Prepared By: Kuntesh R Jalora
Wipro – PP Consultant
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 2 of 183
© Wipro Limited, 2006, All Rights Reserved.
Icons
Icon Meaning
Caution
Example
Note or Tip
Recommendation
Syntax
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 3 of 183
© Wipro Limited, 2006, All Rights Reserved.
TABLE OF CONTENTS
1 MASTER DATA ..................................................................................................................... 5
1.1 MATERIAL MASTER .............................................................................. 5 1.2 BILLS OF MATERIAL ........................................................................... 15 1.3 RESOURCE MASTER ........................................................................... 18 1.4 MASTER RECIPE ................................................................................ 27 1.5 PRODUCTION VERSION ...................................................................... 32
2 SALES AND OPERATIONS PLANNING ............................................................................ 40 2.1 PURPOSE ......................................................................................... 40 2.2 PROCESS FLOW ................................................................................ 40 2.3 PAST CONSUMPTIONS IN MATERIAL MASTER ........................................ 41 2.4 FORECAST RUN ................................................................................. 44 2.5 CONSOLIDATION, VALIDATION, CORRECTION AND FIRMING OF SALES
FORECASTED DATA .................................................................................... 47 2.5.1 CONSOLIDATED REPORT ........................................................................... 47 2.5.2 VALIDATION AND CORRECTION ................................................................. 49
2.6 PRODUCT GROUP .............................................................................. 52 2.7 CREATE SALES & PRODUCTION PLAN ................................................... 54 2.8 VERSION MANAGEMENT ..................................................................... 57 2.9 ROUGH-CUT PLANNING PROFILE ......................................................... 58 2.10 DISAGGREGATION ......................................................................... 61
2.10.1 ROUGH-CUT CAPACITY PLANNING .............................................................. 64 2.11 TRANSFER PRODUCTION PLAN TO DEMAND MANAGEMENT ................... 67
3 DEMAND MANAGEMENT .................................................................................................. 69 3.1 PLANNED INDEPENDENT REQUIREMENT ............................................... 69 3.2 MAINTAIN PIR’S ................................................................................ 69
3.2.1 Splitting PIRs (Periodic Disaggregation) ...................................................... 71 4 MATERIAL REQUIREMENT PLANNING ............................................................................ 76
4.1 MRP RUN (TOTAL PLANNING) .............................................................. 76 4.2 MRP RUN- Single-Item, Multi-Level ...................................................... 80 4.3 EVALUATION OF STOCK/REQUIREMENT LIST ......................................... 85 4.4 PLANNED ORDER .............................................................................. 95 4.5 CONVERT PLANNED ORDER TO PROCESS ORDER ................................... 99
5 CAPACITY PLANNING ..................................................................................................... 102 5.1 CAPACITY EVALUATION .................................................................... 102
5.1.1 Resource View - Load ............................................................................. 102 5.1.2 Resource View - Process order ................................................................. 107
5.2 CAPACITY LEVELING ........................................................................ 109 5.2.1 Capacity leveling - Resource view ............................................................. 109
6 PROCESS ORDER ............................................................................................................ 114 6.1 PROCESS ORDER CREATION ............................................................. 115 6.2 SCHEDULING PROCESS ORDERS ....................................................... 116 6.3 CHECKING AVAILABILITY OF CAPACITY .............................................. 117 6.4 CHECKING AVAILABILITY OF MATERIAL .............................................. 118
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 4 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.5 PRELIMINARY COSTING.................................................................... 120 6.6 RELEASING PROCESS ORDERS .......................................................... 121 6.7 CONTROL RECIPES .......................................................................... 124
6.7.1 Sending Control Recipe ........................................................................... 124 6.7.2 PI Sheet ................................................................................................ 127
6.8 PRINTING SHOP FLOOR PAPERS ........................................................ 130 6.9 MATERIAL WITHDRAWALS (PICK LIST) ............................................... 131 6.10 WORK IN PROCESS (WIP) .............................................................. 135 6.11 CONFIRMATIONS ......................................................................... 138 6.12 DELIVERY TO WAREHOUSE ............................................................ 140 6.13 TECHNICAL COMPLETION (TECO) OF ORDER .................................... 144 6.14 VARIANCE CALCULATION .............................................................. 146 6.15 ORDER SETTLEMENT ..................................................................... 148 6.16 CLOSING PROCESS ORDER ............................................................ 153 6.17 CANCLING CONFIRMATION ............................................................ 155 6.18 GOODS RECEIPT - REVERSAL ......................................................... 157 6.19 REVOKING OF TECHNICAL COMPLETION (TECO) ............................... 159
7 BATCH MANAGEMENT .................................................................................................... 162 7.1 BATCH LEVEL ................................................................................. 162 7.2 BATCH DETERMINATION .................................................................. 163 7.3 FEATURES ...................................................................................... 163 7.4 CREATING BATCH RECORD ............................................................... 164
8 LONG-TERM PLANNING .................................................................................................. 167 8.1 INTEGRATION ................................................................................. 167 8.2 PROCESS FLOW .............................................................................. 168
8.2.1 Creating and Releasing a Planning Scenario ............................................... 168 8.2.2 Copying Firm Planned Orders from Operative Planning ................................ 172 8.2.3 Executing MRP for Long-term Planning ...................................................... 173 8.2.4 Evaluating Long-Term Planning ................................................................ 173 8.2.5 Capacity Planning in Long-Term Planning .................................................. 174 8.2.6 Processing Planned Orders in Long-Term Planning ...................................... 174 8.2.7 Firming Planned Orders in Long-Term Planning .......................................... 174 8.2.8 Copying the Long-Term Planning results to operative planning ..................... 175 8.2.9 Copying/evaluating external procurement data to PURCHIS ......................... 176 8.2.10 Copying Stock/Requirements Data to Inventory Controlling ......................... 176 8.2.11 Transferring Activity Type Requirement to Cost Center Accounting ............... 176
8.3 BUSINESS PROCESS DETAIL ............................................................. 176 9 FORECASTS ..................................................................................................................... 178
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 5 of 183
© Wipro Limited, 2006, All Rights Reserved.
1 MASTER DATA
1.1 MATERIAL MASTER
The material master contains information on all the materials that a company
procures or produces, stores, and sells. It is the company's central source for retrieving material-specific data. This information is stored in individual material
master records. Procedure
1. Access the activity using one of the following navigation options:
Menu Logistics � Production � Master Data� Material Master � Material � Create (General) � Immediately
Transaction code MM01
2. Enter the following Data
Field name
Description R /O /C User action and values
Comment
Material R Internal No. Assignment
Industry Sector R FMCG Industries
Material Type R As Applicable
3. Choose enter button and Select the required views (for PP, Basic Data – 1,
Basic Data – 2, Classification, MRP – 1, MRP – 2, MRP – 3, MRP – 4, and Work
Scheduling) and choose continue button.
4. In the Organization Level Screen, choose the Plant and Storage Location, which are applicable for the material.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 6 of 183
© Wipro Limited, 2006, All Rights Reserved.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 7 of 183
© Wipro Limited, 2006, All Rights Reserved.
5. In Basic Data –1 Screen, make the following entries
Field name Description R /O /C
User action and values
Comment
Material
Description
R As Applicable
Base Unit of Measure
R As Applicable
Material Group R As Applicable
Old Material
Number
O As Applicable
Division O As Applicable
Product Hierarchy
R As Applicable
Gross Weight O As Applicable
Net weight O As Applicable
Weight Unit O As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 8 of 183
© Wipro Limited, 2006, All Rights Reserved.
6. Choose Enter button and go to Basic Data - 2 Screen. All the fields in Basic Data –2 are optional. Choose enter to go to next screen.
7. In MRP-1, make the following entries
Field name Description R /O /C
User action and values
Comment
MRP Group O 0002
MRP Type R PD or As Applicable
Planning Cycle O JCE or As Applicable
MRP Controller R As Applicable
Lot Size R ZK or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 9 of 183
© Wipro Limited, 2006, All Rights Reserved.
8. In the MRP – 2 Screen, Make the following Entries
Field name Description R /O /C
User action and
values
Comment
Procurement
Type
R X or As Applicable
GR processing
time
O 2 Days or As
Applicable
Planning
Calendar
O JCE or As Applicable
Scheduling
Margin key
O 000 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 10 of 183
© Wipro Limited, 2006, All Rights Reserved.
9. In the MRP – 3 Screen, Make the following Entries
Field name Description R /O /C
User action and
values
Comment
Period Indicator O P or As Applicable
Fiscal Year Variant O JC or As Applicable
Splitting Indicator O Z or As Applicable
Strategy Group O 40 or As Applicable
Consumption Mode O 4 or As Applicable
Backward
Consumption Period
O 7 or As Applicable
Backward Consumption Period
O 7 or As Applicable
Mixed MRP O 1 or As Applicable
Availability Check O 01 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 11 of 183
© Wipro Limited, 2006, All Rights Reserved.
10.In the MRP – 4 Screen, Make the following Entries
Field name Description R /O /C
User action and values
Comment
Selection Method O 2 or As Applicable
Data for Production Versions will be maintained later on after creating the Bills of Material (BOM) and Master Recipe.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 12 of 183
© Wipro Limited, 2006, All Rights Reserved.
11.In the Forecasting Screen, Make the following Entries
Field name Description R /O /C
User action and
values
Comment
Historical Periods O 39 or As Applicable
Forecast Periods O 13 or As Applicable
Periods Per Season O 1 or As Applicable
Initialization O J, X or As Applicable
Tracking Limit O 4 or As Applicable
Model Selection O A or As Applicable
Selection Procedure O 1 or As Applicable
Optimization Level O M or As Applicable
Alpha Factor O 0.20 or As Applicable
Beta Factor O 0.20 or As Applicable
Gamma Factor O 0.20 or As Applicable
Delta Factor O 0.20 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 13 of 183
© Wipro Limited, 2006, All Rights Reserved.
12.In the Work Scheduling Screen, Make the following Entries
Field name Description R /O /C
User action and
values
Comment
Production
Scheduler
O 001 or As Applicable
Production
Scheduling Profile
O 000001 or As
Applicable
Batch Management R Put Flag
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 14 of 183
© Wipro Limited, 2006, All Rights Reserved.
13.In the Plant data/Stor. 1 Screen, Make the following Entries
Field name Description R /O /C
User action and
values
Comment
Min. rem. Shelf Life O 15 or As Applicable
Total shelf Life O 30 or As Applicable
Period Ind. For
SLED
O D or As Applicable
Storage percentage O 85 or As Applicable
14.Enter data in the other views as per requirements.
15.Save the data
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 15 of 183
© Wipro Limited, 2006, All Rights Reserved.
Only screens and entries related to PP are explained in this section. There are other screens also like Sales, Purchasing, Foreign trade; Quality, Costing and
Accounting screens also that are required to make a material master complete.
16.Material 400000254 is created
17. Then, this material is to be extended to the all the plants, DP’s, JB’s and Buy-
backs.
1.2 BILLS OF MATERIAL
BOM is a formally structured list of the components that make up a product or assembly. The list contains the object number of each component, together with the
quantity and unit of measure. The components may themselves contain a BOM of their own.
BOMs are used in their different forms in various situations where a finished product is assembled from several component parts or materials. Depending on the industry sector, they can also be called recipes or lists of ingredients and so on.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 16 of 183
© Wipro Limited, 2006, All Rights Reserved.
Procedure
1. Access the activity using one of the following navigation options:
Menu Logistics � Production � Master Data� Bills of Material
� Bill of Material � Material BOM� Create
Transaction code CS01
2. Enter the following Data
Field name Description R /O /C
User action and values
Comment
Material R 400000254
Plant O UN01
BOM Usage R 1 or As Applicable
3. Press Enter. The following screen appears whereby components with their respective quantities are added.
Field name Description R /O /C
User action and values
Comment
Item Category R L or As Applicable
Component O 250000001 or As
Applicable
Quantity R 450 or As Applicable
The same is repeated for other components. Unit of measure gets defaulted from the
material master. Only in cases where alternative unit of measure has been maintained does one need to specify the relevant unit of measure. Else, system shall pick up base unit of measure as default unit of measure.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 17 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Click on the Header button, new screen will appear and enter following data:
Field name Description R /O /C
User action and values
Comment
BOM Text O As Applicable
Base Quantity O 64800 or As Applicable
Header Details
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 18 of 183
© Wipro Limited, 2006, All Rights Reserved.
5. One can maintain the operation scrap (if any) for a particular component by double clicking on the relevant item.
6. BOM is saved and the new BOM for material 400000254 is created for Plant UN01.
If an alternate Bill of Material is required for this material, repeat the whole cycle, message will pop up in create BOM: Initial screen saying alternate 2 added to BOM, Press Enter and continue.
1.3 RESOURCE MASTER
Resources are production facilities and persons involved in a production process that have capacities. They are subdivided into categories to specify their suitability for certain purposes or their use in certain processes. A resource is created for one plant.
Resources can be, for example:
• Persons involved in production that are also recorded as employees in
personnel administration
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 19 of 183
© Wipro Limited, 2006, All Rights Reserved.
• Parts of the plant that are used for production (processing units)
• Parts of the plant that are used for intermediate storage (storage resources)
• Parts of the plant that are used for both intermediate storage and production (storage resources / processing units)
Procedure
1. Access the activity using one of the following navigation options:
Menu Logistics � Production-Process � Master Data� Resources � Resource � Create
Transaction code CRC1
2. Enter the following Data
Field name Description R /O /C
User action and
values
Comment
Plant R UN01 or As Applicable
Resource R FILTUB01 or As Applicable
Resource Category R 0008 or As Applicable
Press Enter. You are taken to the next screen.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 20 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Make the following entries on Basic Data View.
Field name Description R /O /C
User action and
values
Comment
Person Responsible R 001 or As Applicable
Usage R 009 or As Applicable
Standard Value Key R ZE2 or As Applicable
Setup Rules for maintenance
O May not be entered or As Applicable
Machine Rules for maintenance
O Should be entered or As Applicable
Labor Rules for maintenance
O Should be entered or As Applicable
Power Consumption Rules for maintenance
O Should be entered or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 21 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Go to Default Values screen and make the following entries.
Field name Description R /O /C
User action and
values
Comment
Control Key O ZE01 or As Applicable
Standard Text Key
O FILLING or As Applicable
Setup O MIN or As Applicable
Machine O MIN or As Applicable
Labor O MIN or As Applicable
Power Consumption
O KWH or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 22 of 183
© Wipro Limited, 2006, All Rights Reserved.
5. Go to Capacities sub-screen and make the following entries.
Field name Description R /O /C
User action and
values
Comment
Capacity
Category
O 001 or As Applicable
Other
formula
O ZSAP06 or As Applicable
Capacity
Category
O 002 or As Applicable
Other
formula
O ZSAP07 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 23 of 183
© Wipro Limited, 2006, All Rights Reserved.
6. Double Click on 001 in the above screen and make the following entries.
Field name Description R/O/C
User action and Values
Comment
Capacity Short Text O Machine or As Applicable
Capacity Planner Group
O 001 or As Applicable
Grouping O ZE or As Applicable
Factory Calendar ID R KB or As Applicable
Active Version O 1 or As Applicable
Base Unit of Meas. O MIN or As Applicable
Start O 07:00:00 or As Applicable
Finish O 06:59:59 or As Applicable
Length of Breaks O 00:00:00 or As Applicable
Capacity Utilization O 100 or As Applicable
No. Of indiv. Cap. O 1 or As Applicable
Relevant to Finite
Scheduling
O Put Flag or As Applicable
Click here for Intervals and Shifts
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 24 of 183
© Wipro Limited, 2006, All Rights Reserved.
7. Click on Intervals and Shifts on the above screen and make the following
entries.
Field name Description R /O /C
User action and values
Comment
Valid From O 04.07.2006 or As Applicable
Valid to O 31.12.9999 or As Applicable
Shift Sequence O ZSS1 or As Applicable
Repeat the same activity for Capacity category 002 and follow the steps 6
and 7.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 25 of 183
© Wipro Limited, 2006, All Rights Reserved.
8. Go to Scheduling sub-screen and make the following entries.
Field name Description R /O /C
User action and
values
Comment
Capacity
Category
O 001 or As Applicable
Other
Formula
O ZSAP02 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 26 of 183
© Wipro Limited, 2006, All Rights Reserved.
9. Go to Costing sub-screen and make the following entries.
Field name Description R/O/C
User action and values
Comment
Cost Center R PUN0105 or As Applicable
Formula Activity
Setup
R ZSAP01 or As Applicable
Formula Activity
Machine
R ZSAP02 or As Applicable
Formula Activity
Labor
R ZSAP03 or As Applicable
Formula Activity
Power
R ZSAP04 or As Applicable
The resource is now saved by clicking the Save Button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 27 of 183
© Wipro Limited, 2006, All Rights Reserved.
1.4 MASTER RECIPE
The business object master recipe is the description of an enterprise-specific process in process industries that does not relate to a specific order. The master recipe is used
for the manufacture of products or for rendering services. Procedure
1. Access the activity using one of the following navigation options:
Menu Logistics � Production-Process � Master Data� Master Recipes � Recipe and Material List � Create
Transaction code C201
2. Enter the following Data
Field name Description R /O /C
User action and values
Comment
Material R 400000254 or As Applicable
Plant O UN01 or As Applicable
Profile R PI01 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 28 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Enter. Make the following entries in the Recipe Header screen.
Field name Description R /O /C
User action and values
Comment
Status R 4 or As Applicable
Usage R 1 or As Applicable
Base Quantity O 600 PC or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 29 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Go to Operations sub-screen and enter the following data
Field name Description R/O/C
User action and values
Comment
Resource R FILTUB01 or As Applicable
For Operation 0010
Phase Indicator R Put Flag For Operation 0020
Superior Operation R 0010 For Operation 0020
Destination R 01 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 30 of 183
© Wipro Limited, 2006, All Rights Reserved.
5. The phase relevant data are maintained by double clicking the relevant
operation number (that indicates phase). Double click the operation number 0020 (Phase) and enter the following data.
Field name Description R/O/C
User action and
values
Comment
Machine R 10 or As Applicable
Labor R 20 or As Applicable
Power R 2 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 31 of 183
© Wipro Limited, 2006, All Rights Reserved.
6. Go to Process Instructions sub-screen and enter the following data
Field name Description R/O/C
User action and values
Comment
Process Instructions R SIGN or As Applicable
More Process Instructions can be added in this sub-screen as per requirements. Next screen will appear as shown below
Select the Process
Instruction i.e. 0010 and then click here
Click here
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 32 of 183
© Wipro Limited, 2006, All Rights Reserved.
Now the PI sheet will be generated as shown below.
7. The Master Recipe is now saved with Group 50000069 and Material
400000254 by clicking the Save Button.
1.5 PRODUCTION VERSION
A production version determines the various production techniques that can be used to produce a material. It defines the following information:
• Alternative BOM for a BOM explosion • Task list type, task list group, and group counter for assignment to task lists • Lot-size restrictions and period of validity
Procedure
1. Access the activity using one of the following navigation options:
Menu Logistics � Production � Master Data� Material Master
� Material � Change (General) � Immediately
Transaction code MM02
2. Enter Material No. 400000254 and select the MRP-4 view.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 33 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. In the next sub-screen enter Plant UN01 and Storage Location ND01 and then press enter.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 34 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. MRP-4 view screen will appear
5. In the MRP-4 view, click on the ProdVersions button. It will open the
Production Version Overview screen
Click here
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 35 of 183
© Wipro Limited, 2006, All Rights Reserved.
6. Click on the New Details button, it will open Production Version Details
screen. Enter the following details
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 36 of 183
© Wipro Limited, 2006, All Rights Reserved.
Field name Description R/O/C
User action and
values
Comment
Version R 0001 or As Applicable
Text R As Applicable
Valid From R 05.07.2006 or As Applicable
Valid to R 31.12.9999 or As Applicable
Task List Type R 2 Master Recipe or As
Applicable
Group R 50000069 or As Applicable
Group Counter R 1 or As Applicable
Alternative BOM
R 1 or As Applicable
BOM Usage R 1 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 37 of 183
© Wipro Limited, 2006, All Rights Reserved.
7. Now click on the Check button that will show you following details
8. Now if you return back to the Production version details screen, you will
be able to see the green lights indicating that Production Version is OK.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 38 of 183
© Wipro Limited, 2006, All Rights Reserved.
9. Now choose the button continue, which will take you to Production Overview screen where you can see the version you have just created.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 39 of 183
© Wipro Limited, 2006, All Rights Reserved.
10.Now choose the button – New Details and repeat the whole cycle to
create another Production Version. Now, Choose continue button, which will take you to the MRP – 4 View of change material screen.
11. Save your entries and view the message material changed.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 40 of 183
© Wipro Limited, 2006, All Rights Reserved.
2 SALES AND OPERATIONS PLANNING
2.1 PURPOSE
Sales & Operations Planning (SOP) is a flexible forecasting and planning transactions to enable sales, production, and other supply chain targets to be reached on the basis
of historical, existing, and estimated future data. In this scenario, we carry out Rough-cut planning to determine the amounts of the capacities and other resources required meeting these targets. SOP is particularly suitable for long- and medium-term
planning.
We then pass on SOP plans to Demand Management in the form of independent
requirements. In turn, this data is fed to Material Requirement Planning (PP-MRP) to
generate planned orders and process orders.
2.2 PROCESS FLOW
This business process procedure focuses on:
• Past Consumption in Material Master
• Forecast Run
• Suggested Forecasted values
• Consolidation, Validation, correction and firming of Sales Forecasted data
• Create product group
• Create sales plan for product group (by uploading the corrected Sales Forecasted data in to SOP Table)
• Disaggregate sales plan of product group to become sales plans of sub-product
groups or sales plan of the materials as per units wise
• Maintain production plans of product groups or materials
• Transfer production plans of product groups, sub-product group or materials to Demand Management
• Create/change planned independent requirements (transferring SOP to Demand
Management)
• Run MRP- Single item multi-level
• Create planned order
• Convert planned order to process order
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 41 of 183
© Wipro Limited, 2006, All Rights Reserved.
2.3 PAST CONSUMPTIONS IN MATERIAL MASTER
In the real time, material master will be automatically updated by the actual consumption but initially the past consumption is to be fed in the system manually in the material master.
Procedure
1. Access the activity using one of the following navigation options:
Menu Logistics � Production � Master Data� Material Master � Material � Change (General) � Immediately
Transaction code MM02
2. Enter Material No. 400000254, Plant JB01 and DP01 and Storage
Location UN01 and select the Forecasting view.
3. Click on the Consumption Vals button and enter the past consumption
data manually for both Planned and unplanned.
Click here
Here, Reference Material (base material), Plant
(any), Date to (any past date i.e. 31.03.2003) and
Multiplier (1 or any) can be entered for Reference consumption data.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 42 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Enter Total consumption for the specified periods; i.e. for the last 39 JCs.
5. And the same way, enter unplanned consumption for the specified
periods; i.e. for the last 39 JCs.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 43 of 183
© Wipro Limited, 2006, All Rights Reserved.
6. Repeat the above steps for the DP01 as shown below.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 44 of 183
© Wipro Limited, 2006, All Rights Reserved.
2.4 FORECAST RUN
Procedure
1. Access the activity using one of the following navigation options:
Menu Logistics � Production-Process � Production Planning � Materials Forecast � Forecast � Total Forecast �
Execute
Transaction code MP38
2. Enter Material No. 400000254 & 400000386 Plants JB01 & DP01 and Period Indicator P.
3. Execute Forecast by clicking on Execute Button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 45 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Forecast is Executed and the Results are displayed as shown below
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 46 of 183
© Wipro Limited, 2006, All Rights Reserved.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 47 of 183
© Wipro Limited, 2006, All Rights Reserved.
2.5 CONSOLIDATION, VALIDATION, CORRECTION AND FIRMING OF SALES FORECASTED DATA
2.5.1 CONSOLIDATED REPORT
The forecasted data that were generated with above transaction is consolidated in the
Sales forecasted report.
Transaction Code ZSFOR
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 48 of 183
© Wipro Limited, 2006, All Rights Reserved.
1. Enter following data
Field name Description R/O/C
User action and values
Comment
Material No. R 400000254, 400000386 or
As Applicable
First Day of Period
R 20.07.2006 As Applicable
To R 11.10.2006 As Applicable
First Day First
Period
R 20.07.2006 As Applicable
First Day
Second Period
R 17.08.2006 As Applicable
First Day Third
Period
R 14.09.2006 As Applicable
2. Execute Forecast by clicking on Execute Button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 49 of 183
© Wipro Limited, 2006, All Rights Reserved.
2.5.2 VALIDATION AND CORRECTION
1. For updating of data, another Sales Forecast Report can be used. Transaction Code ZSFOR1
2. Enter following data
Field name Description R/O/C
User action and values
Comment
Material No. R 400000254, 400000386 or As Applicable
First Day of Period R 20.07.2006 As Applicable
To R 11.10.2006 As Applicable
First Day First Period
R 20.07.2006 As Applicable
First Day Second Period
R 17.08.2006 As Applicable
First Day Third Period
R 14.09.2006 As Applicable
See the Update Check
Box and here you can put the Flag
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 50 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Forecasted data can be edited in another Report by entering the
Transaction Code ZSFOR2. The report is shown as below:
4. Corrected data can be saved by clicking the Modify button
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 51 of 183
© Wipro Limited, 2006, All Rights Reserved.
5. Forecasted data can be downloaded to Microsoft Excel sheet for further
modification if required and then the validated and firmed data will be uploaded to SOP table.
6. Downloaded Data in Microsoft Excel sheet is corrected, validated, saved and then uploaded in the SOP table for the planning of the Product Group.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 52 of 183
© Wipro Limited, 2006, All Rights Reserved.
2.6 PRODUCT GROUP
A product group combines other product groups and materials according to whatever criteria best meet the needs of your enterprise; for example, manufacturing
procedure, product design, or market niche. Product groups are classified according to whether they are multi-level or single-
level. A product group is multi-level if it contains other product groups. However, the
lowest level in a product group hierarchy always consists of materials. A product group is single-level if its members are materials only. A material or product group
can be a member of more than one owner product group.
Procedure
1. To carry out the activity, choose one of the following navigation options:
Menu Logistics � Production-Process � SOP � Product Group �
Create
Transaction code MC84
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 53 of 183
© Wipro Limited, 2006, All Rights Reserved.
2. Enter following data in Create Product Group: Initial Screen
Field name Description R/O/C
User action and
values
Comment
Product group R PG400000254 or As
Applicable
Text R PG for FGL - FAH 9ml (NEW)
(400000254) As Applicable
Plant R HO00 or As Applicable
Base Unit R PC or As Applicable
The system uses the proportional factors in conjunction with the units of measure conversion factors to calculate the members’ planning data when you disaggregate planning data, the system determines the units of measure
conversion factor if it is stored either in the central units of measure conversion table or in the material master record. You cannot change the conversion factor
in Standard SOP.
Field name Description R/O/C
User action and values
Comment
Product group R PG400000254 or As Applicable
Text R PG for FGL - FAH 9ml (NEW) (400000254) As Applicable
Plant R HO00 or As Applicable
Base Unit R PC or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 54 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Click on Save button, to save the product group PG400000254
2.7 CREATE SALES & PRODUCTION PLAN
In standard SOP, you can forecast the sales quantities of a product group or material. You can base the forecast on the historical consumption of materials to decide the forecast sales plan. It then aggregates these results to the product group level.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � SOP � Planning � For Product
Group � Create
Transaction code MC81
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 55 of 183
© Wipro Limited, 2006, All Rights Reserved.
2. On the Create Plan: Initial Screen, maintain data according to the following
table
Field name Description R/O/C
User action and values
Comment
Product group R PG400000254 or As Applicable
Plant R HO00 or As Applicable
Version R 025 or As Applicable
Version description
R Ver 025 PG400000254 or As Applicable
3. Press Enter
Sales Plan data is to be uploaded automatically from the downloaded excel sheet by running a separate program.
4. Production Plan can be created by the function Create Production Plan –
Synchronous to Sales Plan
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 56 of 183
© Wipro Limited, 2006, All Rights Reserved.
5. Now, you can see the Production Plan, as shown below
6. Save your plan.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 57 of 183
© Wipro Limited, 2006, All Rights Reserved.
2.8 VERSION MANAGEMENT
You can copy any version of an information structure to any other version of the same information structure. A series of pushbuttons supports your choice of version. You
can limit the scope of the planning horizon for which the data is to be copied. To copy data between versions of different information structures, you use a different
transaction. To activate a planning version, you copy its data to version A00. This overwrites any existing data in A00, so if you want to keep this data you should copy
it to another version first.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � SOP � Planning � Version
Management � Copy
Transaction code MC78
2. On the Copy Planning Version Screen, maintain data according to the following table
Field name Description R/O/C
User action and
values
Comment
Source Version R 025 or As Applicable
Target Version R A00 or As Applicable
Text R As Applicable
Period From O As Applicable
For Copying, Click on Copy Button
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 58 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. After Copying the data from Version 025 to Active version A00, the same data can be viewed in the in the Active Version.
2.9 ROUGH-CUT PLANNING PROFILE
Rough-cut planning profiles are used in resource leveling. In a rough-cut planning profile, you plan the requirements of one or more of the following resources:
• Work center capacities • Materials (typically, raw materials) • Production resources/tools
• Costs These are the resources you will require to meet a sales target, production target,
purchasing target, or any other logistic target you have set for a material, product group, or characteristic value combination. Rough-cut planning profiles are designed to give you an aggregate view on your resources. They are therefore an ideal tool for
medium- and long-term planning or for the planning of hierarchies.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � SOP � Tools � Rough-Cut Planning Profile � Create
Transaction code MC35
Click on Active Version, in case,
version not copied then the Plan can be viewed by clicking on the Inactive
version and then selecting the version no. i.e. 025
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 59 of 183
© Wipro Limited, 2006, All Rights Reserved.
2. On the Rough-Cut Planning Profile: Initial Screen, maintain data according to the following table
Field name Description R/O/C
User action and
values
Comment
Material R 400000254 or As Applicable
Plant R UN01 or As Applicable
First, we create the Rough-cut planning profile for the UN01 and then in the same way; it’ll be created for the other plants like KOSM and etc.
3. Click on Execute button, it’ll open a sub-screen enter following data and
then press Enter
Field name Description R/O/C
User action and values
Comment
Time Span R 6 or As Applicable
Status R 4 or As Applicable
Usage R 1 or As Applicable
Lot size R As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 60 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. In the next screen, select the first row and click on the Details button, it’ll
open the sub-screen.
Field name Description R/O/C
User action and values
Comment
Work Center R FILTUB01 or As Applicable
Plant R UN01 or As Applicable
Unit R PC or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 61 of 183
© Wipro Limited, 2006, All Rights Reserved.
5. Save the Rough-Cut Planning Profile by clicking on the Save button.
2.10 DISAGGREGATION
A significant feature of Sales & Operations Planning (SOP) is its multi-level capabilities. You can plan both top-down and bottom-up throughout a complex
planning hierarchy. Thus, both centralized and decentralized planning is supported.
Disaggregation is the process by which planning data at a detailed level is generated through the distribution of key figure values from an aggregate level. The
planning will be run at the central level and will be disaggregated at Plant level.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � SOP � Disaggregation � Break
Down PG Plan
Transaction code MC76
2. On the Copy Planning Version Screen, maintain data according to the following table
Field name Description R/O/C
User action and
values
Comment
Product group R PG400000254 or As Applicable
Plant R HO00 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 62 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Dialog box will show the product group members with proportion. Maintain the data in block Disaggregation according to the following table:
Click on Active version button, it’ll open a Change Plan: Initial
Screen sub-screen
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 63 of 183
© Wipro Limited, 2006, All Rights Reserved.
Field Name Description User action and values Comment
Create Sales Plan � (�) Selected
Disaggregate target stock
� (Remove) Deselected
Copy target days’ supply
� (Remove) Deselected
Disaggregate Sales Plan
�Select
Synchronous to sales �Select
4. You can see the unit wise disaggregated plan as shown below:
5. Save the Plan
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 64 of 183
© Wipro Limited, 2006, All Rights Reserved.
2.10.1 ROUGH-CUT CAPACITY PLANNING
Here we can see the capacity load on the Resources at the unit level.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � SOP � Planning � For Material
� Change
Transaction code MC88
2. On the Change Plan: Initial Screen, maintain data according to the following table and then click on Active version button
Field name Description R/O/C
User action and values
Comment
Material R 400000254 or As
Applicable
Plant R UN01 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 65 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Here, you can see Rough-Cut Plan Data plant wise
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 66 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Select the Production Plan row and follow the menu path as shown in the
figure shown below:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 67 of 183
© Wipro Limited, 2006, All Rights Reserved.
5. Here you can see the capacity load
6. The same can be viewed for the other plants also
2.11 TRANSFER PRODUCTION PLAN TO DEMAND MANAGEMENT
By transferring the production plan to Demand Management you create the planned independent requirements and determine the requirements dates and requirements
quantities of the material.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � SOP � Disaggregation �
Transfer Product Group to Planning
Transaction code MC75
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 68 of 183
© Wipro Limited, 2006, All Rights Reserved.
2. On the Change Plan: Initial Screen, maintain data according to the following table and then click on Active version button
Field name Description R/O/C
User action and
values
Comment
Product Group R PG400000254 or As
Applicable
Plant R HO00 or As Applicable
Version R A00 or As Applicable
Prod. plan for mat.
or PG members as proportion of PG
R �Select
Date From-To R As Applicable
Requirement Type O VSF or As Applicable
Version O GP or As Applicable
Active O � (�) Select
3. Confirm your entries. Accept all information or warning message. Choose
pushbutton Transfer now. Check the transfer log and ignore all the warning messages.
4. Repeat the above steps for transferring the production plan of another product group.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 69 of 183
© Wipro Limited, 2006, All Rights Reserved.
3 DEMAND MANAGEMENT
3.1 PLANNED INDEPENDENT REQUIREMENT
The function of Demand Management is to determine requirement quantities and
delivery dates for finished products assemblies. Customer requirements are created in sales order management. To create a demand program, Demand Management uses Planned Independent Requirements (PIR) and customer requirements.
To create the demand program, you must define the planning strategy for a product. Planning strategies represent the methods of production for planning and
manufacturing or procuring a product.
3.2 MAINTAIN PIR’S
By transferring the production plan from SOP to Demand Management you create the planned independent requirements and determine the requirement dates and
requirements quantities of the material, you can adjust the planned independent requirement manually if necessary.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Production Planning � Demand Management � Planned Independent Requirements � Change
Transaction code MD62
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 70 of 183
© Wipro Limited, 2006, All Rights Reserved.
2. On the Change Planned Independent Requirements: Initial screen, please
enter the following entry:
Field name Description R/O/C User action and values Comments
Material R �Select , and enter
material: 400000254
Plant R UN01 or As Applicable
Requirement
type
VSF or As Applicable
Selected
version
R �Select GP or As
Applicable
From R 22.06.2006 or As
Applicable
To R 13.09.2006 or As
Applicable
Planning
Period
R P or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 71 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. In Screen Plnd ind. reqmts Change: Planning Table displayed the
independent planning requirement, which were generated in the previous step, transfer production plan to demand management. You can also adjust the independent planning requirement for each material if necessary.
4. Save the independent planning requirements.
3.2.1 Splitting PIRs (Periodic Disaggregation)
In the initial stages of planning the demand program, you enter large requirement quantities (for example, annual or monthly quantities from the material forecast or
from SOP) which you refine to a detailed period split. You can split these initial quantities manually or automatically. In this process, you can use periods from the Gregorian calendar, or periods of your choice using the PPC planning calendar (JCE).
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 72 of 183
© Wipro Limited, 2006, All Rights Reserved.
You can create planned independent requirements as one quantity and split them over a number of periods. You can choose between the following periods:
• Daily • Weekly
• Monthly • For each accounting period • Planning calendar period (only possible on schedule line screen)
Here we try to split the quantity from JC month Period (P) to JC weeks (C)
Procedure
1. In Screen Plnd ind. reqmts Change: Planning Table, go to Sched. Line tab pages; select the first row and Click on Distribute Over a Period Button
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 73 of 183
© Wipro Limited, 2006, All Rights Reserved.
2. Enter following data in the Period sub-screen
Field name Description R/O/C User action and values Comments
Period From R C, 13.2006 or As Applicable
To R 20.2006 or As Applicable
Split P or As Applicable
Click on Distribute over
a Period Button, it’ll open Period for Splitting Sub-screen
See the entries
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 74 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Press Enter; see the splitted quantities for the selected period. The same
can be followed for the other periods too.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 75 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Below you can see all splitted quantities.
5. Click on Save button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 76 of 183
© Wipro Limited, 2006, All Rights Reserved.
4 MATERIAL REQUIREMENT PLANNING
The main function of material requirements planning (MRP) is to guarantee material
availability, that is, it is used to procure or produce the requirement quantities on time both for internal purposes and for sales and distribution. This process involves the
monitoring of stocks and, in particular, the automatic creation of procurement proposals for purchasing and production.
In doing so, MRP tries to strike the best balance possible between optimizing the
service level and minimizing costs and capital lockup.
4.1 MRP RUN (TOTAL PLANNING)
MRP generates planned orders and purchase requisitions for the material that is to be procured. You can display the planned orders that are generated in the current
stock/requirements list
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � MRP � Total Planning �
Online
Transaction code MD01
2. In MRP Run Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Scope of Planning
O As Applicable
Plant R UN01 or As Applicable
Processing key NETCH or As Applicable
Create purchase req.
R 1 or As Applicable
Schedule lines R 3 or As Applicable
Create MRP list R 1 or As Applicable
Planning mode R 1 or As Applicable
Scheduling R 2 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 77 of 183
© Wipro Limited, 2006, All Rights Reserved.
Field name Description R/O/C User action and values Comments
Planning date R Current Date
Display
material List
O Put Flag
3. Press Enter Key to Run MRP. Messages will popup to check the entries, press Enter key again.
4. Carry out MRP run for material of plant UN01
5. You can see the MRP run results
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 78 of 183
© Wipro Limited, 2006, All Rights Reserved.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 79 of 183
© Wipro Limited, 2006, All Rights Reserved.
MRP can be run at plant level or material level. When you are running
MRP for the first time in the period (say JC month or week) you may use
Total Planning (MD01). After MRP total planning is run, if there are any changes in planning for some Finished materials, you may run MRP only for that material using Single Item multi level planning run (MD02). You can
schedule Total Planning as the background job on daily, weekly or whatever criteria best suited basis.
When you run MRP first time for a plant then you can run with processing key NEUPL (Regenerative Planning).
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 80 of 183
© Wipro Limited, 2006, All Rights Reserved.
4.2 MRP RUN- Single-Item, Multi-Level
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � MRP � Single-Item, Multi-
Level
Transaction code MD02
2. In Single-Item, Multi-Level Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Material O 400000254 or As Applicable
Plant R UN01 or As Applicable
Processing key NETCH or As Applicable
Create
purchase req.
R 1 or As Applicable
Delivery
schedules
R 3 or As Applicable
Create MRP list R 1 or As Applicable
Planning mode R 1 or As Applicable
Scheduling R 2 or As Applicable
Display results
before they are saved
O Put Flag
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 81 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Press Enter Key to Run MRP. Messages will popup to check the entries, press Enter key.
4. Carry out MRP run for material 400000254 of plant UN01
5. You can see the MRP run results step by steps as shown below.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 82 of 183
© Wipro Limited, 2006, All Rights Reserved.
6. Press Save button for going to next level.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 83 of 183
© Wipro Limited, 2006, All Rights Reserved.
7. Click on Continue button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 84 of 183
© Wipro Limited, 2006, All Rights Reserved.
8. Here you can see the MRP results.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 85 of 183
© Wipro Limited, 2006, All Rights Reserved.
4.3 EVALUATION OF STOCK/REQUIREMENT LIST
In the stock/requirements list, the most up-to-date stock and requirements situation is displayed. Each time the stock/requirements list is called up, the system
selects the various MRP elements and displays the most up-to-date situation. You thus always see the current availability situation of the material in the stock/requirements list. Changes that are made after the planning date are displayed directly, so the list is
therefore dynamic. Stock/requirements lists are not saved in a fixed state in the system, but are subject
to change and only exist in the working memory.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � MRP � Evaluations �
Stock/Requirements List
Transaction code MD04
2. In Stock/Requirements List: Initial Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Material O 400000254 or As Applicable
Plant R UN01 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 86 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Press Enter to go the stock/requirements list as of that time.
By clicking on this button, you can
display List with the Overview Tree
format
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 87 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Stock/Requirement List in the overview tree format
5. Now double click on the BOM component to see the stock/requirement list of that particular material.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 88 of 183
© Wipro Limited, 2006, All Rights Reserved.
6. Now double click on the stock, which will show you the stock statistics
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 89 of 183
© Wipro Limited, 2006, All Rights Reserved.
7. Now click on the Stock overview button which will show more details in
stock overview screen
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 90 of 183
© Wipro Limited, 2006, All Rights Reserved.
8. Now double click on PR Item to see the details of material delivery dates
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 91 of 183
© Wipro Limited, 2006, All Rights Reserved.
9. Now click on Display element button to see the PR
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 92 of 183
© Wipro Limited, 2006, All Rights Reserved.
10.Now go back to the finished material and double click on the planned order
and you can see a window popup,
11.From this pop-up, you can convert planned order into process order or you can change the planned order by clicking on Change button. When you
click on -> Proc. Ord. button, the corresponding planned order will be
converted into process order.
Click here
to convert planned order to
Process Order
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 93 of 183
© Wipro Limited, 2006, All Rights Reserved.
12.Below, you can see the Create Process Order: Header – General Data
screen.
13.Process order can be saved by clicking on the Save button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 94 of 183
© Wipro Limited, 2006, All Rights Reserved.
14.After clicking on Refresh button, the saved process order can be seen in
the Stock/Requirement List
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 95 of 183
© Wipro Limited, 2006, All Rights Reserved.
4.4 PLANNED ORDER
1. Planned order can be viewed in the Stock Requirement List by double clicking on the planned order on then clicking on Change element button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 96 of 183
© Wipro Limited, 2006, All Rights Reserved.
2. By clicking on Components button, you can see Processing Components
3. You can see Assignment tab page for various assignments.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 97 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. In Mast. Data tab page, you can see the master data.
5. Go to Det. Scheduling tab page an then from menu Goto, choose the button capacity leveling
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 98 of 183
© Wipro Limited, 2006, All Rights Reserved.
6. A screen will pop asking for setting for capacity leveling. Choose your option day wise, weekly or monthly and choose continue button
7. Now to check the details of capacity load for the period, you need to go to capacity evaluation, which gives the details of the load on a particular work
center.
You can directly create planned order by following transaction:
Menu Logistics � Production-Process � MRP � Planned Order �
Create
Transaction code MD11
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 99 of 183
© Wipro Limited, 2006, All Rights Reserved.
4.5 CONVERT PLANNED ORDER TO PROCESS ORDER
When the planned order is converted to a production order, the product, the order quantity and the basic order dates are copied from the planned order.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � MRP � Planned Order � Convert to Proc. Ord. � Individual Conversion Or:
Logistics � Production-process � Process order � Process order � Create � With planned orders
Transaction code COR8
2. On the Collective Conversion of Planned Orders: Initial screen, enter the
following data.
Field name Description R/O/C User action and values Comments
Planning Plant R UN01 or As Applicable
MRP controller O 001 or As Applicable
Planning Plant R UN01 or As Applicable
Material O 400000254 or As Applicable
Process order type R ZP01 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 100 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Click on Execute button. In the next screen, select as many planned order
as you want to convert then click on Convert button
Click this button
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 101 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Below, you can see that two planned orders are converted into process
order.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 102 of 183
© Wipro Limited, 2006, All Rights Reserved.
5 CAPACITY PLANNING
The economic use of resources is an objective for many areas of a company. The component "Capacity Planning" is available in the R/3 System for this purpose.
5.1 CAPACITY EVALUATION
You can use capacity evaluations to analyze capacity loads in your company. You can
adjust the analyses for each user according to the planning level, planning horizon and the area of responsibility. Available capacities and capacity requirements can be
selected according to various criteria and cumulated using any period split you choose.
5.1.1 Resource View - Load
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Planning � Evaluation
� Resource view � Load
Transaction code CM01
2. In Capacity Planning: Selection Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Work Center O FILTUB01 or As Applicable
Plant R UN01 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 103 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Click on Standard Overview
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 104 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. You may choose your own setting. Preferably, as mentioned below and
choose continue button
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 105 of 183
© Wipro Limited, 2006, All Rights Reserved.
5. Now you can see the difference in the capacity unit from H (Hour) to PC
(Pieces)
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 106 of 183
© Wipro Limited, 2006, All Rights Reserved.
6. For detailed capacity evaluation of any specific period, select the row and
from menu Goto then Detailed cap. list.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 107 of 183
© Wipro Limited, 2006, All Rights Reserved.
7. Here you can see the capacity list Pegged requirement wise.
5.1.2 Resource View - Process order
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Planning � Evaluation � Resource view � Process Order
Transaction code CM02
2. In Capacity Planning: Selection Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Work Center O FILTUB01 or As Applicable
Plant R UN01 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 108 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Here also, the same steps can be followed as in previous one.
The other useful transaction codes for the capacity evaluation are CM03, CM04 and CM05.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 109 of 183
© Wipro Limited, 2006, All Rights Reserved.
5.2 CAPACITY LEVELING
Capacity leveling is used in various areas of a company and at different planning levels with the objectives of High capacity load, Adherence to dates, Short lead times and Low stocks
The objectives of capacity leveling include: • Leveling overloads and under-loads at work centers
• Achieving optimum commitment of machines and production lines • Selection of appropriate resources
5.2.1 Capacity leveling - Resource view
Procedure (Table)
1. Access the transaction using:
Menu Logistics � Production-Process � Process Planning � Capacity leveling � Resource view � Capacity plan.table (table)
Transaction code CM35
2. In Capacity Planning: Selection Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Work Center O FILTUB01 or As Applicable
Plant O UN01 or As Applicable
Capacity
category
O As Applicable
Capacity
planner grp
O As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 110 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Click on Execute button, it will show the Period Requirement per Resource screen:
Dispatching operations is the main function of capacity leveling. Operations are dispatched to the time when there is sufficient capacity for them to be executed. You
can also dispatch sub-operations and work elements. Depending on whether finite scheduling is to be carried out, operations can be
dispatched based on unlimited available capacity or existing available capacity.
Existing available capacity is calculated as the difference between the available capacity maintained in the capacity and the requirements already dispatched. You can
specify another work center when dispatching operations, if necessary. If you want to deallocate an operation that has already been dispatched, select this
operation and choose the pushbutton Deallocate. The current dispatching data is cancelled. The status “dispatched” of the operation is
reversed. The order is rescheduled. If further operations exist for an order which has already been dispatched, the system automatically carries out midpoint scheduling. If no other dispatched operations exist,
the system carries out lead time scheduling.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 111 of 183
© Wipro Limited, 2006, All Rights Reserved.
Procedure (Graphical)
1. Access the transaction using:
Menu Logistics � Production-Process � Process Planning � Capacity leveling � Resource view � Capacity planning table
Transaction code CM29
2. In Capacity Planning: Selection Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Work Center O FILTUB01 or As Applicable
Plant O UN01 or As Applicable
Capacity category
O As Applicable
Capacity planner grp
O As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 112 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Here you can see the capacity planning table in the graphical view. You can
change display format from the normal calendar week to any period as your requirement.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 113 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Now you can see the table in the days format as shown below:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 114 of 183
© Wipro Limited, 2006, All Rights Reserved.
6 PROCESS ORDER
Process orders are used for the production of materials or for rendering of services in
a specific quantity on a specific date. They enable the planning of resources, control of process order management, and specify the rules for account assignment and
order settlement. Order processing comprises the central processing steps involved in the life cycle of a process order.
Process planning comprising: • Process order creation
• Selecting a master recipe • Creating reservations or copying them from planned orders • Calculating planned costs
• Creating capacity requirements for the resources
Starting with the basic order dates, the system automatically schedules the process order when you create it. In addition, it can later be rescheduled automatically or manually whenever changes relevant to scheduling have been made.
In the SAP System, the printing of shop floor papers is carried out in the form of lists. A list can be a complete printout of a material provision list, for example, or a printout of time tickets.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 115 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.1 PROCESS ORDER CREATION
Process order can be created by one of the following transaction:
• Create Process Order COR1
• Convert Planned Order to Process Order COR8
• From Stock/Requirement List MD04
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 116 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.2 SCHEDULING PROCESS ORDERS
In order processing, the scheduling function calculates the production dates and capacity requirements for all operations within a process order. The scheduling
process starts with the basic order dates (basic start and basic finish). The system either takes the basic order dates from the planned order, or you enter them manually on the header screen of the process order.
There are six types of scheduling as shown below:
• Forward scheduling
• Backward scheduling
• Scheduling to current date
• Only capacity requirements
• Forward in time
• Backward in time
You can schedule the order by clicking on button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 117 of 183
© Wipro Limited, 2006, All Rights Reserved.
Then you can see the message at the status bar showing that scheduling is carried out availability of capacity for this process order.
6.3 CHECKING AVAILABILITY OF CAPACITY
Before starting production, you can check capacity availability of resources for the process order.
Capacity availability can be checked by clicking on the button.
Then you can see the message showing the availability of capacity for this process order.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 118 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.4 CHECKING AVAILABILITY OF MATERIAL
Before you start production, you can check whether all the material components allocated to the process order are available on the calculated requirements dates. In a
process order, the system only checks material components that is relevant to inventory management and have the item category "L" (stock component).
Material availability can be checked by clicking on the button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 119 of 183
© Wipro Limited, 2006, All Rights Reserved.
You can see the Missing parts list and Missing parts overview by clicking on the
respective buttons
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 120 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.5 PRELIMINARY COSTING
When you create a process order; after each subsequent change of data in the order, the system calculates the planned order costs. The planned costs are allocated to cost
elements.
Order cost can be determined by clicking on button.
Then you can see the message at the
status bar.
For detail analysis and itemization of cost, follow the menu path as shown below:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 121 of 183
© Wipro Limited, 2006, All Rights Reserved.
You can see the cost itemization as shown below:
6.6 RELEASING PROCESS ORDERS
When you create a process order if an order is not released, various restrictions apply:
• You cannot carry out completion confirmations for the order. • You cannot print shop floor papers. • You cannot create a control recipe.
• You cannot carry out goods movements for the order, that is, you cannot withdraw any material components.
When you release the order, these restrictions are canceled.
You can release the order by clicking on the button. In case of any material or
capacity shortage, it’ll give the pop-up message and then you can proceed by clicking Release Order button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 122 of 183
© Wipro Limited, 2006, All Rights Reserved.
You can see the message on status bar.
You can see the operations details by clicking on button:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 123 of 183
© Wipro Limited, 2006, All Rights Reserved.
You can see the BOM details by clicking on button:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 124 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.7 CONTROL RECIPES
After a process order has been released for production, the process instructions maintained in the order are bundled into control recipes during process management.
The control recipes are either transferred to a process control system via a specific interface or they are displayed in natural language in the form of a process instruction sheet (PI sheet) which can be maintained by the line operator.
You can see the message on the status bar showing the Control recipe(s) created.
6.7.1 Sending Control Recipe
In process management, the process procedures are compiled into control recipes and sent to the control recipe destination (from the process order).
Procedure
1. Access the transaction using:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 125 of 183
© Wipro Limited, 2006, All Rights Reserved.
Menu Logistics � Production-Process � Process Management �
Control Recipe � Control Recipe Monitor
Transaction code CO53
2. In Control recipe Monitor Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Plant O UN01 or As Applicable
Creation Date O UN01 or As Applicable
Process Order O 10000058 or As Applicable
Status O Put flag or As Applicable
Mode O No test
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 126 of 183
© Wipro Limited, 2006, All Rights Reserved.
Press Enter, it will show the screen as shown below
3. Now select the row then click on Send button and you can see change in the status and message on the status bar.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 127 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.7.2 PI Sheet
In process instructions, you can use predefined characteristics to define process steps that you want. You assign process instructions to the phases of the master recipe and
process order.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Management � PI Sheet � Find
Transaction code CO60
2. In Find PI sheet Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Plant O UN01 or As Applicable
Control Recipe O 100000000000000281 or As
Applicable
Process Order O 10000058 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 128 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Press Enter, you can find the PI sheet
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 129 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Now, select the row and click on the button, it will display the
PI Sheet: Maintain screen. Here make the required entries and click on the Save button.
You can see the message on the
status bar.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 130 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.8 PRINTING SHOP FLOOR PAPERS
In the SAP System, the printing of shop floor papers is carried out in the form of lists. A list can be a complete printout of a material provision list, for example, or a printout
of time tickets.
1. You can control the printing list by following the Menu path Process Order -
> Settings -> List Control. Then it’ll open the sub-screen as shown below:
2. You can print the shop floor papers by following the menu path Process Order -> Functions -> Print or pressing the Ctrl+P short key.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 131 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.9 MATERIAL WITHDRAWALS (PICK LIST)
Before you can start producing a material, all the necessary material components have to be issued from stock via goods issues. The delivery to stock of the
manufactured material is documented in the system via a goods receipt. Both types of goods movement trigger the following transactions in the system: • A material document is created to record the goods movement.
• The stock quantities of the material are updated. • The stock values are updated in the material master record and the
stock/consumption accounts are updated.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Order � Environment
� Material Movement � Picking
Transaction code COIK
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 132 of 183
© Wipro Limited, 2006, All Rights Reserved.
2. In Find Picking List Initial Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Profile R 000002 or As Applicable
Process Order R 10000058 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 133 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Click on button, it will show Order information System: Detail List of
Components.
4. In this screen, click on Select all button and then click on button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 134 of 183
© Wipro Limited, 2006, All Rights Reserved.
5. In this screen, click on the Select all button then click on
button, it will pick the material batch wise as per the batch search strategy.
6. Now click on the button and then in the next screen press the Refresh button. The screen will become blank as shown below:
7. So, goods are issued to the process order
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 135 of 183
© Wipro Limited, 2006, All Rights Reserved.
Goods can be issued to process order by another transaction code MB1A with the
movement type 261.
6.10 WORK IN PROCESS (WIP)
The WIP calculation function valuates the unfinished products (work in process). In
the Product Cost by Order component, the work in process is valuated at actual cost. Work in process is the difference between the debit and credit of an order that has not
been fully delivered. You can calculate WIP at actual costs for the Process orders on the individual or collective basis as per requirement.
Procedure
1. Access the transaction using:
Menu Logistics� Production-Process� Process Order�Period-End Closing � Work in Process � Individual Processing � Determine
Transaction code KKAX
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 136 of 183
© Wipro Limited, 2006, All Rights Reserved.
2. In Calculate Work in Process: Individual Processing, Make the following
Entries
Field name Description R/O/C User action and values Comments
Process Order R 10000058 or As Applicable
WIP to period R 4 or As Applicable
Fiscal Year R 2006 or As Applicable
All RA versions O Select
Layout O 1SAP01 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 137 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Click on button.
4. For the WIP report click on button, it’ll display the following report:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 138 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.11 CONFIRMATIONS
A completion confirmation documents the processing status of orders, operations, phases and individual capacities. As such, completion confirmations are used to
monitor the progress of process orders. A completion confirmation is used to record: • The quantity processed in a phase • How much activity is used to carry out a phase?
• The actual dates of a phase • The resource at which the phase is carried out
• Who carried out the phase? • Precise completion confirmations are important in realistic and exact
production planning.
A completion confirmation can cause: • A reduction in the capacity load on the resource
• An update of the costs, based on the confirmed data • An update of the order data, such as times or order status • Withdrawal postings for back flushed components
• An automatic goods receipt (only for one phase per order) • MRP relevant update of the expected yield in the order.
• Entering Completion Confirmations
Depends on the manufacturing facility, confirmation either milestone (auto-
confirmation at final operation) or time-ticket (confirm specific times, such as start or finish processing, enter a confirmation for a time event).
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Order � Confirmation
� Enter for Phase � Time Ticket
Transaction code COR6N
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 139 of 183
© Wipro Limited, 2006, All Rights Reserved.
2. In Find Picking List Initial Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Process Order R 10000058 or As Applicable
Phase R 0020 or As Applicable
3. Then click on button, it will fill the remaining fields automatically, as shown above.
4. Now click on the button, and then you can see the message
on the status bar.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 140 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.12 DELIVERY TO WAREHOUSE
The data required to deliver the manufactured material to the warehouse is contained in the header screen Goods receipt/Valuation of the process order header.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Order � Environment � Material Movement � Post Material to Stock
Transaction code MB31
2. In Goods Receipt for Order: Initial Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Movement type R 101
Process Order R 10000058 or As Applicable
Plant R UN01 or As Applicable
Storage Location R ND01 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 141 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Press Enter, it’ll open another screen as shown below:
4. Again press Enter; it’ll popup sub-screen with showing that Internal number allocation for materials handled in batches.
5. Press Enter and enter the date of manufacturing in the required field. Here,
you can see the internal batch number is automatically created by the system.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 142 of 183
© Wipro Limited, 2006, All Rights Reserved.
6. Click on button then it will show the Goods Receipt for Order:
Classification screen, press button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 143 of 183
© Wipro Limited, 2006, All Rights Reserved.
7. Now, you can see the message on status bar. And you can see the stock in the stock/Requirement List and process order
as shown below:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 144 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.13 TECHNICAL COMPLETION (TECO) OF ORDER
Technical Completion (TECO) means ending a process order from a logistical
viewpoint. This function is usually used, if the execution of an order has to be stopped prematurely or if the order could not be executed in the required manner and open requirements for the order (reservations, capacities) should be deleted.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Order � Process Order � Change
Transaction code COR2
2. In Change Process Order: Initial Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Process Order R 10000058 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 145 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Now follow the menu path as shown below:
Then you can see the status as TECO.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 146 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.14 VARIANCE CALCULATION
Variance calculation provides you with detailed cost information on products or manufacturing orders.
The variance calculation function does the following: • Shows the variance between target costs and control costs (the control costs
can be the net actual costs, for example)
• Determines the difference between the actual costs debited to the object and the credit from goods receipts (total variance)
• Valuates the unplanned scrap quantities with target costs to determine the scrap variances
• Determines production variances and planning variances for informational
purposes • Shows the causes of the variances and assigns the variances to different
variance categories depending on the cause
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Order � Period-End
Closing � Variances � Individual Processing
Transaction code KKS2
2. In Change Variances Calculation: Initial Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Process Order R 10000058 or As Applicable
Period R 4 or As Applicable
Fiscal Year R 2006 or As Applicable
Selected Target
Cost Vsns
O Select
Test Run R Remove Flag
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 147 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. You can see the Variance calculation list and report as shown below:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 148 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.15 ORDER SETTLEMENT
When a process order is settled, the actual costs incurred for the order are settled to one or more receiver cost-objects (for example, to the account for the material
produced or to a sales order). Offsetting entries are generated automatically to credit the production order. If the costs for the process order are settled to a material account, the order is credited each time material is delivered to stock. The material
stock account is debited accordingly. If the costs for the process order are settled to another receiver (for example to a
sales order), the order is credited automatically at the time of settlement. The cost-objects are debited accordingly. The debit posting remains in the order and can be displayed even after the costs have
been settled. The settled costs are updated in the corresponding receiver cost-object and can be displayed in reporting.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Order � Period-End
Closing � Settlement � Individual Processing
Transaction code KO88
2. In Actual Order Settlement: Order Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Process Order R 10000058 or As Applicable
Settlement Period R 4 or As Applicable
Posting Period R 4 or As Applicable
Fiscal Year R 2006 or As Applicable
Processing type O 1 or As Applicable
Test Run R Remove Flag
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 149 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Click on button, it’ll show the screen as shown below:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 150 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Click on button, it’ll show the following screen:
5. Click on button, it’ll show the following screen:
Click on this button, it’ll show the Accounting
documents
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 151 of 183
© Wipro Limited, 2006, All Rights Reserved.
6. Click on button, it’ll show the following screen:
7. For seeing report, Click on button, it’ll show the following screen:
You can select anyone
of these, and press
Enter
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 152 of 183
© Wipro Limited, 2006, All Rights Reserved.
8. it’ll show the following report:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 153 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.16 CLOSING PROCESS ORDER
The Closed (CLSD) status has been introduced in the process order. It has the
following characteristics: • No more costs can be posted to the order, that is, confirmations and goods
movements are no longer permitted for the order.
• The order can no longer be changed. Exceptions to this are revoking the CLSD status and setting the deletion flag.
• All actions relating to the status technically completed (TECO) are executed.
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Order � Process
Order � Change
Transaction code COR2
2. In Change Process Order: Initial Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Process Order R 10000058 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 154 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Follow the path as shown below:
4. Then you can see the order status as CLSD.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 155 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.17 CANCLING CONFIRMATION
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Order � Confirmation � Enter for Phase � Time Ticket
Transaction code CORS
2. In Find Picking List Initial Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Confirmation O 918 or As Applicable
Process Order R 10000058 or As Applicable
Phase R 0020 or As Applicable
3. It’ll give a popup message Screen, press Enter to continue.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 156 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. It’ll show the following screen:
5. Press button, then enter the Reason for confirmation
6. Then Go-back to previous screen, you can see the message
on the status bar
If the operation for which confirmation is canceled has the function of auto goods receipt, then goods receipt will also be reversed automatically along with production
confirmation cancellation.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 157 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.18 GOODS RECEIPT - REVERSAL
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Order � Environment
� Material Movement � Post Material to Stock
Transaction code MB31
2. In Goods Receipt for Order: Initial Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Movement type R 102
Process Order R 10000058 or As Applicable
Plant R UN01 or As Applicable
Storage Location R ND01 or As Applicable
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 158 of 183
© Wipro Limited, 2006, All Rights Reserved.
3. Press Enter to continue, it’ll show the following screen and here you can
put the quantity, storage location, and batch no. as per requirement.
4. Click on button, it’ll post the document and you can see the message
on the status bar.
Goods receipt reversal, automatically happens when you cancel the confirmation.
Reversal goods movement can be used in a situation like where your confirmation is correct and batch number is not correct and you want to change the batch number alone without canceling the production confirmation.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 159 of 183
© Wipro Limited, 2006, All Rights Reserved.
6.19 REVOKING OF TECHNICAL COMPLETION (TECO)
You can revoke the status TECO if required by following the few steps. Then you can see the difference in the status
Procedure
1. Access the transaction using:
Menu Logistics � Production-Process � Process Order � Process
Order � Change
Transaction code COR2
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 160 of 183
© Wipro Limited, 2006, All Rights Reserved.
2. In Change Process Order: Initial Screen, Make the following Entries
Field name Description R/O/C User action and values Comments
Process Order R 10000061 or As Applicable
3. Now follow the menu path as shown below:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 161 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. You see the change in the status as shown below:
Now, you can make further changes if required
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 162 of 183
© Wipro Limited, 2006, All Rights Reserved.
7 BATCH MANAGEMENT
In various industries – particularly the process industry – you have to work with homogenous partial quantities of a material or product throughout the logistics
quantity and value chain. There are various reasons for this: • Legal requirements (for example, the guidelines set out by GMP - Good
Manufacturing Practice) or regulations on hazardous material
• Defect tracing, callback activities, and regression requirement • The need for differentiated quantity-and value-based Inventory Management
(for example, due to heterogeneous yield/result qualities or varying constituents in Production.
• Differences in usage and the monitoring thereof in materials planning in SD
and Production. • Production or procedural requirements (for example, settlement of material
quantities on the basis of different batch specifications). Batch: The quantity or partial quantity of a certain material or product that has been produced according to the same recipe, and represents one homogenous, non-
reproducible unit with unique specifications. You can use batches in all processes throughout the supply chain. Batches are
always assigned to a material and can only be used for materials that are to be handled in batches
7.1 BATCH LEVEL
You can manage batches in different plants for many materials. For this reason,
batches must be uniquely identifiable. In the SAP System, the batch number uniquely identifies the batch. You use the batch level to specify whether the batch number
for a material is unique in one plant, or in all plants.
Plant level:
The batch number is unique in connection with the plant and material. The batch number is only known in the plant in which it was created if the stock is transferred
to another plant, the batch is unknown in the recipient plant and the system does not adopt any data. You have to recreate and specify the batch in the receiving plant; that is, the same batch number may have different specifications in several plants.
Material level:
The batch number is unique in all plants in connection with the material. The same batch number has the same meaning for the material in all plants. One batch number cannot have different specifications in different plants. During stock transfer to
another plant, the specification of the batch is known in the destination plant even if the batch is placed into storage in that plant for the first time.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 163 of 183
© Wipro Limited, 2006, All Rights Reserved.
Client level:
The batch number is unique in the whole client. A batch number can only be assigned once in the client. You cannot assign the same batch number for different materials.
7.2 BATCH DETERMINATION
In the logistics process that is from procurement to sales you are required time and
again to specify batches for individual business transactions. You can use batch determination for all types of goods movements from the warehouse to find batches
that meet defined specifications. In Inventory Management (IM), you can use batch determination in goods
movements when you are dealing with a goods issue posting (for instance, a
consumption posting to a cost center), with a stock transfer or with a transfer- posting.
In Production (PP/PP-PI) you can use batch determination in production and process orders and run schedule headers to find suitable material components for the product to be produced, and to pick these from stock.
In Sales and Distribution (SD), it is possible to determine batches that match customer specifications. Batch determination can be triggered at two points in the
process, either when the sales order is entered, or when the delivery is created.
7.3 FEATURES
User-defined search strategies You choose the key fields from the business transaction for which you want to search
for batches. For example, you choose the combination customer and material, and specify the criteria for batch selection.
Strategy types These strategies are linked to the individual business transactions. In this way, you
can, for example, make batch determination dependent on the movement type and/or the plant when carrying out a goods movement.
Batch search procedures You can prioritize and group several strategy types into one search procedure. For
example, you can define a general strategy that is canceled under certain circumstances by a special strategy.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 164 of 183
© Wipro Limited, 2006, All Rights Reserved.
7.4 CREATING BATCH RECORD
Batch Record contains all quality-relevant planned and actual data on the production of a batch. Batch records are stored in an optical archive where they cannot be forged
and are approved using one or more digital signatures. They comply with international standards for processing records defined in the guidelines on Good Manufacturing Practices (GMP) for the pharmaceutical industry.
1. Access the transaction using:
Menu Logistics � Production-Process � Process Order � Tools � Process Data Document � Batch Record
Transaction code COEBR
2. In Batch Record: Create Worklist, Make the following Entries
Field name Description R/O/C User action and values Comments
Batch R 0000000827 or As Applicable
Material R 400000254 or As Applicable
Plant R UN01 or As Applicable
Generating R Select
3. Click on button, it will show the screen as shown below:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 165 of 183
© Wipro Limited, 2006, All Rights Reserved.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 166 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. From this screen, you can navigate to the Process Order, PI sheet and
Material list. Now, double click on Material List, it’ll show the screen as shown below:
5. Now click on button, the message will show that batch record is created.
Creation of a batch record in the system is an activity that could prove helpful in terms of tracing back the sensitive process parameters for any specific batch that
might have been produced and consumed in the past. The settings allow the full PI Sheet to get saved as a batch record along with the material list and their respective
quantities.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 167 of 183
© Wipro Limited, 2006, All Rights Reserved.
8 LONG-TERM PLANNING
LTP provides support for long-term production planning and for carrying out
simulations in short and mid-term planning. To carry out an annual planning or a rolling quarterly planning run you require information on the future stock and
requirements situation. This means you need to know how sales and operations planning influence resources. That is, whether the results of sales planning can actually be produced with capacity on hand. If such information is available it is
possible to decide at an early date whether extra work centers will be required to cope with bottlenecks, or whether additional machinery will have to be purchased to reach
the sales target. In long-term planning you can also plan materials that usually require very little
planning in operative planning, such as, materials planned using reorder point
planning, bulk material. In long-term planning, you can plan these materials as you would MRP materials. This provides you with an overview of how these materials
influence the demand program. The purchasing department can also use the results of long-term planning. They use the information on the future requirements quantities to estimate future orders. This provides them with a basis for negotiating delivery
schedules and contracts with vendors. Vendors also gain from long-term planning as they are sent a preview of future purchase orders.
8.1 INTEGRATION
• Operative data provides the basis for long-term planning: material master,
BOMs, resource masters and master recipe. Therefore, there is no need to
create new operative data. • The planning and evaluation procedures in long-term planning are separate
from the operative planning and evaluation procedures. Separate tools are
available for long-term planning, although these tools are basically the same ones as you also use in operative planning. This means the effort involved in
getting used to new functions is kept to a minimum. • The materials you want to plan in long-term planning must have already been
planned in operative MRP.
• When the long-term planning run is complete, you can firm the planned orders in a planning scenario and transfer them to operative MRP.
• Long-term planning is integrated with the following components:
� Purchasing Information System
You can transfer the planning results from external procurement to the Purchasing Information System where you can carry out further
evaluations.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 168 of 183
© Wipro Limited, 2006, All Rights Reserved.
� Inventory Controlling You can transfer the requirements and receipts calculated in long-term
planning to Inventory Controlling. � Cost Center Accounting
You can transfer activity requirements data calculated in long-term planning to Cost Center Accounting as planned figures.
8.2 PROCESS FLOW
• Analyzing the Product Group Hierarchy
• Creating or Changing Sales and Operations Planning (SOP)
• Creating Inactive Sales and Operations Planning (SOP)
• Transferring Planning Data to Demand Management
• Carrying out MRP for the Active Requirements Version
• Creating Inactive Planning Scenarios
• Requirements Run for Long-Term Planning
• Comparing Results from Long-Term Planning
• Displaying the Capacity Situation of the Scenario
• Transferring Requirements of the Scenario into the Purchasing Information
System
• Activating the Inactive Requirements Version
• Analyzing the Current Requirements Version
8.2.1 Creating and Releasing a Planning Scenario
You use the planning scenario to define the settings for long-term planning. The
planning scenario controls how long-term planning is to be carried out. To compare different versions of planned independent requirements or plants, you can create
various planning scenarios and then compare the planning results of these scenarios. You have to release a planning scenario before you can plan it in the long-term planning run.
1. Access the transaction using:
Menu Logistics � Production-Process � Production Planning � Long-Term Planning � Planning scenario � Create
Transaction code MS31
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 169 of 183
© Wipro Limited, 2006, All Rights Reserved.
2. In Batch Record: Create Worklist, Make the following Entries
Field name Description R/O/C User action and values Comments
Planning Scenario R 002 or As Applicable
Description R As Applicable
Long-term Planning R Select
3. Press Enter, it will show another screen, as shown below:
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 170 of 183
© Wipro Limited, 2006, All Rights Reserved.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 171 of 183
© Wipro Limited, 2006, All Rights Reserved.
4. Click on button, it will open sub-screen. In
that sub-screen, click on button and enter Version 02 (Simulation 2)
and then click on button.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 172 of 183
© Wipro Limited, 2006, All Rights Reserved.
5. Click on button, it will open another sub-screen, here enter plant
UN01 then press button.
6. Now click on button. Pop-up message will come, click Yes
and then press Enter to continue. Then, you can see the creation of planning file entries for this scenario.
8.2.2 Copying Firm Planned Orders from Operative Planning
To simulate short and mid-term production planning, you require a realistic representation of the current operative planning situation. Therefore, as well as the
fixed receipts, you can also copy the firm planned orders from operative planning to long-term planning where you can process them.
The system copies the firm planned orders to long-term planning per material in
the planning run. Here, the system selects and copies the entire firm planned orders for every material in a BOM structure irrespective of whether the orders were firmed
as a result of the planning time fence or manual changes.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 173 of 183
© Wipro Limited, 2006, All Rights Reserved.
In long-term planning, the system saves the MRP date of the planned order last on the time axis to be copied from operative planning for each material.
When copying the planned orders from operative planning, the system deletes all existing firm and un-firm simulative planned orders in the period being copied from
long-term planning. Only the planned order headers are copied. This means that any changes to components made in operative planning are lost in the copying process. The planned orders copied to long-term planning are automatically firmed.
8.2.3 Executing MRP for Long-term Planning
The following functions are available for executing the planning run which is always carried out with reference to a planning scenario:
• Total planning • Single-item, single-level planning
• Single-item, multi-level planning • Single-item, multi-level planning in simulative mode
• Make-to-order planning • Individual project planning
After starting the planning run, the system carries out MRP for the specified planning scenario and displays the following results:
• At finished product level, the system creates simulative planned orders for the long-term planning version of the demand program.
• Simulative dependent requirements and simulative planned orders are created
for the components. • If you set the indicator "2" in the initial screen of the planning run in the
Scheduling field, the system creates simulative capacity requirements for the materials produced in-house.
8.2.4 Evaluating Long-Term Planning
Several evaluation options are available for evaluating the results created in long-term planning with reference to a planning scenario.
• MRP lists are also created for long-term planning. Moreover, the stock/requirements list as well as the planning situation as an individual layout is included in the long-term planning menu.
• To compare the results of long-term planning with the operative planning, you can access a compare function from all evaluations. The operative planning of
a particular material can be directly compared to the long-term planning results
of a specific planning scenario. • The function Scenario reqmts is also available. You can display the total
simulative requirements of a material for a planning scenario. Here, you can also select materials using MRP controllers.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 174 of 183
© Wipro Limited, 2006, All Rights Reserved.
8.2.5 Capacity Planning in Long-Term Planning
You can also use capacity planning in long-term planning to determine overloads on certain work centers as early as possible. You can react to these overloads by
rescheduling planned orders using the capacity planning table. You can access capacity planning from: • Planned order processing
• The planning result of single-item planning • The current stock/requirements list
To carry out capacity planning, the simulative planned orders must be scheduled. The following evaluations are available:
• Work center utilization per period
• Work center load required for the production of the selected material • Detailed display of the overloads at the work centers
• Pegged planned order determination • Link to capacity planning table
8.2.6 Processing Planned Orders in Long-Term Planning
As in operative planning, in long-term planning you can also manually create and change planned orders. As opposed to operative planning, the planned orders in long-term planning always reference a planning scenario and are called simulative
planned orders. You can change the firm planned orders copied from operative planning as well as
the planned orders created in the long-term planning run. When copying the firm planned orders, the system only copies the planned order header which means that any manual changes made to BOM items in the planned order are not copied to long-
term planning. The following functions are available in long-term planning for processing planned
orders: • Creating/changing/displaying simulative planned orders • Displaying and printing components
• Checking and leveling capacity • Scheduling
• Firming simulative planned orders • Automatic deletion of firm planned orders
8.2.7 Firming Planned Orders in Long-Term Planning
Planned orders created automatically in the planning run of long-term planning are changed (quantities and dates) in the next planning run if the requirements situation
has changed. If you do not want the planned orders to be changed automatically in subsequent planning runs, you can firm them. Firm planned orders are not changed in
the planning run. This means the system does not make any automatic changes to
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 175 of 183
© Wipro Limited, 2006, All Rights Reserved.
either the planned order quantities or dates. Firm planned orders can only be changed manually.
Firm simulative planned orders can be copied from long-term planning to operative planning. To copy firm planned orders, you have the following options:
Firming as a result of manual changes Planned orders you create or change manually are automatically firmed and are
flagged with an asterisk in the stock/requirements list. By deleting the firming indicator in the planned order, you can cancel the reversal.
Firming using the planning time fence Planned orders that lie in the planning time fence (defined in the material master
record or per MRP group in Customizing) are firmed if they have been allocated an MRP type with the appropriate firming type. However, the firming indicator is not set
and they are only firmed as long as they lie in the planning time fence. Firming using the manual planning time fence
The advantage of the manual firming date over the procedure with the planning time fence is that the planned orders for materials which have been assigned an MRP type
with no firming type are also firmed. The manual firming date is set by the planner in the stock/requirements list or in the planning result.
8.2.8 Copying the Long-Term Planning results to operative planning
Once you have optimized the results of long-term planning, you can copy them to operative planning.
It is not only possible to copy the demand program to operative planning, you can also copy the planned orders firmed in long-term planning per material using the MRP
transaction Interactive single-item planning. When copying the results to operative planning, you can set the system to create
purchase requisitions and delivery schedules instead of planned orders for materials
procured externally.
Copying Planned Orders to Operative Planning You copy the results in the single-item, interactive planning run (in the MRP menu). In the single-item, interactive planning run, you can copy the firm simulative planned
orders of a planning scenario.
Creating Purchase Requisitions and Delivery Schedules in Operative Planning You can set the system to create purchase requisitions and delivery schedules (schedule lines) for materials procured externally when copying results to operative
planning.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 176 of 183
© Wipro Limited, 2006, All Rights Reserved.
8.2.9 Copying/evaluating external procurement data to PURCHIS
You can copy the planning results of external procurement to the Purchasing
Information System where you can carry out further evaluations which are made available to the vendor so he also has an overview of future requirements. You can
also create and evaluate standard analyses for materials, vendors, and material groups directly from long-term planning.
The purchasing information system provides you with a wide-ranging selection of
possibilities for analyzing data, for example immediately apparent graphics. You also have the option of comparing the planning data of long-term planning with the actual
data in the purchasing information system. The standard analyses can also be accessed directly from long-term planning for
materials, vendors, or material groups.
8.2.10 Copying Stock/Requirements Data to Inventory Controlling
You can calculate future stock levels using the information available on existing requirements and planned future receipts. The data calculated in long-term planning
concerning the stock and requirements situation can be copied to Inventory
Controlling where it can be evaluated using the standard analysis functions.
8.2.11 Transferring Activity Type Requirement to Cost Center Accounting
You can transfer the activity requirements data calculated in long-term planning to Cost Center Accounting as planned figures. The system uses this information to
determine the production costs for each cost center and for costing products.
8.3 BUSINESS PROCESS DETAIL
From Business Process Mapping Sheet:
• Analyzing the Product Group Hierarchy –Para 7.1, Transaction Code MC86
• Creating or Changing Sales and Operations Planning (SOP) – Para 7.2, Transaction Code MC94
• Creating Inactive Sales and Operations Planning (SOP) – Para 7.3, Transaction Code MC81
• Transferring Planning Data to Demand Management – Para 7.4, Transaction
Code MC75 • Carrying out MRP for the Active Requirements Version – Para 7.5, Transaction
Code MD02 • Creating Inactive Planning Scenarios –Para 7.6, Transaction Code MC31 • Requirements Run for Long-Term Planning – Para 7.7, Transaction Code MS02
• Stock/Reqmts List – Para 7.8, Transaction Code MD04 • Comparing Results from Long-Term Planning – Para 7.9, Transaction Code
MS44 • Displaying the Capacity Situation of the Scenario – Para 7.10, Transaction
Code MS04
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 177 of 183
© Wipro Limited, 2006, All Rights Reserved.
• Transferring Requirements of the Scenario into the Purchasing Info System – Para 7.11, Transaction Code MS70
• Activating the Inactive Requirements Version – Para 7.12, Transaction Code MS32
• Analyzing the Current Requirements Version – Para 7.13, Transaction Code MD04.
At Emami: LTP can be used as the Budgetary purpose.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 178 of 183
© Wipro Limited, 2006, All Rights Reserved.
9 FORECASTS
MATERIAL CREATE-GENERAL MM01 IMMEDIETELY
MM11 SCHEDULE
CHANGE MM02 IMMEDIETELY
MM12 SCHEDULE
MM13 ACTIVATE
FLAG FOR DELETION MM06 IMMEDIETELY
MM16 SCHEDULE
DISPLAY MM03 DISPLAY CURRENT
MM19 DISPLAY AT KEY DATE
DISPLAY CHANGES MM04 ACTIVE CHANGES
MM14 SCHEDULE CHANGES
MM17 MASS MAINTENANCE
MMAM CHANGE MATERIAL TYPE
OTHER MMBE STOCK OVERVIEW
MMPV CLOSE PERIOD
MMRV ALLOW POSTING TO
PREVIOUS PERIOD
MM50 INSTANT MATERIAL VIEW
MMSC ENTER STORAGE LOCATIONS
MM60 MATERIAL LIST
ARCHIVING (MATERIAL) MM71 ARCHIVE/DELETE
MM72 DISPLAY ARCHIVE
BILL OF MATERIAL (MATERIAL BOM)
CS01 CREATE
CS02 CHANGE
CS03 DISPLAY
EXTRAS CS28 ARCHIVING
CS20 MASS CHANGES
EVALUATION/BOM CS11 BOM MULTILEVEL
EXPLOSION/MATERIAL CS12 STRUCTURE MULTILEVEL
BOM CS13 SUMMURISED BOM
WORK CENTRES CR01 CREATE
CR02 CHANGE
CR03 DISPLAY
CA85 REPLACE
CAPACITY CR11 CREATE
CR12 CHANGE
CR13 DISPLAY
HIERARCHY CR21 CREATE
CR22 CHANGE
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 179 of 183
© Wipro Limited, 2006, All Rights Reserved.
CR23 DISPLAY
LINE HIERARCHY LDB1 CREATE
LDB2 CHANGE
LDB3 DISPLAY
REPORTING CR60 W/C INFORMATION SYSTEM
CR05 W/C LIST
CR06 COST CENTRE ASSIGNMENT
CR07 W/C CAPACITIES
CR08 W/C HIERARCHY
WHERE USED CA80 WORK CENTRE
CR15 CAPACITY
CR10 CHANGE DOCUMENTS
EXTRAS CR09 STD. TEXTS TASK LIST
CR41 ARCHIVING
ROUTING
STAD. ROUTING CA01 CREATE
CA02 CHANGE
CA03 DISPLAY
REF. OPERATION SETS CA11 CREATE
CA12 CHANGE
CA13 DISPLAY
RATE ROUTING CA21 CREATE
CA22 CHANGE
CA23 DISPLAY
REF. RATE ROUTING CA31 CREATE
CA32 CHANGE
CA33 DISPLAY
EXTRAS CA85 REPLACE W/C
MASS CHANGES CA95 REPLACE REF. OP. SET
CA75 REPLACE PRT
DELETE TASK LIST CA99 WITH ARCHIVING
CA98 W/O ARCHIVING
REPORTING CA80 WORK CENTRE
WHERE USED LIST CA90 REF. OP. SETS
CA70 PRODUCTION RESORCE TOOLS
COST CENTRE OKKP MAINTAIN CONTROLLING AREA
KS01 CREATE COST CENTRE
KZS2 CREATE COSTING SHEET
KA01 CREATE PRI. COST ELEMENT
KA06 CREATE SEC. COST ELEMENT
KL01 CREATE ACTIVITY TYPE
KP26 ACTIVITY TYPE/PRICE PLANNING
ALES AND OPERATIONS PLANNING PRODUCT GROUP MC84 CREATE
MC86 CHANGE
MC85 DISPLAY
GRAPHIC MC91 PRODUCT GROUP
MC92 OVERVIEW
PLANNING MC81 CREATE
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 180 of 183
© Wipro Limited, 2006, All Rights Reserved.
FOR PRODUCT GROUP MC82 CHANGE
MC83 DISPLAY
MC75 TRANSFER PG TO PLANNING
FOR MATERIAL MC87 CREATE
MC88 CHANGE
MC89 DISPLAY
MC74 TRANSFER MATERIALS TO DM
MC9K MATERIAL AVAILABILITY
VERSION MANAGEMENT MC78 COPY
MC80 DELETE
FLEXIBLE PLANNING MC93 CREATE
PLANNING MC94 CHANGE
MC95 DISPLAY
MC9K MATERIAL AVAILABILITY
TOOLS/PLANNING TYPE MC8A CREATE
MACRO MC8B CHANGE
MC8C DISPLAY
EVENT MC64 CREATE
MC65 CHANGE
MC66 DISPLAY
ROUGH CUT PLANNING MC35 CREATE
PROFILE MC36 CHANGE
MC37 DISPLAY
ENVIRONMENT MC90 TRANSFER MATERIALS TO DM
ACTIVITY REQT. KSPP TRANSFER TO COST CENTRE
KSBL COST CENTRE OLANNING REPORT
KSOP TRANSFER TO ACTIVITY BASED COSTING
CPBL PLANNING REPORT PROCESSES
MC9C REPORTING
SETTINGS MC96 FORECAST PROFILE
DISSAGGRIGATION MC76 BREAKDOWN PG PLAN
MC77 DISPLAY PG PLAN
MC75 TRANSFER PG TO PLANNING
MC74 TRANSFER MATERIALS TO DM
FORECASTING
INDIVIDUAL FORECAST MP30 EXECUTE
MP31 CHANGE
MP32 DISPLAY
TOTAL FORECAST MP38 EXECUTE
MP33 REPROCESS
MP39 PRINT
MPBT EXECUTE BACKGROUND
MPDR PRINT BACKGROUND
DEMAND MANAGEMENT PIR MD61 CREATE
MD62 CHANGE
MD63 DISPLAY
MD65 REQTS. FOR SCINARIO
MD66 COPY SIMULATED DEPENDENT REQT.
MD70 COPY TOTAL FORE CAST
EVALUATION MD73 DISPLAY TOTAL REQT.
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 181 of 183
© Wipro Limited, 2006, All Rights Reserved.
MD79 EXCELL INTERFACE
MD4C ORDER REPORT
MD72 CHARECTERISTICS PLANNING
CUSTOMER REQT. MD81 CREATE
MD82 CHANGE
MD83 DISPLAY
REPETITIVE MANUFACTURING MASTER DATA C223 PRODUCTION VERTION
PRODUCT COST PLANNING
COSTING RUN CKMATSEL CREATE
SELECTION LIST CKMATCON Edit
CK40N EDIT COSTING RUN
Material Requirement Planning Menu Nodes TransactionActivity
Master Data MD25 Create planning calendar
MD26 Change planning calendar
MD27 Display planning calendar
MDSA Display BOM explosion number
MDSP Edit BOM explosion number
MEQ1 Maintain quota file
OPPP Explode BOM by date
MDUS Display project assignment
MDUP Process project assignment
MDL1 Create production lot
MDL2 Change production lot
MDL3 Display production lot
Planning MD20 Create planning file entry
MD21 Display planning file entry
MDAB Set up planning file entry in background
MDRE Check planning file entry
MD01 Total planning online
MDBT Total planning in background
MD03 Single-item, single-level planning
MD02 Single-item, multi-level planning
MD43 Interactive single-item planning
MD50 Multi-level, make-to-order planning
MD51 Multi-level project planning
MF52 Display planning table
MF50 Change planning table
MF57 Planning table by MRP lists
MF51 Planning table by production list
Evaluations MD04 Stock/requirements list
MD07 Collective access of stock/requirements lis
MD05 MRP list
MD06 Collective access of MRP lists
MDLD Print MRP list
MD45 Planning result
MD46 Collective access of planning result
MD44 Planning situation for a material
MD47 Planning situation for a product group
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 182 of 183
© Wipro Limited, 2006, All Rights Reserved.
MD48 Cross-plant planning situation
MD4C Order report
MD09 Pegged requirements
CO46 Order progress
Planned Order MD11 Create planned order
MD12 Change planned order
MD13 Individual access of planned order
MD16 Collective access of planned orders
MD14 Individual conversion of planned order into
MD15 Collective conversion of planned orders int
MDUM Convert planned order into purchase requisi
CO40 Convert individual planned order into produ
CO41 Collective conversion of planned orders int
CO48 Partial conversion of planned order into pr
COR7 Individual conversion of planned order into
COR7_PC Collective conversion of planned orders int
COR8 Partial conversion of planned order into pr
MDVP Collective availability check
MDAC Execute action for planned order
LONG TERM PLANNING
PALNNING SCENARIO MS31 CREATE
MS32 CHANGE
MS33 DISPLAY
PLANNING RUN MS01 ON LINE
MSBT SA BACKGROUND JOB
MS02 SINGLE ITEM - MULTI LEVEL
MS03 SINGLE ITEM - SINGLE LEVEL
MS50 SINGLE ITEM - SALES ORDER
MS51 SINGLE ITEM PLANNING, PROJECT
MFSO PLANNING TABLE
EVALUTIONS MS05 MRP LIST MATERIAL
MS06 MRP LIST COLLECTIVE DISPLAY
MSLD PRINT MRP LIST
MS04 STOCK/REQUIREMENTS LIST
MS07 STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY
MS44 PLANNING SITUATION MATERIAL
MS47 SITUATION PRODUCT GROUP
MPS-MASTER SCHEDULE ITEMS TOTAL PLANNING MD40 ON LINE
MDBS SA BACKGROUND JOB
MD41 SINGLE ITEM - MULTI LEVEL
MD42 SINGLE ITEM - SINGLE LEVEL
MD43 SINGLE ITEM - INTERACTIVE
MD50 SINGLE ITEM - SALES ORDER
MD51 SINGLE ITEM PLANNING, PROJECT
*** EVALUTION IS SIMILAR TO MRP
PRODUCTION CONTROL
ORDER - CREATE CO01 WITH MATERIAL
CO07 WITHOUT MATERIAL
CO40 FROM PLANNED ORDER
CO41 COLLECTIVE CONVERTION OF PLANNED ORDER
EMAMI Business Blueprint
Production Planning
Wipro Ltd. PP User Manual Page 183 of 183
© Wipro Limited, 2006, All Rights Reserved.
CO08 FOR SALES ORDER
CO10 FOR PROJECT
CO02 CHANGE
CO03 DISPLAY
CONTROL MD04 STOCK/REQUIREMENTS LIST
COHV MASS PROCESSING
COMAC COLLECTIVE AVAILABILITY CHECK
CO05N COLLECTIVE RELEASE
CO04N PRINT
CO09 AVAILABILITY OVER VIEW
GOODS MOVEMENT MF65 STOCK TRANSFER FOR RESERVATION
MATERIAL STAGING MF68 LOG
MB1A GOODS ISSUE
MB31 GOODS RECEIPT
COWBPACK PACK MATERIAL
CONFIRMATION CO1V TIME TICKET
FOR OPERATION CO14 DISPLAY
CO13 CANCEL
CO1L REQUESTED CONFIRMATIONS
CO1P PREDEFINED PROCESSES
TOOLS-ARCHIVING CO78 ORDER
KOAA SETTELMENT DOCUMENTS
CAPACITY PLANNING
EVALUTION CM01 LOAD
WORK CENTER VIEW CM02 ORDERS
CM03 POOL
CM04 BACKLOG
CM05 OVERLOAD
CM07 VARIABLE
EXTENDED EVALUTION CM50 WORK CENTER VIEW
CM51 INDIVIDUAL CAPACITY VIEW
CM52 ORDER VIEW
LEVELLING CM21 PLANNING TABLE (GRAPHICAL)
WORK CENTER VIEW CM22 PLANNING TABLE (TABULAR)
INDIVIDUAL CAPACITY VCM27 PLANNING TABLE (GRAPHICAL)
CM28 PLANNING TABLE (TABULAR)
ORDER VIEW CM31 PLANNING TABLE (GRAPHICAL)
CM32 PLANNING TABLE (TABULAR)
AVAILABLE CAPACITY CR12 CHANGE
CAPACITY CR13 DISPLAY
OP4A SHIFT SEQUENCE
OP43 FACTORY CALENDER