GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 1
Motorola Solutions Internal
USING AgilePLM IN MSI MANAGING PRODUCTS
GNL1147.00E MOTOROLA, MOTO, MOTOROLA SOLUTIONS and the Stylized M Logo are trademarks or registered trademarks of Motorola Trademark Holdings, LLC and are used under license. All other trademarks are the property of their respective owners. © 2013 Motorola Solutions, Inc. All rights reserved.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 2
Motorola Solutions Internal
At the end of this module, you will be able to: At the end of this module, you will be able to:
Module Objectives
• Discuss how AgilePLM supports MGates and PLM.
• Describe the lifecycle of products.
• Discuss how to develop models and options.
• Discuss how to use the Product Readiness Report with products.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 3
Motorola Solutions Internal
Module Map
How AgilePLM Supports
MGates/PLM Models and
Options Product
Readiness Report
Costing for Products
Sales Waivers Product Cancellation Summary
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 4
Motorola Solutions Internal
How AgilePLM Supports MGates/PLM Items, BOMs, Products
Universe of Items
Items
Items with BOMs
Products
Items in AgilePLM • Parts, assemblies, kits,
models, options, documents etc. are all items
• Items can be an individual item or may have a Bill of Material
• Some items with Bills of Material may be a Product
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 5
Motorola Solutions Internal
How AgilePLM Supports MGates/PLM PBT High Level Processes
Create Items Develop & Mature Item / Attributes
Prepare for
Release
Production Release & MOL End of Life
Item Lifecycle Processes
Preliminary Development & Prototype Pilot Production Pending Obsolete & Obsolete
Design Lock-Down
Create BOMs,
Models & Options
Develop & Mature Product / Attributes
Prepare for
Release
Production Release & MOL End of Life
Products & Bill of Materials
Preliminary Development & Prototype Pilot Production Pending Obsolete & Obsolete
Product Lock-Down
Engineering Processes
ECAD Interface
MCAD Interface
Software Interface
Partner & Supplier Collaboration Component
Design & Fab Collaboration
Component Qualification
Contract Manufactures
Product Outsourced or Joint Design
Environmental Compliance
Product Change Notices
AgilePLM
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 6
Motorola Solutions Internal
Create BOMs,
Models & Options
Develop & Mature Product / Attributes
Prepare for
Release
Production Release & MOL End of Life
Products & Bill of Materials
Preliminary Development & Prototype Pilot Production Pending Obsolete & Obsolete
Product Lock-Down
How AgilePLM Supports MGates/PLM AgilePLM Lifecycle Phase: Alignment with PLM and MGates
Business Case
Portfolio Planning
Project Definition
Launch & Closeout
Phase II Plan
Phase III Development
Phase IV Product Acceptance
Phase V Launch & Customer
Sat
Phase VI Sustain
Phase VII End of Life
Execute Plan Execute Continuous Improvement
EOS Plan
PRD Complete
Detailed Design
Complete
General Avail-ability
Proc’t Volume Prod’n Auth.
Vendor Selection
Initiate Beta Test
Last Book
Rev A EOS DN/ PMB
MRD Complete
Engineering Feature
Complete End of
Serv
End of Serv
Comm
Phase I Concept
Implementation
Review PAC
1 Kickoff
Program
0 Review PAC
2 Review PAC
3 Review PAC
5 Review PAC
4 Review PAC
6
M15 Project
Initiation
M13 Solution Selected
PAC Review
M13
M11 Commit
ment
M7 Commit
ment Reaffirmed
M5 System
Test Readiness
M2 Regional
Ship Acceptance
FCSMC Book/Ship
M0 End of
Life
PAC Review
M7
M8 System Rqmts
Allocated
PAC Review
M11 PAC
Review
M3
M4 Ready
for Field Test
M3 Product / System
Readiness
Approval
Milestones
PLM
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 7
Motorola Solutions Internal
How AgilePLM Supports MGates/PLM Product Lifecycle Concepts (Applies to Product Items)
LC Phase-> Concept
Preliminary Develop- ment
Prototype Pilot Production Pending Obsolete
Obsolete
Purpose Initial Product creation
Release to ERP system
Prototype Build Ready
Product lock-down, engineering complete
Product ready for production release
Build Quantities
Not Applicable
Not Applicable
Prototype quantities only
Pilot runs for manufacturing validation
Ramp to production quantities
Ramp down to support phase out
Not Applicable
PLM / MGATEs
PLM only All subitems at production (Rev A / M3)
Order Readiness (GS)
Not Applicable
Not Applicable
Not Applicable
Paper Pilot to verify order readiness (OMAR / COF / MOL)
Not Applicable Not Applicable
Not Applicable
First Customer Ship
Not Applicable
Not Applicable
Not Applicable
Sales waivers if required
Change order initiated to document readiness (ES)
Not Applicable
Not Applicable
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 8
Motorola Solutions Internal
Item Lifecycle Phase vs. Product
Create Items Develop & Mature Item / Attributes
Prepare for
Release
Production Release &
MOL Preliminary Development & Prototype Pilot Production
Design Lock-Down
New Items for Product
Items should be advanced into the Pilot phase well in advance of the higher level BOM or product moving to Pilot.
Create Items Develop & Mature Item / Attributes
Prepare for
Release
Production Release & MOL End of Life
Product Lifecycle
Preliminary Development & Prototype Pilot Production Pending Obsolete & Obsolete
Design Lock-Down
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 9
Motorola Solutions Internal
How AgilePLM Supports MGates/PLM Item Lifecycle vs. Product Lifecycle
• In general, item lifecycles should run well in advance of the Product Lifecycle.
• All items on the Bill of Materials and sub-assemblies should be at the “Production” lifecycle phase prior to the Product being promoted to the “Pilot” lifecycle phase.
• Initial required parts qualification and environmental compliance activities at least 30 days prior to the product entering the “Pilot” lifecycle phase.
• Product Readiness Report can be used to monitor the status of all items on the Bill of Materials for a product.
8/9/2013
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 10
Motorola Solutions Internal
Module Map
How AgilePLM Supports
MGates/PLM Models and
Options Product
Readiness Report
Costing for Products
Sales Waivers Product Cancellation Summary
Purpose of this section: • How to request an item using the worksheet template (item
template & how to submit a CR) • High level process for structuring models & options (no change
from today) • Submit an MC for lifecycle promotion
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 11
Motorola Solutions Internal
Models and Options High level process
Create Product BOM
Create Sales BOM
Promote Lifecycle
• Complete the Item Request Form
• May create in AgilePLM if model / option number(s) are known
• Submit CR (for item request to preliminary) to PCM
• EC (for item requests >= Development) to PCM
• Product Planner completes BOM structure worksheet
• Submit EC to PCM
• PCM assigns items to inventories and creates structures in AgilePLM
• Build BOM using appropriate spreadsheet
• Submit EC to PCM or PDC&MT
• PCM / PDC&MT create structures in AgilePLM and push to OMAR R12
• Review Product Readiness Report
• Submit MC or EC
Create Item
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 12
Motorola Solutions Internal
Models and Options Create Item
1. Identify new items from your BOM structure – Sales BOM (L2 - OMAR R12) & Product BOM (L3 - 11i and Trilogy)
2. Complete Part Number Request Excel Template 3. Complete Create Request (CR or EC) in AgilePLM
– Attach Excel Template to Change Request (CR) if requesting part number in prelim lifecycle
– Attach Excel Template to Engineering Change (EC) if requesting part number in development or further lifecycle
– Submit to PCM
Note: Can also create parts directly in AgilePLM (see Managing Items for detailed instructions)
Create Product BOM
Create Sales BOM
Promote Lifecycle Create Item
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 13
Motorola Solutions Internal
Models and Options Sales / Product BOM Relationships
S-BOM (L2 - OMAR) MFG/DC-BOM (L3 - ERP)
Line transfer from L2 to L3 – only Part Number
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 14
Motorola Solutions Internal
Models and Options BOM Example in AgilePLM
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 15
Motorola Solutions Internal
Models and Options Part Number Request Template
• Excel template can be used to request multiple parts at a time.
– Each row contains the information required to create a single part.
• Columns are color-coded to indicate what information is provided by each role.
– The requester only needs to fill in the orange columns.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 16
Motorola Solutions Internal
Models and Options Part Number Request Template
• The amount of information required increases the further along the lifecycle you request…
• Prelim Life Cycle
– Part number only
• Development (send to Legacy ERPs)
– Makes internally orderable by purchasing through ERPs (“01N”)
• Pilot / Proto
– Makes test orderable through ERPs (“01C”)
• Production
– Orderable by customer through ordering system
• Use the chevrons to identify which columns to complete
Prelim Development
(send to Legacy ERPs)
Pilot / Proto / Production
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 17
Motorola Solutions Internal
Models and Options Part Number Request Template – Required for Prelim
Type SubClass Type
Description
Model Sales Model. Supports options and configurations.
Option Class Used in Sales Model. A grouping of related options.
Product Option A potentially needed internal item, or a potential item ordered to a model. The option could be only assembled and shipped in combination with a model.
Product Model Used for non-configurable models. Does not allow options. (SKU). Standalone products. WARNING: A type of Product can not contain options.
Product Kit An accessory to a product. Does not support options.
Product Phantom Phantom items are BOM items that are not transactable, stockable, or sellable (that contain a logical grouping of parts).
Product Tanapa An intermediate level of structure between a model and a kit.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 18
Motorola Solutions Internal
Models and Options Part Number Request Template – Required for Prelim
Field Description Type Model, Option Class, Product
SubClass Type (Model/Option Class Type)
Define the ATO, PTO, CTO for Item (regardless of target system) • If you need assistance determining which item type to use,
contact your local NPI or PCM contact. SubClass Type (Product Type)
Define Model, Option, Kit, Phantom, or Tanapa
Orange color denotes columns filled in by the
Requestor
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 19
Motorola Solutions Internal
Models and Options Model Subclass Type Definitions
Type Subclass Type
Description
Model / Option Class
ATO Assemble To Order. Used in MFG site where the product is made. This is used in AgilePLM to 11i.
PTO Pick To Order. Used in DC site. This is used in AgilePLM to 11i.
CTO Configure To Order. Used to define sales model for order management in OMAR R12. Note: This is used for PTO models and option classes in OMAR R12.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 20
Motorola Solutions Internal
Models and Options Part Number Request Template – Required for Prelim
Field Description General Description Description of item. MUST USE CAPITAL LETTERS
APC Account Product Code Enterprise Solutions – Use “ENTP”
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 21
Motorola Solutions Internal
Models and Options Part Number Request Template – Required for Prelim
Field Description Commodity Code To identify the Commodity of the Part
N/A for Model, Option & Option Class Only used for “Buy” Items
Owner Closely aligned with “Product Family” but also has elements of affected design function (e.g. electrical, mechanical) as well as site for product groups that have development in multiple global locations.
UoM Unit of Measure Usually use EA (Each) for Models & Options other values FR = For Reference MON = Month
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 22
Motorola Solutions Internal
Models and Options Part Number Request Template – Required for Prelim
Field Description Design Source To identify (Off-the-Shelf or MSI Custom)
For Models / Options, use “MSI Custom” PartNumber The prefix for the part number you to be created.
-Or enter the complete part number to be created. -Or leave blank to have PCM assign a part number.
Item Description Description of the Item to be created. USE CAPITAL LETTERS
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 23
Motorola Solutions Internal
Models and Options Part Number Request – Required for Development
Field Description Destination ERPs The ERPs where this item will reside:
Trilogy R12 Enterprise Solutions, Govt. Solutions Asia SAP Enterprise Solutions, Government Solutions Legacy ERP* Government Solutions
* Distribution Center, Manufacturing Site, OMAR R12 Responsible Location Legacy owner of the item. Used in PDM1.
Which site is responsible for maintaining the master attributes of the item. This is the same as is used today.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 24
Motorola Solutions Internal
Models and Options Part Number Request – Required for Development
Field Description Mgf Site / DC The Manufacturing Sites / Distribution Centers the product will
reside. Legacy Item Status Same as used in the legacy systems today.
Legacy U of M Use EA for Models / Options.
Legacy 11i Item Type Same as used in the legacy systems today.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 25
Motorola Solutions Internal
Models and Options Part Number Request – Required for Development
• If a part is needed in multiple Manufacturing Site / DCs, simply copy the entire line and modify the below fields.
– Template allows the creation of the part in all the Mfg Site/ DCs at the same time. Separate ECNs are no longer required.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 26
Motorola Solutions Internal
Models and Options Multiple Mfg sites / DC
• Note: Any customer orderable items needs to have OM and either Trilogy or Legacy System(s).
• *McAllen is special case for Government Solutions. Contact PCM for more information.
Mfg Site/DC Up to # Lines Description
DC-CQ Elgin 3 OM, CQ, NS
MFG-AF Schaumburg 3 OM, AF, NS
MFG-CX Berlin 2 OM, CX
DC-IT Taunsstein 2 OM, IT Israel 2 OM, IE CD-MN McAllen 4* OM, AF, MN, NS
MFG-OT Reynosa 1 Government Solutions Parts / BOMs in Reynosa, use OT
MFG Penang 2 OM, Trilogy R12
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 27
Motorola Solutions Internal
Models and Options Legacy ERP information in AgilePLM
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 28
Motorola Solutions Internal
Models and Options Part Number Request – Required for Development
Field Description Contains Encryption Denotes if the product contains encryption: Yes / No
Notes Required if contains encryption = Yes Describe what kind of encryption is in the product. Provide a link to encryption questionnaire.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 29
Motorola Solutions Internal
Models and Options Create CR or EC in AgilePLM
• If going to prelim only, must use Change Request (CR).
– See following slides for detailed instructions.
• If requesting a part in development or later, use Engineering Change (EC).
– See Managing Changes training module for detailed instructions.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 30
Motorola Solutions Internal
Models and Options Complete Create Request (CR) in AgilePLM
1. Log into AgilePLM.
2. Create >Changes>Change Request.
3. Select value>Creation Request.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 31
Motorola Solutions Internal
Models and Options Complete Create Request (CR) in AgilePLM
• The CR Number is Auto Generated.
• Product Family
– Choose appropriate value.
– Used for workflow routing and approvals.
• Set Request Priority to “Normal” <default value>.
• Click “Save”.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 32
Motorola Solutions Internal
Models and Options Complete Create Request (CR) in AgilePLM
• Mandatory Fields
– Description of change • What you want done
– Reason for change • Why you want it done
– Reason code • CO_05_Create new item
– Workflow • Creation request
– Change Analyst • Choose appropriate PCM
group
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 33
Motorola Solutions Internal
Models and Options Complete Create Request (CR) in AgilePLM
• Non Mandatory Fields
– Change Category
– ECCN Comment
– CAD Libraries Required
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 34
Motorola Solutions Internal
Models and Options Complete Create Request (CR) in AgilePLM
• Chose attachment tab. • Add Attachment.
• Select your preferred method for
working with files. – Use standard browser upload
and download capabilities. – Use a Java tool to enable bulk
uploads and automated check-ins.
• The Java tool requires that your browser have Java installed and enabled.
• Click OK.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 35
Motorola Solutions Internal
Models and Options Complete Create Request (CR) in AgilePLM
• Add Requester core-id to be notified when the CR is completed.
• Click Next Status to promote to submitted.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 36
Motorola Solutions Internal
Models and Options Create Product BOM
Create Product BOM
Create Sales BOM
Promote Lifecycle
Product BOM (L3 – ERP BOM)
1. Prerequisite – Items are already requested and available in the target system.
2. Product Planner completes BOM structure worksheet.
– Same worksheet using today to define matrix.
Create Item
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 37
Motorola Solutions Internal
Models and Options Create Product BOM
Create Product BOM
Create Sales BOM
Promote Lifecycle
3. Construct structure in AgilePLM.
– Create directly in AgilePLM.
– Use BOM upload template using EC.
– See Managing BOMs Module for training.
4. Submit EC to promote BOM to development phase.
– PCM assign items to manufacturing site ERP(s).
– Propagates BOMs to all requested inventories.
Create Item
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 38
Motorola Solutions Internal
Models and Options Create Sales BOM
Sales BOM is for Ordering System (L2 - OMAR R12)
1. Prerequisite – Items are already requested and available in order management system.
– Mfg Site/DC = OM & other appropriate mfg/DC site(s)
– AgilePLM OM will create the PDM1/OM1 object.
– Initiates GIM/COF upload.
– Initiates OMAR upload.
– Always available in both order management systems.
Create Product BOM
Create Sales BOM
Promote Lifecycle Create Item
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 39
Motorola Solutions Internal
Models and Options Create Sales BOM
Create Product BOM
Create Sales BOM
Promote Lifecycle
2. Build up Sales (OM) BOM using the appropriate template.
– North America / Latin America Use Data Collection Template (DCT).
– Europe / Asia Use Product Data Template (PDT).
3. Send spreadsheet to PCM or Product Data Creation & Maintenance Team (PDC&MT).
– Use same process as today.
4. PCM / PDC&MT creates structures in AgilePLM from templates and push structure to OMAR R12.
Create Item
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 40
Motorola Solutions Internal
Models and Options Promote Lifecycle
Use MC / EC to promote model through the needed lifecycle phases. When moving to Production: • Use product readiness report to check product readiness.
• All items must be a production before moving top level to production.
• All Part Qualification has been completed.
• ECCNs are processed.
• Environment Compliance has been completed.
• All other criteria defined in the PLM or MGate process have been satisfied. • Submit an EC to promote to production.
– Changing a pre-production numeric revision to a production alphanumeric revision.
Create Product BOM
Create Sales BOM
Promote Lifecycle Create Item
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 41
Motorola Solutions Internal
How AgilePLM Supports MGates/PLM Product Lifecycle Concepts (Applies to Product Items)
LC Phase-> Concept
Preliminary Develop- ment
Prototype Pilot Production Pending Obsolete
Obsolete
Purpose Initial Product creation
Release to ERP system
Prototype Build Ready
Product lock-down, engineering complete
Product ready for production release
Build Quantities
Not Applicable
Not Applicable
Prototype quantities only
Pilot runs for manufacturing validation
Ramp to production quantities
Ramp down to support phase out
Not Applicable
PLM / MGATEs
PLM only
All subitems at production (Rev A / M3)
Order Readiness (GS)
Not Applicable
Not Applicable
Not Applicable
Paper Pilot to verify order readiness (OMAR / COF / MOL)
Not Applicable Not Applicable
Not Applicable
First Customer Ship
Not Applicable
Not Applicable
Not Applicable
Sales waivers if required
Change order initiated to document readiness (ES)
Not Applicable
Not Applicable
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 42
Motorola Solutions Internal
Module Map
How AgilePLM Supports
MGates/PLM Models and
Options Product
Readiness Report
Costing for Products
Sales Waivers Product Cancellation Summary
.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 43
Motorola Solutions Internal
Product Readiness Report
Used to monitor the readiness of a BOM structure for production release.
• Assists product managers, project managers, new product introduction managers, and SDE personnel monitor various attributes on the parts of a BOM.
• A one-stop-shop for detailed status of each item on a BOM activities needing to be completed prior to moving to production.
• Subset of information: – Lifecycle Status – Design Lockdown Date – W18’s info – Compliance – ECCN – Part Approval Status
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 44
Motorola Solutions Internal
Product Readiness Report Creating a Report
1. Search from the BOM in which you are interested.
2. Select Actions > Product Readiness Report.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 45
Motorola Solutions Internal
Product Readiness Report Creating a Report (cont.)
A window will pop up.
3. Enter information in the Program Name and Production Date fields.
4. Click Submit.
AgilePLM displays a message indicating that the report is scheduled.
5. Click Close.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 46
Motorola Solutions Internal
Product Readiness Report Creating a Report (cont.)
The report is sent you your email.
6. Select the attachment and open it.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 47
Motorola Solutions Internal
Product Readiness Report Sample Report • Change Pending Indicator • BOM Items • Description of Part • Quantity • Motorola Part # • Revision # • Manufacturer • Manufacturer Part • Part Class • Commodity Code • Lifecycle Status • Design Lockdown Date • W18’s info • Compliance • ECCN • Part Approval Status • Std Cost Status
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 48
Motorola Solutions Internal
Module Map
How AgilePLM Supports
MGates/PLM Models and
Options Product
Readiness Report
Costing for Products
Sales Waivers Product Cancellation Summary
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 49
Motorola Solutions Internal
Costing for Products
Costing processes used today have not changed.
• Enterprise Solutions uses Cost Manufacturing Change (CMC) process in AgilePLM.
– For more information refer to the existing CMC process training.
• Government Solutions uses a different costing process external to AgilePLM and will not be covered here.
– For more information refer to the existing costing process training.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 50
Motorola Solutions Internal
Module Map
How AgilePLM Supports
MGates/PLM Models and
Options Product
Readiness Report
Costing for Products
Sales Waivers Product Cancellation Summary
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 51
Motorola Solutions Internal
Sales Waivers Sales Waiver processes used today have not changed.
• Enterprise Solutions uses processes in AgilePLM and Trilogy R12.
– For more information refer to the existing Sales Waiver process training.
• Government Solutions uses processes external to AgilePLM and will not be covered here.
– For more information refer to the existing Sales Waiver process training.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 52
Motorola Solutions Internal
Module Map
How AgilePLM Supports
MGates/PLM Models and
Options Product
Readiness Report
Costing for Products
Sales Waivers Product Cancellation Summary
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 53
Motorola Solutions Internal
Product Cancellation
• Once confirmed that a product will be cancelled and all the other external processes have been done, change the lifecycle.
– Create an MC.
– Change Lifecycle Phase to OBSOLETE.
– Make sure all levels “UP” and “DOWN” are cancelled as appropriate.
– Before cancelling, evaluate items for ongoing service needs.
Note: Processes to determine whether a product will be cancelled are not covered in this training.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 54
Motorola Solutions Internal
Module Map
How AgilePLM Supports
MGates/PLM Models and
Options Product
Readiness Report
Costing for Products
Sales Waivers Product Cancellation Summary
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 55
Motorola Solutions Internal
Summary
• AgilePLM supports MGates/PLM in rough alignment of product lifecycle with program milestones.
• Use the part number request template or AgilePLM to create new part numbers.
• The process and tools to set up Product and Sales BOMs are not changing from today.
• An EC is used to promote a product to Production only after all items in the product are in Production, Part Qualification and Environment Compliance have been completed, and ECCNs have been processed.
• The Product Readiness Report can be used to monitor the readiness of a BOM for production release.
GNL1147.00E - Using AgilePLM in MSI August 2013
Managing Products 56
Motorola Solutions Internal
Summary (cont.)
• The cost processes and sales waiver processes used by Enterprise Solutions and Government Solutions are not changing due to the rollout of PBT.
• After all external processes to cancel a product have been completed, an MC is used to change the lifecycle phase to Obsolete.