user acceptance testing slide show (1.25 mb ppt)

29
1 User Acceptance Testing CMIS Remediation

Upload: softwarecentral

Post on 28-Nov-2014

10.088 views

Category:

Documents


3 download

DESCRIPTION

 

TRANSCRIPT

Page 1: User Acceptance Testing slide show (1.25 MB PPT)

1

User Acceptance Testing

CMIS Remediation

Page 2: User Acceptance Testing slide show (1.25 MB PPT)

2

UAT Meeting Agenda Introductions Purpose of Meeting Summary of Changes What is User Acceptance Testing (UAT)? Expectations The Testing Process Tracking Defects Fixing Defects When and Where Demo of New Case Wizard Q and A

Page 3: User Acceptance Testing slide show (1.25 MB PPT)

3

Introductions

Mike Pryor, Project Manager Linda Spinks, SWR Test Coordinator Deanna Reader, Group Manager Kelvin Grayson, IT Subject Matter Expert,

[email protected] Mary Ellis, IT Test Coordinator,

[email protected]

Page 4: User Acceptance Testing slide show (1.25 MB PPT)

4

Purpose of Meeting

Explain Software and Website Remediation Project (SWR)

Discuss User Acceptance Testing Demo of CMIS New Case Wizard Answer Questions

Page 5: User Acceptance Testing slide show (1.25 MB PPT)

5

Summary of Changes

What is Remediation? What is not included in the project Summary of CMIS Remediation Changes you will see

Page 6: User Acceptance Testing slide show (1.25 MB PPT)

6

What is UAT?

User Acceptance Testing is a process where the actual users of the system test the remediated functionality to make sure there are no errors or defects.

The users will “Accept” the system when all testing has passed.

Page 7: User Acceptance Testing slide show (1.25 MB PPT)

7

Expectations

Expectations of IT staffProvide test environment (location,

equipment, software, etc.).Provide instructions and test documentation.Be available to answer questions and address

issues.

Page 8: User Acceptance Testing slide show (1.25 MB PPT)

8

Expectations (cont.)

Expectations of testersBe available during the scheduled test time,

with minimal interruptions or distractions.Follow instructions carefully.Document any defects or errors, and

communicate to the IT Test Coordinator (Mary) and IT Subject Matter Expert (Kelvin).

Complete UAT within allocated timeframe.

Page 9: User Acceptance Testing slide show (1.25 MB PPT)

9

The Testing Process

You will be set up with access to the test database.

You will be provided with testing instructions. When you have finished your testing, send your

results via email to Mary and Kelvin.

Page 10: User Acceptance Testing slide show (1.25 MB PPT)

10

The Testing Process (cont.)

All UAT testers are encouraged to exercise the CMIS application as much as possible to ensure all your work functions are tested. Some of the UAT testers will receive specific test

case documents to run. If you receive a test case document, record in

that document whether the test passed or failed, add comments, then email it to Mary and Kelvin.

Page 11: User Acceptance Testing slide show (1.25 MB PPT)

11

Test Case Document Example

Page 12: User Acceptance Testing slide show (1.25 MB PPT)

12

Tracking Defects A “defect” is an error or any situation where the system

does not perform as expected. If a defect is found: Do a print screen if possible. Attempt to duplicate the error. Report the error via email to both Mary and Kelvin. Include detailed information in the email, including

steps to recreate the error, and attach the print screen.

Page 13: User Acceptance Testing slide show (1.25 MB PPT)

13

Fixing Defects

After a defect is reported,

1. We will investigate and resolve the problem

2. We will let you know when it is resolved

3. You will retest (if necessary) The process will continue until all identified

defects have been resolved, and all test steps in the test cases have passed.

Page 14: User Acceptance Testing slide show (1.25 MB PPT)

14

When and Where

Dates: Regional staff testing:

• Mon, July 7 thru Wed, July 9• Retesting July 10 and 11

Central Office staff testing: • Mon, July 13 thru Wed, July 15• Retesting July 16 and 17

Time: 9:00-3:00 each day. Duration: 30 minutes to one hour Place: You will work from your own workstation.

Page 15: User Acceptance Testing slide show (1.25 MB PPT)

15

Demo

Demo of the CMIS New Case Wizard

Page 16: User Acceptance Testing slide show (1.25 MB PPT)

16

Q and A

Any questions?

Page 17: User Acceptance Testing slide show (1.25 MB PPT)

17

Login

Page 18: User Acceptance Testing slide show (1.25 MB PPT)

18

Home Page

Page 19: User Acceptance Testing slide show (1.25 MB PPT)

19

Search by Case Number

Page 20: User Acceptance Testing slide show (1.25 MB PPT)

20

Search by Client Info

Page 21: User Acceptance Testing slide show (1.25 MB PPT)

21

Search by Tracking Number

Page 22: User Acceptance Testing slide show (1.25 MB PPT)

22

Client

Page 23: User Acceptance Testing slide show (1.25 MB PPT)

23

Guardian

Page 24: User Acceptance Testing slide show (1.25 MB PPT)

24

Financial

Page 25: User Acceptance Testing slide show (1.25 MB PPT)

25

Insurance

Page 26: User Acceptance Testing slide show (1.25 MB PPT)

26

Medical/General

Page 27: User Acceptance Testing slide show (1.25 MB PPT)

27

Medical/Diagnosis

Page 28: User Acceptance Testing slide show (1.25 MB PPT)

28

Medical/Doctor

Page 29: User Acceptance Testing slide show (1.25 MB PPT)

29

Logout