
Attach a computer by RJ-45 to the OMU serial port. Log into the MMI system by using the default administrator user ID and password SYSTEM.
Create a new MMI user profile (ZIAA).
Create a new administrator user ID (ZIAH).
Delete the default administrator user ID (SYSTEM)(ZIAD).
Table 6. Logging into the MMI system for the first time
The preset IP addresses are changed during integration.
Commissioning Checklist for IPA-RNC Verifying system startup
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
13 /40
4.3 Verifying functional units’ start-up
Commissioning phase / related documents Completed
Check that all units have the correct working states and that there are no major alarms
Table 7. Verifying functional units’ start-up
Managing network element specific data Commissioning Checklist for IPA-RNC
14 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
5 Managing network element specific data
5.1 Changing system name
Commissioning phase / related documents Completed
Change the system name and then verify the new name from the NECONF file.
Table 8. Changing system name
5.2 Setting the calendar date and time
Commissioning phase / related documents Completed
Set the correct date and time (and optionally time zone) for the network element (ZDCS).
Set the correct NTP server IP address (ZDCM).
NTP IP address:
Table 9. Setting the calendar date and time
Commissioning Checklist for IPA-RNC Managing network element specific data
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
15 /40
5.3 Enabling CPLD upgrade
Commissioning phase / related documents Completed
Check the status of the CPLD remote upgrade. If it is disabled, enable it.
Table 10. Enabling CPLD upgrade
Inspecting SW build and HW data Commissioning Checklist for IPA-RNC
16 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
6 Inspecting SW build and HW data 6.1 Creating Telnet or HTTP connection to OMU
Commissioning phase / related documents Completed
Establish a Telnet or HTTP connection to the OMU IP address, port 11111.
Check that the logical files that are used in printing out alarms are connected to the correct VPP devices (ZIID).
If not, connect the corresponding logical files to the correct VPP devices (ZIIS).
Record the devices in table Logical files and VPP device connections.
Check that the state of the corresponding VPP devices is WO-EX (ZIHI).
Check that you can see alarms on the Telnet terminal or the web browser.
Table 11. Creating a Telnet or HTTP connection to OMU
Logical file VPP device Logical file VPP device
ALARMS ALACOMM2
ALACOMM1 ALAQUAL2
ALAQUAL1 ALAPROC2
ALAPROC1 ALAEQUI2
ALAEQUI1 ALAENVI2
Commissioning Checklist for IPA-RNC Inspecting SW build and HW data
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
17 /40
Logical file VPP device Logical file VPP device
ALAENVI1
Table 12. Logical files and VPP device connections
6.2 Inspecting Hardware Management System
Commissioning phase / related documents Completed
Activate the HMEXTE service terminal extension (ZLP:2,HME).
List the system configuration (Z2DP). Check that the information on the location of the plug-in units is correct.
Make sure that each plug-in unit has a respective HMS slave node.
Check that the version number of the HMS software is the same for each plug-in unit that belongs to the same node type (master node, A variant master node, bridge node, slave node, A variant slave node).
1. Block the following alarms: 1183, 1186, 1291, 2689, 3287, and 3290.
2. Ensure that all HMS slave nodes have the same level of software version.
3. Disable HMS independent switchover.
4. Check the active HMS transmission line.
5. Interrogate the software version of the HMS bridge nodes.
6. Perform a switchover of the HMS transmission line and check that the transmission line switchover is successful.
7. Interrogate the software version of the HMS bridge nodes.
8. Enable HMS independent switchover and check that the status of HMS independent switchover is ENABLED.
9. Interrogate the software version of the HMS master nodes.
10. Unblock the alarms you blocked in step 1.
Inspecting SW build and HW data Commissioning Checklist for IPA-RNC
18 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
Commissioning phase / related documents Completed
Record version numbers to the table HMS software versions.
Check that the version matches the requirement for software level.
Software Release Binder
Table 13. Inspecting Hardware Management System
HMS node type All corresponding units
checked Version number
HMS master node
HMS A variant masters
HMS bridges
HMS slaves
HMS A variant slaves
Table 14. HMS software versions
6.3 Interrogating SW build information
Commissioning phase / related documents Completed
Verify that the correct software build is on the hard disk and loaded for every unit needed (ZWQO).
Managing IPA-RNC Software Configuration
Software Release Binder
Default software package:
Package-ID:
Change Note ID:
Commissioning Checklist for IPA-RNC Inspecting SW build and HW data
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
19 /40
Commissioning phase / related documents Completed
Check the software build versions (ZWQB) to find any erroneous modules.
Managing IPA-RNC Software Configuration
Compare the versions with the hardware specific documents.
Software Configuration Management
Software Release Binder
Check the version of the flash memory boot package of the unit against the SW package. See the table Boot-SW versions checklist.
Table 15. Interrogating SW build information
Plug-in unit SW version Plug-in unit SW version
CCP1D-A CCP18*
SF20H CDSP-DH
MX1G6* MX622*
NP2GE-B NP8S1-B * refers to the plug-in unit itself or/and its variants
Table 16. Boot-SW versions checklist
Inspecting SW build and HW data Commissioning Checklist for IPA-RNC
20 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
6.4 Interrogating equipment database
Commissioning phase / related documents Completed
Check the state and integrity of the equipment database and copy database files to disk.
Hardware Configuration Management in IPA-RNC
Inquire cabinet information (ZWFI:J:..). Check that the cabinet information in the database meets the physical configuration. Correct any discrepancies (ZWFJ, ZWFK).
Hardware Configuration Management in IPA-RNC
Inquire sub-rack information (ZWFI:C:..). Check that the sub-rack information in the database meets the physical configuration. Correct any discrepancies (ZWFC, ZWFD).
Hardware Configuration Management in IPA-RNC
Inquire plug-in unit information (ZWFI:P:..). Check that the plug-in unit information in the database meets the physical configuration. Correct any discrepancies (ZWFP, ZWFQ).
Hardware Configuration Management in IPA-RNC
Inquire connection information on plug-in unit ports (ZWFI:S:..). Check that the plug-in unit port connections in the database meet the physical configuration. Correct any discrepancies (ZWFS, ZWFT).
Hardware Configuration Management in IPA-RNC
ATM Links and LAN Connections in RNC2600
Inquire functional unit information (ZWFI:U:..). Check that the functional unit information in the database meets the physical configuration.
Correct any discrepancies (ZWFU, ZWFV).
Hardware Configuration Management in IPA-RNC
Commissioning Checklist for IPA-RNC Inspecting SW build and HW data
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
21 /40
Table 17. Interrogating equipment database
6.5 Verifying hardware data consistency with actual configuration
Commissioning phase / related documents Completed
Interrogate all hardware data of plug-in units (ZWFL). Verify that the printed data are the same as on the labels of the plug-in units.
Interrogate all hardware data of subracks (ZWFL). Verify that the printed data are the same as on the subrack labels.
Table 18. Verifying hardware data consistency with actual configuration
6.6 Checking the memory size of the CCP1D-A plug-in unit
Commissioning phase/Related documents Completed
Check the memory pool size of the CCP1D-A plug-in unit (ZDOI). Ensure that the displayed memory pool size of the CCP1D-A unit is bigger than 3000 MB.
Table 19. Checking the memory size of the CCP1D-A plug-in unit
6.7 Inspecting I/O system
Commissioning phase / related documents Completed
Display the I/O devices (ZWFI). Check their operating states and state transitions (ZIHI).
Managing I/O System in IPA-RNC
Inspecting SW build and HW data Commissioning Checklist for IPA-RNC
22 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
Commissioning phase / related documents Completed
Diagnose hard disks (ZUDD).
• OMU (WDU-0)
• OMU (WDU-1)
Managing I/O System in IPA-RNC
Optional:
1. Change the operating state of an optical disk or a USB memory stick to TE-EX and diagnose it (ZUDD).
2. Display a list of running and queuing tests (ZUDQ).
3. Display the history of the diagnostic reports (ZUDH).
Managing I/O System in IPA-RNC
Table 20. Inspecting I/O system
6.8 Inspecting unit diagnostics and working states
Commissioning phase / related documents Completed
Print out the working states of the units (ZUSI). Check that the units are in the WO-EX or SP-EX state. Check that all units of the network element are on the list (compare with the equipment list).
Equipment Lists for RNC2600
Diagnostics and Testing in IPA-RNC
Run unit diagnostics and perform change of unit states.
Note
There are differing instructions for 2N redundant units, N+1 redundant units, SN+ units and non-redundant units in Commissioning IPA-RNC.
First run diagnostics on SFUs, then continue with MXUs. Then perform diagnostics for all other units.
Commissioning Checklist for IPA-RNC Inspecting SW build and HW data
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
23 /40
Commissioning phase / related documents Completed
Note
The TBU units (connected to OMU 0/1) and all units connected to SFU and MXU units must be tested twice: First when the state of the OMU 0 / SFU 0 / MXU x is WO-EX, then when the state of the OMU 1 / SFU 1 / MXU 1 is WO-EX. MXU x is the MXU connected to the unit to be tested.
Diagnostics and Testing in IPA-RNC
Note
In some cases, one sub-rack slot may house different functional units depending on the configuration of the network element. For detailed information on the equipping of sub-racks in different configurations, see IPA-RNC Engineering Description, and Equipment Lists for RNC2600.
Table 21. Inspecting unit diagnostics and working states
Functional unit OMU 0 (WO-EX) OMU 1 (WO-EX)
TBU 0
TBU 1
Table 22. TBU 0 and TBU 1 units
Functional unit MXU 0 (WO-EX) MXU 1 (WO-EX)
SFU 0
SFU 1
Table 23. SFU 0 and SFU 1 units RNAC
Functional unit SFU 0 (WO-EX) SFU 1 (WO-EX)
MXU 0
MXU 1
Inspecting SW build and HW data Commissioning Checklist for IPA-RNC
24 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
Functional unit SFU 0 (WO-EX) SFU 1 (WO-EX)
MXU 2
MXU 3
MXU 4
MXU 5
MXU 6
MXU 7
MXU 8
MXU 9
MXU 10
MXU 11
MXU 12
MXU 13
MXU 14
MXU 15
Table 24. MXU units in RNAC and RNBC
Functional unit MXU 0 (WO-EX) MXU 1 (WO-EX)
DMCU 0
DMCU 1
DMCU 2
DMCU 3
ICSU 0
OMU 0
RSMU 0
SFU 0
TBU 0
TBU 1
SWU 0
OMS
Commissioning Checklist for IPA-RNC Inspecting SW build and HW data
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
25 /40
Table 25. Functional units in sub-rack 1 (RNAC)
Functional unit MXU 2 (WO-EX) MXU 3 (WO-EX)
DMCU 4
DMCU 5
DMCU 6
DMCU 7
ICSU 1
ICSU 2
OMU 1
RSMU 1
SFU 1
TBU 0
TBU 1
Table 26. Functional units in sub-rack 2 (RNAC)
Functional unit MXU 4 (WO-EX) MXU 5 (WO-EX)
DMCU 8
DMCU 9
DMCU 10
DMCU 11
DMCU 12
EHU
ICSU 3
ICSU 4
ICSU 5
ICSU 6
ICSU 7
TBU 0
TBU 1
Inspecting SW build and HW data Commissioning Checklist for IPA-RNC
26 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
Table 27. Functional units in sub-rack 3 (RNAC)
Functional unit MXU 6 (WO-EX) MXU 7 (WO-EX)
DMCU 13
DMCU 14
DMCU 15
DMCU 16
DMCU 17
ICSU 8
ICSU 9
ICSU 10
ICSU 11
ICSU 12
ICSU 13
TBU 0
TBU 1
Table 28. Functional units in sub-rack 4 (RNAC)
Functional unit MXU 8 (WO-EX) MXU 9 (WO-EX)
DMCU 18
DMCU 19
DMCU 20
DMCU 21
DMCU 22
ICSU 14
ICSU 15
ICSU 16
ICSU 17
ICSU 18
ICSU 19
TBU 0
TBU 1
Commissioning Checklist for IPA-RNC Inspecting SW build and HW data
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
27 /40
Table 29. Functional units in sub-rack 1 (RNBC)
Functional unit MXU 10 (WO-EX) MXU 11 (WO-EX)
DMCU 23
DMCU 24
DMCU 25
DMCU 26
DMCU 27
ICSU 20
ICSU 21
ICSU 22
ICSU 23
ICSU 24
ICSU 25
TBU 0
TBU 1
Table 30. Functional units in sub-rack 2 (RNBC)
Functional unit MXU 12 (WO-EX) MXU 13 (WO-EX)
DMCU 28
DMCU 29
DMCU 30
DMCU 31
DMCU 32
ICSU 26
ICSU 27
ICSU 28
ICSU 29
ICSU 30
ICSU 31
TBU 0
TBU 1
Inspecting SW build and HW data Commissioning Checklist for IPA-RNC
28 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
Table 31. Functional units in sub-rack 3 (RNBC)
Functional unit MXU 14 (WO-EX) MXU 15 (WO-EX)
DMCU 33
DMCU 34
DMCU 35
DMCU 36
DMCU 37
ICSU 32
ICSU 33
ICSU 34
ICSU 35
ICSU 36
ICSU 37
TBU 0
TBU 1
Table 32. Functional units in sub-rack 4 (RNBC)
6.9 Inspecting messaging system
Commissioning phase / related documents Completed
Print out the working states of units (ZUSI). Check that all units are on the list (compare with the equipment list).
Run messaging system test. In detail, do the following:
• Open a service terminal connection RS232 to the active OMU or, if not possible, open a new MMI terminal session (ZDDS).
Commissioning Checklist for IPA-RNC Inspecting SW build and HW data
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
29 /40
Commissioning phase / related documents Completed
Note
The service terminal connection or the second MMI terminal connection is used for executing and monitoring the test. The first MMI terminal session is used for changing the states of the active SFU and MXU units during the test.
• Load a post office service terminal extension in the active OMU (ZLP:1,POH).
• List all computing units in the messaging system (Z1F:::1).
• Start messaging system test (Z1YY). Monitor the output for a minimum of 5 minutes.
• Print the working state SFU unit (ZUSI).
• Print the working states of all MXU units (ZUSI). Record the index numbers of the active units in the table Checklist 1 for active MXU units. Mark the status of the active MXUs for the active SFU in the table Checklist 1 for active MXU units.
• Change the state of the working state SFU unit to SP-EX, (WO-EX -> SP-EX), (ZUSC). Monitor the output for a minimum of 5 minutes.
• Print the working states of all MXU units (ZUSI). Record the index numbers of the active units in table Checklist 2 for active MXU units. Compare with Checklist 1 for active MXU units that the index number of each MXU is now different within each MXU pair. Mark the status of the active MXU units in the table Checklist 2 for active MXU units for the active SFU.
• Change the states of working state SFU units to SP-EX (WO-EX -> SP-EX), (ZUSC). Monitor the output for a minimum of 5 minutes. Record the status of the active MXU units in the table Checklist 2 for active MXU units for the new active SFU unit.
Inspecting SW build and HW data Commissioning Checklist for IPA-RNC
30 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
Commissioning phase / related documents Completed
• Stop the test (CTRL + C) and monitor the output.
Table 33. Inspecting messaging system
MXU index SFU 0
WO-EX
SFU 1
WO-EX
MXU
MXU
MXU
MXU
MXU
MXU
MXU
MXU
Table 34. Checklist 1 for active MXU units
MXU index SFU 0
WO-EX
SFU 1
WO-EX
MXU
MXU
MXU
MXU
MXU
MXU
MXU
MXU
Table 35. Checklist 2 for active MXU units
Commissioning Checklist for IPA-RNC Inspecting synchronization system
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
31 /40
7 Inspecting synchronization system Commissioning phase / related documents Completed
Check the synchronization cabling (external timing / line timing) connections against documentation. Make changes to the cabling if needed.
Equipment Lists for RNC2600
Synchronization and Timing in IPA-RNC
Cable Lists for RNC2600
Cabinet Interfaces and External Cables of MGW and IPA-RNC
Recovery and Working State Administration
Replacing Plug-in Units
Hardware Configuration Management in IPA-RNC
Check SSM values for external references and synchronization (ZDYI). Change them with ZDYK if needed.
Synchronization and Timing in IPA-RNC
Check available references and parameters (ZDYI), changing the WTR timer values if needed (ZDYL).
Use ZDYR if you need to control general synchronization system settings.
Synchronization and Timing in IPA-RNC
Inspecting synchronization system Commissioning Checklist for IPA-RNC
32 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
Commissioning phase / related documents Completed
Check outgoing references (ZDYP). If outgoing synchronization is not given, set it with the command ZDYE.
Synchronization and Timing in IPA-RNC
Check system clock operating modes, and change them if needed.
Synchronization and Timing in IPA-RNC
Table 36. Inspecting synchronization system
Commissioning Checklist for IPA-RNC Configuring VDS device
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
33 /40
8 Configuring VDS device Commissioning phase / related documents Completed
Define the size and number, and the overwrite, skipping, and compression mode of disk files (ZIFF).
Managing I/O System in IPA-RNC
Connect the desired logical file to the VDS device (ZIID, ZIIS).
Managing I/O System in IPA-RNC
Set alarm limits for the file group (ZIFA).
Set time control for closing the data file of the VDS device (ZIFT).
Managing I/O System in IPA-RNC
Back up the VDS device.
Managing I/O System in IPA-RNC
Table 37. Configuring the VDS device
Connecting RNC to standalone RNC OMS Commissioning Checklist for IPA-RNC
34 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
9 Connecting RNC to standalone RNC OMS
Commissioning phase / related documents Completed
Set up the RUOSTEQX service terminal extension.
Set the OMS southbound IP address for the RNC O&M connection, and check that the connection works (ZQRS).
If BTS O&M connection is not established, restart BOI (506) and BOR (A0F) processes
Table 38. Connecting RNC to standalone RNC OMS
Commissioning Checklist for IPA-RNC Verifying OMS system startup
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
35 /40
10 Verifying OMS system startup 10.1 Verifying OMS BIOS system time
Commissioning phase/ Related documents Completed
Check the time (#date) and change it if needed.
Table 39. Verifying OMS BIOS system time
10.2 Testing TCP/IP connections for OMS
Commissioning phase/ Related documents Completed
Ping all IP addresses as specified in Commissioning IPA-RNC.
Table 40. Testing TCP/IP connections for OMS
10.3 Testing OMS software startup
Commissioning phase / related documents Completed
Log into OMS and check that all the services to start.
Check that the status returns no disabled processes.
Verifying OMS system startup Commissioning Checklist for IPA-RNC
36 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
Table 41. Testing OMS software startup
10.4 Testing Element Manager applications
Commissioning phase / related documents Completed
Install the Application Launcher (EM client).
Start the Application Launcher and log into the Element Manager.
Start and close each Element Manager application.
Check OMS Syslog (master-syslog) for error messages.
Table 42. Testing Element Manager applications
10.5 Testing secure Element Manager MMI window
Commissioning phase / related documents Completed
Start the Application Launcher and log into the Element Manager.
Open the MMI window by double-clicking the icon. Give MML commands to test the MMI window application.
Make a switchover to the OMU.
Give MML commands to test the MMI window application.
Log out from the Application Launcher.
Check OMS Syslog for error messages.
Table 43. Testing Element Manager's MMI window
Commissioning Checklist for IPA-RNC Finalizing commissioning
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
37 /40
11 Finalizing commissioning 11.1 Checking the delivery dependent functionalities
Note By default, NSN pre-configures the delivery dependent functionalities for each customer. During commissioning, it is recommendable to check the pre-configured delivery dependent functionalities.
Commissioning phase / related documents Completed
Find out the local configuration requirements for the IPA-RNC.
For detailed information on Configurations and capacity steps, see IPA-RNC Engineering Description.
Interrogate parameter value (ZWOI:2,1248;).
If necessary, use the command ZWOC to change the parameter value as defined in Commissioning IPA-RNC.
Restart the system with the ZUSS command only if the parameter value was changed.
Mark here the parameter value used in the IPA-RNC in question: _____
Table 44. Checking the delivery dependent functionalities in RNC
Finalizing commissioning Commissioning Checklist for IPA-RNC
38 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05
11.2 Performing SW update
Commissioning phase / related documents Completed
If the pre-installed package is not compatible with the network CD level, update the SW.
Table 45. Performing SW update
11.3 Safecopying SW build again
Commissioning phase / related documents Completed
Make a fallback copy of the SW build and verify it.
Make FB build backup copies on OMU hard disks and/or USB stick
Table 46. Safecopying SW build
11.4 Recording item code and serial number
Table 47. Recording item code and serial number
Commissioning phase / related documents Completed
Record the item codes and serial numbers of the network element.
Commissioning Checklist for IPA-RNC Commissioning certificate of completion
DN0939536 Issue 05
Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
39 /40
12 Commissioning certificate of completion
CUSTOMER NAME
CONTRACT NO.
NETWORK ELEMENT TYPE
DELIVERY NO.
SITE NAME
SITE NO.
SITE ADDRESS
SOFTWARE RELEASE
SOFTWARE VERSION / BUILD
CHANGE NOTES / CN SETS COMMISSIONING STAGE COMPLETE / OK (initials)
Preparation of commissioning
Safecopying FBEMPTY SW build
Inspecting hardware
Verifying system startup
Managing network element specific data
Inspecting SW build and HW data
Inspecting synchronization system
Configuring VDS device
Connecting RNC to standalone RNC OMS
Verifying OMS system startup
Finalizing commissioning COMMENTS / DEFICIENCIES
Nokia Solutions and Networks hereby states that the whole of the supplies detailed above have been inspected, tested and, unless otherwise stated, conform to the specified requirements in the contract or order identified above.
Date: _______________________________________________________________________________________________
Signature of site responsible: ____________________________________________________________________________
Commissioning certificate of completion Commissioning Checklist for IPA-RNC
40 /40 Copyright © 2013 Nokia Solutions and Networks. All rights reserved.
DN0939536 Issue 05