using existing infrastructure at the lesourdsville wrf to ......•centrifuge added in 2003...
TRANSCRIPT
![Page 1: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/1.jpg)
Using Existing
Infrastructure at
the LeSourdsville
WRF to Increase
Wet Weather
Capacity
June 24, 2015
Tony Farina, PE
![Page 2: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/2.jpg)
• Original 4 MGD plant
constructed in 1974
– RBCs, tertiary filtration,
chlorine disinfection
• Expansion to 6 MGD in 1989
– 2 MG oxidation ditch added
• Solids improvements in 1992
• Expansion to 12 MGD in 1994
– 5 MG oxidation ditch, final
clarifiers and UV added
• Centrifuge added in 2003
LeSourdsville WRF History
![Page 3: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/3.jpg)
• Completed in
2007
• Estimated future
growth up to
buildout
• Estimated peak
flows from 2, 5
and 10-year
storms
Collection System Master Plan
![Page 4: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/4.jpg)
• Goals:
– Address reliability and redundancy
– Plan for future growth and more stringent effluent limits
– Increase wet weather capacity
– Evaluate biosolids options
– Evaluate non-process facilities
• Completed in 2008
• Recommended phased improvements
WRF Master Plan
![Page 5: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/5.jpg)
Prior Configuration
• RBC train taken out of
service
• Limited influent pumping
capacity (32 MGD total)
• All flows through
screening and grit
removal with limited
capacity
![Page 6: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/6.jpg)
Prior Configuration
• Large oxidation ditch
provided majority of
biological treatment
– Small oxidation ditch used
only for wet weather and
during maintenance of large
ditch aerators
• Limited clarifier capacity
• Limited RAS pumping
capacity and redundancy
![Page 7: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/7.jpg)
Influent Flow Criteria
Condition Annual Average
Capacity (MGD)
Peak Secondary
Capacity (MGD)
Peak Influent
Capacity (MGD)1
2008 12 32 32
Near-Term 15 36 70
Future 18 54 100
NOTES: 1 Desired peak influent capacity based on collection system modeling for 6 hr simulated storm event.
![Page 8: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/8.jpg)
• Evaluated combination of flow EQ and
optimizing secondary treatment for wet
weather
• Considered two alternatives for flow EQ:
– New flow EQ tanks (prestressed)
– Convert oxidation ditches to flow EQ
Wet Weather Flow Management
![Page 9: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/9.jpg)
• Estimated EQ storage volumes based on
collection system modeling:
Wet Weather Flow Management
Annual Average
Capacity (MGD)
EQ Storage Volume (MG)
2-Year Storm 5-Year Storm
12 2.5 9.0
15 3.1 11.7
18 3.5 13.1 NOTES: 1 Volumes determined based on assumed hydraulic capacity of secondary treatment of
three times annual average capacity and 6-hour storm. 18 MGD volumes estimated based
on extrapolating values for 15 MGD condition.
![Page 10: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/10.jpg)
• Compared estimated construction costs: new
EQ tanks approx. 3X converting existing
oxidation ditches
• First convert large ditch (5 MG)
• In future, convert small ditch (2 MG) as
needed
Wet Weather Flow Management
![Page 11: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/11.jpg)
• Used BioWin model to estimate volumes
based on anticipated future effluent limits:
Secondary Treatment Evaluation
Parameter Anticipated Future Effluent Limits
Near Term Future
TSS (mg/L) 12 12
CBOD5 (mg/L) 9 summer /
10 winter
9 summer /
10 winter
NH3 (mg/L) 1 summer /
3 winter 1
TP 1 (above 12 MGD) 1
TN - 5 summer /
10 winter
![Page 12: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/12.jpg)
• Considered two alternatives:
– Existing + new oxidation ditches + additional reactors
– New conventional activated sludge (CAS) aeration
basins
• Estimated construction costs:
– 15 MGD, summer nit. – CAS approx. 2X OD
– 18 MGD, year-round nit., bio P – CAS approx. 1.5X OD
– 18 MGD, BNR – CAS approx. 1.25X OD
Secondary Treatment Alternatives
![Page 13: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/13.jpg)
• EQ / secondary treatment combined costs:
– 15 MGD, summer nit. – approx. same
– 18 MGD, BNR – CAS < OD
• Selected CAS with conversion of OD to flow EQ
– Accommodate wet weather flow management (step
feed)
– Additional redundancy (multiple basins)
– More easily expandable in future for nutrient limits
Wet Weather Management / Secondary Treatment Evaluation
![Page 14: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/14.jpg)
• Limited capacity (32 MGD total), pump
maintenance concerns
• Options to increase influent pumping capacity:
– Rehab existing pump station + construct small new
pump station
– Demo existing pump station + construct large new
pump station
• Size influent pumping firm capacity to match
projected peak influent flows (70 MGD,
expandable to 100 MGD)
Influent Pumping
![Page 15: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/15.jpg)
Influent Pumping
Trenton
Pump Station
PTF
Influent
Channel
Incoming
Sewer
Additional
Sewer
for Future
Capacity
Existing IPS
New IPS
Trenton
Pump Station
PTF
Influent
Channel
Incoming
Sewer
Incoming
Sewer
Additional
Sewer
for Future
Capacity
Additional
Sewer
for Future
Capacity
Existing IPS
New IPS
Trenton
Pump Station
PTF
Influent
Channel
Incoming
Sewer
New IPS
Trenton
Pump Station
PTF
Influent
Channel
Incoming
Sewer
Trenton
Pump Station
PTF
Influent
Channel
PTF
Influent
Channel
Incoming
Sewer
Incoming
Sewer
New IPS
Rehab Existing + Construct New Demo Existing + Construct New
• Similar estimated construction costs – demo
existing / construct new selected based on site
constraints
![Page 16: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/16.jpg)
• Options to increase screening and grit removal
capacity:
– Construct new screening and grit removal facility + use
existing facility for grit dewatering
– Demo existing structure and construct new screening
and grit removal facility
• Size screening/grit removal capacity to match
projected peak influent flows (70 MGD,
expandable to 100 MGD)
Preliminary Treatment
![Page 17: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/17.jpg)
• Similar estimated construction costs – demo
existing / construct new selected based on site
constraints
Preliminary Treatment
PTF
Influent
Channel
From
IPS
To Flow EQ
To
Secondary
Treatment
Existing PTF
New PTF
Convert to
Grit Treatment
ONLY
PTF
Influent
Channel
PTF
Influent
Channel
From
IPS
To Flow EQ
To
Secondary
Treatment
Existing PTF
New PTF
Convert to
Grit Treatment
ONLY
PTF
Influent
Channel
From
IPS
To Flow EQ
To
Secondary
Treatment
New PTF
PTF
Influent
Channel
PTF
Influent
Channel
From
IPS
To Flow EQ
To
Secondary
Treatment
New PTF
Demo Existing + Construct New Existing Grit Dewat. + Construct New
![Page 18: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/18.jpg)
• Clarifier stress testing
– Addition of EDI and density
baffles recommended to
improve performance
• Other improvements needed:
– Improved scum removal
– Additional clarifiers for
increased secondary capacity
– Increased RAS pumping
capacity and redundancy
Final Clarifiers and RAS Pumping
![Page 19: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/19.jpg)
• Phase 1 – more immediate needs (smaller project)
• Phase 2
– Increase capacity from 12 MGD to 15 MGD
– Increase wet weather capacity from 32 MGD to 70 MGD
• 5 MG flow EQ
– Accommodate future expansion
• Future
– 18 MGD capacity
– 100 MGD wet weather capacity
• 2 MG additional flow EQ if needed
– Biological nutrient removal if needed
Phased Improvements
![Page 20: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/20.jpg)
• Completed in 2009
• Addition of second
centrifuge
• New vactor unloading
and septage receiving
stations
• RBC train removed
– More space for
vehicles and material
storage
Phase 1 Improvements
![Page 21: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/21.jpg)
• In operation in 2014
• New Influent Pump Station (submersible)
• New Preliminary Treatment Facility
• Convert Oxidation Ditches to Flow EQ
• New Aeration Basins and Blower Building
• New Final Clarifier, Replace Existing Mechanisms
• Expand RAS Pump Station
Phase 2 Improvements
![Page 22: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/22.jpg)
• Traveling Rake
– Similar to previous mechanical bar
screen (Parkson Aquaguard)
– Less removal than perforated plate
– Less headloss
• Perforated Plate
– New type of screen to plant staff
– Greater removal than traveling rake
– Greater headloss
• Selected perforated plate screens
due to increased screenings removal
Screenings Removal Alternatives
![Page 23: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/23.jpg)
• Grit sampling performed to assess particle sizes
and quantities
– Approx 30% < 300 micron
– Approx 10% < 150 micron
• Considered two types of grit removal basins:
stirred vortex and stacked tray
– Similar footprint, similar estimated construction cost
– Selected stacked tray for increased grit removal
Grit Removal Alternatives
![Page 24: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/24.jpg)
Grit Removal Alternatives
Stacked Tray Stirred Vortex
Courtesy: Smith & Loveless
Courtesy: Hydro International
![Page 25: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/25.jpg)
• Aeration alternatives considered:
– Floating aerators
– Blowers / coarse bubble diffusers
– Jet aeration
– Floating aerators selected (lower cost)
• Washdown alternatives considered:
– Water cannons
– Tipping buckets
– Flushing gates
– Water cannons selected (lower cost,
greater flexibility)
EQ Basin Aeration / Washdown Alternatives
![Page 26: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/26.jpg)
Aeration Basin Layout Alternatives
![Page 27: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/27.jpg)
Aeration Basin Selected Layout
![Page 28: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/28.jpg)
• Evaluated multiple types of fine bubble
membrane diffusers:
• Selected discs (lowest overall net present worth)
Aeration Basin Diffuser Alternatives
Discs Tubes Panels
![Page 29: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/29.jpg)
• Evaluated multiple types of
blowers:
– Multi-stage centrifugal
– Integrally geared single-stage
centrifugal
– High speed direct drive centrifugal
• Selected high speed direct drive
blowers (air foil bearing) based
on reduced maintenance and
operating range
Aeration Basin Blower Alternatives
![Page 30: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/30.jpg)
• Clarifiers:
– New clarifier, rehab existing
– Sludge scraper mechanisms to match existing config.
– Full radius scum removal
– Energy dissipating inlet and density baffles to improve
flocculation and settling
• RAS pumps:
– New pumps – one per clarifier plus standby
– Expand existing pump station structure to reduce
construction cost
Final Clarifiers and RAS Pumping
![Page 31: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/31.jpg)
• Increased dry weather and wet weather capacity
– Influent pumping
– Screening and grit removal
– Flow EQ
– Biological treatment
– Clarifiers and RAS pumping
• Increased redundancy and reliability
• Accommodate future expansion, effluent limits
• Reuse existing facilities / infrastructure where
possible to reduce cost
Overall Objectives
![Page 32: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/32.jpg)
Photos of New / Retrofitted Facilities
![Page 33: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/33.jpg)
Photos of New / Retrofitted Facilities
![Page 34: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/34.jpg)
Photos of New / Retrofitted Facilities
![Page 35: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/35.jpg)
Photos of New / Retrofitted Facilities
![Page 36: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/36.jpg)
Photos of New / Retrofitted Facilities
![Page 37: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/37.jpg)
Photos of New / Retrofitted Facilities
![Page 38: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/38.jpg)
Photos of New / Retrofitted Facilities
![Page 39: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/39.jpg)
Photos of New / Retrofitted Facilities
![Page 40: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/40.jpg)
Photos of New / Retrofitted Facilities
![Page 41: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/41.jpg)
Photos of New / Retrofitted Facilities
![Page 42: Using Existing Infrastructure at the LeSourdsville WRF to ......•Centrifuge added in 2003 LeSourdsville WRF History •Completed in 2007 •Estimated future growth up to buildout](https://reader033.vdocuments.us/reader033/viewer/2022050201/5f54fd84f8704518a2706d0a/html5/thumbnails/42.jpg)
• Butler County Water and Sewer Department
– Steve Seitz, PE – Chief Engineer
– Todd Madden – Chief Operator
– LeSourdsville WRF Operations and Maintenance Staff
• Hazen and Sawyer Team
Acknowledgements