using serial number tracking at an operation_spd
TRANSCRIPT
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
1/19
System Process DocumentUsing Serial Number Tracking at an Operation
Department
Responsibility/Role
File Name 27762880.docRevision
Document Generation Date 18/01/2010 09:38:00
Date Modified 1/18/2010 09:38:00 AM
Last Changed by
Status
Using Serial Number Tracking at an Operation
Trigger:
Concept
The Serialization Start Op Seq flag in the Routing Details page indicates that item tracking
with serial numbers begins at this particular operation. This enables you to track items using
serial numbers prior to the completed transaction. You must check this field to use serial number
tracking for Oracle Work in Process transactions.
Serialization Start Operation determines the job operation where serial number tracking begins.
The serial start operation on the item routing is always copied to the job routing during jobcreation. If there is no serialization start operation on the item routing, and this parameter is
enabled, the serialization start operation is defaulted to the first operation on the job routing. This
value displays on the Discrete Jobs page. If this parameter is not enabled, the serialization startoperation on the job routing is blank, and serialization is disabled.
In this topic, you will use serial number tracking at an operation.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/18/2010 09:38:00 AM Page 1
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
2/19
System Process DocumentUsing Serial Number Tracking at an Operation
Procedure
Step Action
1. Begin by navigating to the Routings page.
Click the vertical scrollbar.
Page 2 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
3/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
2. Click the Manufacturing and Distribution Manager link.
Last changed on: 1/18/2010 09:38:00 AM Page 3
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
4/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Routings link.
Page 4 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
5/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
5. Use the Organizations page to select your organization.
Last changed on: 1/18/2010 09:38:00 AM Page 5
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
6/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OKbutton.
orPress [Alt+O].
Page 6 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
7/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
8. Use the Routings page to define the operations for a routing and the sequence to
perform them.
You can define a primary or an alternate routing.
You can also navigate to the Routing Details and Routing Revisions pages from
this page.
Last changed on: 1/18/2010 09:38:00 AM Page 7
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
8/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
9. Click in the Item field.
Page 8 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
9/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
10. Press [F11].
Step Action
11. Enter the desired information into the Item field. Enter "RT1000".
Last changed on: 1/18/2010 09:38:00 AM Page 9
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
10/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
12. Press [Ctrl+F11].
Step Action
13. Click the Routing Details button.
Page 10 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
11/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
14. Use the Routing Details page to enter the serialization start operation sequence and
the details of where you store the finished assemblies upon completion.
The Serialization Start Operation determines the job operation where serial
number tracking begins. The serial start operation on the item routing is always
copied to the job routing during job creation. If there is no serialization start
operation on the item routing, and this parameter is enabled, the serialization startoperation is defaulted to the first operation on the job routing. If this parameter is
not enabled, the serialization start operation on the job routing is blank, and
serialization is disabled.
Last changed on: 1/18/2010 09:38:00 AM Page 11
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
12/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
15. Click in the Serialization Start Op Seq field.
Page 12 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
13/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
16. Enter the desired information into the Serialization Start Op Seq field. Enter "10".
Step Action
17. Click in the Locator field.
Last changed on: 1/18/2010 09:38:00 AM Page 13
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
14/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
18. Use the Completion Locatorpage to enter the row and rack where you want the
finished goods to be stored.
Page 14 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
15/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
19. Click in the Row field.
Step Action
20. Enter the desired information into the Row field. Enter "A".
Last changed on: 1/18/2010 09:38:00 AM Page 15
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
16/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
21. Click in the Rackfield.
Page 16 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
17/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
22. Enter the desired information into the Rackfield. Enter "1".
Step Action
23. Click the OKbutton.
orPress [Alt+O].
Last changed on: 1/18/2010 09:38:00 AM Page 17
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
18/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
24. Click the Save button.
Page 18 Last changed on: 1/18/2010 09:38:00 AM
-
8/14/2019 Using Serial Number Tracking at an Operation_SPD
19/19
System Process DocumentUsing Serial Number Tracking at an Operation
Step Action
25. You have completed the Using Serial Number Tracking at an Operation procedure.
End of Procedure.
Last changed on: 1/18/2010 09:38:00 AM Page 19