utah · 2013-12-20 · production start or resume reclamation of well site recomplete different...

108

Upload: others

Post on 10-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 2: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 3: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 4: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 5: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 6: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 7: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 8: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 9: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 10: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 11: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 12: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 13: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 14: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 15: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 16: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 17: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 18: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 19: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 20: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 21: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 22: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 23: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 24: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 25: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 26: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 27: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 28: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 29: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 30: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 31: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 32: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 33: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 34: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 35: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 36: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 37: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 38: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 39: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 40: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 41: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 42: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 43: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 44: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 45: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 46: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 47: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 48: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 49: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 50: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 51: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 52: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 53: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 54: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 55: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 56: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 57: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 58: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 59: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 60: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 61: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 62: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 63: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 64: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 65: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 66: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 67: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 68: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 69: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 70: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 71: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 72: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 73: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 74: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 75: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 76: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 77: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 78: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 79: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 80: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 81: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 82: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 83: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 84: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 85: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 86: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 87: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 88: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 89: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 90: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 91: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 92: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 93: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 94: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 95: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 96: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 97: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 98: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering
Page 99: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering

API Well No: 43047309490000

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9

5.LEASE DESIGNATION AND SERIAL NUMBER: U-462

SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

7.UNIT or CA AGREEMENT NAME: NATURAL BUTTES

1. TYPE OF WELL Gas Well

8. WELL NAME and NUMBER: CIGE 63D

2. NAME OF OPERATOR: KERR-MCGEE OIL & GAS ONSHORE, L.P.

9. API NUMBER: 43047309490000

3. ADDRESS OF OPERATOR: P.O. Box 173779 1099 18th Street, Suite 600, Denver, CO, 80217 3779

9. FIELD and POOL or WILDCAT: NATURAL BUTTES

4. LOCATION OF WELL FOOTAGES AT SURFACE: 0521 FNL 0977 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NWNW Section: 29 Township: 09.0S Range: 22.0E Meridian: S

COUNTY: UINTAH

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NOTICE OF INTENTApproximate date work will start:

SUBSEQUENT REPORTDate of Work Completion:

9/21/2009

SPUD REPORTDate of Spud:

DRILLING REPORTReport Date:

ACIDIZE ALTER CASING CASING REPAIR

CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

DEEPEN FRACTURE TREAT NEW CONSTRUCTION

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

KERR-McGEE NO LONGER WANTS TO PERFORM THE PLUG AND ABANDON ONTHE SUBJECT LOCATION.

NAME (PLEASE PRINT) Sheila Wopsock

TITLE Regulatory Analyst

SIGNATURE N/A

DATE 8/21/2009

PHONE NUMBER:720 929-6007 Ext

PHONE NUMBER435 781-7024

August 21, 2009

August 24, 2009

Page 100: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering

API Well No: 43047309490000

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9

5.LEASE DESIGNATION AND SERIAL NUMBER: U-462

SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

7.UNIT or CA AGREEMENT NAME: NATURAL BUTTES

1. TYPE OF WELL Gas Well

8. WELL NAME and NUMBER: CIGE 63D

2. NAME OF OPERATOR: KERR-MCGEE OIL & GAS ONSHORE, L.P.

9. API NUMBER: 43047309490000

3. ADDRESS OF OPERATOR: P.O. Box 173779 1099 18th Street, Suite 600, Denver, CO, 80217 3779

9. FIELD and POOL or WILDCAT: NATURAL BUTTES

4. LOCATION OF WELL FOOTAGES AT SURFACE: 0521 FNL 0977 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NWNW Section: 29 Township: 09.0S Range: 22.0E Meridian: S

COUNTY: UINTAH

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NOTICE OF INTENTApproximate date work will start:

9/3/2009

SUBSEQUENT REPORTDate of Work Completion:

SPUD REPORTDate of Spud:

DRILLING REPORTReport Date:

ACIDIZE ALTER CASING CASING REPAIR

CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

DEEPEN FRACTURE TREAT NEW CONSTRUCTION

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

THE OPERATOR REQUESTS AUTHORIZATION TO TEMPORARILY ABANDONTHE SUBJECT WELL LOCATION. THE OPERATOR PROPOSES TO TEMPORARILY

ABANDON THE WELL TO DRILL THE NBU 922-29D PAD WELLS, WHICHCONSIST OF NBU 922-29D3S, NBU 922-29C1S, NBU 922-29C4S,NBU

922-29D1T. PLEASE REFER TO THE ATTACHED TEMPORARILY ABANDONPROCEDURE.

NAME (PLEASE PRINT) Andy Lytle

TITLE Regulatory Analyst

SIGNATURE N/A

DATE 9/1/2009

PHONE NUMBER:720 929-6007 Ext

PHONE NUMBER720 929-6100

September 01, 2009

September 02, 2009

Page 101: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering

CIGE 63D 521’ FNL & 977’ FWL NWNW SEC.29, T9S, R22E Uintah County, UT KBE: 4772’ API NUMBER: 43-047-30949 GLE: 4754’ LEASE NUMBER: UTU-462 TD: 6500’ WI: 100.0000% PBTD: 6348’ NRI: 83.202950% CASING: 12 1/4” hole

9.625” 36# K-55 @ 213’ GL Cemented with 225 sx Class G; Circ cement to surface. 7.875” hole 4 1/2” 11.6# N-80 @ 6500’ Cemented with 2120 sx 50/50 POZ, cmt circ to surface.

TUBING: 2.375” 4.7# J-55 tubing landed at 5562’

Capacities Tubular/Borehole Drift inches

Collapse psi

Burst Psi Gal./ft. Cuft/ft. Bbl./ft.

2.375” 4.7# J-55 tbg. 1.901 8100 7700 0.1626 0.02173

0.00387

4.5” 11.6# N-80 3.875 6350 7780 0.6528 0.0872 0.01554 9.625” 36# K-55 csg 8.765 2020 3520 3.2470 0.4340 0.0773 Annular Capacities 2.375” tbg. X 4.5” 11.6# csg. 0.4226 0.0565 0.01006 4.5” csg X 9.625” 36# csg 2.2159 0.3236 0.0576 4.5”csg X 7.875” hole 1.7052 0.2278 0.0406 GEOLOGIC INFORMATION: Formation Depth to top, ft. Uinta Surface Green River 1404’ Mahogany 2101’ Wasatch 4549’ Tech. Pub. #92 Base of USDW’s USDW Elevation ~3500’ MSL USDW Depth ~1272’ KBE

September 01, 2009

Page 102: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering

PERFORATIONS:

WELL HISTORY:

• Spud Well on 7/29/1981 • Sep 1981 - Perforated gross Wasatch interval f/ 4933’ – 5558’. Broke w/ 2200 gal

5%,. Frac’d interval w/ 45,000 gal gel & 90,000# 20/40 sand. • 1st Sales on 1/23/1982 • Jan 1997 – Acidize wellbore, lower tbg and install PLE

REMARKS:

• Land Exploration/Operations - This well is producing from the Was formation. The lease is held by the NB Unit. OK to TA. Jason Rayburn 8/20/2009.

• Geology - All productive sands stimulated. OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering - The CIGE 063D was completed to the Wasatch in October

1981 and has gross cum production of 2,032 mmcf. The net remaining reserves as of Q209 are 150 mmcfe. The well was shut-in in February 2009 for preparation to P&A the wellbore. Before shut-in, the average rate over the previous 12 months was 65 mcfd with a LGR of 0 bbl/mmcf. Based on the current rate of the well and the remaining reserves on the books, it is recommended to TA this well rather than to P&A this well. Approve to TA the well. Lisa Gauthier 8/20/09.

• Operations Engineering - The NPV10 for the TA is much better than the PA as long as the gas price is above $2.40, therefore operations recommends a TA for this well. MB 8/26/2009

September 01, 2009

Page 103: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering

CIGE 63D TEMPORARY ABANDONMENT PROCEDURE

GENERAL • H2S MAY BE PRESENT. CHECK FOR H2S AND TAKE APPROPRIATE PRECAUTIONS. • CEMENT QUANTITIES BELOW ASSUME NEAT CLASS G, YIELD 1.145 CUFT./SX. IF A

DIFFERENT PRODUCT IS USED, WELLSITE PERSONNEL ARE RESONSIBLE FOR CORRECTING QUANTITIES TO YIELD THE STATED SLURRY VOLUME. WHEN SQUEEZING, INCLUDE 10% EXCESS PER 1000’ OF DEPTH.

• TREATED FRESH WATER WILL BE PLACED BETWEEN ALL PLUGS INSTEAD OF BRINE. • ALL DISPLACEMENT FLUID SHALL CONTAIN CORROSION INHIBITOR AND BIOCIDE. PREMIX 5

GALLONS PER 100 BBLS FLUID. • NOTIFY BLM 24 HOURS BEFORE MOVING ON LOCATION.

PROCEDURE Note: An estimated 178 sx Class “G” cement needed for procedure Note: Gyro has been run to 5500’

1. MIRU. KILL WELL AS NEEDED. ND WH, NU AND TEST BOPE.

2. PULL TBG & LD SAME. RU WIRELINE AND MAKE A GAUGE RING RUN TO CHECK FOR FILL.

3. PLUG #1, ISOLATE WASATCH PERFORATIONS (5222’ – 5804’): RIH W/ 4 ½” CBP, SET @ ~5172’. RELEASE CBP, BRK CIRC W/ FRESH WATER. PRESSURE TEST CASING TO 500 PSI. INFORM ENGINEERING IF IT DOESN’T TEST. DISPLACE A MINIMUM OF 4 SX (4.36 CUFT.) ON TOP OF PLUG. PUH ABOVE TOC (~5122’). REVERSE CIRCULATE W/ TREATED FRESH WATER.

4. PLUG #2, PROTECT WASATCH TOP (~4549’): PUH TO ~4649’. BRK CIRC W/ FRESH WATER.

DISPLACE 17.44 CUFT. (~16 SX) AND BALANCE PLUG W/ TOC @ ~4449’ (200’ COVERAGE). PUH ABOVE TOC. REVERSE CIRCULATE W/ TREATED FRESH WATER.

5. LOWER WELLHEAD TO GROUND LEVEL TO ACCOMMODATE DRILLING OPS AND INSTALL

MARKER PER BLM GUIDELINES.

6. RDMO. TURN OVER TO DRILLING OPERATIONS. ALM 8/27/09

September 01, 2009

Page 104: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering

API Well No: 43047309490000

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9

5.LEASE DESIGNATION AND SERIAL NUMBER: U-462

SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

7.UNIT or CA AGREEMENT NAME: NATURAL BUTTES

1. TYPE OF WELL Gas Well

8. WELL NAME and NUMBER: CIGE 63D

2. NAME OF OPERATOR: KERR-MCGEE OIL & GAS ONSHORE, L.P.

9. API NUMBER: 43047309490000

3. ADDRESS OF OPERATOR: P.O. Box 173779 1099 18th Street, Suite 600, Denver, CO, 80217 3779

9. FIELD and POOL or WILDCAT: NATURAL BUTTES

4. LOCATION OF WELL FOOTAGES AT SURFACE: 0521 FNL 0977 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NWNW Section: 29 Township: 09.0S Range: 22.0E Meridian: S

COUNTY: UINTAH

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NOTICE OF INTENTApproximate date work will start:

SUBSEQUENT REPORTDate of Work Completion:

9/13/2009

SPUD REPORTDate of Spud:

DRILLING REPORTReport Date:

ACIDIZE ALTER CASING CASING REPAIR

CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

DEEPEN FRACTURE TREAT NEW CONSTRUCTION

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

THE OPERATOR HAS PERFORMED THE TEMPORARILY ABANDON OPERATIONSON THE SUBJECT WELL LOCATION ON 9/13/2009. THE OPERATOR HAS TATHE WELL TO DRILL THE NBU 922-29D PAD WELLS, WHICH CONSIST OF

NBU 922-29D3S, NBU 922-29C1S, NBU 922-29C4S, NBU 922-29D1T. PLEASEREFER TO THE ATTACHED TEMPORARILY ABANDON CHORONOLOGICAL WELL

HISTORY.

NAME (PLEASE PRINT) Andy Lytle

TITLE Regulatory Analyst

SIGNATURE N/A

DATE 9/17/2009

PHONE NUMBER:720 929-6007 Ext

PHONE NUMBER720 929-6100

September 17, 2009

September 17, 2009

Page 105: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering

US ROCKIES REGION

Operation Summary ReportWell: CIGE 63D Spud Date:

Project: UTAH-UINTAH Site: CIGE 63D Rig Name No: MILES 2/2

Event: ABANDONMENT End Date: Start Date: 9/11/2009Active Datum: RKB @0.00ft (above Mean Sea Level) UWI: CIGE 63D

Time Start-End

MD From(ft)

Code Sub Code

P/U OperationPhaseDuration(hr)

Date

9/11/2009 48 JSA MOVING SAFELY0.25 7:15 7:00 -ABAND 30 P MOVE RIG & EQUIP FROM NBU 354 TO CIGE 63D

SPOT RIG & EQUIP RU RIG SIWP= 200 PSI REPAIR PMP & PMP 20 BBLS TREATED WTR TO CONTROL WELL ND WELL HEAD NU BOPS RU FLOOR & TUB EQUIP RU SCAN TECH START OUT OF HOLE W/ PROD TUBING.LD 35 JNTS OF RED BAND STAND BACK 14 LD 1 JNT GOOD PIPE SWIFW.

7.7515:00 7:15 -

9/12/2009 ABAND 48 P DAY 2 - JSA & SM. NO H2S PRESENT.0.25 7:15 7:00 -ABAND 31 I P WHP = 350 PSI. EOT @ 3546'. CONT. POOH

W/TBG & SCANNING. SCANNED 180 TOTAL JTS. 102 JTS BAD, 54 JTS BLUE BAND, 24 JTS YELLOW BAD. (78 JTS TOTAL GOOD).

MIRU CASED HOLE SOLUATIONS. PU 3 7/8" CSG SCRAPPER & RIH TO PBTD @ 6348'. TAG FILL @ 6230'. POOH W/WIRELINE & LD SCRAPPER. RIH W/BAKER 8K CBP & SET @ 4873'. POOH W/WIRELINE & LD TOOLS.

LOAD CSG W/2% TMAC & PT CSG TO 500 PSI. HOLD 5 MIN. (GOOD TEST)

PU 2 3/8" NOTCHED COLLAR & RIH. TAG CBP @ 4873'. PU 3' & SPOT 5 SK (1 BBL) CMT ON TOP CBP. CMT FROM 4873' TO 4808'. POOH & LD 7 JTS. EOT @ 4661'. SPOT 20 SK (4 BBLS) CMT FROM 4661' TO 4404'. RDMO PRO PETRO.

POOH & LD 21 JTS TBG. EOT @ 4021'.SWI - SDFN. PREP WELL TO CONT. TO POOH & LD TBG.

0.00 7:15 7:15 -

9/13/2009 ABAND 48 P DAY 3 - JSA & SM. NO H2S PRESENT.0.25 7:15 7:00 -ABAND 31 I P WHP = 0 PSI, EOT @ 4021'. CONT. TO POOH &

LD 2 3/8" TBG ON FLOAT. LD NOTCHED COLLAR. ND 4 1/2" CSG FLANGE. BOLT TOP CAP ONTO SURFACE CSG FLANGE. RDMO LOCATION.

0.00 7:15 7:15 -

9/17/2009 7:49:26AM 1

September 17, 2009

Page 106: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering

API Well No: 43047309490000

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9

5.LEASE DESIGNATION AND SERIAL NUMBER: U-462

SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

7.UNIT or CA AGREEMENT NAME: NATURAL BUTTES

1. TYPE OF WELL Gas Well

8. WELL NAME and NUMBER: CIGE 63D

2. NAME OF OPERATOR: KERR-MCGEE OIL & GAS ONSHORE, L.P.

9. API NUMBER: 43047309490000

3. ADDRESS OF OPERATOR: P.O. Box 173779 1099 18th Street, Suite 600, Denver, CO, 80217 3779

9. FIELD and POOL or WILDCAT: NATURAL BUTTES

4. LOCATION OF WELL FOOTAGES AT SURFACE: 0521 FNL 0977 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NWNW Section: 29 Township: 09.0S Range: 22.0E Meridian: S

COUNTY: UINTAH

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NOTICE OF INTENTApproximate date work will start:

SUBSEQUENT REPORTDate of Work Completion:

6/28/2010

SPUD REPORTDate of Spud:

DRILLING REPORTReport Date:

ACIDIZE ALTER CASING CASING REPAIR

CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

DEEPEN FRACTURE TREAT NEW CONSTRUCTION

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

THIS TEMPORARILY ABANDONED WELL HAS RETURNED TO PRODUCTION.THIS WELL RETURNED TO PRODUCTION ON 6/28/2010.

NAME (PLEASE PRINT) Andy Lytle

TITLE Regulatory Analyst

SIGNATURE N/A

DATE 6/29/2010

PHONE NUMBER:720 929-6007 Ext

PHONE NUMBER720 929-6100

June 29, 2010

June 29, 2010

Page 107: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering

US ROCKIES REGION

Operation Summary ReportWell: CIGE 63D Spud Date:

Project: UTAH-UINTAH Site: NBU 922-29D PAD Rig Name No: MILES 2/2

Event: WELL WORK EXPENSE End Date: 6/15/2010Start Date: 6/10/2010Active Datum: RKB @0.00ft (above Mean Sea Level) UWI: CIGE 63D

Time Start-End

MD From(ft)

Code Sub Code

P/U OperationPhaseDuration(hr)

Date

6/14/2010 ABAND 48 P FISHING0.50 7:30 7:00 -ABAND 44 P SET ANCHORS, CSG BENT ON WH, MIRU, CUT

OFF CSG, WELD ON EXTENTSION,PU POB, BIT RIH 1 JT TBG FOR DRIFT, DRIFTED OK, SWIFN

9.5017:00 7:30 -

6/15/2010 ABAND 48 P DRILLING PLUGS0.50 7:30 7:00 -ABAND 44 P NU TBG HEAD, NU BOP'S, TEST TO 3000#, PU

SN, BIT SUB, 3 7/8" BIT, RIH TO TOP OF CEMENT PLUG, BREAK CIRC, PRESSURE TEST 500# 5 MINS, DRILL CEMENT FROM 4432' TO 4685', FELL THRU, RIH 3 JTS, TAGGED CEMENT AT 4775', DRILLED 2 JTS TO 4843', BREAK CIRC, SWIFN

11.0018:30 7:30 -

6/16/2010 ABAND 31 P RIH TBG0.50 7:30 7:00 -ABAND 31 P RU CUDD, BREAK CIRC, DRILL CBP 4873', RIH 191

JTS, POOH STD BACK 88 STDS, LD BIT SUB, BIT, NU S/N NOTCHED COLLAR, RIH WITH 175 JTS 4.7# J-55 YB TBG, LAND TBG, BROACH TO S/N, NU WH, RU CUDD, BREAK CICR, RD CUDD, 175 JTS, XNSN 1.875", NOTCHED COLLAR, EOT 5547.46'. RDMO SEE ABN REPORT FOR TBG DETAIL

9.5017:00 7:30 -

6/29/2010 9:22:13AM 1

June 29, 2010

Page 108: Utah · 2013-12-20 · PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION REPERFORATE ... OK to TA during pad drilling. BJK 8/20/09 • Reservoir Engineering

API Well No: 43047309490000

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9

5.LEASE DESIGNATION AND SERIAL NUMBER: U-462

SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

7.UNIT or CA AGREEMENT NAME: NATURAL BUTTES

1. TYPE OF WELL Gas Well

8. WELL NAME and NUMBER: CIGE 63D

2. NAME OF OPERATOR: KERR-MCGEE OIL & GAS ONSHORE, L.P.

9. API NUMBER: 43047309490000

3. ADDRESS OF OPERATOR: PHONE NUMBER: P.O. Box 173779 1099 18th Street, Suite 600, Denver, CO, 80217 3779 720 929-6007 Ext

9. FIELD and POOL or WILDCAT: NATURAL BUTTES

4. LOCATION OF WELL FOOTAGES AT SURFACE: 0521 FNL 0977 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NWNW Section: 29 Township: 09.0S Range: 22.0E Meridian: S

COUNTY: UINTAH

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NOTICE OF INTENTApproximate date work will start:

SUBSEQUENT REPORTDate of Work Completion:

1/7/2011

SPUD REPORTDate of Spud:

DRILLING REPORTReport Date:

ACIDIZE ALTER CASING CASING REPAIR

CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

DEEPEN FRACTURE TREAT NEW CONSTRUCTION

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

The subject well location has returned to production form a shut-in status onFriday, January 7, 2011.

NAME (PLEASE PRINT) PHONE NUMBER Gina Becker 720 929-6086

TITLE Regulatory Analyst II

SIGNATURE N/A

DATE 1/17/2011

January 17, 2011

01/18/2011