×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents of r0b0t2013
ANALYSIS ON DIELECTRIC STRENGTH OF SF6 GAS FOR GAS INSULATED TRANSFORMER
133 views
REACTIVE POWER CONTROL IN WIND FARMS: REAL EXPERIENCE AND RESULTS
47 views
POSSIBILITIES TO INCREASE POWER AND EFFICIENCY OF HYDRO GENERATING UNIT
17 views
ON THE ELECTROMAGNETIC TORQUE PULSATION, TORSIONAL OSCILLATIONS, FAULT DETECTION AND DIAGNOSIS IN THE SUBSYNCHRONOUS CASCADE DRIVE
24 views
EXPERIMENTAL STUDY OF THE LATEST DESIGN OF THE POWERFUL AIR-COOLED TURBOGENERATOR STATOR
22 views
RICH OPERATION EXPERIENCES AND NEW TECHNOLOGIES ON ADJUSTABLE SPEED PUMPED STORAGE SYSTEMS IN JAPAN
84 views
A New Definition for Total Harmonic Distortion in Inverter-fed Induction Motors Including Loss Considerations
18 views
A NEW METHOD FOR ONLINE THYRISTOR CONDUCTION MONITORING BASED ON THYRISTOR CURRENT WAVEFORM RECORDING IN STATIC EXCITATION SYSTEM
50 views
ROTATING DIODES EXCITER HAVING COMPETITIVE PERFORMANCE FOR NUCLEAR PLANT
52 views
Application of vegetable oil-based insulating fluids to hermetically sealed power transformers
115 views
Developments of gas insulated transformer and low-viscosity silicone immersed transformer with the fire safety considered environment aspect
49 views
STRATEGIES TO REPLACE, REFURBISH, REPAIR AND UPGRADE POWER TRANSFORMERS: THE SPANISH EXPERIENCE
60 views
COMPACT POWER TRANSFORMERS FOR SUBSTATION IN URBAN AREAS USING HYBRID INSULATION SYSTEM
212 views
IMPACT OF WIND POWER GENERATORS ON THE FREQUENCY STABILITY OF SYNCHRONOUS GENERATORS
214 views
Improved Operation of DFIG Based Wind Generation Systems Under Network Unbalance
216 views
Experiences of Air Cooled Generator Stator Flexible failures D.K.SOOD, P.K.ANIL KUMAR
215 views
HYDROGEN / WATER - COOLED TURBOGENERATORS: A MATURE TECHNOLOGY ON THE MOVE
223 views
AN EXTENDED MODELING OF SYNCHRONOUS GENERATORS FOR INTERNAL FAULT EVALUATION AND PROTECTION ASSESSMENT
219 views
EDA TEST TO PERFORM PREDICTIVE MAINTENANCE IN RELEVANT ROTATING MACHINES
213 views
THOROUGH ON AND OFF-LINE INSPECTION OF THE GENERATORS OF A HYDROELECTRIC PLANT AFTER TEN YEARS OF BEING REHABILITATED
213 views
Next >