Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: •Be able to explain the unscheduled flow mitigation plan including the qualification of devices and paths •Be able to define terms used in the UFMP •Be able to state the calculations WebSAS performs •Be able to describe actions taken by operators in response to WebSAS •Be able to demonstrate how to get reports from WebSAS •Be able to explain the examples in the WebSAS training Remember: Testing should prove the participant can do the above

Upload: amelia-mcintosh

Post on 27-Mar-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

Using WEBSASNERC Learning Objectives

Suggested Learning Objectives:•Be able to explain the unscheduled flow mitigation plan including the qualification of devices and paths•Be able to define terms used in the UFMP•Be able to state the calculations WebSAS performs•Be able to describe actions taken by operators in response to WebSAS •Be able to demonstrate how to get reports from WebSAS•Be able to explain the examples in the WebSAS trainingRemember: Testing should prove the participant can do the above

Page 2: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

Using WEBSAS

The problemThe planThe toolsExamples

Page 3: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

The problem

Loop flow

Aka

Unscheduled flow

Page 4: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

4

Loopflow and WEBSAS

• There are many WECC-approved loopflow training modules.

• Loopflow can be dealt with using paper matrices or..

• The Unscheduled Flow Administrative Subcommittee has developed a tool called webSAS written by OATI to implement the Unscheduled Flow Mitigation Plan.

• The following slides focus on the UFMP and the use of webSAS to reduce USF.

Page 5: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

The Plan

The WECC Unscheduled Flow Mitigation Plan

Page 6: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

6

WECC Unscheduled Flow Mitigation Plan

• Western version of east-coast TLR.– Most important difference is the western system allows the

market to select schedule to curtail vs. TLR curtails automatically

• UFM Plan embraces these principles:1. Early steps require accommodation of unscheduled flows.2. Later steps require Coordinated Operation of Controllable

devices unless the PST operator creates an overload or low voltage by altering actual flows.

3. Subsequent steps require Import Schedule Curtailments (generation re-dispatch). This is where WEBSAS comes in.

• Paths and controllable devices are “qualified” to take part in the plan.

• Emergency operation is allowed to help non-qualified paths.

Page 7: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

7

WECC UFMP

• The plan requires both tagged and non-tagged transactions be assessed and curtailed (as necessary). The webSAS tools described later deals only with tagged transactions.

• Failure to comply with UFMP can result in RMS sanctions (either a letter or monetary sanctions).

Page 8: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

8

UFMP Terms• Qualified path: A path proven to suffer from unscheduled

flows• Qualified device: A device proven to be effective in

reducing unscheduled flow, usually on more than 1 qualified path.

• Controllable device (series caps, PST’s etc).• + TDF: means your transaction (aka off-path schedule) is

loading someone else’s path (bad)• -TDF: Means your transaction is unloading someone

else’s path (good)• Plan year 1 = 1995, PY2=1996 etc.• Zones: Sources which are electrically very close may be

in the same zone. Schedules move power from one zone to another

Page 9: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

9

UFMP Terms

• Implement – A tag is implemented when it approved and accepted and is in the scheduler. Prior to this, a tag is pending and may be denied or accepted.

• COPS – Coordinated Operation of Phase Shifters, usually coordinated by the RD reliability coordinator.

• Accomodation – Accepting a certain amount of unscheduled flow on a qualified path

• Hubbing – A marketing tool for scheduling energy deliveries to a POR/POD (the hub) that does not represent a true sink. This is similar to scheduling energy receipts from a POR/POD (another hub) that isn’t a true source.

Page 10: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

10

UFMP core principles

• The following chart shows the core principles of the plan and details specific actions triggered by specific flow levels.

• The TDF’s referred to are determined twice each year by the WECC staff and programmed into WEBSAS.

• Remember: In order to provide 2.5 MW relief on a path where your schedule has a 25% TDF, you must curtail the schedule by 10 MW.

Page 11: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

11

Largest TDF’s curtail first

Accommodate 5%

COPS begins at step three

Plan has 9 steps

Page 12: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

12

WECC MessageFrom: OATI1Sent: Tuesday, May 31, 2005 13:15To : ALL WSCCSubject: Path 66 – COI Unscheduled Flow Reduction Procedure

1.       Dispatcher – cisosched12.       Phone – 916-351-24933.       Action Required – See Below4.       Qualified Path – Path 66 – COI5.       Path Flow 37986.       Transfer Capability – 37847.       Schedule – 32888.       Path Operator – CISO9.       Initiating Party – CISO10.   Device Action – Start Coordinated

Controllable Device Operation

11. PPT Action Date – 05/31/05 12. PPT Action Time – 1400 13. PPT Action Zone – PPT 14. Schedule Curtailment – Start

Indicated Level of Schedule Curtailments (See Below)

15. Schedule Curtailment Date – 05/31/05 16. Schedule Curtailment Time – 1400 17. Time Zone – PPT 18. Level – Fourth Level (Step 9) 19. Comments – Path 66 is continuing to

experience USF constraints, they are accommodating 7% or more of USF on the path and is invoking Step 9, Level Four Curtailment of the contributing schedules

Page 13: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

13

Steps 1 & 2: Controllable devices in the overloaded path &

Accommodation• Note the first step is for the qualified path

operator to try to reduce flows on their own path using:– Series caps or inductors– Using PST’s in the overloaded path

• The second step is accomodation of 5% unscheduled flows. More accommodation is required in later steps.– For example, a path with an OTC of 3784 would put

in-place a scheduling limit of .95*3784 or 3595 to accommodate 5% unscheduled flow.

Page 14: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

14

Page 15: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

15

WECC Unscheduled Flow Mitigation Plan (UFMP) Step 3

• MORC says if a PST is not on neutral, it must meet schedule. – This protects an owner from being expected to always

use a PST to meet schedules; natural flow is OK.– Exception in Administrative Procedure 8 allows

incremental adjustments to PST to help unload a qualified path. An incremental adjustment is when a PST is moved a certain number of taps rather than all the way to schedule.

• MORC also says a PST cannot be moved beyond schedule.

• PST’s must be within two (2) taps of schedule if not on neutral.

Page 16: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

16

During Coordinated Operation of Phase Shifters (COPS)

• Takes place after initial accommodation of unscheduled flows by qualified path operator.

• Shouldn’t go beyond schedule on PAR

• Shouldn’t increase USF on the constrained path unless it relieves a similar overload or curtailment elsewhere. (beginning of competing path AP004)

Page 17: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

17

Page 18: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

18

Steps 4 through 9

• Each step requires progressively more accommodation and more off-path import schedule curtailments

Page 19: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

19

UFAS Administrative Practices

• UFAS Administration Practice 001- Procedure for qualifying a controllable device (to get $$ for moving the device).

• UFAS Administration Practice 002 - qualified path needs to be loaded to 95% or more to request relief from unscheduled flow

• UFAS Administration Practice 003 – Procedures for transfer path qualification

Page 20: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

20

UFAS Administrative Practices

• UFAS Administration Practice 004 – Competing requests for qualified path relief (matrix for Paths 36 and Path 66)– Rocky Desert Reliability Coordinator

coordinates competing requests for relief

Page 21: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

21

Pacific Ocean

El Paso

San FranciscoArea

Tucson Area

Phoenix Area

Market

Place

Denver Area

Laramie RiverSalt Lake

City Area

Round Mountain

Malin

MidpointBorah

Celilo

Portland

Area

Seattle

Colstrip

Jim Bridger

Four Corners

Albuquerque

Mexico

Canada

Nevada

Oregon

Washington

Idaho

Arizona

Utah

New

Mexico

Colorado

Wyoming

Montana

California

Los Angeles

Area

Las Vegas Area

British

ColumbiaAlberta

Peace River

San Diego

Path 66Path 36

Page 22: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

22

Competing Paths

• Goals:– Maximize the total unscheduled flow relief brought to

both competing qualified paths.

• Causes:– COPS for one path overloads another– 2 paths encounter congestion for normal patterns of

generation & load

• Solution:– Build matrices to:

• Assure significant BENEFIT to one while not being a significant detriment to the other.

Page 23: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

23

Schedules can affect two paths in three ways

• Hurt both– In this case, curtail the schedule by the

amount corresponding to the largest Transfer Distribution Factor (TDF)

• Help both– Don’t curtail

• Help one and hurt the other– Curtail only if you help one TWICE as much

as you hurt the other.

Page 24: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

24

PSC Cherokee to LDWP Example

Path 66

TTC= 4175

Path 36

TTC = 1424

COPS of TOT 2

Cherokee

LA

Page 25: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

25

Cherokee to LDWP TDF’s

• On Path 66, TDF = + 37– 37% of a schedule from Cherokee to LA

increases loading on path 66

• On Path 36, TDF = - 35– 35% of a schedule from Cherokee to LA

decreases loading on path 36

• In other words, this schedule LOADS path 66 and UNLOADS path 36.

Page 26: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

26

AP004

• If Positive TDF/Positive path rating is greater than TWICE Negative TDF / Negative path rating, then curtail the schedule which will unload path 66 by twice what it loads path 36.

• Also, AP004 instructs the RDRC to go immediately to step 8 accommodation level and step 9 curtailment level.

Page 27: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

27

UFAS Administrative Practices

• UFAS Administration Practice 005 – rapid advance to latter steps of procedure

• UFAS Administration Practice 006 – Use of TOT 2 phase shifters for coordinated cut-plane operation (allows total TOT2 to meet MORC, vs. TOT2a, or b, or c)

Page 28: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

28

UFAS Administrative Practices

• UFAS Administration Practice 007 – Curtailment event evaluation selection process

• UFAS Administration Practice 008 – Use of phase shifters to provide obligated path relief

Page 29: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

29

PST’s require two special exemptions from the UFMP

1. Owners of any PST’s (not just qualified) may be exempt from curtailing certain schedules between neighbors.

– Schedules to neighbors through qualified PST’s operating under COPS may also be exempt. These schedules are identified by POR’s/POD’s on either side of the PST AND by source and sink in the CA’s immediately adjacent to the PST.

2. Owners of PST’s may use the PST to unload a qualified path in-lieu of curtailing a schedule

Page 30: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

30

PST’s holding schedule with neighbor

1. Owners of PST’s may be exempt from curtailing certain schedules.– If COPS doesn’t provide all of the relief required and

the UFMP is moving into the schedule curtailment steps (steps 4-9), then…

– Schedule curtailments are required from all (including PST owners) and…

– Whether a PST is holding schedule (act=sched) OR a qualified PST is participating in COPS (in COPS, PST actuals need NOT equal to schedules)…

• Schedules across the PST between adjacent CA’s will not be curtailed

Page 31: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

31

Use of PST’s vs. curtailing schedules

2. Owners of PST’s may use the PST to unload a qualified path in-lieu of curtailing a schedule– It is OK to move the PST away from schedule or

neutral in-lieu of curtailing schedules. This is referred to as incremental PST operation.

– The PST owner must demonstrate the effectiveness of the incremental change on reducing unscheduled flows on the qualified path.

– The PST must not be participating in COPS for this incremental operation.

Page 32: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

32

AP008 using PST vs curtailmentUse of PST operation to meet a Member’s Path relief obligation

under the Schedule Curtailment phase of the Procedure.• “Schedule reductions shall not be required by the Member to the

extent that controllable elements (which are not operated in a coordinated manner) are incrementally operated during the USF event to achieve an equivalent reduction in USF across the constrained Qualified Transfer Path. The Member shall be able to document and demonstrate that an equivalent USF reduction has been achieved through the use of the controllable element.”

• Allowed relief under this provision of AP008 is only available to the Member that operates a controllable device as only this member can document and demonstrate an equivalent USF reduction. This relief is a function of the incremental operation of a phase shifting transformer or other controllable device and cannot be identified by adjustment or curtailment of a NERC Transaction Tag. Therefore, this relief would be identified directly in webSAS by the Control Area responsible for PST operation.

Page 33: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

33

One method to document and demonstrate the use of a PST vs

Tag Curtailments

1. Determine the relief required on the qualified path

2. Contact the reliability coordinator and path operator and express your intentions to use the PST vs curtailing tags.

3. Move the PST and verify the affects on the path suffering USF by talking to the path operator.

Page 34: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

34

Examples of AP008

• Colstrip to Bonanza (Utah)

• Colstrip to Northeastern Colorado

• Colstrip to LDWP

• Colstrip to PACW(Wyoming)

Page 35: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

35

AP008 example: Curtailments required in Step 9 of UFMP

TDF% Curtailment %10-14 10

15-19 15

20-29 20

30-49 25

50+ 35

Page 36: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

36

AP008 Example 1 (see next slide)

• Colstrip to Bonanza (Utah) TDF on path 30 (TOT1 east to west ) = +34.5. This means 34.5 % of a schedule from CS to Bonanza flows on path 30– Step 9 UFMP would require a 25% reduction in any

schedule between the zone containing CS and the zone containing Bonanza

– If WEBSAS identified 4 schedules totaling 80 MW’s between these two zones, 27.6 MW’s (34.5%) would be flowing on Path 30.

• The UFMP would require 6.9 MW (25% of 27.6 MW) reduction in Path 30 flows

• NWMT may choose to incrementally change the PST’s at Montana-Southeast to reduce the flow on Path 30 by 6.9 MW.

• If NWMT reduced the PST flows at MTSE by 6.9 MW, NOT all of the 6.9 would show up on Path 30.

• Thus, NWMT must change PST flows more than 6.9 to assure enough relief of Path 30.

Page 37: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

37

Path 30 E to W, CS-Bon Example

CS

BonNE Col

100 MW sc

hedule

Path 30 TDF = 34.5

Page 38: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

38

AP008 Example 2

• Colstrip to Northeastern Colorado TDF = -28.6 meaning a 100 MW schedule from CS to NE Colorado reduces east to west flows on path 30 by 28.6 MW.

Page 39: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

39

Path 30 E to W CS-NE Colorado Example

CS

BonNE Col

100

MW

sch

edul

e

Path 30 TDF = 28.6

Page 40: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

40

TDF’s for Colstrip Schedules affecting other qualified paths

• Path 15

• Path 66

Page 41: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

41

CS TDF’s for Path 15 (path 15 South to North)

CS-LADWP TDF = -70.8 CS-PACW/SOR = +9.7

CS CS

PACW/SOR

LA

Page 42: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

42

CS TDF’s for Path 66 (COI North to South)

CS- SMUD = +83.5 CS – PACW/SOR = -8.8

CS CS

SMUD

PACW/SOR

Page 43: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

43

Actual AP008 examples

• To be provided later

Page 44: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

44

UFAS Administrative Practices• UFAS Administration Practice 009 – In the

past, any schedule that affected a qualified path would not be allowed to start during a UFM Event, regardless of how small the affect is.

• This could shut down 1000’s of MW’s of schedules for almost no reason.

• AP009 says that if a schedule has a very small (<5%) affect on a qualified path, allow the schedule to start because the system has at least +/- 5% incertainty.

Page 45: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

The tools

Websas is a tool developed by OATI to implement the plan.

There are non-webSAS methods also, primarily using paper

matrices.The following is for webSAS only.

Page 46: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

46

UFMP Tools

• WEBSAS is the Security Analysis Service program from OATI to coordinate unscheduled flow mitigation in the WECC Interconnect– Determines relief requirements– Suggests on and off-path schedule curtailment

options– Ties to e-tag and WECC message net

• WEBSAS determines affect of on and off-path schedules on path that is loading due to USF.

• WEBSAS then recommends schedule cuts

Page 47: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

47

WEBSAS needs or calculates the following:

• Path Operator establishes:– Stage (step) of USF event– Path(s) suffering USF

• Websas determines:– Your implemented tags from zone to zone– Your TDF’s from zone to zone affecting the suffering path– The MW’s relief you could provide given tags you are sinking

and their TDF’s– Is it the top of the hour?

• Doesn’t need to know:– Your total net interchange schedule– Ramp information (WEBSAS uses fully ramped-in tag MW’s)

Page 48: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

48

WEBSAS Curtailments

• On-path tags are on the qualified path and a subject to accommodation curtailments.

• Off-path tags are those on paths parallel to the qualified path and are subject to relief mitigation.– The WECC member load control area or the

load serving entity (or their assigned agent) are responsible for the curtailments of off-path schedules based on TDF’s.

Page 49: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

49

From the UFAS FAQ list on the WECC website

Question - The Unscheduled Flow Mitigation Procedures (USF) describe a Receiver as being responsible for providing USF relief. How has this been interpreted by WECC with relation to E-tags?

Answer – WECC has determined that the Receiver is the Load Serving Entity (LSE) on the E-tag. The entity responsible for providing the relief is dependant upon if the LSE on the E-tag is a WECC member or not, as follows:– If the LSE on the E-tag is a WECC member, then that LSE is

responsible for providing relief requirements under the USF.– If the LSE on the E-tag is NOT a WECC member, then the Load

Control Area on that E-tag is responsible for providing relief requirements under the USF.

Reference USFMP Section 9.h.ii

Page 50: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

50

Member LSE’s

• The host control area won’t see the tags to be curtailed if the LSE is a WECC member unless the CA is an agent for the LSE.

• If the CA is not an agent for the LSE, the LSE is responsible for curtailments.

• Also, a member LSE practicing “hubbing” is not exempt from making tag curtailments. They may assign their responsibility to their host control area if the host CA is their agent .

Page 51: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

51

Responsible Party can be found on Tag

CA   GPE SOURCE   CONTRACT MISC

CISO   SELLPSE SP15      

  TP PSE POR POD SE CONTRACT MISC

  CISO SELLPSE SP15 ELDORADO500 CISO    

  CISO SELLPSE ELDORADO500 FOURCORNE345 AZPS    

  AZPS BUYPSE FOURCORNE345 VALLEY AZPS    

CA   LSE SINK   CONTRACT MISC

AZPS   BUYPSE BANKONEBALLPARK      

Responsible Party

Page 52: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

52

UFMP Tools

• WEBSAS uses a matrix to determine the affect of a schedule from one zone to another on the path experiencing the overload due to unscheduled flows.

• The matrix provides Transfer Distribution Factors (TDFs) to determine the % of on and off-path schedules that shows up on overloaded path.– No action required if the TDF is less than 10%

Page 53: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

53

WebSAS

• WEBSAS snaps a schedule picture and applies the TDF’s when UFS event is announced on WECC_NET.

• WEBSAS then recommends tag cuts for each entity that will reduce overloads on path suffering due to USF.

• The tag cuts are based on the impact a particular schedule has on the over-loaded path.

Page 54: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

54

Add Alternative Action• If the operator desires to provide required relief

via some alternative mechanism rather than curtailing E-tags (perhaps raising generation at a particular unit or issuing a counterflow transaction or operating a PST), then the operator should:– Leave all E-tags unselected and select “Confirm”– In the new window that opens, select “Add Alternative

Action”. Type in the text notes describing the alternative action and select confirm. No E-tag curtailments will occur, but your text entry will be logged for WECC staff to review.

Page 55: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

55

Execution & Effective Time

• Execution Time: When the path operator requests a USF event (asks for relief). This is when the event is called.

• Effective Time: Top of hour following execution time. This is when the event actually starts and when webSAS determines compliance.

• Pre-event tags are any tags implemented before the execution time

• Post-event tags are any tags implemented after the execution time.

Page 56: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

56

Pre-event tag example

• Let’s say a tag is approved and accepted and is in the scheduler (either real-time or day-ahead) and power is to begin to flow at 14:50 (as the ramp begins) and is supposed to flow for three hours.

• Let’s also say an event is called at 14:20 (execution time) with an effective time of 15:00.

• Because the tag was in the scheduler prior to execution time, webSAS treats this as a pre-event tag.

Page 57: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

57

WECC Message

From: OATI1Sent: Tuesday, May 31, 2005 13:15To : ALL WSCCSubject: Path 66 – COI Unscheduled Flow Reduction Procedure 10.   Device Action – Start Coordinated Controllable Device Operation 11. PPT Action Date – 05/31/05 12. PPT Action Time – 1400 13. PPT Action Zone – PPT 14. Schedule Curtailment – Start Indicated Level of Schedule Curtailments (See Below) 15. Schedule Curtailment Date – 05/31/05 16. Schedule Curtailment Time – 1400 17. Time Zone – PPT 18. Level – Fourth Level (Step 9) 19. Comments – Path 66 is continuing to experience USF constraints, they are accommodating 7% or more of USF on the path and is invoking Step 9, Level Four Curtailment of the contributing schedules

Execution Time

Effective Time

Page 58: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

58

Pre & Post event tags

• There are different rules for curtailing pre and post event tags.

• Pre-event tags with TDF’s as high as 9.99% may not be curtailed

• Post-event tags with TDF’s as low as 6% will be curtailed– The tags with TDF’s between 6% and 9% are

most susceptible to NOT flowing post event and flowing pre-event.

Page 59: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

59

Your actions to curtail tags may help or hurt

0You are helping (unloading) the suffering path

You are hurting (loading) the suffering path

1) USF events of interest start with you hurting path.

2) WEBSAS calculates you should help this much.

NEG relief provided POS relief provided

3) WEBSAS helps you move from NEG to POS

Page 60: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

60

Floating Box

Agent: ControlAreaXYZ

Relief

Required4.5 Total Relief

Provided = (1) + (2)

-6.5

(1) Post USF Tags Relief

(2) IMPLEMENTED

E-tag Adjustments

(3) webSAS Relief

Selected Adjustments

Total Relief Expected =

(1) + (3)

-11.6 5.1 0.0 -11.6

Page 61: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

61

WEBSAS output curtailed schedules

• Relief required: WEBSAS calculates your responsibility for relief on the suffering path to be this much. This is all based on tags sinking in your control area and their TDF percentages.

• This amount is calculated when the event is called, that is, the execution time.

• The amount is based on all current IMPLEMENTED tags.

• This value does not change.

Page 62: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

62

Relief Required

• Relief Required is calculated for each entity by WEBSAS using the TDF matrices at execution time.– POS Relief Required means the receiving

entity (i.e. your control area) must take action to provide some relief.

– NEG Relief Requirement means the receiving entity (i.e. your control area) took actions prior to the execution time that helped relieve the path.

Page 63: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

63

Relief Provided

• Relief Provided is calculated between execution time and effective time.– POS Relief Provided indicates you have taken

some action to relieve the suffering path and you have helped.

– NEG Relief Provided means you have taken some action to LOAD up the suffering path and you haven’t helped at all.

Page 64: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

64

Relief Provided

• This value must be equal to or greater than Relief Required in order to be compliant.

• Remember the relief provided is measured as you are going into the top of the hour.

Page 65: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

65

WEBSAS output Floating Box

• (1) Post USF tags Relief: This value is the result of applying the TDF’s to all “Implemented” tags after the USF event is called at the execution time. This number can change as tags come in or are withdrawn.– A negative value means you are hurting the

suffering path.– A positive value means you are helping the

suffering path.

Page 66: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

66

Floating Box 2 (must refresh to update!!)

• Floating Box 2: IMPLEMENTED E-tag Adjustments

• This value is calculated form all E-tag adjustments, curtailments, and extensions that went IMPLEMENT after the USF event was called.

• The value is Positive to help or Negative to hurt the current USF event.

• This number can change as more E-tags go Implemented.

Page 67: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

67

Floating Box 3 (must refresh to update!!)

• Floating Box 3: webSAS relief selected adjustment

• This value is calculated from all E-tags selected in the webSAS tool at the current time.

• This number fluctuates as new E-tags are selected within the current display.

• This is an aid to help determine if the selected E-tags provide adequate relief.

Page 68: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

68

Floating Box

Agent: ControlAreaXYZ

Relief

Required4.5 Total Relief

Provided = (1) + (2)

-6.5

(1) Post USF Tags Relief

(2) IMPLEMENTED

E-tag Adjustments

(3) webSAS Relief

Selected Adjustments

Total Relief Expected =

(1) + (3)

-11.6 5.1 0.0 -11.6The word “Implemented” refers to tag status and means the tags and/or tag changes affecting your ACE.

Box 3 represents adjustments made with WEBSAS

Page 69: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

69

Floating Box

Agent: ControlAreaXYZ

Relief

Required4.5 Total Relief

Provided = (1) + (2)

-6.5

(1) Post USF Tags Relief

(2) IMPLEMENTED

E-tag Adjustments

(3) webSAS Relief

Selected Adjustments

Total Relief Expected =

(1) + (3)

-11.6 5.1 0.0 -11.6

Turns Green if enough has been curtailed. Main page also turns green/red depending on if you’ve curtailed enough.

These numbers only change when curtailment has been implemented with WEBSAS.

This number will change as tags & changes are implemented

Page 70: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

70

Floating Box Example

1. Using the TDF’s applied to active schedules when the USF event was called (execute time), WEBSAS came up with your relief required = 4.5 MW

2. Post-event tags have come in that hurt the victim path by 11.6 MW

3. Curtailments (non-WEBSAS), adjustments, counterschedules, and extensions have been implemented that have helped by 5.1 MW’s

4. So you need to use WEBSAS to get from -6.5 (hurting) to + 4.5 (helping) or about 11 MW’s of further actions required to reduce your impact on victim path.

Page 71: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

71

Floating box example

(1) Due to post-event schedules, you are now hurting the other path by 11.6 MW

NEG(Hurting)

POS(Helping)

(2) WEBSAS has calculated your help so far to be

+ 5.1 MW

-6.5-11.60

(3) Your initial relief required was 4.5 MW’s

You need to use WEBSAS to get 11 MW’s more relief on the victim path.

Page 72: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

72

Event time reset

• For the first years of the plan, a USF event could go on for days.

• Timer now starts when moving past step 3 of procedure.

• Event terminates whenever the event goes below step 4.

Page 73: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

73

Post-event tag problem• Let’s say the original WEBSAS snapshot showed you

had no “relief required”. In other words, at execution time, none of your tags affected the path suffering USF.

• Also, let’s say before the ramp, you get 3 tags with TDF’s higher than 5% on the suffering path and you IMPLEMENT the schedules.

•   On the hour, when WEBSAS does another snapshot to send to WECC RMS group to determine compliance, your relief provided will be NEGATIVE and will show up in the “IMPLEMENTED E-tag adjustments” in the floating box because of the 3 new IMPLEMENTED tags.

Page 74: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

74

Solution to post-USF tag problem

• Refresh the screen often, especially around 00:50 to catch late tags.

• Once refreshed, your floating box will properly reflect your actions and obligations.

Page 75: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

Websas screens

Page 76: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

76

Welcome page

Page 77: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

77

Welcome Screen

• Look for your control area name and make sure it is correct

• Look at your user name to make sure it is correct (not all users have permission to curtail tags).

• Look at the messages for any recent changes. Often specific Change Orders are listed.

• Note the time and verify your time zone

Page 78: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

78

Try to review the latest Business Rules old

Page 79: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

79

WebSAS Transaction List:ToolsTransactions

Page 80: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

80

Transaction Screen

• This screen shows all tags sinking in your control area for which you are the agent– View transactions means see current hour

transactions only.– View next hour transaction changes means

show this hour tags PLUS next hour tag MW’s, changes or terminations.

– Transaction and Active MW’s will differ if there has already been a curtailment.

Page 81: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

81

ToolsTransaction Contributions

NWMT may be required to reduce these schedules for a path 20-C event

Page 82: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

82

Transaction Contributions• Shows how much each OFF-path tag

sinking in your control area affects the qualified path.– A POS TDF means these tags make the

loading on the victim path WORSE.– A NEG TDF means these tags make the

loading on the victim path BETTER.

• This screen is useful if an event is in the non-curtailment steps (steps 1-3) and an entity wants to see if they have tags coming up that may have to be curtailed.

Page 83: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

83

Red/green/black TDF column

Warning or Highlight for Negative TDFs – TDFs in the USF Procedure Report are color coded (red, green, and black).

• Red = Over the minimum threshold and must be dealt with immediately.

• Green = These tags are helping the suffering path and should not be curtailed

• Black = No action required

Page 84: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

84

TDF % in color

Page 85: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

85

Preload MW Cap According To Curtailment Requirement

• This feature gives the option to preload the MW Cap column for Off Path tags according to the curtailment requirements for each tag.

• To use the new functionality, click on the icon next to the ‘Tag Adjustments’ header when looking at off-path tags in a USF Report. 

• A menu will be displayed with an option to preload the MW Cap column or to reset the column. 

• Since fractional adjustments are not allowed, the preloaded MW Cap is rounded down to the next whole number so as to assure that the total relief provided will be no less than the requirement. 

• After preloading, the ability to modify the adjustments before confirmation will still be available.

Page 86: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

86

MW Cap selection

Page 87: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

87

Dropdown Path Listing shows other paths and NWMT transactions

affecting those paths

Path 20 aka Path C is affected by these NWMT Schedules

Page 88: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

88

ModelTransfer Dist Factor

Page 89: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

89

TDF Study

• Under ModelTransfer Distribution factor, you are able to study how much a schedule from source to sink affects a qualified path.

Page 90: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

90

LogUSF Procedures

Page 91: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

91

USF Log

• The log is useful to examine recent history:– Paths that have had trouble recently– Time of day to expect trouble– To determine how long events on this path

may last– Determine what step of the plan was reached– Note also the TDF update date to let you

know when OATI put in the latest TDFs from the WECC staff.

Page 92: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

92

ModelZones

Page 93: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

93

Zones

• The TDF’s are calculated from Zone to Zone.

• The Zone Lists cross reference from Zone Name to Zone Number.

Page 94: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

94

Record Name Zone #59 Statelin 419

60 SUN 197

61 TPWR 412

62 WalcDavs 191

63 WAUM 631

64 WKPL 521

65 WYO/Cent 652

66 WYO/NE 737

67 WYO/SE 731

68 YTbighrn 734

69 Zone 1 1

Page 95: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

95

Zone Lists

• Each zone has a name and a number.

• Sources and sinks are assigned to zones

• Tags do not contain zone information so this tables cross-references sources and sinks to zones.

Page 96: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

96

MappingSource/Sink-Zone

Page 97: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

97

Websas Examples

• Ex. 1: May 31, 2005 NWMT had post-event tags.

• Ex. 2: Path 36 and 66 Event on May 19, 2005– Competing requests for relief

Page 98: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

98

WEBSAS Ex 1 May 31, 2005

• COI (Path 66) event at step 9• Path Limit = 3784 MW• Path Actual = 3798 MW, 14 MW OTC violation

• Schedule Limit = 3519 MW, Accomodating 3784 – 3519 = 265 MW which is 7% of Path Limit

• Schedules = 3288, which is 231 MW less than schedule limit

• Total Unavailable to COI owners = 231 + 265 = 496 MW

Page 99: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

99

Ex 1, Solution• Since Path Actual exceeds Path Limit by 14 MW

and• On-path accomodation is over 7% (265 MW’s)• Off-path tags must be cut to get 15 MW relief• At the time the event was called:

– BPA P01 PSE could provide 1.9 MW relief– SPP S1 PSE could provide 7.0 MW relief– TSPMTS PSE could provide 6.6 MW relief– NO relief required from NWMT

• All WEBSAS agents should watch for post-event tags, however

Page 100: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

100

Ex 1, NWMT’s part of Solution

• NWMT had 38 tags (36 Implemented tags at time event was called and 2 post-event tags); 4 implemented and 1 post affect COI.

• 5 post/impl tags affected COI, 4 with +TDF and 1 with – TDF

• TDF * scheduled MW’s for the 5 tags summed to +3.8 and -0.6 for net of +3.1

• Curtail the + TDF tags to get 3.1 MW relief

Page 101: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

101

Ex 1 NWMT post/impl tags

• POSTCHPD_AVA_NWMT .04*70 = 2.8

• IMPLBPAT_BPAP_NWMT .05*12=.6

• IMPLBPAT_BPAP_NWMT .05*5=.25

• IMPLCHPD_REMC_NWMT .04*2=.1

• IMPLIPC_IPC_NWMT -.02*30=-.6

Total = 2.8 + .3 = 3.1

Page 102: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

102

Ex 1 NWMT Actions on May 31, 05 didn’t help

• Didn’t curtail the IMPLEMENTED tags using WEBSAS as seen in Floating Box part 2 & 3 (=0)

• Didn’t curtail the post-event tags as seen in Floating Box part 1 (= - 2.8)

Page 103: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

103

Ex 1, What we should have done May 31, 2005

• Use WEBSAS to curtail IMPLEMENTED tags for .3 MW relief (Box 2 & 3 = 0.3)

• Use WEBSAS to curtail post-event tags for 2.8 MW relief (Box 1 = +2.8)

• Total relief provided would be 3.1for cutting 89 MW’s of tags

Page 104: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

104

May 31, 2005 Event Floating BoxAgent: ControlAreaXYZ

Relief

Required0.0 Total Relief

Provided = (1) + (2)

-2.8

(1) Post USF Tags Relief

(2) IMPLEMENTED

E-tag Adjustments

(3) webSAS Relief

Selected Adjustments

Total Relief Expected =

(1) + (3)

-2.8 0.0 0.0 -2.8

Should have been 0.3

Should have been +3.1

Should have been +2.8

Page 105: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

105

Special Tags affecting Path 66

• If a schedule from AVA to NWMT is cut because it has a POS TDF for Path 66, be sure AVA doesn’t replace it with a tag equally as bad on path 66.

• A list of generators with NEG TDF for Path 66 to NWMT may be handy.

• NWMT must serve the load with tags not POSITIVELY affecting COI.

Page 106: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

106

WEBSAS Ex 2, Path 36 & 66

• Path 36 should accommodate 77 MW (13%) and has only cut on-path schedules by 50 so they have 27 left to cut on-path. There were no off-path schedules to cut for path 36.

• Path 66 had accomodated 154 MW (5%) but needed some help from NWMT.

Page 107: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

107

Ex 2, NWMT tags for path 66• 1 post-event tags for 20 MW at 5% = 1 MW• 4 tags with POS TDF

– BPAT_BPAP_NWMT 5% * 6 = 0.3– BPAT_BPAP_NWMT 5% * 20 = 1.0– BPAT_PSCMPS_NWMT 5% * 1 = 0.0– BPAT_PPLMS_NWMT 5% * 10 = 0.5

• 1 tag with NEG TDF– IPCO_IPCM01_NWMT -2%*30 = -0.6

• Total = 1.8 + 1 = 2.8 and with credit for IMPLEMENTED NEG TDF tag with -.6 affect, 2.8 - .6 = 2.2 MW relief from NWMT.

• This shows we get credit for good tags that help reduce the path overloads.

Page 108: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

108

NWMT total relief required

• 2.2 MW relief required– 1 MW post-event– 1.2 MW IMPLEMENTED tags

• 1.8 POS TDF’s• -0.6 NEG TDF’s

Page 109: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

109

Ex 2 May 19, 2005: NWMT Actions

• NWMT did not curtail 20 MW post event tag to get 1 MW relief

• NWMT did not curtail 37 MW’s of IMPLEMENTED tags to get 1.2 MW relief

• NWMT should have used WEBSAS to do both to get – Box 1 = 1– Box 2 = 1.2

Page 110: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

110

May 19, 2005 Event Floating BoxAgent: ControlAreaXYZ

Relief

Required2.2 Total Relief

Provided = (1) + (2)

-1.0

(1) Post USF Tags Relief

(2) IMPLEMENTED

E-tag Adjustments

(3) webSAS Relief

Selected Adjustments

Total Relief Expected =

(1) + (3)

-1.0 0.0 0.0 0.0

Should have been 1.2

Should have been 2.2

Should have been +1

Page 111: Using WEBSAS NERC Learning Objectives Suggested Learning Objectives: Be able to explain the unscheduled flow mitigation plan including the qualification

Go forth and curtail!

Please send comments and suggestions to the Unscheduled Flow Administrative Subcommittee exploder