CampusRec.unh.edu Frequently Asked Questions Why is the expansion and renovation of the Hamel Recreation Center necessary? For years, students, faculty, staff and community have expressed the need for more space in the recreation center. To inform the development of the scope of this project, feedback was gathered from surveys, focus groups, open forums, Residence Hall Association, Student Senate, & Graduate School Senate. Additional data from peer institutions and national standards were incorporated as well. What are the highlights of the Hamel Recreation Center project? • Increased Fitness Space • 1/10 mile Suspended Track • Large Multi-Activity Court (MAC) – providing space for a wide range of activities • Wellness space & Instructional Kitchen • Additional Social and gathering space • Interior/Exterior renovations to existing facility. What is the total budget of the project? Total project funding: $35.5 million Expansion - $30 million Deferred Maintenance - $5.5 million What is the timeline for the renovation/expansion project? February 2015 - USNH Board of Trustees Approval April 2015 - Construction Begins Fall 2016 - Expansion Scheduled Opening December 2017 - Renovation Scheduled Opening Will the Hamel Recreation Center be open during construction? Yes. The Hamel Recreation Center will be open during construction, although some activities will be moved to accomodate construction. Campus Recreation Hamel Recreation Center Expansion & Renovation Project 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Competive Context: Indoor Recreation Space (Square Feet per Student) Square Footage Per Student University of New Hampshire 6.5 Oregan State University 7.5 Univ. of Colorado-Boulder 10.1 University of Delaware 11.4 7.4 University of Mass. - Amherst 4.6 University of South Carolina 12.8 University of Vermont 10.0 University of Maine NC State 10.0 SUNY - Buffalo 10.2 Washington State University 8.0 U Conn 4.9 Prevailing national standards for recreational space per student is between 10-12 sf per student Current Expansion 11.0 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4. 1.6 Competive Context: Fitness Space (Square Feet per Student) Square Footage Per Student University of New Hampshire 0.39 Oregan State University 0.73 Univ. of Colorado-Boulder 0.96 University of Delaware 0.97 0.84 University of Mass. - Amherst 0.89 University of South Carolina 0.67 University of Vermont 0.50 University of Maine NC State 0.78 SUNY - Buffalo Washington State University 0.90 U Conn 0.47 University of Rhode Island Prevailing national standards for recreational space per student is between 1.0-1.25 sf per student 0.78 0.54 Expansion 1.10 Watch It All Come Together.

Upload: others

Post on 27-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: uson Hamel Recreation Center Expansion & Renovation Project · The Hamel Recreation Center will be open during construction, although some activities will be moved to accomodate construction

CampusRec.unh.eduFrequently Asked Questions

Why is the expansion and renovation of the Hamel Recreation Center necessary?For years, students, faculty, staff and community have expressed the need for more space in the recreation center. To inform the development of the scope of this project, feedback was gathered from surveys, focus groups, open forums, Residence Hall Association, Student Senate, & Graduate School Senate. Additional data from peer institutions and national standards were incorporated as well.

What are the highlights of the Hamel Recreation Center project?

• Increased Fitness Space• 1/10 mile Suspended Track• Large Multi-Activity Court (MAC) – providing space for a wide range of activities• Wellness space & Instructional Kitchen• Additional Social and gathering space• Interior/Exterior renovations to existing facility.

What is the total budget of the project?Total project funding: $35.5 million Expansion - $30 million Deferred Maintenance - $5.5 million

What is the timeline for the renovation/expansion project?February 2015 - USNH Board of Trustees ApprovalApril 2015 - Construction BeginsFall 2016 - Expansion Scheduled OpeningDecember 2017 - Renovation Scheduled Opening

Will the Hamel Recreation Center be open during construction?Yes. The Hamel Recreation Center will be open during construction, although some activities will be moved to accomodate construction.

Campus

Recreation

Hamel Recreation CenterExpansion & Renovation Project

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Competive Context: Indoor Recreation Space (Square Feet per Student)

Squa

re F

oota

ge

Per St

uden

t

University

of New Hampshire

6.5

Oreg

an State U

niversity

7.5

Univ.

of Colorado-Bo

ulder

10.1

University

of Delaware

11.4

7.4

Unive

rsity of M

ass. - Amher

st

4.6

Unive

rsity of So

uth Carolina

12.8

Unive

rsity of Ve

rmont

10.0

Unive

rsity of M

aine

NC State

10.0

SUNY - B

uffalo

10.2

Washington S

tate Unive

rsity

8.0

U Conn

4.9

Prevailing national standards for recreational space per student isbetween 10-12 sf per student

Cur

rent

Expans

ion

11.0

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4.

1.6

Competive Context: Fitness Space (Square Feet per Student)

Squa

re F

oota

ge

Per St

uden

t

University

of New Hampshire

0.39

Oreg

an State U

niversity

0.73

Univ.

of Colorado-Bo

ulder

0.96

University

of Delaware

0.97

0.84

Unive

rsity of M

ass. - Amher

st

0.89

Unive

rsity of So

uth Carolina

0.67

Unive

rsity of Ve

rmont

0.50

Unive

rsity of M

aine

NC State

0.78

SUNY - B

uffalo

Washington S

tate Unive

rsity

0.90

U Conn

0.47

Unive

rsity of Rh

ode Island

Prevailing national standards for recreational space per student isbetween 1.0-1.25 sf per student

0.78

0.54

Expans

ion

1.10

Watch It All Come Together.