user manual for bepza

Upload: bepza-automation-system

Post on 10-Jul-2015

150 views

Category:

Documents


0 download

TRANSCRIPT

User Manual for BEPZAFor the Automation of Three Priority Processes Import Permit (IP), Export Permit (EP) and Sub-Contracting Permit (SCP) at BEPZA

Supported by:

IFCBangladesh Investment Climate Fund (IFC-BICF) World Bank Group

Submitted by:

_____________ ______

_______

Business Automation Ltd.BDBL Bhaban, 9th Floor 12 Kawran Bazar, Dhaka-1215 Phone: 8144817-20, Fax: 9143656 Email- [email protected] Corporate website: www.batworld.com

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Table of Contents Login Page.......................................................................................................................6 Password Changed Form...............................................................................................9 Work Flow of BEPZA Users........................................................................................14 Work Flow of Assistant Manager (EP/IP)..................................................................16 Application Queue:.......................................................................................................19

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Application Process Form of Ast Manager:...............................................................23 Work Flow of Deputy Manager or Manager (CO) - EP& IP...................................30 Application Queue for Deputy Manager....................................................................33 Application Process Form of Deputy Manager:........................................................36 Reports:..........................................................................................................................40 Summary of Report......................................................................................................43

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

List of FiguresFigure 1: Login Form.................................................................................................................................8 Figure 2: Change Password Form............................................................................................................13 Figure 3: Work flow of Assistant manager..............................................................................................18 Figure 4: Applications Queue for Ast.Manager.......................................................................................21 Figure 5: Application Process Form........................................................................................................27 Figure 6: Application Process Status Form..............................................................................................29 Figure 7: Workflow of Deputy Manager.................................................................................................32 Figure 8: Applications Queue for Deputy Manager.................................................................................35 Figure 9: Application Process for Deputy Manager................................................................................39

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Figure 10: Report Generation Form.........................................................................................................42 Figure 11: Summary of report..................................................................................................................45

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Login Page Enter User Id in the text box. Enter Password in the text box. Press Log In button to login the system.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Figure 1: Login Form.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Password Changed FormWhen a user first time login in the system, System will give this form for scanned and password changed option. Select document type from the list. Browse your signature from your system. Press Save button to scan signature. Enter old, new and confirm password in the text box. Press Change Password button.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Click Save button to save signatur e.

Browse scanned signature and save it.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Download or delete signature

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Figure 2: Change Password Form.

Click Changed Password button for save

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Work Flow of BEPZA Users

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

There could have assistant manager, general manager, deputy manager, manager (co) at BEPZA. They can receive, check and approve the submission form on his own-desk. Another user custom confirms the submission form and security gate will give a get pass to enterprise.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Work Flow of Assistant Manager (EP/IP)

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Figure 3: Work flow of Assistant manager.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Application Queue:After login as an Ast.Manager, Ast.Manager will get application list. All of applications will show in the form by a token number which is auto created. An Ast. Manager can send application to a person of selected desk for different status. Ast. Manager can see report for different criteria.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Select multiple applications and send to a person of selected desk for different status

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Figure 4: Applications Queue for Ast.Manager.

My Desk- All won application will be show in My Desk menu. New Application: - All new submits form will be available in new Application menu Export: Contain processing applications of Export permit. Import: Contain processing applications of Import Permit.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Sub-Contract: Contain processing application of Sub-Contract. Ast. Manager will get print, undertaking application, and process application option in this window.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Application Process Form of Ast Manager:When Ast. Manager click Application Process and Details button Ast.Manager will get this form:

Process of Application:1. 2. 3. 4. 5. 6. Select status from Apply Status list. Select desk from Send to Desk list. Select officer name from list. Give remarks in Remarks text box. Press Process Application button. Press Mark Unread for marked.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Figure 5: Application Process Form

If Assistant manager or deputy manager apply Regret status they can check and write the causes of deny it will automatically go back to Enterprise.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Figure 6: Application Process Status Form.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Work Flow of Deputy Manager or Manager (CO) - EP& IP.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Figure 7: Workflow of Deputy Manager.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Application Queue for Deputy Manager

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Figure 8: Applications Queue for Deputy Manager.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Application Process Form of Deputy Manager:When Deputy Manager click Application Process and Details button Deputy Manager will get this form: Process of Application: 1. 2. 3. 4. Select status from Apply Status list the application will go to Customs automatically. Give remarks in Remarks text box. Press Process Application button. Press Mark Unread for marked.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Figure 9: Application Process for Deputy Manager.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Reports:Click on Reports menu of Application Queue to view reports. The window appeared as bellow: To view report select report parameter. (*) Red Star means you have to give parameter must. Press Generate Report button.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Figure 10: Report Generation Form.

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Summary of Report

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

You can view the application by Permit No and Undertaking No

Figure 11: Summary of report.

THE END

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011

Project Project ID

Automation of 3 Priority Process of BEPZA System BEPZA/IP-EP-SCP/2009-0244

June, 2011