  • PBIP/NIC PUNJAB 1 | P a g e

    User Manual for Investors

    Table of Contents

    Sr. No. Content Page No.

    1. Document Conventions 2

    2. Access One Stop Clearance System (i.e. OSCS) 3

    3. Add Projects 7

    4. Objection Handling 18

    5. Relevance of different statuses 22

    6. Accepted In Principle and Beginning of LORC-I stage 26

    7. Due Payments 33

    8. Objections at LORC-I stage 38

    9. Abstract workflow for LORC-II & LORC-III 40

    10. LORC-I Issued and Beginning of LORC-II stage 40

    11. LORC-II Issued & Beginning of LORC-III stage 51

    12. Issuance of Clearances for LORC-III 52

    13. Screenshots of all the Regulatory Forms (*These screenshots are for reference purpose only)

    53

  • PBIP/NIC PUNJAB 2 | P a g e

    1. Document Conventions

    Sr. No. Acronym Description

    1. OSCS One Stop Clearance System

    2. OTP One Time Password

    3. Captcha A CAPTCHA is a program that protects websites against bots by generating and grading tests that humans can pass but current computer programs cannot.

    4. CAF Common Application Form

    5. KVA 1000 volt amps

    6. KW Kilo Watt

    7. PBIP Punjab Bureau of Investment Promotion

    8. Validation of Forms Providing information required by respective departments for granting Regulatory/Fiscal clearances.

    9. LORC Letter of Regulatory Clearances

    10. CLU Change of Land Use

    11. CTE Consent to Establish

    12. Temp. Connection Temporary Electricity Connection

    13. CSA Competent State Authority Clearance

    14. SAC Site Appraisal Committee Clearance

    15. PPCB Punjab Pollution Control Board

    16. GOI Government of India

    17. CLU-HUD Change of Land Use from Housing and Urban Development

    18. RTGS Real Time Gross Settlement System

    19. NEFT National Electronic Fund Transfer

    20 HOD Head of the Department

  • PBIP/NIC PUNJAB 3 | P a g e

    2. Access One Stop Clearance System (i.e. OSCS)

    Open browser and go to http://investpunjab.gov.in, it will show official website of Punjab

    Bureau of Investment Promotion (i.e. PBIP) as shown below:

    On screen as shown in above screenshot, either clicks on LOGIN link (shown with yellow circle)

    at the top in the menu bar or click on One Stop Clearance button (shown with yellow circle), it

    will display login screen as shown below:

    http://investpunjab.gov.in/

  • PBIP/NIC PUNJAB 4 | P a g e

    If investor is new, then he/she has to register with One Stop Clearance System (i.e. OSCS). For

    this, click on New Investor Registration link on the screen as shown above. It will bring New

    Investor Registration form as shown below:

    In New Investor Registration form as shown above, the investor needs to fill his/her details like

    Username, First Name, Last Name, Email, Country, Mobile No. and submit it to OSCS. Once the

    above form is submitted, a confirmation link will be sent the registered e-mail ID of the investor

    and an OTP to his/her registered Mobile No.

    By clicking on Click Here (green button as shown on screen above) button in the email sent to

    investor, the investor can verify his email Id.

  • PBIP/NIC PUNJAB 5 | P a g e

    In the next step OSCS will bring investor to Verify Mobile page as shown in the screenshot

    below. Here fill OTP and Captcha and click on Verify Mobile button.

    After verification of Mobile No., OSCS will allow the investor to set his / her password as shown

    in the screenshot below:

  • PBIP/NIC PUNJAB 6 | P a g e

    Once the registration process is over, investor can login into the OSCS by browsing

    https://investpunjab.gov.in/Account/Login link.

    To get into the system, please enter valid Username, Password and Captcha and click on Log In

    button. The OSCS system will facilitate the investor with following menu items:-

    a) Projects can add a new project or view applied projects.

    b) Land Bank can view land (required to buy, sell, lease/rent) details.

    c) Queries can ask or view queries raised.

    d) Welcome can view profile and change password.

    https://investpunjab.gov.in/Account/Login

  • PBIP/NIC PUNJAB 7 | P a g e

    3. Add Projects

    To add project, investor needs to click on Add Project button on the screen as shown in

    screenshot above. The addition of the project starts with instructions for filling Common

    Application Form (i.e. CAF) as shown in screenshot below:

  • PBIP/NIC PUNJAB 8 | P a g e

    If you need to apply for Housing and Real Estate Projects, OSCS will ask you to apply separately

    through offline mode otherwise click on Proceed button on the screen as shown below:

  • PBIP/NIC PUNJAB 9 | P a g e

    In Part-I of CAF as shown below, please add Application For, Policy Chapter (if applying for Fiscal

    Incentive), Correspondence Address and Firm Details.

  • PBIP/NIC PUNJAB 10 | P a g e

    In Part-II of CAF as shown below, enter Proposed Site Detail like Site Address, Hadbast Number,

    Khasra Number, Revenue/Shajra Plan, Jamabandi, Non-Emcumbrance Certificate of the site etc.

    It is mandatory for the investor to select atleast one options from Certified Copy of

    Ownership/Certified Copy of Lease Document/Certified Copy of Land under Agreement. The

    investor can select more than one option also. If investor already has building on proposed land

    then investor can upload Approved Building Plan.

  • PBIP/NIC PUNJAB 11 | P a g e

    In Part III of CAF as shown below, please add Project Details and Percentage of apportionment

    of Fiscal Incentive under various heads. The sum of various heads should not be greater than

    100% (exception is border area where it can go up to 125%).

  • PBIP/NIC PUNJAB 12 | P a g e

    In Part-IV of CAF as shown below, the investor needs to enter Proposed Fixed Capital

    Investment (In Crores), Means of Finance (In Crores), Proposed Employment and Proposed

    Schedule.

  • PBIP/NIC PUNJAB 13 | P a g e

    In Part V of CAF as shown below, the investor needs to enter Manufacturing Data (like Raw

    Material, Main Products and Manufacturing Process Flow), Environment Impact Data (like Raw

    Water & Effluent Details, Source of Water Supply, Mode of disposal for Discharge, Emission Data

    and Solid Waste Generation Details)

  • PBIP/NIC PUNJAB 14 | P a g e

    In Part VI of CAF as shown below, the investor needs to enter Electric Power Requirement. If

    investor is selecting Yes in Existing Connection then investor needs to enter existing load and

    must upload the existing bill. Please note that value in KVA

  • PBIP/NIC PUNJAB 15 | P a g e

    1. Save Application - By pressing this button, the user can save entered information into

    OSCS. This information can be changed any time till investor presses Submit and Lock

    Application.

    2. Submit and Lock Application - By pressing this button, the user will make final data save,

    no further editing shall be allowed. Before locking application, the OSCS will ask for

    confirmation with message as shown below:

    Please note that it is mandatory for the investor to upload his photo and signature otherwise

    OSCS will not treat CAF as complete.

    After submission of CAF to OSCS, please submit two hard copies and a soft copy (in CD/DVD) to

    Bureau Office within 72 hours as shown in instructions given below:

    If investor wants to view submitted CAF and then click on View Submitted Common Application

    Form as shown above, it will display following screen. Click on Details button on the screen

    shown below:

  • PBIP/NIC PUNJAB 16 | P a g e

    It will display following screen which is showing details about the submitted project. With the

    submission of CAF, Project Acceptance stage starts. The investor can view the status of CAF in

    Project Acceptance section as shown in screenshot given below. In addition to that investor can

    view CAF any time by clicking View Form and download CAF by clicking Save as PDF. The Status

    (i.e. Project Submitted) in front of Clearance (i.e. CAF) will always tell investor about the current

    status of the clearance and if investor wants to view the entire remarks for status then investor

    has to refer Application Status section (Remarks column).

  • PBIP/NIC PUNJAB 17 | P a g e

    Investor needs to keep watch on the status of the different clearances regularly, e.g. in case the

    status is Objection Raised as shown in the screenshot below, that means investor has to reply

    the objection raised to satisfaction of the PBIP. If investor wants to know the exact reason then

    please refer Application Status section (i.e. Remarks column) it includes explanation of

    objection explanation raised by member department of the PBIP.

  • PBIP/NIC PUNJAB 18 | P a g e

    4. Objection handling

    To view objections raised, click on Objections button as shown on the screenshot given above. It

    will display screen as shown below, where investor can View Objections. To resolve the

    objection, investor needs to do two things. One is resolve objection and other is reply to Bureau

    for the same. For first (i.e. to resolve objection), click on Resolve button as shown in screenshot

    below:

  • PBIP/NIC PUNJAB 19 | P a g e

    It will open affected CAF section, in this case Correspondence Address. Edit affected data click

    on Submit and Move Next button as shown in screenshot below:

  • PBIP/NIC PUNJAB 20 | P a g e

    It will display an alert as shown below, asking for investor to reply.

    Now click on Reply button on View Objections screen. It will display screen as given below using

    which investor can reply to Bureau regarding resolution of objection.

  • PBIP/NIC PUNJAB 21 | P a g e

    After objection resolution, the status of CAF in Project Acceptance section will change to

    Objection Resolved by Investor and Application Status (i.e. Remarks column) section includes

    text written by investor while sending objection reply to PBIP as shown below.

  • PBIP/NIC PUNJAB 22 | P a g e

    5. Relevance of different statuses

    Sr. No. Status Description

    1. Project Submitted CAF Submitted to PBIP

    2 Project forwarded to

    Departments

    CAF forwarded to member departments of PBIP

    for comments

    3. Objection Raised Objection raised by PBIP

    4. Objection Resolved by Investor Raised Objection resolved by Investor

    5. Project Rejected Project rejected by PBIP

    6. Accepted in Principle Project Accepted in Principle in initial scrutiny.

    Please apply for clearances required for LORC-I by

    validating forms given in LORC-I section on

    investors dashboard.

    7. Form validation required by

    Investor

    The investor has to validate (or fill) the form

    selected by regulatory department of PBIP for

    clearance.

    8. LORC-I Issued Letter of Regulatory Clearance 1 issued which

    includes clearances from different regulatory

    departments of PBIP.

    9. Form validated

    by Investor

    Investor has filled the regulatory form.

    10. form validated

    and fee paid

    Investor has filled the form and paid the fee for

    the same.

    11. forwarded to

    Department(s)

    Validated form forwarded to

    respective department for scrutiny and issuance

    of clearance.

    12. Scrutiny Complete & Fee

    Payable

    Form scrutiny complete by the department. Now

    investor needs to pay intimated fee for the same.

    13. Form validated, but fee

    Pending

    Form given in front of status filled by Investor but

    required to deposit the fee.

    14. Clearance Issued and Eligible

    for LORC-I

    Regulatory Department has issued the clearance

    and as per departments observations investor is

    eligible for LORC-I.

    15. Statutory Fee Paid Regulatory Department of PBIP has demanded

    the statutory fee and investor has deposited the

  • PBIP/NIC PUNJAB 23 | P a g e

    same.

    16. Applied for

    Clearance

    Investor has applied for

    Clearance and submitted the particulars to OSCS.

    17. Uploaded Investor has got Forest GOI Clearance and

    uploaded the same to OSCS.

    18. Already Obtained Clearance

    Uploaded

    Investor already has the clearance and uploaded

    the clearance to OSCS.

    19. Payment yet to be verified Investor has paid the fee through offline mode

    and submitted the details to OSCS. Now PBIP

    Account Section will verify offline payment.

    20. Objection in Payment

    Verification

    PBIP Account section has raised objection on

    offline payment.

    21. Objection Resolved, Payment

    yet to be verified

    Investor has resolved the objection raised by PBIP

    Account Section but needs verification from PBIP

    Account section.

    22. Project Deactivated Project Deactivated by PBIP as Investor is not

    responding to Objections raised by PBIP

    23. Project Activated Project again Activated by PBIP

    24. Project Closed Project Closed by PBIP

  • PBIP/NIC PUNJAB 24 | P a g e

    After scrutinizing the CAF IFO/DO shall forward the CAF to all member departments for further

    action. When the case is forwarded, the Status of CAF in Project Acceptance section will change

    to Project forwarded to Department(s) and Application Status section will be updated with the

    remarks as shown in the screenshot below:

  • PBIP/NIC PUNJAB 25 | P a g e

    After forwarding CAF to member departments, HODs of the concerned department may raise

    objections after scrutinizing the CAF. If any HOD finds any discrepancy in the CAF, he /she shall

    raise an objection; this objection shall be visible in the investors dashboard as shown below.

    The investor can resolve the same by using method given in section 4. Objection Handling.

  • PBIP/NIC PUNJAB 26 | P a g e

    If any HOD does not have any objection and project is feasible. The Punjab Bureau of Investment

    Promotion will give Accepted In Principle status to the project as shown in screenshot below:

    6. Accepted In Principle and Beginning of LORC-I stage

    Once the Project status is Accepted In Principle. The process for LORC1 starts and for obtaining

    LORC-I, investor needs to have following clearances:

    Sr. No. Clearance Department involved

    1. Change of Land Use (CLU) Housing & Urban Development/Local

    Government/PSIEC

    2. Consent to Establish (CTE)

    CSA (if applicable)

    Punjab Pollution Control Board

    3. Temporary Power

    Connection

    Punjab State Power Corporation Ltd

    4. Forest NOC Department of Forest

    The process starts with filling of Regulatory Forms selected by HOD of regulatory department in

    Project Acceptance stage.

  • PBIP/NIC PUNJAB 27 | P a g e

    After logging in the investor shall view the following screen as shown below:

    To view the details of the submitted project investor has to click on Details button as shown in

    the screenshot above. Investor has to carefully understand the status of CAF in Project

    Acceptance section. For example if the status is Accepted in Principle (as shown below) that

    means project has been accepted by Bureau in principle, now investor has to validate the forms

    and deposit the requisite fee for further processing

  • PBIP/NIC PUNJAB 28 | P a g e

    Once the project is Accepted in Principle, a new section shall be added in the dashboard i.e.

    LORC-I (as shown in the screenshot above), this section shall display various regulatory approvals

    required for LORC-I. Under this section, every regulatory clearance has its respective status as

    described in the sub-sections.

    6.1. CLU This clearance has status like Form validation required by Investor as shown above.

    Now there are two options (i.e. buttons) for the investor which are described below:

    6.1.1. Apply Here Using this button investor can fill the form for CLU as shown below and

    apply for CLU in the Bureau.

    For saving CLU application form as shown above, there are two buttons:

  • PBIP/NIC PUNJAB 29 | P a g e

    6.1.1.1. Save button By pressing this button, the user can save entered

    information into OSCS. This information can be changed any time till

    investor presses Save and Lock button.

    6.1.1.2. Save and Lock By pressing this button, the user will make final data save,

    no further editing shall be allowed.

    After submission of CLU application form, the status of CLU shall change to Form

    Validated, but Fee Pending. For payment of the fee, please refer 7. Due Payments.

    6.1.2. Already Obtained Clearance Using this button the investor can upload the already

    obtained clearance if he/she already obtained clearance from concerned regulatory

    department. The investor needs to give Clearance Number, Issue Date, Expiry Date

    and Attach Clearance in PDF format as shown in screenshot below:

  • PBIP/NIC PUNJAB 30 | P a g e

    6.2 CTE As mentioned above (in CLU), investor is required to validate form by clicking Validate

    Form button in front of CTE.

    After validating the form, the status of CTE will change to Form validated, but Fee Pending.

    For payment of fee, please refer 7. Due Payments

    6.3 Feasible and Temporary Connection Not Required In case of Temporary Connection, the

    department has selected Feasible and Temporary Connection Not Required status

    therefore no action is required by the investor.

  • PBIP/NIC PUNJAB 31 | P a g e

    6.4 CSA/SAC CSA/SAC is a pre-requisite clearance for CTE. For CSA/SAC, please apply to

    Chairman, Punjab Pollution Control Board (i.e. PPCB). After obtaining clearance from PPCB,

    please upload the clearance by clicking on Process button in front of CSA and select Already

    Obtained Clearance in Clearance Category selection list and fill the details of the clearance

    like shown in the screenshot below:

    After submission of CSA clearance the status will change to CSA Clearance Uploaded as

    shown below:

  • PBIP/NIC PUNJAB 32 | P a g e

    6.5 Forest GOI Approval In this case, investor has to apply on https://forestclearance.nic.in

    and provide the applied information to OSCS. Please click Process button, OSCS will display

    screen as shown in screenshot below. Select Applied For Clearance in Clearance Category

    selection list and give Receipt Number, Receipt Date and Attach Receipt in PDF format.

    After submitting above form the status of Forest GOI Approval changes to Applied for GOI

    Clearance as shown in screenshot below.

    Once clearance from Forest Department, Government of India is obtained, investor has to

    upload this proof on OSCS. This can be done clicking on Process button and following the

    procedure of Already Obtained Clearance.

    Now investor has taken action on every regulatory department form prior submitting to PBIP

    investor has to deposit the requisite fee.

    https://forestclearance.nic.in/

  • PBIP/NIC PUNJAB 33 | P a g e

    7. Due Payments

    In OSCS, an investor can make payment in two ways:

    7.1 Online Through OSCS Payment Gateway

    7.2 Offline On Desk Payment

    To explain precisely we are taking two examples, in case of CLU payment method is Online

    Through OSCS Payment Gateway and for CTE is Offline On Desk Payment in the section

    below. The investor can choose any method as per his/her convenience.

    7.1 Online Through OSCS Payment Gateway

    In section 6. Accepted In Principle and Beginning of LORC-I, two forms have been validated i.e. CLU and CTE. The current status of both is Form validated, but Fee Pending. In addition OSCS will start displaying Due Payments button as shown in the screenshot below:

    Click on Due Payments button for payment of CLU on the screen as shown in screenshot

    above.

  • PBIP/NIC PUNJAB 34 | P a g e

    It will display screen as shown in screenshot below:

    At the screen as shown in screenshot above, select Online Through OSCS Payment

    Gateway and CLU-HUD form and click on Proceed button. The OSCS will ask for confirmation

    with screen as shown in screenshot below:

  • PBIP/NIC PUNJAB 35 | P a g e

    Confirm it by clicking on Click here to Pay button. It will bring investor to payment gateway

    where investor can make payment using Debit Card/Credit Card/RTGS/NEFT through screen

    as shown in screenshot below:

    When fee is paid, the status of the form will change to CLU form validated and fee paid as

    shown below:

  • PBIP/NIC PUNJAB 36 | P a g e

    7.2 Offline Payment On Desk Payment

    If investor has submitted payment on the desk at the Bureau then he/she must have Bureau

    Receipt Number. The investor needs to inform OSCS about the Receipt and mode of

    payment (via Draft/NEFT/RTGS) submitted to Desk Officer/ Account Section. For submitting

    offline fee to OSCS, click on Due Payments button at the bottom of LORC-I section, it will

    display screen as shown in the screenshot below:

    At the screen as shown in screenshot above, select Offline On Desk Payment and CTE form

    and click on Proceed button.

  • PBIP/NIC PUNJAB 37 | P a g e

    It will display screen as shown in screenshot below where investor can enter receipt details

    of offline payment (i.e. Receipt No, Receipt Date, Payment Mode, DD No/Transaction No,

    Payment Date, Bank, Upload the receipt):

    After entering all details, click Submit button on the screen as shown in the screenshot

    above. This submission will change the status of CTE to Payment yet to be verified as shown

    in the screenshot below:

    Please note that offline payment requires verification from account section of PBIP, so this

    will go to account section. When account section verified the offline payment, the status of

    CTE form will change to CTE form validated and fee paid as shown in the screenshot below:

  • PBIP/NIC PUNJAB 38 | P a g e

    8. Objections at LORC-I stage

    By using Point 6 and Point 7 of LORC-I stage, the investor has submitted all the forms to Bureau.

    Now, if any HOD has raised any objection on submitted form, the investor can view the same in

    front of the form as shown in the screenshot below:

    The investor can view the objection by clicking on Objections button on the screen as shown in

    screenshot above.

  • PBIP/NIC PUNJAB 39 | P a g e

    This will bring investor to View Objections screen as shown below, there are two buttons in

    front of objection i.e. Resolve and Reply. Using these buttons, first investor will resolve the

    objection and then will reply to Bureau for the same.

  • PBIP/NIC PUNJAB 40 | P a g e

    9. Abstract workflow of LORC-II & LORC-III

    Regulatory Form Submission

    Form Scrutiny Complete & Fee

    Payable

    Fee Deposit by Investor

    Clearance Issued

    ObjectionYes

    No

    ObjectionObjection Resolution by InvestorYes

    No

    With approval of CEO/ACEO, process for

    Issuance of LORC- starts

    10. LORC-I Issued and Beginning of LORC-II stage

    Once Bureau issued LORC-I (includes all the clearance involved at LORC-I stage) to investor, it will

    display Download LORC-I link at the bottom of LORC-I section as shown in screenshot blelow:

  • PBIP/NIC PUNJAB 41 | P a g e

    In addition to end of LORC-I stage the process for LORC-II starts. LORC-II contains following

    clearances along with regulatory departments:

    Sr. No. Clearance Department involved

    1. Building Plan Approval a) Factories Department (if applicable)

    b) Housing & Urban Development/Local

    Government/PSIEC

    2. Application for registration of

    establishments employing

    Contract Labour

    Labour Department

    3. Permission for Boiler

    Installation/Erection

    Director Boilers (if applicable)

    4. Regular Power Connection Punjab State Power Corporation Limited

    5. Provisional Fire Certificate Fire Department

  • PBIP/NIC PUNJAB 42 | P a g e

    After issuance of LORC-I, PBIP will also issue advisory for LORC-II. In this advisory, HODs involved

    in LORC-II will select whether clearance required from their department or not. In the advisory

    as given below, HOD (PSPCL) has selected that Regular Power Connection is not required by the

    investor thats why Regular Power Connection is not shown in LORC-II section given below:

    As per requirement, the investor will click on Apply Here (If he wants to apply to PBIP for

    clearance) or on Already Obtained button (if he/she already has the clearance) on the screen as

    shown above. We will take it one by one.

  • PBIP/NIC PUNJAB 43 | P a g e

    10.1 Boiler Installation/Erection Permission By validating this form, the investor shall have to

    provide the details of the boiler for which he/she is seeking permission. Once department is

    satisfied in all respects then department will intimate investor about required fee for the

    clearance.

    The status of Boiler I/E Permission will change to as shown below:

  • PBIP/NIC PUNJAB 44 | P a g e

    10.2 Building Plan Approval By validating this form, the investor shall have to provide details of

    the building which he wants to construct for his/her industry. The regulatory departments of

    PBIP will examine the same and if satisfied then in the next step they will intimate investor

    about required fee for clearance. The Building Plan Approval form will start with

    instructions as given in screenshot below:

  • PBIP/NIC PUNJAB 45 | P a g e

    In the second page of Building Plan Approval form, the investor has to enter information

    and attach requirement documents. Please note that under labels (i.e. Undertaking), Know

    More link is given which will provide information about documents to attach (Please refer

    screenshot give below)

    The investor has to submit 4 hard copies of the same in the PBIP within 72 hours. (Please

    refer instructions given below)

  • PBIP/NIC PUNJAB 46 | P a g e

    After submission of Building Plan Approval form, the status will look like below:

    10.3 Establishment Registration for Contract Labour By validating this form, the investor shall

    provide information about Contractor which he is going to deploy for various kind of work

    (i.e. Civil, Mechanical) for his/industry. The Establishment Registration for Contract Labour

    form will start with instructions as given in screenshot below:

    The form fee will be calculated automatically as per manpower (Please refer instructions

    given in screenshot above). For latest instructions always refer online portal.d

  • PBIP/NIC PUNJAB 47 | P a g e

    The form will look like given below:

  • PBIP/NIC PUNJAB 48 | P a g e

    After submission of Establishment Registration for Contract Labour form, the status of form

    will look like as given in screenshot below:

    10.4 Provisional Fire NOC - By validating this form, the investor shall provide information about

    Building Fire control details. The form will look like given in screenshot below:

    After submission of application, the investor needs to submit two sets of drawings and hard

    copy of undertaking duly marked to firefighting system as per the National Building Code of

    India 2005, Part-IV, Table 23 within 48 hours.

  • PBIP/NIC PUNJAB 49 | P a g e

    After submission of Application For Grant of Provisional Fire Safety Certificate, the status of

    form will look like as given in screenshot below:

    10.5 Payment of Fee For LORC-II Forms -

    After filling of all the forms, the LORC-II section will look like as shown in screenshot below:

    Here please note the in case of Boiler I/E Permission and Building Plan Approval the fee will

    be intimated later on thats why status is Boiler I/E form validated and Building Plan

    Approval. For Establishment Registration for Contract Labour status is Form validated, but

    Fee Pending, please deposit the fee by clicking on Due Payments button and pay fee

    through desired mode (i.e online/offline) as explained in section 7. Due Payments. After

    payment the status of form will change to Contract Employer for validated and fee paid as

    shown in screenshot below:

    All the validated regulatory forms shall go to PBIP regulatory departments. The regulatory

    departments may raise objection on any submitted forms. The raised objection can be

    handled using section 4. Objection Handling & 8. Objections at LORC-I stage.

  • PBIP/NIC PUNJAB 50 | P a g e

    Otherwise regulatory departments are satisfied with all submitted forms then DO/IFO will

    intimate investor about fee for Boiler I/E Permission and Building Plan Approval. The status

    of both forms will change to Scrutiny Complete and Fee Payable as shown in screenshot

    below:

    Click on Due Payments button on screen as shown in screenshot above. Please pay fee

    through desired method (online/offline) as explained in section 7. Due Payments. After

    payment, status of both forms changed to Statutory Fee Paid as shown in screenshot below:

  • PBIP/NIC PUNJAB 51 | P a g e

    11. LORC-II Issued and Beginning of LORC-III stage

    Once Bureau issued LORC-II (which includes all the clearances involved at LORC-II stage) to

    investor, it will display Download LORC-II link at the bottom of LORC-II section as shown in

    screenshot blelow:

    In addition to end of LORC-II stage the process for LORC-III starts. LORC-III contains following

    clearances along with regulatory departments:

  • PBIP/NIC PUNJAB 52 | P a g e

    Sr. No. Clearance Department involved

    1. Shop Registration Factories Department

    2. Certificate of Stability Factories Department

    3. Consent to Operate

    CTO (Air)

    CTO (Water)

    CTO (Hazardous Waste)

    Punjab Pollution Control Board

    4. Boiler Registration Director Boiler

    5. Notice of Completion &

    Permission

    Housing & Urban Development/Local Government

    6. Electrical Equipment Approval Chief Electrical Inspector

    7. Final Fire NOC Fire Department from LG

    After issuance of LORC-II, PBIP will also issue advisory for LORC-III. In this advisory, HODs

    involved in LORC-III will select whether clearance required from their department or not. For this

    HOD shall go to LORC-III section and click on Process the project accordingly.

    12. Issuance of Clearances for LORC-III

    The process for issuance of clearances for LORC-III is same as given in 10. LORC-I Issued &

    Beginning of LORC-II & 11. LORC-II Issued & Beginning of LORC-III. Thats why please refer

    section 10 & section 11 for the same.

  • PBIP/NIC PUNJAB 53 | P a g e

    13. Screenshots of all the Regulatory Forms (For reference purpose only)

    13.1 Forms for LORC-I

    13.1.1. Change of Land Use (CLU)

  • PBIP/NIC PUNJAB 54 | P a g e

    13.1.2. Consent To Establish (CTE)

    CTE Page 1

  • PBIP/NIC PUNJAB 55 | P a g e

    CTE Page 2

  • PBIP/NIC PUNJAB 56 | P a g e

    CTE Page 3

  • PBIP/NIC PUNJAB 57 | P a g e

    CTE Page 4

  • PBIP/NIC PUNJAB 58 | P a g e

    CTE Page 5

  • PBIP/NIC PUNJAB 59 | P a g e

    13.1.3. Temporary Power Connection

    Temporary Power Connection LT Supply Page 1

    Temporary Power Connection LT Supply Page 2

  • PBIP/NIC PUNJAB 60 | P a g e

    Temporary Power Connection CS-I (R) (if load is greater than 500 KVA)

    Temporary Power Connection HT Supply Form

  • PBIP/NIC PUNJAB 61 | P a g e

    13.2 Forms for LORC-II

    13.2.1. Boiler Installation/Erection Permission

  • PBIP/NIC PUNJAB 62 | P a g e

    13.2.2 Building Plan Approval

  • PBIP/NIC PUNJAB 63 | P a g e

    13.2.3 Provisional Fire Safety Certificate

  • PBIP/NIC PUNJAB 64 | P a g e

    13.2.3 Regular Power Connection

    Regular Power Connection LT Supply Page 1

    Regular Power Connection LT Supply Page 2

  • PBIP/NIC PUNJAB 65 | P a g e

    Regular Power Connection CS-I (R) (if load is greater than 500 KVA)

    Regular Power Connection HT Supply

  • PBIP/NIC PUNJAB 66 | P a g e

    13.2.4. Application For Registration of Establishment employing Contract Labour

  • PBIP/NIC PUNJAB 67 | P a g e

    13.3 Forms for LORC-III

    13.3.1. Consent to Operate (CTO)

    CTO Page 1

  • PBIP/NIC PUNJAB 68 | P a g e

    CTO Page 2

  • PBIP/NIC PUNJAB 69 | P a g e

    CTO Page 3

  • PBIP/NIC PUNJAB 70 | P a g e

    CTO Page 4

    CTO Page 5

  • PBIP/NIC PUNJAB 71 | P a g e

    13.3.2. Notice of Completion

    13.3.3. Stability Certificate

  • PBIP/NIC PUNJAB 72 | P a g e

    13.3.4. Final Fire Safety Certificate

  • PBIP/NIC PUNJAB 73 | P a g e

    13.3.5. Application for Boiler Registration (If applicable)

  • PBIP/NIC PUNJAB 74 | P a g e

    13.3.6. Approval for Electrical Equipment

  • PBIP/NIC PUNJAB 75 | P a g e

    13.3.7. Shop Registration