utilization of ict for enhanced water resources management &monitoring networks at mwri
DESCRIPTION
ITU Workshop on “ICT as an Enabler for Smart Water Management ” (Luxor, Egypt, 14-15 April 2013). Utilization of ICT for Enhanced Water Resources Management &Monitoring Networks at MWRI. Ayman Ibrahim, General Director for Studies and Projects , Telemetry, MWRI [email protected] - PowerPoint PPT PresentationTRANSCRIPT
Luxor, Egypt, 14-15 April 2013
Utilization of ICT for Enhanced Water Resources Management
&Monitoring Networks at MWRI
Ayman Ibrahim,General Director for Studies and
Projects , Telemetry, [email protected]@mwri.gov.eg
ITU Workshop on “ICT as an Enabler for Smart Water Management”
(Luxor, Egypt, 14-15 April 2013)
ChallengesLimited Water Resources Increased Population, Share 55.5 billion m3 /year according to the 1959 Agreement
Population increase, thereby increasing the requirements of drinking waterIndustry growth9 million acres cultivated area
Luxor, Egypt, 14-15 April 2013 2
Challenges
Pollution & Water Quality deterioration Plan Horizontal Expansion
National Programs adopted by the State to increase the cultivated area in the near future (reclamation and cultivation of 3.4 million acres)
Conflicts between users Illegal Agricultural LandAgricultural Policies
Luxor, Egypt, 14-15 April 2013 3
To face these challenges
Improving the overall water use efficiency in order to minimize the losses out of the system and distributing the available water for agriculture in an equitable way.Improved planning and management procedures are key measures generally prescribed to make the optimum use of the available water resources.
Luxor, Egypt, 14-15 April 2013 4
To face these Challenges
Satisfying future demands in Egypt will highly depend on better utilization and efficient use of present water resources.Development of additional water resources
Re-use of agricultural drainage water,Groundwater, Rain and storm water
Luxor, Egypt, 14-15 April 2013 5
To face these challenges
The Egyptian Ministry of Water Resources and Irrigation MWRI is currently adopting the Integrated Water Resources Management IWRM approach and also actively involved in National Water Policy which is also based on integrated water management.
Luxor, Egypt, 14-15 April 2013 6
ICT & Water Resources
The Information technology, Supervisory Control and Data Acquisition SCADA Systems, telemetry, Remote Sensing and automatic control systems are disciplines that highly contribute in achieving such MWRI goals to face Limited water resources challenges. Part of Mitigation measures
Luxor, Egypt, 14-15 April 2013 7
ICT & Water Resources
A main engine to achieve such goals and face these challenges is the availability of accurate and continuous (real time) water related data about the behavior of the irrigation system. This will help decision makers and water distribution managers take the appropriate and right decisions at the right times.
Luxor, Egypt, 14-15 April 2013 8
ICT & Water Resources
Information technology and rapid development of communication systems definitely help implement such IT systems in a very cost effective way.
Luxor, Egypt, 14-15 April 2013 9
Monitoring Networks
During the last few years the Ministry of Water Resources and Irrigation has adopted many programs that aim to establishment of different monitoring networks that provides real time data on water quantity and water quality.
Luxor, Egypt, 14-15 April 2013 10
Telemetry Monitoring Network
Implementation of water level monitoring network at the main irrigation structures along the Nile River and main canals. This monitoring system covers now 103 sites on the Nile barrages and main canals and some second order canals.
Luxor, Egypt, 14-15 April 2013 11
Telemetry System Components
At Sites:Data LoggerGSM/GPRS ModemWater Level SensorsPower Supply
Solar Cell & BatteryNEMA Box
Luxor, Egypt, 14-15 April 2013 12
Telemetry System Components
At Irrigation Directorates GDWater Distribution ManagerTelemetry Department
Computer System Equipped with S/W and GSM/GPRS modem
At Ministry CenterServers and GSM/GPRS Modems equipped
with needed S/W
Luxor, Egypt, 14-15 April 2013 13
Data Monitored
MeasuredUp Stream Water LevelDown Stream Water LevelTemperatureBattery VoltagePump Units Status On/Off
CalculatedPump Working HoursWater Flow
Luxor, Egypt, 14-15 April 2013 14
Data Types
Real Time Data Historic Data
Communication Dedicated APN Access Point NameSupports up to GPRS - Edge
Luxor, Egypt, 14-15 April 2013 15
Luxor, Egypt, 14-15 April 2013 16
Luxor, Egypt, 14-15 April 2013 17
Luxor, Egypt, 14-15 April 2013 18
Luxor, Egypt, 14-15 April 2013 19
Water Quality Monitoring
Water quality monitoring system includes 25 sites located along the Nile River and main canals and drains. The measured data includes
Dissolved Oxygen , PH, Conductivity and Turbidity
Luxor, Egypt, 14-15 April 2013 35
IQ 2020 Data Logger System
Luxor, Egypt, 14-15 April 2013 36
HMI at Site
Luxor, Egypt, 14-15 April 2013 37
Communication System
Dial Up Data SIMPay as you GoOnly SIM at the center pays bill
Luxor, Egypt, 14-15 April 2013 38
Lake Nasser Evaporation Monitoring Network
Number of sites : 8 sites distributed along lake Nasser
Luxor, Egypt, 14-15 April 2013 39
Measured Parameters
Net RadiationWind Speed at 2m & 4mWind Direction at 2m & 4mWater Temperature at different Depths
Surface2m5m10m15m20m
Luxor, Egypt, 14-15 April 2013 40
Measured Parameters
Humidity at2m4m
Air Temperature at2m4m
Luxor, Egypt, 14-15 April 2013 41
Communication System
APN GPRS/EdgeSatellite
Luxor, Egypt, 14-15 April 2013 42
Luxor, Egypt, 14-15 April 2013 43
Luxor, Egypt, 14-15 April 2013 44
Satellite
Luxor, Egypt, 14-15 April 2013 45
2 Km US High Aswan Dam Station
Luxor, Egypt, 14-15 April 2013 46
240 Km US High Aswan Dam StationToshka
Luxor, Egypt, 14-15 April 2013 47
280 Km US High Aswan Dam StationAbo Sambel
Luxor, Egypt, 14-15 April 2013 48
Luxor, Egypt, 14-15 April 2013 49
Main User Interface Screen
Luxor, Egypt, 14-15 April 2013 50
Luxor, Egypt, 14-15 April 2013 51
Luxor, Egypt, 14-15 April 2013 52
Water flow Monitoring system
Water flow monitoring system include 30 sites located at IWMDs in Gharbyia, Behra and kafr El Sheik directorates The measured data is directly water flow via ultra sonic flow sensors
Luxor, Egypt, 14-15 April 2013 53
Water flow sites
Luxor, Egypt, 14-15 April 2013 54
Conclusions and Recommendations
The Ministry, to some extent, has achieved many of the planned goals by implementing such monitoring networks.
Even though of the great benefits provided by these monitoring networks, more effort towards optimizing its operation is still required.
Luxor, Egypt, 14-15 April 2013 55
Conclusions and Recommendations
The areas of the needed efforts could be summarized as follows:
Information technology part of the system that will utilize the huge collected data. A reliable Information system design is a need at this stage of the project. The system design should carefully define data flows among different users.
Luxor, Egypt, 14-15 April 2013 56
Conclusions and Recommendations
This should also include design and implementation of Decision Support System DSS to support decision makers at different management levels
The existing water level monitoring network should be generalized to allow monitoring of water flows and water volumes to follow Ministry policies related to water volume based allocation.
Luxor, Egypt, 14-15 April 2013 57
Conclusions and Recommendations
The existing monitoring network should be extended to cover the key points at the irrigation network. In order to achieve the Ministry integrated approach in water resources management,
These monitoring networks should be linked together.
Luxor, Egypt, 14-15 April 2013 58
Conclusions and Recommendations
At many sites a real time monitoring of the data is very essential and it is not supported with the existing network.
The real time monitoring is required at the mixing pumping stations where, pump units operation along with water quality and water quantity should be continuously monitored in a real time sense.
Luxor, Egypt, 14-15 April 2013 59
Conclusions and Recommendations
The drawbacks and pitfalls of the recently implemented monitoring networks will be overcome in order to effectively strengthening the capabilities of the Ministry’ operations staff
in the field of water resources management through implementing an integrated monitoring network for water management (quality and quantity) to monitor and analyze water.
Luxor, Egypt, 14-15 April 2013 60
Conclusions and Recommendations
Utilize the data collection network to build a remote control system Design for irrigation structures for possible generalization.
design of sustainable Geographical Information System GIS Decision Support System DSS,
Luxor, Egypt, 14-15 April 2013 61